These are plumbing and fire suppression design documents for a seismic deficiency remediation project at the VA SCI & CLC Hospital located at 3350 La Jolla Village Drive, San Diego, California. The drawings are conformed set documents dated October 31, 2020, prepared by CannonDesign with consultants TTG and stamped by registered professional mechanical engineer Paul Q Iping Dong (License No. M029768, expiration 06/30/22).
The plumbing scope includes domestic cold and hot water systems, sanitary waste piping, medical gas distribution (vacuum, oxygen, and medical air), and a greywater recycling system for toilet flushing. The greywater system processes 20 gallons per minute through settling and multi-stage filtration, supporting approximately 286 fixture units for toilet and urinal flushing. Key plumbing components include a 240-gallon medical vacuum receiver tank, multiple legionella monitoring controllers, reverse osmosis equipment, pressure-reducing valves, and electric water heaters. The system serves a 176,939 square-foot, five-story hospital building with approximately 168 medical gas outlets distributed across patient rooms, exam areas, and operational spaces. The fire protection scope includes an automatic sprinkler system and standpipe system designed to NFPA 13 and 24 standards (2013 edition), with a 342,000-gallon underground fire storage reservoir, fire pump rated at 750 gallons per minute at 110 PSI, and jockey pump. The fire suppression system is divided into six zones across multiple floors with 2½-inch fire hose cabinets and connections throughout the building, including penthouse and roof-level protection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26226Q1193 0001.docx | DOCX document | |
| SOW Att2.pdf | ||
| LOTO RFI responses.docx | DOCX document | |
| 36C26226Q1193 0002.docx | DOCX document | |
| SOW Att3.pdf | ||
| Questions.docx | DOCX document | |
| 36C26226Q1193_2.pdf | ||
| FMS Vendor File Update Request Form.pdf | ||
| W-9 Form.pdf | ||
| VA10091.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:0 :0
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P D e b b ie
.K w a n
.r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
PLUMBING SCHEDULES
PP502
664-401
10/31/2020
MEDICAL GAS ZONE VALVE ASSEMBLY
MEDICAL GAS ALARM PANEL
MEDICAL GAS SERVICE INLETS/OUTLETS
MEDICAL VACUUM RECEIVER TANK
SPECIALTIES
ELECTRIC WATER HEATER
LEGIONELLA MONITORING SCHEDULE LEGIONELLA MONITORING SCHEDULE
LEGIONELLA MONITORING CONTROLLER
(EXTERIOR)
3" & 4''
WITH POLYETHYLENE DOME, UNDERDECK CLAMP AND SUMP RECEIVER.
STAINLESS STEEL RECESSED HOSE SUPPLY BOX WITH DOOR AND HOSE BIBB WITH VACUUM BREAKER.
REMARKS
COLD WATER
3/4''
WASTE VENT
HOT WATER
MIN.ROUGH-IN/CONN.
DESCRIPTION
ROOF DRAIN
HOSE BIBB
MARK
RD-1
P-804
OD-1
DUCO CAST-IRON BODY WITH COMBINED FLASHING CLAMP AND GRAVEL STOP
STORM
FLOOR SINKFS-1
DUCO CAST-IRON BODY WITH COMBINED FLASHING CLAMP AND GRAVEL STOP
WITH POLYETHYLENE DOME, AND PVC STANDPIPE AND UNDERDECK CLAMP AND SUMP RECEIVER.
FD-2
CAST-IRON BODY AND FLASHING COLLAR WITH NICKEL BRONZE
TRACTOR GRATE 12"X12" SQUARE TOP AND SLOTTED SEDIMENT BUCKET. TRAP PRIMER CONNECTION.
FLOOR DRAIN
(MECHANICAL ROOM)
SQUARE RECEPTOR 12"X12"X6" DEEP CAST-IRON BODY WITH ACID RESISTANT PORCELAIN ENAMEL INTERIOR AND TOP, WITH WHITE
A.R.C. ANTI-SPLASH BOTTOM DOME STRAINER LESS GRATE.
---2" ---4"
--- 2"2"
CAPACITY
GALLON
REMARKS
INLET
TEMPERATURE RISE
@ 1.0 GPM
CONNECTIONS
OUTLET
DESCRIPTIONMARK
3/4" 3/4"
WATER HEATER
26-WH1
POINT-OF-USE
NA
ELECTRICAL REQUIREMENTS
VOLTAGE PHASE AMPERAGE WATTS
6,240208V SINGLE 3043
OVERFLOW ROOF DRAIN 3" & 4''
FD-1 CAST-IRON FLOOR DRAIN WITH 5" DIAMETER NICKEL BRONZE STRAINER, FLASHING AND TRAP PRIMER CONNECTION.
FLOOR DRAIN
(TOILET RMS./LAUNDRY RMS.)
--------- 2"2"
TRAP PRIMERTP-1 PROVIDE TRAP PRIMER WITH ISOLATION VALVE AND STAINLESS STEEL 8"X8" ACCESS PANEL WITH DOOR.------ ------ 3/4''
ALARMING AND WITH INTERNET CONNECTIVITY AND WEB SERVING CAPABILITIES.
REMARKS
PHASE AMPS
120 ---
ELECTRICAL REQUIREMENTS
DESCRIPTION
LEGIONELLA MONITORING
MARK
26-LMP-1
PROGRAMMABLE LEGIONELLA CONTROLLER WITH SUPERVISION, DATA LOGGING,
VOLTAGE
---CONTROLLER/PANEL
INPUTS, ANALOG OUTPUTS AND DIGITAL OUTPUTS. BACNET/LONWORKS OR
CONTROLLER CAPABLE TO MONITOR POINTS OF CONFIGURED I/O UNIVERSAL
I/O UNIVERSAL INPUTS - 10K TYPE III THERMISTORS, 0-1000 OHM, 0-10V
MODBUS.
RELAY OUTPUTS - FORM A CONTACTS, 24 VAC @ 0.5 AMP RATED.
AND 0-20mA WITH EXTERNAL RESISTOR.
(LYNXSPRING INC. JENE SYS ONE)
ANALOG OUTPUTS - 0-10 VDC
(DWYER WM2-A-C-06)
MULTI-JET WATER METER, SIZE 1-INCH, 5-100 GPM, PULSE OUTPUT
OXIDENTI-24VAC, MYRON L COMPANY 720 SERIES
3"
(11-INCHES SQUARE).
DECK DRAIN
DD-1
DUCO CAST-IRON BODY WITH FLASHING CLAMP AND UNDERDECK CLAMP AND BRONZE HEEL PROOF GRATE.
2" ------ ---
DECK DRAIN
DD-2
DUCO CAST-IRON BODY WITH FLASHING CLAMP AND 8-1/2" BRONZE ROUND TOP.
(BALCONY/TERRACE)
(WALKWAY)
(MONITORED)MARK
AREA
LOCATION
ELECTRICAL DATA
PHASEVOLT HERTZ
ROOMS SERVEDMARK LOCATION
SERVICE/SIZE
N No O MA MV
STORAGE TANK
VERTICAL ASME MEDICAL VACUUM
DESCRIPTIONMARK LOCATION
EXHAUSTCAPACITY INLET
CONNECTIONS
240 GAL.
RECEIVER
4" 4" 690 LBS.
OPERATING
WEIGHT REMARKS
115 SINGLE 60
SINGLE115 60
SINGLE115 60
SINGLE115 60
SINGLE115 60
SINGLE115 60
SINGLE115 60
OVERALL DIMENSION
36"DIA. X 66-3/4''H
1-1/4''
- - 3/4''
MARK DESCRIPTION LOCATION MOUNTING
No. 0F OUTLETS
MANoN O MV
21-CEILING
SURGICAL CEILING
COLUMN (JSN A1120)
(RETRACTABLE)
1-1/4''
2''
CO
PUMP ROOM 1B132C
AREA ALARM PANELS - MONITORED CONDITIONS
EXAM PATIENT HEADWALL W/
1--- 1 1
MEDICAL GAS SERVICE
INLETS/OUTLETS
HEADWALL 2--- 2 2
SCI PATIENT HEADWALL UNIT W/
UNIT
HALLWAY 1A148
HALLWAY 1A148
HALLWAY 2A103B
HALLWAY 4A103
HALLWAY 3A166
HALLWAY 2B146
HALLWAY 4B130
HALLWAY 3B127
1'' 3/4''
3/4'' 3/4''
1-1/4'' 1''
2''1-1/4''
3/4'' 2''1-1/4''
1-1/2'' 2''1''
1-1/2'' 2''1''
1-1/2'' 2''1''
URODYNAMICS/CYSTOSCOPE RM. -
NURSE STATION 1A153
NURSE STATION 1A153
NURSE STATION
SOUTH 2A129
NURSE STATION
URODYNAMICS/CYSTOSCOPE RM.
HOUSE CARE 3A106A
NURSE STATION 3B118B
SINGLE115 60
26-VR1 200 PSIG RATED, ASME STAMP
NORTH 2B123
MGA-1
MGA-2
MGA-3
MGA-4
MGA-5
MGA-6
MGA-7
MGA-8
HOUSE CARE 4A112A
HOUSE CARE 4B104
ZVB-1
MGS-1
MGS-2
MGS-3
ZVB-2
ZVB-3
ZVB-4
ZVB-5
ZVB-6
ZVB-7
ZVB-8
CRITICAL
CONTROL MEASURE
CP-01
POINT
SYSTEM
CP-02
CP-03
CP-04
CP-05
CP-06
CP-07
CP-08
HWR
LOCATION
HWR IS MEASURED AT REMOTE LOCATIONSTORAGE
1A143 TO VERIFY TEMPERATURE
TEMP F
124 F MIN
HWR
HWR IS MEASURED AT REMOTE LOCATIONNURSE STATION
1A153 TO VERIFY TEMPERATURE
124 F MIN
HWR
HWR IS MEASURED AT REMOTE LOCATIONIDF
1A127 TO VERIFY TEMPERATURE
124 F MIN
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
IDF
1A127
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
EXAM RM.
1A159
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
STORAGE
1A143
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
STAFF LOUNGE
1A141
CP-09
CP-10
CP-11
CP-12
CP-13
CP-14
CP-15
CP-16
CW ---
CWR
FLOW OF RECIRCULATION OF COLD WATERPUMP RM.
1BA132C DISTRIBUTION SYSTEM IS MEASURED
HWR
HWR
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
STORAGE
1B102A
CWR
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
67 F MAX
PHYSICAL/KINESIOLOGY
THERAPY 1B126
HWR
HWR IS MEASURED AT REMOTE LOCATIONRECREATIONAL THERAPY
STORAGE 1B115 TO VERIFY TEMPERATURE
124 F MIN
MECHANICAL RM.
1B132D
CWR
FLOW OF RECIRCULATION OF COLD WATERPUMP RM.
1BA132C DISTRIBUTION SYSTEM IS MEASURED
PUMP RM.
1BA132C
PUMP RM.
1BA132C
FLOW OF RECIRCULATION OF HOT WATER
DISTRIBUTION SYSTEM IS MEASURED
FLOW OF RECIRCULATION OF HOT WATER
DISTRIBUTION SYSTEM IS MEASURED
CW
OXIDANT LEVELS MEASURED CONTINUOUSLY
AS WATER ENTERS THE BUILDING SERVING---
MECHANICAL RM.
1B132D THIRD, FOURTH AND FIFTH FLOORS
OXIDANT LEVELS MEASURED CONTINUOUSLY
AS WATER ENTERS THE BUILDING SERVING
FIRST AND SECOND FLOORS
CP-17 HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CP-18 HWR
HWR IS MEASURED AT REMOTE LOCATIONPATIENT RM.
2A123 TO VERIFY TEMPERATURE
124 F MIN
PATIENT RM.
2A122
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CP-19 CW 67 F MAX
PATIENT RM.
2A123
CP-20 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A122
CP-21 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A139
CP-22 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A139
CP-23 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A129
CP-24 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A113
CP-25 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A107
CP-26 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PATIENT RM.
2A107
CP-27 HWR
HWR IS MEASURED AT REMOTE LOCATIONPATIENT RM.
2B118 TO VERIFY TEMPERATURE
124 F MIN
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CP-28 CW 67 F MAX
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CP-29 CW 67 F MAX
PATIENT RM.
2B133
PATIENT RM.
2B118
CP-30 HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
PATIENT RM.
2B133
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-31
RESP. WORK RM.
2B156
CP-32 HWR
HWR IS MEASURED AT REMOTE LOCATIONVISITOR LOUNGE
2B138 TO VERIFY TEMPERATURE
124 F MIN
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-33
PATIENT RM.
2B155
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-34
FAMILY KITCHEN
2B161
NURSE MANAGER OFFICE
2B120
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-35
WHEELCHAIR STRETCHER
STORAGE 2B103
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-36
RESIDENT RM.
3A120
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-37
NOT USEDCP-38
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-39
MEDICATION
3A129
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-40
MEDICAL EQUIPMENT
STORAGE RM. 3A147
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CP-41
CP-42 HWR
HWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
124 F MIN
RESIDENT RM.
3A116
CP-43 HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
RESIDENT RM.
3A118
RESIDENT RM.
3A118
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CW 67 F MAXCP-44
CRITICAL
CONTROL MEASURE
CP-45
POINT
SYSTEM
CP-46
HWR
LOCATION
HWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
TEMP F
124 F MIN
HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
SOCIAL WORK OFFICE
3B118
CP-47
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
67 F MAXCW
CP-48
CP-49
CP-50
CP-51
CP-52
CP-53
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
NOURISHMENT KITCHEN
3B149
RESIDENT RM.
3B129
NURSE SUPERVISOR RM.
3B156
WHEELCHAIR'S STRETCHER
3B162
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
ANNUAL EVAL. RESIDENT
3B100
CP-54
CP-55
CP-56
CP-57
CP-58
CP-59
HWR
HWR IS MEASURED AT REMOTE LOCATIONRESIDENT RM.
4A127 TO VERIFY TEMPERATURE
124 F MIN
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
67 F MAXCW
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
67 F MAXCW
RESIDENT RM.
4A127
RESIDENT RM.
4A129
HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
RESIDENT RM.
4A129
CP-60
CP-61
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
RESIDENT RM.
4A137
DEN
4A136
MEDICATION RM.
4A112A
MEDICATION RM.
4A112A
CP-62 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
DEN
4A136
CP-63
CP-64
CP-65
CP-66
CP-67
CP-68
CP-69
CP-70
HWR
HWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
124 F MIN
CW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
67 F MAXCW
HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
RESIDENT RM.
4B123
RESIDENT BATHROOM
4B123A
RESIDENT BATHROOM
4B123A
BARBER/BEAUTY SHOP
4B161
BARBER/BEAUTY SHOP
4B161
RESIDENT BATHROOM
4B109
NURSE SUPERVISOR
4B158
RESIDENT BATHROOM
4B156
MEDICAL GAS SERVICE
INLETS/OUTLETS
HEADWALL
UNIT
115 SINGLE 60HALL 1B105
MEDICAL VACUUM, OXYGEN AND MEDICAL AIR PIPELINES
MGA-9
MECHANICAL ROOM (SOURCE)
CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
PHARMACY OFFICE
3B159
SOCIAL WORK OFFICE
3B118
SOCIAL WORK OFFICE
3B117
MEDICAL EQUIPMENT
STORAGE RM. 3A147
CP-71 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
RESIDENT BATHROOM
4B102
CP-72 CWR 67 F MAX
CWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
RESIDENT BATHROOM
4B111
CP-73 HWR
HWR IS MEASURED AT REMOTE LOCATION
TO VERIFY TEMPERATURE
124 F MIN
CP-74 HW 130 F MAX
HW IS MEASURED AT REMOTE LOCATION
FOR MAIN/RISER TO VERIFY TEMPERATURE
PUMP RM.
1BA132C
PHYSICAL/KINESIOLOGY
THERAPY 1B126
RESIDENT RMS. 4B101, 4B102, 4B108, 4B118, 4B119, 4B120, 4B123, 4B124, 4B136,
4B142, 4B143, 4B147, 4B151, 4B152, 4B153, 4B155, 4B156 & 4B157, BARIATRIC
RMS. 4B111 & 4B132 ISOLATION RMS. 4B109 & 4B135
RESIDENT RMS. 3B107, 3B108, 3B110, 3B116, 3B117, 3B145, 3B146,
3B149, 3B150 & 3B151, ANNUAL EVAL. RESIDENT RMS. 3B100, 3B101 &
3B104 AND ISOLATION BEDROOMS 3B129 & 3B137
PATIENT RMS. 2B108, 2B109, 2B110, 2B117, 2B118, 2B133, 2B140, 2B142,
2B143, 2B144, 2B153, 2B154, 2B155, 2B101, 2B102 & 2B104
RESIDENT RMS. 4B101, 4B102, 4B108, 4B118, 4B119, 4B120, 4B123, 4B124, 4B136,
4B142, 4B143, 4B147, 4B151, 4B152, 4B153, 4B155, 4B156 & 4B157, BARIATRIC
RMS. 4B111 & 4B132 ISOLATION RMS. 4B109 & 4B135
RESIDENT RMS. 3B107, 3B108, 3B110, 3B116, 3B117, 3B145, 3B146,
3B149, 3B150 & 3B151, ANNUAL EVAL. RESIDENT RMS. 3B100, 3B101 &
3B104 AND ISOLATION BEDROOMS 3B129 & 3B137
PATIENT RMS. 2B108, 2B109, 2B110, 2B117, 2B118, 2B133, 2B140, 2B142,
2B143, 2B144, 2B153, 2B154, 2B155, 2B101, 2B102 & 2B104
RESIDENT RMS. 4A114, 4A115, 4A116, 4A123, 4A124, 4A125, 4A127,
4A129, 4A130, 4A131 & 4A137
BARIATRIC BEDROOM 3A111, RESIDENT RMS. 3A112, 3A113, 3A119, 3A121,
3A122, 3A123, 3A126, 3A127, 3A128 & ISOLATION BEDROOM 3A131
PATIENT RMS. 2A116, 2A119, 2A120, 2A122, 2A123, 2A125,
2A135, 2A136, 2A138, 2A139, 2A141, 2A144, 2A146 & 2A148
URO. EXAM TREATMENT 1A149 AND 1A152, EXAM RMS.1A155,
1A157, 1A158 & 1A159
URODYNAMIC/CYSTOSCOPY 1A46
URO. EXAM TREATMENT 1A49 AND 1A52, EXAM RMS.1A55,
1A57, 1A58 & 1A59
RESIDENT RMS. 4A114, 4A115, 4A116, 4A123, 4A124, 4A125, 4A127,
4A129, 4A130, 4A131 & 4A137
BARIATRIC BEDROOM 3A111, RESIDENT RMS. 3A112, 3A113, 3A119, 3A121,
3A122, 3A123, 3A126, 3A127, 3A128 & ISOLATION BEDROOM 3A131
PATIENT RMS. 2A116, 2A119, 2A120, 2A122, 2A123, 2A125,
2A135, 2A136, 2A138, 2A139, 2A141, 2A144, 2A146 & 2A148
VACUUM LOW
MEDICAL AIR LOW LINE PRESSURE
MEDICAL AIR HIGH LINE PRESSURE
OXYGEN HIGH LINE PRESSURE
OXYGEN LOW LINE PRESSURE
CC-1 CONDENSATE COOLER 1" ARMSTRONG CONDENSATE DRAIN COOLER MODEL CC-40 32-13/16" HEIGHT x 15" DIA. WITH 1" CW CONNECTION & 2" INLET HOT CONDENSATE DRAIN PIPE FROM MECHANICAL HUMIDIFIER TO 2-1/2" DRAIN COOLER OUTLET MOUNTED ON WALL WITH BRACKET AND
UNIT STRUT W/ GALV. STEEL CLAM & STRAPS REFER TO DETAIL # 9 /PP403
CC-2
CONDENSATE COOLER 1" DRISTEEM-DRANE-KOOLER CONDENSATE DRAIN COOLER 10.5" HEIGHT x 7.5" DIA. WITH 1/2" CW CONNECTION & 1" INLET HOT
CONDENSATE DRAIN PIPE INCREASER TO 2" HOT CD & 2" DRAIN OUTLET FROM MECHANICAL CLEAN STEAM EQUIPMENT MOUNTED ON WALL/FLOOR WITH BRACKET AND UNIT STRUT W/GALV. STEEL CLAM & STRAPS DISCHARGE 2" DRAIN INTO NEREAST FLOOR SINK
NT-1
NEUTRALIZATION TANK ORION NEUTRALIZATION TANK TK5 30/10 GALLONS CAP. 30.5" HEIGHTx 17.25" DIA. MOUNTED ON FLOOR AND ANCHORE TO WALL WITH
1-1/2" Wx20 GAUGE THICK GALVANIZED SRTEEL STRAP & BOLTS OR SCREWS. REFER TO DETAIL # 9/PP403 2"
RELIEF- --------- ---
PRV-1 & 2 PRESSURE REDUCING VALVES 2"
VICTAULIC PRESSURE REDUCING VALVES STATION LEAD FREED SERIES 386A WITH STRAINER AND BALL VALVES SET TO 60 PSI BOTH PRVS WITH REDUCER AND INCREASER FITTINGS AND FREE STANDING RACK MOUNTED ON FLOOR VICTAULIC SERIES 360
REFER TO DETAIL # 10/PP403
RPBFP-1 REDUCED PRESSURE
BACKFLOW PREVENTER
2" ZURN -WOILKIN REDUCED BACKFLOW-PREVENTER LEAD FREE MODEL 975XLQT REFER TO DETAIL # 10/PP403
3" ------ ---
TRENCH DRAIN
TD-1
ZURN, MODEL NO. Z884-HPP, ADA, CLASS A GRADE, HEEL PROOF; MODULAR CHANNEL SECTIONS MADE OF 0% ABSORBENT
POLYPROPYLENE. 2" NO-HUB BOTTOM OUTLET , CAST IRON SLOTTED GRATE
(BALCONY/TERRACE)
RFI 8352283
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek Text Box 619-398-0215
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:2 :3
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P S a m e e r.
V .A n u p o ju .r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
PLUMBING SCHEDULES
PP503
664-401
10/31/2020
60SINGLE11520
REMARKS
PHASE HzVOLT
ELECTRICAL DATA
FLOW RATE (GPM)
PROCESSING
LOCATIONDESCRIPTIONMARK
26-GTS1
LIQUID
CAPACITY
MARK DESCRIPTION LOCATION
CONNECTIONS
INLET OUTLET
REMARKS
DIMENSIONS
LENGTH WIDTH HEIGHT
WEIGHT
(LBS.)DIAMETER
PROCESSING SKID
26-HT2
STAGING TANK
TREATED/FILTERED WATER
NA NA1,000 GAL.
26-HT3
SETTLING TANK
SANITATION/CLHORINATION
NA NA200 GAL.
SYSTEM. 1.5 HP PUMP RATED FOR 20 GPM @ 50 PSI (460/3/60), 3-WAY MOTORIZED VALVE AND SOLENOID VALVE , PUMP ROOM
ALCOVE
1B132B
PUMP ROOM
ALCOVE
1B132B
1'' MAKE-UP
WATER (RINSE)
2'' OVERFLOW
1'' PUMPED
3'-6" 6'-6"
5'-0" 9'-1"
TO PROCESSING
SKID
1-1/2'' PGW
CHLORINE IS ADDED TO GREYWATER SETTLING/STAGING TANK TO PROVIDE INITIAL SANITATION VIA CHLORINATION
INSTALLED IN GREYWATER (RAW) SUPPLY FROM HOLDING TANK REQUIRES 115 VOLTS, CONICAL BOTTOM TANK, NA
NA
2'' OVERFLOW
SKID
4" TREATED/
TO TRIPLEX
2'' FROM
PROCESSING
1'' MAKE-UP
WATER
CHLORINE SENSOR AND LEVEL SENSOR INCLUDED WITH GREYWATER SETTLING TANK ACCESSORIES.
FILTERED WATER
PUMPING SYSTEM
60THREE460
PRESSURE ZONE DESIGN CALCULATIONS
WATER CALCULATION - LOW ZONE
MAIN PRESSURE (PSI) @ BLDG. NO. 2 CENTRAL PLANT
ELEVATION LOSS FROM CENTRAL PLANT (IE.315.00) TO
FIRST FLOOR LEVEL OF SCI BUILDING (IE. 347.00)
INCOMING PRESSURE AVAILABLE AT THE SCI BUILDING FIRST FLOOR LEVEL
PRESSURE REGULATOR SET @ 80 PSI AND 70 PSI
FALL-OFF PRESSURE THRU PRESSURE REGULATOR
RESIDUAL REQUIREMENT PER VA PLUMBING DESIGN MANUAL
ELEVATION LOSS FROM FIRST TO SECOND FLOOR LEVELS (16 FT.)
DEVELOPED LENGTH (605 FT.)
(NOTE: FROM ENTRANCE @ TUNNEL FOR SCI BUILDING)
PRESSURE AVAILABLE
CALCULATED ALLOWABLE DROP (PSI/100 FT.)
___PSI X 100 FT. / ___ FT. (DEVELOP LENGTH) = ___PSI/100 FT.
WATER CALCULATION - HIGH ZONE
MAIN PRESSURE (PSI) @ BLDG. NO. 2 CENTRAL PLANT
ELEVATION LOSS FROM CENTRAL PLANT (IE.315.00) TO
THIRD FLOOR LEVEL OF SCI BUILDING (IE. 379.00)
INCOMING PRESSURE AVAILABLE AT THE SCI BUILDING THIRD FLOOR LEVEL
RESIDUAL REQUIREMENT PER VA PLUMBING DESIGN MANUAL
ELEVATION LOSS FROM THIRD TO ROOF LEVELS (66-32 FT.)
DEVELOPED LENGTH (646 FT.)
(NOTE: FROM ENTRANCE @ TUNNEL FOR SCI BUILDING)
PRESSURE AVAILABLE
CALCULATED ALLOWABLE DROP (PSI/100 FT.)
___PSI X 100 FT. / ___ FT. (DEVELOP LENGTH) = ___PSI/100 FT.
=105 PSI
= 14 PSI
= 91 PSI
= 10 PSI
= 35 PSI
= 7 PSI
= 18 PSI
= 2.9 PSI
=105 PSI
= 28 PSI
= 77 PSI
= 35 PSI
= 15 PSI
= 27 PSI
= 4.1PSI
0.7
1.4
1.4
43.4
2.8
37.8
74.2
0.7
1.4
BUILDING SERVICE WATER PIPE SIZE CALCULATION
TOTAL COLD & HOT WATER DEMAND FOR FIRST & SECOND FLOORS
FIXTURE QUANITY WSFU TOTAL
P-510 EXAM/TREATMENT SINK
P-514 SINK (STAFF) (HAND WASHING)
P-404/413/418 LAVATORIES (PATIENT)
P-413/414 LAVATORIES (PUBLIC/STAFF)
P-711 SHOWERS (PATIENT)
P-701 SHOWERS (PUBLIC/STAFF)
P-528 NURSE'S SINK
P-520 SURGEON'S SCRUB-UP SINK
P-420 ANTE ROOM SINK
P-505 CLINICAL SERVICE SINK
P-512 SOILED UTILITY SINK
P-528 CLEAN UTILITY SINK
P-528 SINK, OTHER
P-528 SINK (MEDICATION)
P-502 SERVICE SINK
P-528 NOURISHMENT SINK
P-302 BATHTUB/SHOWER COMBINATION
P-528 STAFF LOUNGE SINK
P-808 CLOTHES WASHER
P-521 LAUNDRY SINK
PROCESSING CLEAN-UP STATION
P-528 URODYNAMICS SINK
P-101 WATER CLOSET, FV (PUBLIC)
P-107 WATER CLOSET, FV (PRIVATE)
P-202 URINAL
TOTAL WSFU - 799.95
TOTAL COLD & HOT WATER DEMAND FOR THIRD & FOURTH FLOORS
FIXTURE QUANITY WSFU TOTAL
SHAMPOO SINK
P-514 SINK (STAFF) (HAND WASHING)
P-404/413/418 LAVATORIES (PATIENT)
P-413/414 LAVATORIES (PUBLIC/STAFF)
P-711 SHOWERS (PATIENT)
P-528 NURSE'S SINK
P-420 ANTE ROOM SINK
P-505 CLINICAL SERVICE SINK
P-512 SOILED UTILITY SINK
P-528 CLEAN UTILITY SINK
P-528 SINK, OTHER
P-528 SINK (MEDICATION)
P-502 SERVICE SINK
P-524 DBL. COMP'T SINK
P-530 3-COMP'T SINK
P-528 STAFF LOUNGE SINK
P-808 CLOTHES WASHER
P-521 LAUNDRY SINK
P-101 WATER CLOSET, FV (PUBLIC)
P-107 WATER CLOSET, FV (PRIVATE)
TOTAL WSFU - 858.75
TOTAL WSFU - 1,658.7 WHICH EQUATES TO 290 GAL./MIN. - 4-INCH PIPE SIZE.
NOTE: RECYCLED WATER SYSTEM BEING USED FOR TOILET FLUSHING THAT IS
BEING COLLECTED FROM THE FIXTURES CONNECTED TO THE GREYWATER SYSTEM
COLLECTED AND FILTERED.
1.5
697.5
1.5
1.5
186.75
0.5
0.5
0.5
2.0
1,050.25
1.28
787.2
0.125
2.5
789.7
N/A
4 2 8 2 8 2 8
2 2 4 2 4 2 4
78 2 156 2 156 2 156
4 1 4 1 4 1 4
2 1 2 1 2 1 2
1 1 1 2 2 3 3
175 176 177
P-604 ELECTRIC WATER COOLER 2 0.25 0.5
P-528 OUTSIDE TERRACE SINK 1 2 2
FIBER SCOPE WASHER 1 2 2
P-601 BOTTLE FILLING STATION 1 0.25 0.25
P-516 HAND SINK 1 22
P-604 ELECTRIC WATER COOLER 2 0.25
P-601 BOTTLE FILLING STATION 1 0.25 0.25
0.5
P-711 SHOWERS (STAFF) 1 44
GREY WATER PRODUCTION SHALL BE BASED THE NUMBER OF PLUMBING FIXTURES
LISTED WHICH ARE CONNECTED TO THE GREY WATER SYSTEM AND THE FOLLOWING
KEY ASSUMPTIONS:
THE NUMBER OF BATHTUB/SHOWERS (PATIENT/STAFF)
AVERAGE LENGTH OF SHOWER (MINUTES)
SHOWER HEAD FLOW RATE (GPM)
TOTAL GREY WATER PRODUCTION PER DAY (GALLONS) (MAXIMUM)
(BATHTUBS/SHOWERS)
NUMBER OF LAVATORIES (PATIENT)
AVERAGE USAGE (MINUTES/DAY/PERSON)
LAVATORY FLOW RATE (GPM)
TOTAL GREY WATER PRODUCTION PER DAY (GALLONS) (MAXIMUM)
(LAVATORIES - PATIENT)
NUMBER OF PERSONS (STAFF/PUBLIC)
AVERAGE USAGE (MINUTES/DAY/PERSON)
LAVATORY FLOW RATE (GPM)
TOTAL GREY WATER PRODUCTION PER DAY (GALLONS)
(LAVATORIES - STAFF/PUBLIC)
NUMBER OF HAND WASHING SINKS (STAFF)
AVERAGE USAGE (MINUTES/DAY/PERSON)
LAVATORY FLOW RATE (GPM)
TOTAL GREY WATER PRODUCTION PER DAY (GALLONS)
(HAND WASHING SINKS -STAFF)
TOTAL GREY WATER PRODUCTION PER DAY (GALLONS)
GREY WATER DEMAND
NUMBER OF WATER CLOSETS (PATIENT/STAFF/PUBLIC)
NUMBER OF TOILET FLUSHES PER DAY
WATER CLOSET FLOW RATE (GAL./FLUSH)
TOTAL TOILET FLUSHING WATER DEMAND (GALLONS)
NUMBER OF URINALS (PUBLIC)
NUMBER OF URINAL FLUSHES PER DAY
URINAL FLOW RATE (GAL./FLUSH)
TOTAL URINAL FLUSHING WATER DEMAND (GALLONS)
TOTAL GREY WATER DEMAND PER DAY (GALLONS)
THE COMMERCIAL GREY WATER TREATMENT SYSTEM SPECIFIED IS DESIGNED TO
PROCESS 2 -3 GPM OR 3,000 GPD.
PACKAGE BOOSTER PUMPING SYSTEM USED FOR TOILET FLUSHING IS BASED ON THE
FOLLOWING DESIGN CRITERIA:
THE TOTAL NUMBER OF WATER CLOSETS (PATIENT/STAFF/PUBLIC)
THE TOTAL NUMBER OF FIXTURE UNITS (WSFU)
DEMAND FLOW RATE (GPM)
DEVELOPED LENGTH OF PIPING SYSTEM (FT.)
STATIC LIFT (PSI) (NOTE: FROM PUMP DISCHARGE TO HIGHEST
FIXTURE - ELEVATION 69 FT. X 0.433 PSI/FT.)
PIPE FRICTION LOSSES (PSI) (SIZING BASED ON 3 PSI/100FT.)
RESIDUAL PRESSURE REQUIRED (PSI)
SYSTEM PRESSURE REQUIRED (PSI)
SUCTION PRESSURE AT THE PUMPS (PSI)
REQUIRED PUMP BOOST (PSI)
THE PACKAGED BOOSTER PUMPING SYSTEM SPECIFIED IS A TRIPLEX SYSTEM WITH
(1) 7.5 HP. PUMP RATED FOR 70 GPM AND (2) 10 HP. PUMPS EACH RATED FOR
NUMBER OF LAVATORIES (STAFF/PUBLIC) 40
PERCENT OF TOTAL PEOPLE BATHING/SHOWERING 50
GREY WATER PRODUCTION
THE TOTAL NUMBER OF URINALS (STAFF/PUBLIC) 1
140 GPM @ 219 FT. OF
THD.
BUILDING SERVICE SANITARY WASTE PIPE SIZE CALCULATION
TOTAL DFU FOR SCI/CLC BUILDING
FIXTURE QUANITY DFU TOTAL
P-510 EXAM/TREATMENT SINK
P-528 NURSE'S SINK
P-520 SURGEON'S SCRUB-UP SINK
P-420 ANTE ROOM SINK
P-505 CLINICAL SERVICE SINK
P-512 SOILED UTILITY SINK
P-528 CLEAN UTILITY SINK
6-INCH HUB DRAIN
P-528 MEDICATION SINK
P-502 SERVICE SINK
P-528 NOURISHMENT SINK
P-528 STAFF LOUNGE SINK
P-808 CLOTHES WASHER
P-521 LAUNDRY SINK
P-528 URODYNAMICS SINK
P-101 WATER CLOSET, FV (PUBLIC)
P-107 WATER CLOSET, FV (PRIVATE)
P-202 URINAL
TOTAL WSFU - 1,104
FLOOR SINK 8 6 48
P-SHAMPOO SINK 2 3 6
P-524 DBL. COMP'T KITCHEN SINK 10 3 30
PROCESSING SINK
P-528 INTERNET CAFE SINK
P-528 ACTIVITIES/WORK SINK
P-528 OCCUPATIONAL THERAPY SINK 5 3 15
NOTE: 6-INCH HUB DRAIN PROVIDE FOR POOL FILTER BACKWASH @ 143 GAL./MIN.
P-524 DBL. COMP'T KITCHEN SINK 3 2 6
SHAMPOO SINK 2 42
NOTE: MEDICAL AIR PROVIDED BY (4) EXISTING GARDNER DENVER UNITS
MODEL 15EWTR45W, NFPA 99 OIL-LESS COMPRESSORS, 15 HP. EACH
LOCATED IN BUILDING No.2 - BOILER PLANT & CO-GENERATION.
NOTE: MEDICAL SURGICAL VACUUM PROVIDED BY (3) EXISTING BUSCH R5
ROTARY VANE AIR COOLED VACUUM PUMP MODEL RC0630, 25 HP. EACH
LOCATED IN BUILDING No.2 - BOILER PLANT & CO-GENERATION.
NOTE: OXYGEN PROVIDED BY EXISTING BULK CRYOGENIC OXYGEN FROM
AIR PRODUCTS INC WHICH CONSIST OF A 6,000 GAL. AND A 500 GAL.
VERTICAL PRIMARY AND SECONDARY LIQUID OXYGEN STORAGE TANKS.
HIGH DENSITY POLYETHYENE ABOVE GROUND TANK WITH 18"DIAMETER MANWAY COVER AND FLANGED INLET CONNECTIONS, LEVEL TRANSMITTER, AIR GAP FOR MUNICIPAL WATER MAKE-UP, CHLORINE RECIRCULATING LOOP
CONSISTING OF PIPING AND VALVE AND RECIRCULATING CHLORINE PUMP 460/3/60, 0.6 HP.
PUMP ROOM ALCOVE
1B132B
COMMERICAL GREYWATER
TREATMENT SYSTEM
DISC FILTER, MULTI-MEDIA FILTER WITH
DIFFERENTIAL PRESSURE SWITCH, CARBON FILTER,
CHLORINE CONCENTRATE RECIRCULATING PUMP,
CHLORINE DOSING PUMP, 6 GALLON CHLORINE
CONCENTRATION TANK, UV STERILIZER, CONTROL
PANEL AND PRE-PLUMB ON SKID.
SYSTEM TO INCLUDE THE FOLLOWING ITEMS/COMPONENTS: SETTLING TANK, STAGING TANK AND
PRESSURIZATION TRIPLEX PUMPING SYSTEM. THE GREYWATER TREATMENT SYSTEM TO BE DESIGNED TO EMPTY
THE SUMP (HOLDING TANK) EVERY 24 HOURS.
MEDICAL GAS USAGE
MEDICAL AIR:
168 OUTLETS X 1.0 SCFM PER OUTLET X 10% DIVERSITY FACTOR = 16.8 SCFM
6 OUTLETS X 1.0 SCFM PER OUTLET X 25% DIVERSITY FACTOR = 1.5 SCFM
1 OUTLETS X 1.0 SCFM PER OUTLET X 100% DIVERSITY FACTOR = 1.0 SCFM
TOTAL = 19.3 SCFM
MEDICAL VACUUM:
168 INLETS X 1.0 SCFM PER OUTLET X 10% DIVERSITY FACTOR = 16.8 SCFM
6 INLETS X 1.0 SCFM PER OUTLET X 25% DIVERSITY FACTOR = 1.5 SCFM
2 INLETS X 1.0 SCFM PER OUTLET X 100% DIVERSITY FACTOR = 2.0 SCFM
TOTAL = 20.3 SCFM
OXYGEN:
168 OUTLETS X 1.0 SCFM PER OUTLET X 10% DIVERSITY FACTOR = 16.8 SCFM
6 OUTLETS X 1.0 SCFM PER OUTLET X 25% DIVERSITY FACTOR = 1.5 SCFM
3 OUTLETS X 1.0 SCFM PER OUTLET X 100% DIVERSITY FACTOR = 3.0 SCFM
TOTAL = 21.5 SCFM
0.331 5,000
0.500 3,000
0.507 1,900
0.441 1,000
0.451
0.509
2"1-1/2"1-1/4"1"3/4"1/2"
ALLOWABLE FRICTION LOSS 0.55 PSI/100FT.
NOTE: BASED ON A DEVELOPED LENGTH OF 952 FT.
PRESSURE LOSS
FLOW (LPM)
PIPE SIZE
0.331 5,000
0.500 3,000
0.507 1,900
0.441 1,000
0.451
0.509
2"1-1/2"1-1/4"1"3/4"1/2"
ALLOWABLE FRICTION LOSS 0.52 PSI/100FT.
NOTE: BASED ON A DEVELOPED LENGTH OF 952 FT.
PRESSURE LOSS
FLOW (LPM)
PIPE SIZE
TOTAL
URODYNAMICS
CYSTOSCOPY (MGS-1)
URODYNAMICS
EXAM/TREATMENT
ROOM (MGS-2)
EXAM/TREATMENT
ROOM (MGS-2)
ONE-BED
PATIENT/RESIDENT
ROOM (LONG TERM
CARE)(MGS-3)
ONE-BED BARIATRIC
PATIENT ROOM
(MGS-3)
ISOLATION PATIENT
ROOM, NEGATIVE
PRESSURE (MGS-3)
NOTES:
0.320 0.312 4"2-1/2"
0.314
0.303
0.282
0.369
0.540
3"2"1-1/2"1"3/4" ALLOWABLE FRICTION LOSS 0.32 in. Hg/100FT.
NOTE: BASED ON A DEVELOPED LENGTH OF 928 FT.
PRESSURE LOSS
FLOW (SCFM)
PIPE SIZE
3. ARRANGE HANGERS TO PREVENT TRANSMISSION OF VIBRATION FROM PIPING TO BUILDING STRUCTURE AND ALLOW FOR EXPANSION AND CONTRACTION TO HANGERS AND SUPPORTS.
2. PROVIDE 18 GAGE GALVANIZED STEEL SHIELD OVER INSULATION, MINIMUM 6 INCHES LONG AT PIPE SUPPORT FOR INSULATED COLD AND HOT WATER PIPING. SHIELDS FOR VERTICAL COPPER PIPE RISERS SHALL BE SHEET LEAD.
PVC COATED STEEL
(GALVANIZED) RISER
CLAMP
GALVANIZED STEEL, ADJUSTABLE BAND HANGER WITH PLASTIC COATING
GALVANIZED STEEL, ADJUSTABLE SWIVEL, SPLIT RING OR CLEVIS
STEEL (GALVANIZED)
RISER CLAMP
3/8"
3/8" UP TO 2" AND
1/2" FOR 2-1/2"
AND LARGER
1/2"CARBON STEEL,
COPPER PLATED
CARBON STEEL,
COPPER PLATED
CARBON STEEL,
COPPER PLATED
CARBON STEEL RING, ADJUSTABLE SWIVEL, COPPER PLATED
CARBON STEEL RING, ADJUSTABLE SWIVEL, COPPER PLATED
CARBON STEEL RING, ADJUSTABLE SWIVEL, COPPER PLATED
1/2"
1/2'
1/2'
3/8" FOR 2" AND
SMALLER AND 12"
FOR 2-1/2" AND
3" AND 5/8" FOR
4" AND LARGER
1/2" FOR 3" AND
SMALLER AND 5/8"
FOR 4" AND LARGER
STEEL RISER CLAMP
STEEL RISER CLAMP
1-1/2" PIPE SIZE AND SMALLER - MALLEABLE IRON, ADJUSTABLE SWIVEL,
SPLIT RING AND 2" PIPE SIZE AND LARGER - CARBON STEEL, ADJUSTABLE,
CLEVIS.
1/2" TO 1-1/2" PIPE SIZE - MALLEABLE IRON, ADJUSTABLE SWIVEL, SPLIT
RING
2" AND LARGER COLD PIPE SIZE - CARBON STEEL, ADJUSTABLE, CLEVIS.
2" TO 4" HOT PIPE SIZE - CARBON STEEL, ADJUSTABLE, CLEVIS
STEEL RISER CLAMP
1-1/2" PIPE SIZE - MALLEABLE IRON, ADJUSTABLE SWIVEL, SPLIT RING AND
2" PIPE SIZE AND LARGER - CARBON STEEL, ADJUSTABLE, CLEVIS.
104POLYVINYL CHLORIDE (PVC) ASTM D1785 SCH. 80REVERSE OSMOSIS DE-IONIZED WATER
STEEL (GALVANIZED) SCH. 40, 3" DIAMETER AND
SMALLER
PUMPED GREYWATER
COPPER TUBING (ASTM B88) 1-1/2" DIAMETER
AND LARGER
RECYCLED WATER
COPPER TUBING (ASTM B88) 1-1/4" DIAMETER
AND SMALLER
RECYCLED WATER
COPPER TUBING (ASTM B88/ASTM
B819/OXY/MED) 1-1/4" DIAMETER AND SMALLER
LABORATORY AIR (NON-MEDICAL)
COPPER TUBING (ASTM B88/ASTM
B819/OXY/MED) 1-1/2" DIAMETER AND LARGER
COPPER TUBING (ASTM B88/ASTM
B819/OXY/MED) 1-1/4" DIAMETER AND SMALLER
DOMESTIC COLD, HOT AND HOT WATER
RETURN
MEDICAL GASES
MEDICAL GASES
DOMESTIC COLD, HOT AND HOT WATER
RETURN
DWV, SANITARY, GREYWATER AND
STORM DRAINAGE
1. THE MAXIMUM HORIZONTAL SPACING OF CAST-IRON PIPE HANGERS SHALL BE INCREASED TO 10 FEET WHERE 10-FOOT LENGHTS OF PIPE ARE INSTALLED.
COPPER TUBING (ASTM B88) 1-1/2" DIAMETER
AND LARGER
COPPER TUBING (ASTM B88) 1-1/4" DIAMETER
AND SMALLER
CAST-IRON PIPE, STANDARD WEIGHT
GREYWATER TREATMENT SYSTEM
STORAGE TANKS
PIPING MATERIAL
MAXIMUM
PIPE SUPPORT - HANGER SPACING
HORIZONTAL
SPACING
(FEET)
MAXIMUM
VERTICAL
SPACING
(FEET)
SERVICE
SUPPORT
HORIZONTAL
SUPPORT
VERTICAL
HANGER ROD
DIAMETER
(INCHES)
MEDICAL VACUUM SIZING CHART
QUANTITY
MEDICAL AIR
NUMBER OF
ROOM NAME
DEMAND CALCULATION
MEDICAL GAS STATION INLET/OUTLET TABULATION CHART
OUTLETS
TOTAL
MEDICAL VACUUM
NUMBER OF
OUTLETS
TOTAL
OXYGEN
NUMBER OF
OUTLETS
TOTAL
MEDICAL VACUUM, MEDICAL AIR AND OXYGEN MEDICAL AIR CALCULATION
MEDICAL AIR SIZING CHART
MEDICAL VACUUM CALCULATION
OXYGEN CALCULATION
MEDICAL AIR SIZING CHART
0.55X 100 =
895 FT.
5 PSI
(SOV, ZONE VALVES, DROPS, ELBOWS, ETC.)
ALLOWABLE FRICTION LOSS:
FT.895EQUIVALENT RUN (- FT. x 10%)
FT.813LENGTH OF RUN
PSI5MAXIMUM PRESSURE LOSS
PSI50POINT OF USE PRESSURE
PSI55SOURCE PRESSURE
0.32X 100 =
928 FT.
3 Hg
(SOV, ZONE VALVES, DROPS, ELBOWS, ETC.)
ALLOWABLE FRICTION LOSS:
FT.928EQUIVALENT RUN (- FT. x 10%)
FT.845LENGTH OF RUN
3" HgMAXIMUM PRESSURE LOSS
15" HgPOINT OF USE PRESSURE
19" HgSOURCE PRESSURE
0.52X 100 =
952 FT.
5 PSI
(SOV, ZONE VALVES, DROPS, ELBOWS, ETC.)
ALLOWABLE FRICTION LOSS:
FT.952EQUIVALENT RUN (- FT. x 10%)
FT.865LENGTH OF RUN
PSI5MAXIMUM PRESSURE LOSS
PSI50POINT OF USE PRESSURE
PSI55SOURCE PRESSURE
60208 VAC5
REMARKS
PHASE HzVOLT
EMERGENCY POWER
ELECTRICAL DATA
FLOW RATE (GPM)
CONTINOUS
LOCATIONDESCRIPTIONMARK
26-RO-1
PROCESSING SKID
THREE
PUMP ROOM
1B132C
COMMERICAL RO-1
REVERSE OSMOSIS
SYYSTEM WATTS #
PWR40213053 W/ CARBON
FILTERS & 165 STORAGE
TANK COMPLETE PACKAGE
DISC FILTER, MULTI-MEDIA FILTER WITH
DIFFERENTIAL PRESSURE SWITCH, CARBON FILTER,
CHLORINE CONCENTRATE RECIRCULATING PUMP,
CHLORINE DOSING PUMP, 6 GALLON CHLORINE
CONCENTRATION TANK, UV STERILIZER, CONTROL
PANEL AND PRE-PLUMB ON SKID.
RO SYSTEM TO INCLUDE THE FOLLOWING ITEMS/COMPONENTS: RO-1 5 HP SPECE REQUIRED 51"x18"x57", 900 GPD W/ CONTROL & AUT. FLUSH W/ OP.WT 1000 LBS, AND WATTS PWTNK165PKG ATMOSPHERIC TANK AND BOOSTER PUMPS SYSTEM 165 GALLON STORAGE TANK OP.WT. 2,000 LBS, GROUNDFOS MQ3 PUMP 110 V, 1 PAHSE & 60 Hz. WATTS PWC15121E10 COMMERCIAL CARBON FILTER SYSTEM16" x 65" TANK WITH 4 CU-FT CARBON SERVICE CHLORINE REDUCTION 14.8 GPM, BASCKWASH 12 GPM SPACE REQUIRED 17"x18"x75" OP.WT 350 LBS.COMPLETE PACKAGE WITH CONTROL AND BMS CONNECTION. REFERTO DETAIL # 8/PP404
REVERSE OSMOSIS WATER EQUIPMENT SYSTEM
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek
P -1
1A
P -1
1A
1A
P
-2
P -1
2A
2B
P -5
4A
P -5
4A
4C
(1)P528
2A155B
2A155C
(1)P107
(1)P101
3A109A
P -5
1A
(1)P107
(1)P404
2A116A
3A111A
4A115A
4A116A
(2)P404
2A146A
2A148A (2)P107
(2)P404
2A144A
(2)P107
(2)P404
2A135A 2A125A
A
P -5
2A
P -5
2A
P -5
2A
P -5
3A
P -5
4A
4A
P -8
4A
F D
-1 4A
P -5
4A
8A
P -1
2A
P -1
1A
(2)P107
(2)P404
2A123A
2A122A
3A115A
3A116A
(1)P107
(1)P404
2A120A
P -5
1A
(1)P107
(1)P404
2A119A
(1)P420
3A115A
(1)P107
4A123A
(2)P107
(2)P404
2A136A 2A138A
(1)P107
(1)P404
2A139A
WCO
FCO
(1)P107
(1)P107
(2)P107
(2)P107
(1)P528
P -5
4A129A
4A127A
4A124A
4A125A
(4)P107
(2)P107
FCO
FCO
2"2" 4"(33)
C O
L R
-1
S -8
C O
L N
-1
S -9
C O
L P
-4 .9
S -1
C O
L Q
-1
S -1
C O
L U
-8
S -4
C O
L U
-1
S -5
C O
L U
-1
S -6
C O
L S
-1
S -7 C
O L
U -5
S -3
C O
L U
-1
S -2
2"
4"(4)
4"
4"
1-1/2"2"
2"(4)
1-1/2" 3"(8)
4"(14)
4"(10)
4"(38) 4"(37)
2"
4"(34)
1-1/2"
4"(5) 4"(27) 4"(17)4"(11)
3" 2" 4" 4"
2" 1-1/2"2"
2"4"(23)
2"
4"(17)
2" 2" 2" 2" 2"
1-1/2"1-1/2" 2" 2"
4"(24)
4"(16)
C O
L S
-1
2"
4"(20)
P -5
2"
4"
2"
P -5
3A
1-1/2"
2"
(1)P528
4A175D
(1)P107
2"(7)
4"(54)
2"
F D
-1 1A
1-1/2"
2"
P -1
1A
2"
FCO F
D
-1 1A
1-1/2"
2"
P -1
1A
P -1
1A
FCO
2" 2"
4" 4"
F D
-1 1A
1-1/2"
2"
IN
S
T R
U M
E N
T
2"
FCO
F D
-1 1A
1-1/2"
2"
P -1
1A
2"
FCO
2" B
W O
M E
N 'S
A
S -1
2"
3"
4" 2"
P -1
1A
2"
4"
1-1/2"
2"
1-1/2"
M E
N 'S
A
4"
C O
L Q
-1
2"
C O
L U
-1
F D
-1 2A
P -8
2A
P -5
2A
P -5
2A
1-1/2" 1-1/2" 2"
2" 2" 2" 2"
WCO T
O
IL
E
T
A
1A
P -1
1A
2"
4"
P -5
1A
2"
2"
P -5
1A
2"
4"
P -5
1A
3"
2"
2"
P -5
1A
P -5
1A
1-1/2" 1-1/2"
2"
2"
F D
C Y
S T
O 1A
6 P -5
1A
1-1/2" 1-1/2"
2" 2"
P -5
1A
2"
2"
P -5
1A
1-1/2"
2"
2"
P -5
1A
1-1/2"
2"
P -5
1A
1-1/2"
2"
C O
L U
-1
P -5
1A
1-1/2"
2" 2"
2" (6)
2"
B
2"
C O
L R
-1
2"
C O
L S
-1
2"3" 3"
2A141A
(1)P420
2A148B 2A149
P -1
4A
2"
P -5
2A
P -5
2A
P -5
2A
1-1/2"1-1/2"2"
2"2"2"
3"
2"
2"
4"
2"
3"
(3)P107
(1)P502
4A134 4A137A
4A130A 4A131A
(2)P107 3A118A 3A119A
C O
L S
-8 .1
P A
T
IE
N T
A
P -5
4A
2"
P -1
4A
2"
4"
P -1
4A
F D
-1 4A
1-1/2"
2"
F D
-1 4A
P -1
4A
2"
4"
P -1
4A
P -5
4A
4"
P -5
4A
2"
C O
L P
-4 .9
.8
F S
-1
2"
4"
2"
1-1/2"
2"3"
2"
2"
1-1/2"
4"
2"
C O
L Q
-8
2"
3" 3"2"
3"
3"
2"
2"
2"
2"
4"
A
2"
2"
3" 2" 2"
J
2"
J
2"
C
2"
C
D
2"
D
2"
3"
3"
3"
4"
4"
C O
L N
Q
-1
4"
(1)P524
4A114A
C O
L M
-1
3"
F S
-1
2"
4"
4"
F S
-1
2"
C O
L Q
-7 .8
C O
L P
Q
-8
4"
E
4"
E
4"
C O
L S
U
-5
2"
2"
2"
C O
L P
-2 .9
4.
3"
F
F
3"
2"
C O
L Q
-4 .9
C O
L M
-1 0.
G
2"
G
2"
4"
C O
L N
-1
4"(3)
2"(6)
4"
H
4"
2"
C O
L Q
-1 0.
2&
C O
L Q
-1
F S
-1
H
2"
I
I
4"(11)
4"
4"
4"(22)
4"(36)4"(8)4"(44)4"(48)
(4)
4"(58) 4"(62)
4"(10)
4"(28)
4"(90)4"(143)
4"(12)
4"(5)4"(19)3"(9)
4"(53)
4"(4)
4"(6)
4"(14)4"(19)
4"(143) 4"(19)
4"(8)
4"(5)
4"(18)4"(21)4"(26)4"(32)
2"(6)
4"(51)
(2)
4"(8) 4"(10)4"(16)
4"(20)
(3)(2)(3)
4"(28)
4"(31)
4"(85)4"(88)
4"(6)
3"(8) 2"(5) 3"(11)
4"(122)4"(126)6"(163)
4"(6)4"(6)4"(6)
4"(8) 4"(14)
4"(22)
4"(11)
4"(33)
4"(46)
4"(50)
6"(213) 4"(143)4"(143)6"(394)
4"(28)
6"(251)
SAN SAN SAN SAN
SANSANSANSANSAN
SAN SAN
SAN SAN
SANSAN
SAN
SAN
SAN
SANSANSANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S A
N
S A
N
S A
N S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
V V V
V
V V
V
VV
V
V
V
VVV
V V V
V
VVV
V V V
VV
V V
V
V
V
V
V V
V
V
V
V
V V
V
V
V
V V
V
V V
VV
V
VV
V V
V V
V
V
M A
T C
H
LI
N E
M A
T C
H
LI
N E
M A
T C
H
LI
N E
M A
T C
H
LI
N E
P -5
3A
2"(3)
F D
-1 3A
1-1/2"
2"
1-1/2" 1-1/2"
1-1/2"
2"(3)
P -5
3A
4"
2"
P -5
3A
2"
1-1/2"
P -5
3A
2"
1-1/2"
P -5
3A
2"
1-1/2"
1-1/2"
V
4"(10)
(2)P107
3A120A 3A121A
4"(8)
(2)P107
3A122
3A123
4"(4)
2"
(1)P502 4"(19)
1-1/2"
1-1/2"
WCO
P -5
4A
4A
P -8
4A
P -5
2" 2" 2"
1-1/2"1-1/2" 2"
3"(9)
P -5
S
C I T
E R
R A
C E
2"
V
P -5
S
C I T
E R
R A
C E
4"(12)
2"
4"(15)
C
LE
A N
IN
G
D U
A L
B A
S
IN
P R
O C
E S
S
IN
G
S
IN
K
A
2"
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:2 :3
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P S a m e e r.
V .A n u p o ju .r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
DWV-SANITARY PIPING DIAGRAM
PP601
664-401
10/31/2020
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek
F S
-1
P -5
2B
P -5
2B
P -5
2B
P -5
2B
A
2"
2"
4"2"
1 1/2"1 1/2" 2"2"
(2)P107
(2)P404
2B133A
2B140A
(1)P107
(1)P420
3B120A
3B121
(2)P107
(1)P420
4B132A
4B135A
4B135B
P -5
1B
(1)P107
(1)P404
2B155A
(1)P107
3B129A
(4)P107
4B153A
4B155A
4B156A
(2)P107
(2)P404
2B143A
(2)P107
(1)P528
3B122A
3B149
4B136A
4B142A
P -5
1B
5A
(2)P107
(2)P404
2B153A
2B154A
(2)P107
3B127A
3B128A
(2)P107
4B151A
4B152A
P -5
4B
4A
(1)P107
(1)P404
2B144A
(1)P107
3B123A
C O
L F
-1
C O
L A
-1
C O
L F
-1
C O
L A
-2
S -1
S -1
S -1
S -1
2"
4"(15)
4"(10)
4"(29)
4"(16)
2"
(2)P107
4"(8)
4"(16)
4"(34)
2"
FCO
(1)P404
2B142A
4B157A
P -5
2B
1B
1 1/2"
F S
-1
4"
2"
F S
-1
2"
FCOF
S
-1
2"
P -5
1B
F S
-1
4"
2"
F S
-1 4"
2" F
D -2
2"
2"
P -1
1B
5C
2"
4"
P -3
1B
5C
1 1/2"
P -8
2B
P -5
2B
2"2"
4"
1 1/2" 2" 4"(27)
4"(14)
P -5
1B
P -5
1B
2"
1 1/2"
P -1
1B
2"
4"
P -1
1B
P -1
1B
0B
2"
4"
P -5
1B
P -5
1B
2A
2" 3"
1 1/2" 2"
1B
2B
2"
4"
F D
-2
1B
2B
2"
2"
F S
-1
1B
2B
3"
6"
P -1
1A
3A
2"
F D
-1
1-1/2"
1A
3A
C O
L A
-1
S -1
4"(25)
2"
3"
2"
P -5
1B
2"
1 1/2"
3"
2"
1 1/2"
3"
3" 2"
P -5
3"
2"
F D
-1
2"
1-1/2"
P -3
2" P -1
2B
1D
2"
4"
2B
2B
1D
2B
1D
A 2"
3"
3"
(2)P107
4B147A 4B143A
P -1
2B
2"
4"(4)
C O
L C
-1 2/
C O
L E
-1
P -5
2B
2"
F D
-1
2"
1-1/2"
2B
P -8
3B
P -5
3B
P -1
3B
2" 2"4"
1 1/2"
2" 2"
P -1
3B
2"
F D
-1 3B
4"
P -5
4B
F D
-1 4B
P -1
4B
2" 2"
2"(17)
P -8
4B
2"
2"
P -5
4B
2" 4"
2" P -5
4B
2"
3"
2"
P -5
3B
P -5
3B
P -5
3B
2" 4"2"
1 1/2" 2"2"
P -5
4B
3"
P -4
4B
2"
2" 1 1/2"
F S
-1
4"
2"
F S
-1
4"
2"
P -1
2"
P -4
2"
P -6
2"
P -1
2"
4"(4)
1 1/2"1 1/2"
2"
4"
G
C O
L A
-1
4"
C O
L A
/B -1
4"
2"
4"
2"
2"
2"
C O
L E
-1 8.
C O
L E
-1 7.
4"
4"
C O
L E
-1
C O
L C
-1
2"
H
I2"
H I
3"2"
3"
C O
L C
-1
3"
J
KK
LL
2"
2"
2" 2"
2"
2" 2"
2"
3"
3"
3"
4"
4"
C O
L C
-7
M
2"
C O
L C
-C
2" 2" 3"
2"
C O
L C
-7
3"
4"
F
3"
J
4"
2" 4"
4"
P -4
P -5
4B
2"
P -5
4B
2"
2"
(2 )S
H A
M P
O O
B O
W L
2"
4"
2"
P -5
4B
2"
4"
2"2"
C O
L E
-C
(2)P107
(2)P404
(2)P101
2B101A
2B102A
2B100
(2)P107
3B100A
3B101A
4B102A
4B100A
4B100
(1)P107
(1)P404
2B104A
(1)P107
3B104A
(2)P107
(1)P420
4B108A 4B109A
P -1
1B
P -1
1B
P -1
1B
P -1
(2)P107
(2)P404
2B108A
2B109A
(1)P101
3B107A
(1)P107
(1)P404
2B110A
4"(12)
S -2
C O
L G
-6
C O
L G
-4
C O
L A
-2
C O
L A
-6
S -2
S -1
S -1
(2)P107
(1)P101
4"(43)
FCO
4"(33)3"
2" 2"
NOTE:
PROVIDE 6" WASTE FOR POOL FILTER BACKWASH @ 143
GAL./MIN. (286 FU's)
4"(30)
(1)P420
4"(20)
6"(366)
(2)P107
(2)P404
2B117A
(4)P107
4B123A
4B124A
C O
L A
-8
S -1
FCO4"(26)
2"(4)
P -7
1B
P -7
1B
F D
-1 1B
P -1
1B
7A
FCO
P -4
1B
2"
P -4
1B
P -4
1B
F D
-2
2"
2"
H U
B D
R A
IN
3"
F D
-2
2"
2"
1B
F D
-1
1-1/2"
P -1
1B
2"
F D
-1
2"
1B
F D
-1
2"
1B
6"
4"
2" 4"
2" 3"
2"
2"
1-1/2"
2"
1-1/2"
4" 4"
2"
2"
1-1/2" 1-1/2"
2"
4"
4"
6"(318)
2" 2"
1-1/2" 1-1/2"
4"
4"(8)
4"4"
2"
C O
L C
-7
P -1
4B
4"
P -5
4B
6A
2"
1 1/2"
P -5
4B
2"
1 1/2"
F S
-1
4"
2"
F S
-1
4"
2"
(2)P107
(2)P404
4B111A
4B118A4B109B
2B101B 2B1142B118A
4B119A
4B120A
C O
L C
-2
C
C O
L A
-3 .9
4"
3"
C O
L A
-4
4"
C
O
G
C O
L G
-6 /7
4"
C O
L G
-4 /6
3"
4"
2"
2"
2"
4"
2"3"
P -1
1B
2"
4"
M
FO
4"(22)
4"(12)
2"(6)
4"
4"(37)4"(41)4"(44)
4"(10)
4"(14)
6"(310)
4"(9)
4"(13)
4"(18)
6"(384) 6"(362)
6"(392)6"(435)
4"(16)
4"(26)
6"(435)
4"(8) 3"(2) 4"(18)
(6)
4" (6)
4" (6)
4"(12)
4"(40)4"(52)
4"(8)
4"(12)
4"(8)
4"(79) 4"(72)
4"(8)
4"(19)
4"(29)
4"(32)
4"(111)
4"(20)
(6) (6) 4"(12)
4"(44)
4"(155)
4"(31)
6"(186)
4"(10) 3"(4)
1-1/2"
4"(13)
2"(5) 2"(3) 4"(35)
(38.5)
6"(227.5)
6"(253.5)6"(268.5)6"(273.5)
(6)(6) 6"(160)
(3.5)
4"(7.5)4"(17.5)
(6)(6)
4"(10)4"(23.5)
4"(41.5)
4"(11)
4"(52.5)
4"(253)
6"(526.5)8"(961.5)
8"(965.5)
2"
4"
2"
(5)
SAN SAN SAN SAN SAN SAN
SANSANSANSAN
SANSAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN
SANSAN
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
SAN
SAN
VV
V V
V V
V V
V V
V
V V V
V
V V
V
VV
V
V
V
V V
V V
VVV
V V V V V
VV
V
V V
V V
V
V V V
V
V V
V V
V V
V
V
V
V
V
V
VV
VV
V
V V V
VV V
V
V
V
VV
V V
VV
V
V
VV
V
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
M A
T C
H
LI
N E
M A
T C
H
LI
N E M
A T
C H
LI
N
E M
A T
C H
LI
N
E
3B121A
P -6
1B
2"
1 1/2"
2"
2"
2"
2"
P -6
1B
2"4"
E
2"
2"(6)
S A
NP
-5
2B
2"
1-1/2"
3"(14.5)
H A
N D
S
IN
K 3B
2"
1 1/2"
3- C
O M
P 'T
S
IN
K 3B
2"
F S
-1
1-1/2"
2B
V
3"
2"
1 1/2"
3"(11.5)
2"
4"(28)
P -5
4B
6A
2"
1 1/2"
P -5
4B
1 1/2"
SAN
2"(6)
EV
F D
-1 3B
1 1/2"
2"
6"(435) 4"(26)
4"(20)
P -5
2B
4A
2"
1 1/2"
4"(66.5) P -5
1B
V
P -6
1B
2"
1 1/2"
2" 2"
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:2 :3
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P S a m e e r.
V .A n u p o ju .r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
DWV-SANITARY PIPING DIAGRAM
PP602
664-401
10/31/2020
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek
2A155C
2A152B
(1)P514
2A116A
(2)P514
3A111A
(1)P514
4A115A
(2)P514
2A146A
2A148A
(2)P418
(2)P514
2A144A
(2)P514
2A135
2A125
(2)P418
3A118A
3A119A
4A131
4A130A
4A130
4A129
3A116
3A118
3A115A
3A116A
P -4
1A
2A120
2A120A
(2)P514
2A119
(2)P514
3A121
4A123
4A124
(2)P514
2A135
2A136
(2)P514
2A139 (1)P701
(2)P414
(2)P418
4A137
4A131A
(3)P418
4A127A 4A129A
4A124A
4A127
(4)P711
(2)P418
FCO
C O
L R
-1
G W
-8
C O
L N
-1
G W
-9
C O
L P
-5
G W
-1
C O
L P
-1
G W
-1
C O
L U
-8
G W
-4
C O
L U
-1
G W
-5
C O
L U
-1
G W
-6
C O
L G
W -1
G W
-7
C O
L U
-5
G W
-3
C O
L U
-1
G W
-2
P -4
1A
(4)P514
(1)P414
2A109
(1)P418
2A139A
(2)P418
2A136A
2A138A
(1)P418
2A119A
(1)P418
2A123A
2A122A
(2)P418
(2)P418
2A135A
2A125A
2A144
2A146
2A148
(1)P418
2A116
S T
A F
F T
O
IL
E T
P A
T
IE
N T
T O
IL
E
T
P -4
1A
FCO
M E
N S
S T
A F
F L
O C
K E
R
P -4
1A
W O
M E
N S
S T
A F
F L
O C
K E
R
P -4
1A
W O
M E
N S
S T
A F
F L
O C
K E
R
P -4
1A
W O
M E
N S
P U
B
LI
C T
O
IL
E T
P -4
1A
W O
M E
N S
P U
B
LI
C T
O
IL
E T
P -4
1A
M E
N S
P U
B
LI
C T
O
IL
E T
P -4
1A
M E
N S
P U
B
LI
C T
O
IL
E T
P -4
1A
S T
A F
F T
O
IL
E T
FCO
FCO
3A119
(2)P514
4A115 4A114A
(1)P711
(2)P711 (2)P711(2)P711
(2)P711
(1)P711
(1)P711 (2)P711
(1)P711
VENTING FROM THE VARIOUS HANDWASHING SINKS, SHOWERS
AND LAVATORIES CONNECT TO THE VENTING SYSTEM PROVIDED
FOR THE PLUMBING FIXTURES CONNECTED TO THE SANITARY
SYSTEM. REFER TO DWV, SANITARY PIPING DIAGRAMS FOR
ADDITIONAL INFORMATION.
3"(25)
3"(12)3"(9)
2"(3)
3"(6)
3"(9)
3"(18)
3"(9)
3"(18)
3"(18)
3"(30)
3"(27)
3"(39)
3"(37)
3"(12)
3"(12)
3"(25)
3"(9)
3"(13)
2"(2)
2"(5)
2A138
(1)P414
4A162
(2)P514
3A121A 3A120A
(2)P404
(2)P711
3A120
2A122 2A120
3A119A
(1)P418
(1)P711
(2)P514
4A123A
(1)P418
(1)P711
(2)P711
4A125A
4A125
(4)P418 (2)P514
(2)P711
(3)P711
4A137A
2A141A
2A141
3A111 3A109
(1)P418
(1)P711
4A116 4A116A
(2)P418
(2)P711
(1)P711
(1)P418
4A114
P -7
1A
2"(3)
FCOFCO
2"(2)
FCO
P -7
1A
FOR CONTINUATION SEE AREA "C"3"(14)3"(16)3"(17)
2" 2"
2"
2"
2"2"(2)
2"2"2"
2"
3"(19) 2"(1)
(4)P413
4A106
C O
L Q
-8 .5
FCO
2"(4)
4A107 4A135
2"(1)
4A140
3"(11)
FCO
3"(9)
3"(12)
3"(24)
3"(49)
3"(9)
3"(27)
3"(30) 3"(24)
3"(9)
3"(25)
3"(12)
3"(7)
3"(21)
3"(6)
3"(12)
4"(55)4"(92)4"(131)
TO HOLDING TANK FOR CONTINUATION
SEE PLUMBING SITE PLAN 6"(317)6"(322)6"(341)6"(366)6"(377)6"(426)
6"(557)
GW
GW GW GW GW GW GW GW GW
GW GW GW GW GW GW
GWGWGWGWGWGW
G W
G W
G W
G W
G W
G W
G W
G W
G W
SHEET PP604
S H
A F
T /E
LE
C
W A
LL
(3)P514
3A123 3A122 3A121
(2)P418
(2)P711
2"(1)
3A119A 3A105A
(1)P418
(1)P413
(1)P701
(1)P711
3"(6)
3"(10)
3"(15)
3A123A 3A122A
3A119
(2)P514
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:2 :3
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P S a m e e r.
V .A n u p o ju .r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
DWV-GREY WATER PIPING DIAGRAM
PP603
664-401
10/31/2020
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek
2B101A
2B102A
4B100
4B101
2B140
3B120
4B132
4B132A
4B135A
2B155A
3B128A
3B129A
(4)P514
(2)P711
4B132
4B140
4B132A
2B153A 2B154A
4B152
4B152A
4B153
(1)P711
2B143A
(2)P418
2B118A
4B124A
3"(10)
G W
-2
C O
L G
-6
C O
L A
-1
C O
L F
-1
C O
L A
-1
C O
L F
-1
C O
L A
-2
C O
L A
-8
G W
-1
G W
-1
G W
-1
G W
-1
G W
-1
G W
-1
FCO
FCO
2B142A
P -4
1B
5C
P -4
1B
P -4
1B
P -4
1B
FCO
FCO
2"2"
2"
2B104A
3B104
3B104A
4B109
4B109A
2B109A
2B110
3B107
C O
L G
-4
C O
L A
-2
C O
L A
-6
G W
-2
G W
-1
G W
-1
FCO
P -7
1B
6A
P -7
1B
7A
P -4
1B
P -4
1B
P -4
1B
P -7
1B
P -4
1B
P -4
1B
P -4
1B
P -7
1B
FCO
P -7
1B
2"2"2"2" 2"
2" 2" 2"
2"
FCO
2B118 2B117A
(1)P514
(2)P711
2B143
(2)P514
(1)P418
(1)P711
(2)P514
(1)P418 2B154
2B142
2B140(1)P711
(1)P418
(2)P711
(1)P514
(2)P418
2B133A
2B1302B101 2B100
(2)P418
(1)P414
(1)P514
(2)P711
2B104
2B102
(1)P418
(3)P514
(1)P711
2B109 2B108A
(2)P418
(2)P514
(2)P711
2B110A 2B117 (1)P418
(1)P514
(1)P711 2B153
(2)P418
(3)P514
(2)P711
(1)P711
3B123A 3B123
(2)P514
(1)P418
3B122A
(3)P711
(1)P514
(3)P418
3B121A
3B120A
(1)P514
(2)P711
3B128A 3B127A
(1)P514
(2)P418 3B127
(1)P711
(2)P514
(1)P418
3B101A
3B100B 3B100A
(2)P418
(1)P514
(2)P711
3B101
(1)P418
(2)P514
(1)P711
(1)P414
4B147A
4B143A
4B147
4B135(2)P418
4B118A
4"(29)FOR CONTINUATION SEE AREA "A"
SHEET PP603
3"(6)
3"(9)
3"(10)
3"(22)
3"(15)
3"(24)
3"(36)
3"(19)
3"(30)
3"(12)
3"(21)
3"(9)
3"(30)
3"(38)
3"(30)
3"(39)
3"(15)
3"(24)
3"(40)
3"(9)
3"(18)
3"(27)
3"(27)
4"(36)
4B156A
4B157
4B157A
4"
4"(67)
4"(168)
6"(207)
3"(13) 4"(40) 4"(80) 4"(110) 6"(317) 6"(317)
VENTING FROM THE VARIOUS HANDWASHING SINKS, SHOWERS
AND LAVATORIES CONNECT TO THE VENTING SYSTEM PROVIDED
FOR THE PLUMBING FIXTURES CONNECTED TO THE SANITARY
SYSTEM. REFER TO DWV, SANITARY PIPING DIAGRAMS FOR
ADDITIONAL INFORMATION.
2B1442B1552B108
P -4
2B
1 3"
C O
L C
-1
2"(1)
P -4
3B
2"
P -4
3B
2"
P -4
3B
2"
3"(4)
4B120A
4B123
3B122
4B108
4B108A
4B102A
(3)P418
(2)P514
(3)P711
4B101A
4B102
(2)P418
(2)P514
(1)P711
4B111A
4B111
(2)P418
(1)P514
(2)P711
4B119A
4B120
4B119 4B118
(2)P418
(4)P514
(2)P711
4B124 4B123A
(2)P711
(1)P514
(2)P418
(2)P711
(1)P514
(2)P4184B151
4B151A
(2)P711
(3)P514
(2)P418
4B156 4B155 4B153A
(4)P711
(3)P514
(4)P418 (2)P711
(1)P514
(2)P418
P -4
2B
2"(1)
P -4
2B
1D
2"(1)
P -4
4B
2"
2"
3"(18)
3"(9)
3"(27)
3"(9)
3"(9)
3"(9)
3"(9)
3"(16)
3"(18)
3"(12)
3"(9) 3"(5)
3"(8)
3"(21)
3"(9)
2"(3)
3"(9)
3"(9)
3"(11)
3"(9)
3"(12)
2"(1)
3"(12)
4"(106)4"(144)
3"(24)
3"
4"(35) 4"(78)
6"(204)
GW GW GW
GW
GW
GW GW GW GW
GWGWGW
GWGW
GWGW
G W
G W G
W
G W
G W
G W
G W
G W
G W
G W
G W
G W
3B1213B128
3B129
P -3
1B
5C
2"
R E
G
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
R
S T
A
T E
OF CA L I FORN
I A
No. M029768
Exp. 06/30/22
M
E C H A N I C A
L
P A
U L
Q I P I NG
DO
N G
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
Department of Veterans Affairs
2 3 4 5 6
C
B
A
EBA
CONFORMED SET 2020-10/31
/2
/2
:2 :3
P
M C
R e v it
L o c a l F il e s \V
A S
C I_
P S a m e e r.
V .A n u p o ju .r v t
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 La Jolla Village Dr.
San Diego, CA 92037
DWV-GREY WATER PIPING DIAGRAM
PP604
664-401
10/31/2020
S
I
T A
E
T S
L
N
E C C
N
O
CFO FILA
R
A I
T
I
CRADE H
E T
REN.: 10-31-21
NO. C-28367
DAVID HUNT
ktabaknek
WATER HARVESTING SYSTEM SEQUENCE
H.
GREYWATER COLLECTION: GREYWATER FROM SHOWERS AND LAVATORIES WILL BE CONVEYED BY GRAVITY AND
COLLECTED IN A 2,000 GALLON PRE-CAST CONCRETE COLLECTION SUMP LOCATED BELOW GRADE, OUTSIDE OF THE
BUILDING. GREYWATER SHALL BE PROCESSED AS IT IS PRODUCED THOUGHOUT THE DAY SO THAT NO GREYWATER IS
LEFT STANDING FOR MORE THAN A FEW HOURS AT A TIME. AN OVERFLOW OUTLET IN THE COLLECTION SUMP DRAINS
TO THE SEWER SYSTEM. DUPLEX SUBMERSIBLE SEWAGE EJECTOR PUMPS RATED FOR 20 GPM AT 30 PSI WILL
TRANSFER THE RAW GREYWATER TO THE SETTLING TANK LOCATED INSIDE THE MECHANICAL ROOM OF THE BUILDING.
THE PUMP SHALL ALSO EJECT RAW GREYWATER TO SEWAGE ONCE PER DAY TO LIMIT THE MAXIMUM HOLDING TIME
TO A 24 HOUR PERIOD.
PROCESSING: GREYWATER IS TREATED THRU THE THE FILTRATION SKID WHICH THE SYSTEM ACHIEVES NSF-350
WATER QUALITY SUITABLE FOR ANY NON-POTABLE APPLICATION. THE FILTRATION PROCESSING SYSTEM IS DESIGNED
TO PROCESS 20 GALLONS PER MINUTE IN BATCHES OF 200 GALLONS AND INCLUDEDS MULTIPLE FILTRATION STEPS, SANITATION, MUNICIPAL MAKE-UP, PROCESSED WATER HOLDING TANK AND RE-PRESSURIZATION COMPONENTS.
SETTLING TANK: RAW GREYWATER WILL BE PROCESSED AS IT IS PRODUCED IN BATCHES OF 200 GALLONS;
EACH TOTAL BATCH CYCLE LASTS APPROXIMATELY 30 MINUTES. GREYWATER FROM THE SUMP IS MIXED WITH
CHLORINE AS IT ENTERS THE 200 GALLON HIGH DENSITY POLYPROPYLENE CONE BOTTOM SETTLING TANK.
ONCE THE BATCH LEVEL IS REACHED, IT IS ALLOWED TO SETTLE FOR 10 MINUTES BEFORE FILTRATION
BEGINS. THE WATER IS CONVEYED THROUGH A FLOATING FILTER INSIDE THE TANK TO THE PROCESSING SKID
FOR FINAL FILTRATION AND SANITATION. SOLIDS WILL SETTLE AT THE BOTTOM OF THE CONE SHAPED TANK
AND WILL BE FLUSHED ON A REGULAR BASIS THROUGHOUT THE DAY. EACH BATCH IS PROCESSED AT A
RATE OF 20 GPM.
FILTRATION: WATER FOR THE SETTLING TANK TO PASS THROUGH A THREE STEP FILTRATION PROCESS ON THE
FILTRATION SKID. THE FIRST FILTER REMOVES ALL PARTICLES LARGER THAN 80 MICRONS. THE MULTI-MEDIA
FILTER WILL REMOVE PARTICULATES GREATER THAN 10 MICRON IN SIZE. THE CARBON FILTER THAT WILL
POLISH WATER TO 1 MICRON. EACH OF THE FILTER STAGES USES PROCESSED WATER/MAKE-UP MUNICIPAL
WATER TO AUTOMATICALLY SELF-CLEAN AS NECESSARY TO MAINTAIN FILTRATION CAPACITY.
STERILIZATION: TO STABILIZE THE GREYWATER AND TO KILL ANY PATHOGENS THAT MAY BE PRESENT, CHLORINE WILL BE ADDED AS WATER ENTERS THE SETTLING TANK. A CHLORINATION SYSTEM USING A
CONCENTRATED LIQUID CHLORINE SOLUTION IS SENT TO THE PROCESSED WATER HOLDING TANK TO MAINTAIN
WATER QUALITY IN THE TANK AND DOWNSTREAM OF THE SYSTEM.
PROCESSED WATER HOLDING TANK: AFTER PASSING THROUGH THE FILTRATION AND STERILIZATION STEPS, THE
TREATED NON-POTABLE WATER WILL ENTER INOT A 1,000 GALLON HDPE TANK TO AWAIT PRESSURIZATION TO
THE TOILETS. WHEN THE LEVEL OF TRATED WATER REACHES THE TANK'S CAPACITY, ANY UNTREATED RAW
GREYWATER WILL BE SENT TO THE SEWER SYSTEM FROM THE COLLECTION SUMP. IN THE EVENT THAT THE
WATER LEVEL INSIDE THE HOLDING TANK DROP TO A PRESET POINT AND NO ADDITIONAL UNTREATED
GREYWATER IS AVAILIBLE, MAKE-UP WATER WILL BE SUPPLIED FROM THE MUNICIPAL WATER LINE.
MUNICIPAL MAKE-UP: IF THE DEMAND FOR TREATED GREYWATER EXCEEDS THE SUPLY OF BOTH THE SUMP
AND THE PROCESSED WATER HOLDING TANK, A SOLENOID VALVE WILL AUTOMATICALLY OPEN TO ADD
MUNICIPAL WATER THROUGH AN AIR GAP FITTING TO THE PROCESSED WATER HOLDING TANK. THE VALVE IS
DESIGNED TO BE NORMALLY OPEN TO MUNICIPAL WATER SO THAT THE GREYWATER HARVESTING SYSTEM
MUST BE OPERATIONAL BEFORE THE VALVE SWITHCHES TO THE HARVESTING WATER SOURCE. IN THIS
MANNER, THE MUNICIPAL MAKE-UP SYSTEM SERVES AS A SAFETY BACK-UP IN THE EVENT THAT THERE ARE
ISSUES WITH THE TREATMENT SYSTEM.