36C26226Q0508 0003.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C26226Q0508
About this file
This is Amendment Three to a federal solicitation (Standard Form 30) issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 22 (VISN 22) at the Mesa Annex facility in Mesa, Arizona. The amendment responds to additional vendor questions regarding the rental of temporary steam boilers and related services under solicitation 36C26226Q0508. All offers must be submitted via email to Felicia Simpson, Contract Specialist at Felicia.Simpson@va.gov, with a deadline of April 16, 2026, at 1:00 PM MST. Offerors are required to submit all documentation under Section E and acknowledge receipt of all amendments; failure to provide required documentation or amendment acknowledgment will result in rejection of the offer.
The questions and answers clarify key technical and operational requirements for the rental boiler. The minimum boiler capacity is 700 HP, with 800 HP preferred, though larger boilers (up to approximately 1,160 BHP) are acceptable if they meet operational, safety, and regulatory requirements and fit the designated 800 HP fire tube boiler footprint. The temporary boiler must comply with state regulations for steam boilers per VA HEFP standards. Electrical connections must be located 10 feet from the boiler connection point to the Central Utility Plant, with VA providing 30-amp single-phase power; additional electrical requirements depend on vendor submittals subject to VA approval. The rental boiler must be procured, onsite, and ready for connection by Notice to Proceed, though the start date is flexible. VA will provide engineering drawings to the selected vendor post-award. ADA requirements apply to the mobile office, and substitutes for the Cleaver Brooks manufacturer are acceptable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26226Q0508 0004.docx | DOCX document | |
| 36C26226Q0508 0002.docx | DOCX document | |
| 36C26226Q0508 0001.docx | DOCX document | |
| FMS Vendor File Update Request Form.pdf | ||
| W9 Request for Taxpayer Identification Number and Certification.pdf | ||
| VA10091 Vendor Request Form.pdf | ||
| 36C26226Q0508_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-13-2026 664-26-2-5033-0019 None 36C262
NCO 22
Department of Veterans Affairs NCO 22 - Mesa Annex 4135 S. Power Rd #103 RM 116 Mesa AZ 85212 36C262
NCO 22
Department of Veterans Affairs NCO 22 - Mesa Annex 4135 S. Power Rd #103 RM 116 Mesa AZ 85212 To all Offerors/Bidders
TBD
36C26226Q0508 03-26-2026
X X X X The purpose for this amendment is to respond to additional questions received from vendors.
All offers are due NLT April 16, 2026, at 1:00 PM MST. Offerors shall be submitted via email to: Felicia Simpson, Contract Specialist at Felicia.Simpson@va.gov.
ALL OFFERS SHALL SUBMIT ALL DOCUMENTATION UNDER SECTION E and all AMENDMENTS, failure to provide any required document and acknowledgment of all amendments will result in the offer not being accepted and will not be evaluated.
CONTINUATION PAGE
Questions and Answers 36C26226Q0508 Rental Boiler and 36C26226Q0515 Boiler Service
1. Does the mobile office require a 42” door?
ANSWER: Must meet ADA Requirements.
2. Is the mobile office going to get electrical power from the existing plant?
ANSWER: Yes, will provide 30amp 2 phase
3.Who is responsible for the electrical connections for the mobile office and temporary boiler?
ANSWER: Electrical Connections must be 10ft from the mobile office and temporary boiler to the point of feed connection from the Central Utility Plant. Separate Construction Site Prep. will provide 30amp single 2 phase to the mobile office and depending on the selected vendor’s submittal on their Boiler VA will review and approval via submittal approval process.
4. Cleaver Brooks is listed as the manufacturer. Are substitutes acceptable?
ANSWER: Yes, the current construction site preparation piping was intended for Cleaver Brooks. (Refer to the Services Contract SOW, pg. 38 of 80).
5. The scope of work calls out 800HP, but on section A (6) it calls 31,050 lbs/hr which is a 900 HP Steam boiler equivalent. Please confirm size.
ANSWER: At minimum a 700 HP Boiler is required.
6. Please confirm distance from rental location to piping connections for all services to central plant.
ANSWER: The Central Utility Plant connection point is located 10 ft from the rental boiler connection point.
7. It was mentioned that the boiler needed to meet VHA directive 1810 which includes extensive semi-annual calibrations per the VHA Boiler and Associated Plant Safety Device Testing manual which are not specifically called out in the scope. Please confirm this is required.
ANSWER: As per VA HEFP the temporary boiler must comply with state regulations for Steam Boilers. (Or further directions are delegated by VA HEFP).
8. Will a larger boiler with a similar footprint and weight be acceptable?
ANSWER: Yes
9. Is the start date flexible?
ANSWER: Yes, but Rental Boiler must be procured, onsite, and ready for connection at NTP by VA Contracting.
10. The boilers currently installed at the SDVA are 700HP boilers. Will the VA accept a 700HP boiler instead of a 800HP? If a smaller boiler is not acceptable will a 1000HP boiler be acceptable?
ANSWER: Please refer to question No. 5 above. A 1000HP Boiler will be acceptable if it meets the VA’s requested footprint.
11. One of our suppliers has indicated that an ~800 HP unit is not currently available; however, they do have a 40,000 PPH water tube boiler (approximately 1,160 BHP) available for the required period. In this regard, we respectfully request confirmation on whether a boiler of approximately 1,160 BHP be considered acceptable, provided it meets all operational, safety, and regulatory requirements?
ANSWER: Yes, boiler of approximately 1,160 BHP be considered acceptable, provided it meets all operational, safety, and regulatory requirements (All applicable requirements including designated footprint of an 800 HP fire tube boiler)
12. Can we receive the drawings from the engineers regarding the layout and piping?
ANSWER:VA will provide drawings from the AE DOR upon award to the selected Vendor.
AMENDMENT THREE IS RESPONDING TO ADDITIONAL QUESTIONS
File details come from the government source that posted it. Updated .