This document is an Amendment with Questions and Answers for Solicitation 36C26226Q0214, issued by the Department of Veterans Affairs Network Contracting Office 22 in Long Beach, California. The solicitation is for the replacement and installation of a new Grundfos CR32-7 Boiler Feed Pump at the West Los Angeles VA Medical Center, set aside exclusively for Service-Disabled Veteran Owned Small Businesses (SDVOSB). The amendment provides detailed responses to 20 vendor questions, clarifying key details such as no site visit will be conducted, the project involves complete replacement of the boiler feed pump's top, bottom, motor, and stack, and electrical connections are required.
The solicitation is for a firm fixed-price contract under NAICS code 238220 with a small business size standard of $19.0 Million. The contractor will be responsible for removing and disposing of the existing pump and motor, with no additional drawings or site visits provided. The offer close date remains January 7, 2026, at 2:00 PM PST. Notable specifications include a strict requirement for the Grundfos CR32-7 model with no approved equals, tax-exempt status, and compliance with VA Directive 1810 regarding equipment bolting. Wage Determination 2015-5613 applies to this requirement, and the project involves working in Building 295's Boiler Plant with easy access and ample working space.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
12-30-2025
36C262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
36C262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 To all Offerors/Bidders
36C26226Q0214 12-18-2025
X
See CONTINUATION Page
One(1) The purpose of this amendment is to provide information relating to questions provided by interested parties and answered by the facility.
1. See Questions and Answers on Continuation Page.
2. The offer close date is NOT EXTENDED and remains as 01/07/2026 at 2:00 PM (PST).
Helena Roba Contracting Officer
CONTINUATION PAGE
Solicitation 36C26226Q0214 Amendment 0001- Questions and Answers
1. Could you please advise whether a site visit is scheduled or anticipated for this requirement? If so, what is the proposed date, time, and any instructions confirming attendance. There will be no site walk; all the information has been written in the scope of work. In addition, refer to pictures on question #2 for the location of the BPF and connections.
2. Will there be a site visit to review existing conditions? No, there will be no site visit, however, please see pictures (6 total) below for the conditions and connections.
3. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. Yes, this is a new contract. Please reference FPDS.gov for any contract award information regarding research purposes.
4. We believe a site visit would allow us to properly assess site access, labor requirements, and existing site conditions, ensuring that we submit a comprehensive and competitive response. Please let us know if there is availability for our representative to meet with an on-site Point of Contact. Could you provide pictures of the pump and pump tag? Please refer to the statement of work and Question #2 for pictures of the pump and pump tag.
5. Is there an estimated budget available for this project? This is a competitive solicitation. If interested, please submit your best offer in accordance with the solicitation.
6. We understand that no formal site visit is scheduled under the solicitation; however, due to the restricted access nature of Building 295 (Boiler Plant) and the mechanical and electrical tie-ins associated with this requirement, we respectfully request confirmation on whether a site visit or escorted site walkthrough may be arranged for interested offerors prior to the quotation deadline. Please refer to answers on Question #2.
a. If a site visit is permissible, please advise on:
· Availability and proposed dates/times (within normal working hours, if applicable)
· Any security or access procedures that must be followed
b. If a site visit cannot be accommodated, please confirm so that we may proceed accordingly and ensure our pricing and assumptions are fully aligned with the solicitation requirements.
7. Will shop drawings, cut sheets, or as-built drawings of the existing installation be provided? We do not possess any drawings; all work will be performed on the first floor with easy access and ample working space.
8. Are new motor starters, VFDs, or control components required, or will existing controls be reused? The entire BFP top and bottom, motor and stack are to be replaced. No controllers needed, only electrical connections and disconnections needed.
9. What is the estimated weight and removal path for the existing pump and motor?
Please research the combined weight of the motor and stack. My approximate weight estimate is several hundred pounds. This can be separated into two parts, stack and motor.
10. Can the VA confirm the available electrical voltage at the point of connection? Please see Statement of Work for further information in addition to ID plates for voltage.
11. Can the Government confirm that Grundfos CR32-7 is the exact required model, with no approved equals or substitutions? Yes, this is correct. Please refer to the brand name justification document in solicitation.
12. Is this project tax exempt? If so, will a tax exemption certificate be provided? Yes, this is a government requirement and is Tax exempt.
13. Are there any hazardous materials used on the piping or piping supports? LOTO will be required to avoid electrical hazards as stated in the Statement of Work.
14. Will a site visit be allowed prior to quote submission? Please refer to Question #2 for answer.
15. Are there any rigging, hoisting, weight, or clearance limitations within Building 295 that could affect pump removal and installation? No.
16. Is the contractor responsible for removal and disposal of the existing pump and motor, and should all such costs be included in CLIN 0001? Yes.
17. Who is the incumbent control contractor for the facility? Please reference FPDS.gov for any contract award information regarding research purposes. We cannot provide incumbent contractor information.
18. Is the contractor responsible for the replacement of the removal and replacement of the mechanical piping insulation? If so, please specify the type of insulation required. No, there is no insulation on the BFP itself. Please see pictures provided in Question #2.
19. What is the NPS of the inlet side of the pump? We have a 2 inch flange 8 bolt assembly, not threaded. Please note, 307 A bolts are not permitted on any equipment due to safety concerns.
20. What is the NPS of the outlet side of the pump? We have a 2 inch flange 8 bolt assembly, not threaded. Please note, 307 A bolts are not permitted on any equipment due to safety concerns.
Please ensure that Question numbers 19 & 20 are understood, no 307 A bolts are permitted per VA Directive 1810.