This document appears to be a power specifications sheet for rack-mounted equipment in a Department of Veterans Affairs data center. It specifies the power requirements for a multi-rack IT system, including details on the power distribution units (PDUs), uninterruptible power supplies (UPS), circuit breakers, and associated power connections.
The key details are:
- The system requires two 60A, 3-phase 208V circuits terminating in a junction box to support three racks of equipment.
- Each rack requires a 5kW, 208V UPS with a NEMA L21-20P input and L21-20R output.
- PDUs are specified to distribute power within each rack, with NEMA L21-20R and L21-30R receptacles.
- Detailed one-line power schematics are provided for 4, 5, and 6 rack configurations.
This appears to be a technical specifications document, not a solicitation or contract. No procurement details, response dates, or award information is included.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Y
0A 120/ 208V2
Y Y
3 3 20A 28V 0A 120/ 208V
120/ 20
SIDE A SIDE B DEPARTMENT OF VETERANS
REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT, REQUIRES A 208V, 60A, THREE-PHASE CIRCUIT, AFFAIRS
TERMINATING IN A HARD-WIRED JUNCTION BOX. TERMINATING IN A HARD-WIRED JUNCTION BOX
J J
CB 3 CB 3 CB3 CB3 CB3 CB 3 BUS A BUS B
45 45 45 45 45 45
44 44 44 44 44 44
43 43 43 43 43 43
RACK/ENCLOSURE RACK/ENCLOSURE RACK/ENCLOSURE 42 42 42 42 42 42
CB3 CB3 CB3 CB3 CB3 CB3
CB2 CB2 CB2 CB2 CB2 CB2
41 41 41 41 41 41
40 40 40 40 40 40
RACKED RACKED RACKED 39 39 39 39 39 39
EQUIPMENT EQUIPMENT EQUIPMENT 38 38 38 38 38 38
CB2 CB2 CB2 CB2 CB2 CB2
CB1 CB1 CB1 CB1 CB1 CB1
37 37 37 37 37 37
36 36 36 36 36 36 PDU PDU PDU PDU PDU PDU
35 35 35 35 35 35 PS1 PS2 PS1 PS2 B A PS1 PS2 B AA B
34 34 34 34 34 34 IT OPERATIONS AND SERVICES CB1 CB1 CB1 CB1 CB1 CB1
CB3 CB3 CB3 CB3 CB3 CB3
33 33 33 33 33 33
SOLUTION DELIVERY 32 32 32 32 32 32
31 31 31 31 31 31
30 30 30 30 30 30 RACK-MOUNT RACK-MOUNT RACK-MOUNT CB3 CB3 CB3 CB3 CB3 CB3
R ack
P D
U
UPS UPS 29 29 29 29
28 28 28 28 28 28
27 27 27 27 27 27
I n
IO
IO
IO
O ut
I n
IO
IO
IO
O ut
29 29
UPS
CH
AT
SW
O
R
TH
K
P
O D
U C
T
N I
O N I
O N I
W ar ni ng
C rit ic al
/ 1
IO
IO
Te m p/ Hu m id ity
O N I
CH
AT
SW
O
O D
U
W ar ni ng
C rit
IO
/1
In
IO
I O
O N I
CH
AT
SW
O
RT
H
O D
U ni ng rit
IO
p/ Hu m p/ Hu m p/ Hu m p/ Hu m p/ Hu m
Re se t
O K
W ar t
O K
W ar t
C rit t
C rit s e t
Re s e t
O K
CB2 CB2 CB2 CB2 CB2 CB2
26 26 26 26 26 26
25 25 25 25 25 25
24 24 24 24 24 24
23 23 23 23 23 23 LEG1 LEG2
CB2 CB2 CB2 CB2 CB2 CB2
CB1 CB1 CB1 CB1 CB122
CB1 2222 22 22 22
21 21 21 21 21 21ZONE PDU
20 20 20 20 20 20 ZONE PDU
REQUIRES ONE (1) L21-20R
APC AP8861 RPDU OR EQUIVALENT;
RACK PDU 2G, METERED; L21-20
PLUG; THREE PHASE; 120/208V
INPUT; 20A; ZERO U, 5.7 KW, 208V,
(36) C13 & (6) C19 & (2) 5-20
OUTLETS; FOR USE IN
TELECOMMUNCIATION ROOMS AND
LOCATIONS WITH LEGACY 110V ONLY
EQUIPMENT
NOTE: USED IN TELECOMMUNICATIONS
60A 3-PHASE ZONE PDU BASE 19 19 19 19 19 19
CB1 CB1 CB1 CB1 CB1 CB1
18 18 18 18 18 18
UNIT – REQUIRES TWO 60A 3- 17 17 17 17 17 17
16 16 16
B3
N 151515151515I
CH
AT
SW
O
RT
H
P R
O D
U
14 14 14 14 14 14
B3
CH
AT
SW
O
R
TH
P
C B3
CH
AT
SW
O
R
TH
P
D U
C T
D U
C T
16 16 16
B1
B2
PHASE (WYE) CIRCUITS HARD- O
FF
F F
O N I
13 13 13 13 13 13
12 12 12 12 12 12
C B2
O N
C B2
O N
I I
O OO
WIRED IN JUNCTION BOX C
O
FF
11 11 11 11 11 11
10 10 10 10 10 10
C B1
O C B1
O C
N
O N
O N I I I
20 20
RACK-MOUNTED 5 KW, 208V
ROOMS WHERE 110V DISTRIBUTION
USING NEMA 5-15 OR NEMA 5-20
9 9 9 9 9 9
GR GR GR GR GR GR
BA OU A OU B OU A OU
XP Y ZP X YP Z XP Y YP Z XP Y
B OU A OUO O O O O O O O O O O O8 8 8 8 8 8 UNINTERRUPTIBLE POWER SUPPLY
O O O O O O7 7 7 7 7 7LE Z LE Y LE X LE Z LE X LE Z
B G G G G G G 1 2 1 2 1 2
(UPS) WITH NEMA 20A L21-20P ENTERPRISE DATA CENTER AND 6 6 6 6 6 6
RECEPTACLES ARE REQUIRED IN 5 5 5 5 5 5
INFRASTRUCTURE ENGINEERING 4 4 4 4 4 4
3 3 3 3 INPUT AND L21-20R OUTPUT ADDITION TO THE STANDARD 208V 3 3
2 2 2 2 2 2
PROJECT: 1 1 1 1 1 1
3 POWER ELEVATION AND SCHEMATIC FOR A THREE RACK TR 4 208V RACK PDU FOR TRs
OIT DESIGN GUIDE TEMPLATES
PROJECT NO:
L21-30P SIDE A
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA L21-
30R LOCKING RECEPTACLE.
L21-30P SIDE B
REQUIRES A 208V, 30A, THREE-PHASE
CIRCUIT, TERMINATING IN A NEMA L21-
30R LOCKING RECEPTACLE.
L21-20P SIDE A
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
L21-20P SIDE B
REQUIRES A 208V, 20A,
THREE-PHASE CIRCUIT,
TERMINATING IN A NEMA
L21-20R LOCKING
N/A
RECEPTACLE. RECEPTACLE.
CB 3
CB3
CB 3
CB3
BUS A BUS B CB 3
CB3
BUS A BUS B
CB3 CB3 CB3 CB3
CB2 CB2 CB2 CB2 42 42
41 41 41 41
CB3 CB3
CB2 CB2
41 41
40 40 40 40 RACK/ENCLOSURE RACK/ENCLOSURE
40 40
39 39 39 39 RACK/ENCLOSURE 39 39
38 38 38 38
38 38RACKED RACKED CB2 CB2 CB2 CB2
CB1 CB1 CB1 CB1
37 37 37 37
CB2 CB2
CB1 CB1
37 37 RACKED 36 36 36 36 EQUIPMENT EQUIPMENT
36 36
35 35 35 35 EQUIPMENT PDU PDU PDU PDU 35 35
34 34 34 34 MARK DATE DESCRIPTION PDU PDU PS1 PS2 B A PS1 PS2 BACB1 CB1 CB1 CB1
34 34CB3 CB3 CB3 CB3
33 33 33 33 CB1 CB1
32 32 32 32
CB 3
CB3
A PS1 PS2 B
32 32
31 31 ISSUE:
30 30
CB3 CB3
CB3 CB3 CB3 CB3
RACK-MOUNT RACK-MOUNT
I O
IO
IO
I O
IO
IO
O ut
29 29 29 29
28 28 28 28 UPS UPS
C
HA
TS
W
O
O D
U
O N I
O N I
W ar i c
I O em p/ H u m
HA
TS
W
O
O D
U
O N I
O N I
W ar
I O p/ H u m p/ H u m p/ H u m
29 29
28 28
I n
IO
I O
IO
CH
A T
S W O
RT
H
O D
U
O N I
O N I
W ar
IO
p/ Hu m
RACK-MOUNT Te p/ Hu m
13C
A T
S W O
RT
H
P R
O D
U C
DRAWING No: 27 27 27 27
UPSR
es et
W ar
W ar
27 27CB2 CB2 CB2 CB2
26 26 26 26 W ar t
O K
Re s e t
CB2 CB2
26 26
25 25 25 25 FILE: 25 25
24 24 24 24
24 24 23 23 23 23
DESIGN BY: KEVIN GRZELKA, CTDC LEG1 LEG2 23 23CB2 CB2 CB2 CB2
CB1 CB1 CB1 CB1
22 22 22 22 CB2 CB2
CB1 CB1
22 22 21 21 21 21
21 21 MICHAEL JULIAN, RCDD
20 20 20 20 VERIFIED BY: ZONE PDU 20 20 KELLY BATES, DCIE 19 19 19 19
19 19
CB1 CB1
CB1 CB1 CB1 CB1
18 18 18 18 DOC VERSION No: 18 18 17 17 17 17
O N I
C
HA
TS
W
O R
TH
O N I
C
HA
TS
W
O R
TH
16 16
15 15 15 15
14 14 14 14
O D
U C
T
O D
U C
T
17 17 16 16
ISSUE DATE: 16
14 14
O N I
O O
B2 20
13 13 13 13
12 12 12 12
SHEET TITLE
O N
O
NI I
RACK-MOUNTED 5 KW,
O O
12 12
11 11 11 11
10 10 10 10
O N
O
NI I
RACK-MOUNTED 5 KW, 208V 11 11
10 10
C B1
O
FF
ZONE PDU
30A 3-PHASE ZONE PDU
BASE UNIT – REQUIRES TWO
30A 3-PHASE (WYE)
CIRCUITS WITH L21-30R
RECEPTACLES
208V UNINTERRUPTIBLE
9 9 9 9
PH ASE Z P HASE Y PHAS E X 9 9
A GROUP A GROUP B GR OUP A GROUP B8 8 8 8OX OY OZ OX OY OZ OX OY
G RP A
G RP B L EG 1
L EG 2 G RP A
G RP B L EG 1
L EG 2 GRP A
GRP B L EG 1
L EG 2 UNINTERRUPTIBLE POWER SUPPLY 8 8
OZOZ OY OX7 7 7 7
B
LEG 1 LEG 2 LEG 1 LEG 2
POWER SUPPLY (UPS)
7 7
(UPS) WITH NEMA 20A L21-20P INPUT ZONE PDU POWER DISTRIBUTION
6 6 6 6
5 5 5 5
6 6 WITH NEMA 20A L21-5 5
IN TRS4 4 4 4
3 3 3 3 AND L21-20R OUTPUT
3 3
4 4 20P INPUT AND L21-20R
2 2 2 2
1 1 1 1 1 1
2 2
OUTPUT
POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR POWER ELEVATION AND SCHEMATIC FOR A ONE RACK TR SHEET: 20 OF 3712
3.1
OIT_DESIGN_GUIDE_TEMPLATE
S-04162021-V3.1.VSDX
Apr 16, 2021
D. 19 DX EHRM RACK POWER SPECS D.19 DX EHRM RACK POWER SPECS - 36C26224R0121
VHASDCCHAVEL
Cloud
PROJECT:
DRAWING No:
DEPARTMENT OF VETERANS
AFFAIRS
IT OPERATIONS AND SERVICES
SOLUTION DELIVERY
DATE
ISSUE:
DESCRIPTIONMARK
FILE:
DESIGN BY: KEVIN GRZELKA, CTDC
VERIFIED BY:
DOC VERSION No:
PROJECT NO:
SHEET TITLE
ISSUE DATE:
SHEET: 21 OF 37
MICHAEL JULIAN, RCDD
KELLY BATES, DCIE
3.1
OIT DESIGN GUIDE TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
ZONE PDU POWER DISTRIBUTION
IN FOUR AND FIVE RACK TRS
ENTERPRISE DATA CENTER AND
INFRASTRUCTURE ENGINEERING
RACK/ENCLOSURE
ZONE PDU
RACK/ENCLOSURE
PDU
B
PDU
A
BUS A BUS B
RACKED
EQUIPMENT
PS1 PS2
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
RACK-MOUNT UPS RACK-MOUNT UPS
LEG2LEG1
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
C
HA
TS
W
O R
TH
P
R O
D U
C T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C
HA
TS
W
O R
TH
P
R O
D U
C T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C
HA
TS
W
O R
TH
P
R O
D U
C T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
C
HA
TS
W
O R
TH
P
R O
D U
C T
T em p/ H um id ity O ut
In
IO
IO
IO
/1
R es et
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
A
B
OZ
GROUP B
OX OY
OX
GROUP A
OY OZ
OY
GROUP B
OZ OX
OZ
GROUP A
OX OY
LEG 1 LEG 2 LEG 2LEG 1
PHASE Z PHASE Y PHASE X
G RP A
G RP B L EG 1
L EG 2 G RP A
G RP B L EG 1
L EG 2 GRP A
GRP B L EG 1
L EG 2
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
J
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
J
A
B O Z
GR
OU
P
BO
X
O Y
O X
GR
OU
P
AO
Y
O Z
O Y
GR
OU
P
BO
Z
O X
O Z
GR
OU
P
AO
X
O Y
LE
G
LE
G
LE
G
LE
G
O Z
GR
OU
P
BO
X
O Y
O X
GR
OU
P
AO
Y
O Z
LE
G
LE
G
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
POWER ELEVATION AND SCHEMATIC FOR A FIVE RACK TR2
POWER ELEVATION AND SCHEMATIC FOR A FOUR RACK TR1
L21-30P SIDE A
REQUIRES A 208V,
30A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
NEMA L21-30R
L21-30P SIDE B
REQUIRES A 208V,
30A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
NEMA L21-30R
SIDE A
REQUIRES A 208V, 60A,
THREE-PHASE CIRCUIT,
TERMINATING IN A
JUNCTION BOX.
SIDE B
REQUIRES A 208V, 60A,
THREE-PHASE CIRCUIT,
TERMINATING IN A
JUNCTION BOX
ONE ZONE PDU
30A 3-PHASE ZONE PDU BASE UNIT –
REQUIRES TWO 30A 3-PHASE (WYE)
CIRCUITS WITH L21-30R RECEPTACLES
TO SUPPORT TWO RACKS
ONE ZONE PDU
60A 3-PHASE ZONE PDU BASE UNIT –
REQUIRES TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED IN JUNCTION
BOX TO SUPPORT THREE RACKS
RACK-MOUNTED 5 KW, 208V
UNINTERRUPTIBLE POWER SUPPLY
(UPS) WITH NEMA 20A L21-20P INPUT
AND L21-20R OUTPUT PER RACK
RACK/ENCLOSURE
ZONE PDU
LEG1
PDU
B
PDU
A
LEG2
BUS A BUS B
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
RACKED
EQUIPMENT
PS1 PS2
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
RACK-MOUNT
UPS
RACK-MOUNT
UPS
RACK-MOUNT
UPS
ONE ZONE PDU
60A 3-PHASE ZONE PDU BASE UNIT –
REQUIRES TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED IN JUNCTION
BOX TO SUPPORT THREE RACKS
RACK/ENCLOSURE
ZONE PDU
LEG1
PDU
B
PDU
A
LEG2
BUS A BUS B
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
RACKED
EQUIPMENT
PS1 PS2
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B
PDU
A PS1 PS2
RACK-MOUNT
UPS
RACK-MOUNT
UPS
RACK-MOUNT
UPS
REQUIRES TWO 20A 3-
PHASE (WYE) CIRCUITS
TERMINATING IN L21-20Rs
RACK/ENCLOSURE
PDU
B
PDU
A
BUS A BUS B
RACKED
EQUIPMENT
PS1 PS2
RACK-MOUNT
UPS
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
J
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
J
A
B O Z
GR
OU
P
BO
X
O Y
O X
GR
OU
P
AO
Y
O Z
O Y
GR
OU
P
BO
Z
O X
O Z
GR
OU
P
AO
X
O Y
LE
G
LE
G
LE
G
LE
G
O Z
GR
OU
P
BO
X
O Y
O X
GR
OU
P
AO
Y
O Z
LE
G
LE
G
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
SIDE A
REQUIRES A 208V, 60A,
THREE-PHASE CIRCUIT,
TERMINATING IN A
JUNCTION BOX.
SIDE B
REQUIRES A 208V, 60A,
THREE-PHASE CIRCUIT,
TERMINATING IN A
JUNCTION BOX
RACK-MOUNTED 5 KW, 208V
UNINTERRUPTIBLE POWER SUPPLY
(UPS) WITH NEMA 20A L21-20P INPUT
AND L21-20R OUTPUT PER RACK
20A 120/ 208V
Y
20A 120/ 208V
Y
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
L21-20P SIDE A
REQUIRES A
208V, 20A, THREE-PHASE
CIRCUIT,
TERMINATING IN
A NEMA L21-20R
LOCKING
RECEPTACLE.
L21-20P SIDE B
REQUIRES A 208V,
20A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
NEMA L21-20R
LOCKING
RECEPTACLE.
CH
AT
SW
O
RT
H
P R
O D
U C
T
Te m p/ Hu m id ity O ut
In
IO
IO
IO
/1
Re se t
W ar ni ng
O K
C rit ic al
CB2
CB2
CB1
CB1
CB1
CB1
CB3
CB3
CB3
CB3
CB2
CB2
O
FF O
O N I
C B2 20
O
FF O
O N I
C B1 20
O
FF O
O N I
C B3 20
OIT_DESIGN_GUIDE_TEMPLATE
S-04162021-V3.1.VSDX
Apr 16, 2021
D.19 DX EHRM RACK POWER SPECS - 36C26224R0121
CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2
CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3
SIDE A
REQUIRES A 208V,
60A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
JUNCTION BOX.
SIDE B
REQUIRES A 208V,
60A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
JUNCTION BOX
SIDE A
REQUIRES A 208V,
60A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
JUNCTION BOX.
SIDE B
REQUIRES A 208V,
60A, THREE-PHASE
CIRCUIT,
TERMINATING IN A
JUNCTION BOX
DEPARTMENT OF VETERANS
AFFAIRS
J J J J
CB 3
CB 3 CB 3
45 45
44 44
43 43
42 42
CB3 CB 3
45 45
44 44
43 43
42 42
CB3
CB 3
CB 3 CB 3
45 45
44 44
43 43
42 42
CB3 CB 3
45 45
44 44
43 43
42 42
CB3
CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2
41 41 41 41 41 41 41 41 41 41 41 41
40 40 40 40 40 40 40 40 40 40 40 40
39 39 39 39 39 39 39 39 39 39 39 39
CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1
37 37 37 37 37 37 37 37 37 37 37 37
38 38 38 38 38 38 38 38 38 38 38 38 IT OPERATIONS AND SERVICES
11 11 11 11 11 11 11 11 11 11 11 11
10 10 10 10 10 10 10 10 10 10 10 10 ENTERPRISE DATA CENTER AND
9 9 9 9 9 9 9 9 9 9 9 9
GR GR GR GR GR GR GR GR GR GR GR GR
B OU A OU B B OU A OU BA OU A OU B OU A OU A OU A OU B OU A OU
XP Y ZP X YP Z XP Y YP Z XP Y
O O O O O O O O O O O O O O O O O O O O O O O O8 8 8 8 8 8 8 8 8 8 8 8
XP Y ZP X YP Z XP Y YP Z XP Y INFRASTRUCTURE ENGINEERING
O O O O O O
LE Z LE Y LE X LE Z LE X LE Z
O O O O O O7 7 7 7 7 7 7 7 7 7 7 7LE Z LE Y LE X LE Z LE X LE Z
B G G G G G G
1 2 1 2 1 2 B G G G G G G
1 2 1 2 1 2
6 6 6 6 6 6 6 6 6 6 6 6
5 5 5 5 5 5 5 5 5 5 5 5 PROJECT:
4 4 4 4 4 4 4 4 4 4 4 4
3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 OIT DESIGN GUIDE TEMPLATES 1 1 1 1 1 1 1 1 1 1 1 1
PROJECT NO:
RACK-MOUNTED 5 KW, 208V
N/A
UNINTERRUPTIBLE POWER SUPPLY
(UPS) WITH NEMA 20A L21-20P INPUT
AND L21-20R OUTPUT PER RACKPOWER ELEVATION FOR A SIX RACK TR
B1
O C B1
C B1
O
FF
C B1
O C B1 p/ Hu m
13 13 13 13 13 13 13 13 13 13 13 13
12 12 12 12 12 12 12 12 12 12 12 12
C B2
O N
C B2
O N
C B2
O N
C B2
C B2
O N
C B2
O N
C B2
O N
16 16 16 16 16 16
15 15 15 15 15 15 15 15 15 15 15 15
14 14 14 14 14 14 14 14 14 14 14 14
CH
A
TS
W O
R T H
P
O N I
CH
A
T S W
O R
T H P
O N I
CH
A
T S W
O R
T H P
CH
A
TS
W O
R T H
P
O N I
CH
A
T S W
O R
T H P
O N I
CH
A
T S W
O R
T H P
CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1
CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1
CB1 CB122
CB1 CB1 22 22 22 22 22 22 22 22 22 22
21 21 21 21 21 21 21 21 21 21 21 21
20 20 20 20 20 20 20 20 20 20 20 20
19 19 19 19 19 19 19 19 19 19 19 19
CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2
18 18 18 18 18 18 18 18 18 18 18 18
17 17 17 17 17 17 17 17 17 17 17 17
CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2 CB2
26 26 26 26 26 26 26 26 26 26 26 26
25 25 25 25 25 25 25 25 25 25 25 25
24 24 24 24 24 24 24 24 24 24 24 24
23 23 23 23 23 23 23 23 23 23 23 23
Re s e t
O K
W ar
29 29 29 29 29 29 29 29 29
28 28 28 28 28 28 28 28 28 28 28 28
27 27 27 27 27 27 27 27 27 27 27 27
In
IO
IO
IO
IO
IO
IO
IO
IO
IO
IO
IO
IO
IO
I D
U C t
IO
m p/ Hu m
O N I
CH
A
TS
W
O
T H
O D
U
IO
p/ H um i d
I D
U C
T
Re s e t
O K
W ar m p/ H um
AT
SW
O
RT
H
O D
U
O N I
O N I
W ar
IO
p/ H um
I D
U C
T
Re s e t
O K
W ar m p/ H um
SW
O
RT
H
O D
U
O N I
O N I
W ar
IO
p/ Hu m t
O K
W ar
I D
U C m p/ Hu m
O N I
CH
A
TS
W
O
T H
O D
U
IO
p/ H um
I D
U C
T
Re s e t
O K
W ar t m p/ H um
SW
O
RT
H
O D
U
O N I
O N I
W ar
IO
p/ H um t
O K
W ar
I
D U
C T
C rit m p/ H um
O N I
CH
AT
SW
O
RT
H
O D
U
IO
CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3
CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1 CB1
36 36 36 36 36 36 36 36 36 36 36 36 SOLUTION DELIVERY
35 35 35 35 35 35 35 35 35 35 35 35
34 34 34 34 34 34 34 34 34 34 34 34
CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3 CB3
33 33 33 33 33 33 33 33 33 33 33 33
32 32 32 32 32 32 32 32 32 32 32 32
31 31 31 31 31 31 31 31 31 31 31 31
30 30 30 30 30 30 30 30 30 30 30 30
29 29 29
BUS A BUS B BUS A BUS B
RACK/ENCLOSURE RACK/ENCLOSURE RACK/ENCLOSURE RACK/ENCLOSURE RACK/ENCLOSURE RACK/ENCLOSURE
RACKED RACKED RACKED RACKED RACKED RACKED
EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT EQUIPMENT
PDU PDU PDU PDU PDU PDU PDU PDU PDU PDU PDU PDU MARK DATE DESCRIPTION
A PS1 PS2 B A PS1 PS2 B A PS1 PS2 B A PS1 PS2 B A PS1 PS2 B A PS1 PS2 B
ISSUE:
RACK-MOUNT RACK-MOUNT RACK-MOUNT RACK-MOUNT RACK-MOUNT RACK-MOUNT DRAWING No:
UPS UPS UPS UPS UPS UPS
FILE:
DESIGN BY: KEVIN GRZELKA, CTDC
LEG1 LEG2 LEG1 LEG2 VERIFIED BY: MICHAEL JULIAN, RCDD
KELLY BATES, DCIE
ZONE PDU ZONE PDU DOC VERSION No: 3.1
ISSUE DATE:
ONE ZONE PDU ONE ZONE PDU
SHEET TITLE
60A 3-PHASE ZONE PDU BASE UNIT – 60A 3-PHASE ZONE PDU BASE UNIT –
REQUIRES TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED IN JUNCTION
REQUIRES TWO 60A 3-PHASE (WYE)
CIRCUITS HARD-WIRED IN JUNCTION ZONE PDU POWER DISTRIBTUION
IN A SIX RACK TR
BOX TO SUPPORT THREE RACKS BOX TO SUPPORT THREE RACKS
SHEET: 22 OF 371
OIT_DESIGN_GUIDE_TEMPLATE
S-04162021-V3.1.VSDX
Apr 16, 2021
D.19 DX EHRM RACK POWER SPECS - 36C26224R0121
File details come from the government source that posted it. Updated .