This document is a set of questions and answers related to Solicitation 36C26224Q1737 for Preventative Maintenance and Support of CCTV systems. The key details are:

The solicitation is issued by the Department of Veterans Affairs, Veterans Integrated Service Network 22. It seeks to establish a contract for preventative maintenance and support of CCTV systems at various VA medical facilities, including Kearny Mesa, Miramar, Oceanside, San Diego, Chula Vista, and Rio CBOCs. The period of performance is 12 months with four 1-year option periods.

The solicitation includes questions and answers addressing the CLIN structure, equipment and inventory details, service level requirements, parts coverage, and pricing terms. It also extends the due date for offers to September 11, 2024 at 12:00 PM PDT. No specific set-aside or pricing information is provided. The document does not contain the full Statement of Work or other full solicitation details, only the Q&A.

View the file

Other files for this federal contract opportunity

Other files attached to J063--PM & SUPPORT FOR CCTV - Correction to answers and questions from site visit, newest first.
File Type Posted
36C26224Q1737 0003_1.docx DOCX document
S06 36C26224Q1737 0003 Correction-Line Item.pdf PDF
36C26224Q1737 0002_1.docx DOCX document
36C26224Q1737 0001_1.docx DOCX document
S06 36C26224Q1737 0001 Site Visit.pdf PDF
W-9 Form.pdf PDF
S02 36C26224Q1737_1 CCTV.pdf PDF
36C26224Q1737_2.docx DOCX document
VA Form 10091.pdf PDF
CEP Registration Guidance -Venderization.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

None

36C262

NCO 22

Department of Veterans Affairs NCO 22 - Contracting 650 East Indian School Road Phoenix AZ 85012

36C262

NCO 22

Department of Veterans Affairs NCO 22 - Contracting 650 East Indian School Road Phoenix AZ 85012

To all Offerors/Bidders

36C26224Q1737

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to:

X 1

Preventative Maintenance and Support of CCTV

The purposeof this amendment is to:

1. Answer questions submitted.

2. Extend due date to September 11, 2024, at 12:00 PM PDT

This amendment needs to be acknowledged.

Anita Amodia Contracting Officer

Answers to Questions Submitted

1. (Pg. 5) CLIN/Item Number 0001 Quantity is 200. May the Government please clarify how this quantity was chosen? What happens if Labor required is less or greater than “200 EA” may this quantity be adjusted on contractor’s price submission?

Answer: HTM has 2 to 3 work orders a month anywhere from 4 to 8 hours each. 16.6 x 12= 200; If 200 hours are used, we can create a modification to work order. If less, funds will be de-obligated. No adjustments to contractor’s price submission once it is awarded will be accepted.

2. (Pg. 31-32) SOW; May the government provide complete equipment listings for all sites listed under Item 1 in the table? (SOW page 1 Item Description table)

Answer: Kearny Mesa CBOC – Cameras: 145 Miramar/ Carroll Rd. – Cameras: 6 Oceanside CBOC – Cameras: 48 VA San Diego 2 Main Site – Cameras: 446 Chula Vista CBOC – Camera: 44 Rio CBOC – Cameras: 11

3. (Pg. 32) “The vendor shall provide… software maintenance support for period of 12 months with

4 one-year options.” Without equipment counts (Cameras, Recorders, Client Workstations) we cannot accurately determine how many Licenses/SSAs are required. May the Government please advise how many total Licenses will be required?

Answer: We currently have a total of 1060 Licenses. Per Avigilon (the system that we use at the VA for all our cameras) once these licenses are purchased, they are good for life or until a new full Avigilon system upgrade is installed in which case these licenses can potentially carry over. Any new cameras needed to be installed will require additional licenses, 1 new license per additional camera.

4. (Pg. 32) How many total network closets are there? May the government provide drawings that identifies each Head End location?

Answer: 73 IT closets. We have general maps of all facilities but not specific Avigilon System equipment location diagrams.

5. May the government provide Site Diagrams describing all physical security equipment locations, for all covered sites?

Answer: See item 4.

6. (Pg. 32) Are multiple network closets (head ends) utilized or is everything centrally connected at a singular location?

Answer: There are multiple network closets.

7. (Pg. 32) “On-site service calls shall be included, with a response time of (2) business days”. Does the government have different response times for system critical or emergency response?

Answer: HTM response in 1 to 3 business days depending on issue.

8. (Pg. 32-33) “Avigilon Licenses/Software/Firmware updates (new releases) as available”. When do the current/existing Avigilon Software Service Agreements (SSAs) expire?

Answer: Only the Miramar cameras are expired. We have no SSA.

9. (Pg. 33) Planned Maintenance Inspections (PMI) – “(A) Labor and materials to replace unit warranty if problem not fixable”. I’m having trouble interpreting what this means. May the government please clarify the intention of Item (A) for PMI services?

Answer: A replace part should be available to install if the unit being replaced in under warranty.

10. (Pg. 34) Parts – To avoid expenses for unnecessary materials, would the government consider amending the Price/Cost schedule to include a funded CLIN line to bill against for replacement parts at a value set by the government? Example: REPAIR CLIN 0003 -- $25k or $50k?

Answer: When repairs parts outside of warranty are needed, a separate purchase order will be completed. See item G under “Parts”.

11. (Pg. 34) Parts (A) – (G) have multiple references to covered and not covered parts. Please provide a listing of all COVERED equipment including accurate equipment counts, manufacturers, SKU/model numbers, and approximate date the equipment was installed. This information is critical to provide a quote as requested.

Answer: We currently use Pelco and Avigilon Cameras at our VA sites. As we continue to purchase new cameras, we are generally purchasing specifically Avigilon Brand Cameras due to their higher quality and durability. We use various Avigilon Camera Models depending on the need of the location per VA Police needs. These cameras are purchased and installed throughout the years all the time.

12. (Pg. 34) Parts (E) – “Unserviceable parts will be replaced…. Within (8) Hours”. There is a different response requirement outlined on page 32. May the government clarify response times for all service call scenarios?

Answer: On-site service calls and replacement of unserviceable parts are two different items. If during the on-site service call a replacement needs to be done, it should be completed within 8 hours. When a problem is reported which requires an on-site service call, the Contractor will need to respond within 2 business days.

13. (Pg. 34) Parts (E) – “Unserviceable parts will be replaced…. Within (8) Hours”. Government should acknowledge procurement/availability of replacement parts will dictate any contractors (sic) ability to repair within the (8) hour time frame.

Answer: It can be stipulated that some parts will need to be ordered; however, maintenance parts should be available and be installed in the 8-hour timeframe.

14. Breakdown of the cameras per site, as there are thirteen (13) sites listed?

Answer: See item 5.

15. Breakdown of camera type and model per location?

Answer: See item 5.

16. Server models and QTY per location?

Answer: We can provide this as an individual pdf report for each site.

17. Lift needed for any of the cameras/sites.

Answer: Most cameras are accessible by a 6–10-foot ladder. There are some cameras which will require a lift to be accessed.

18. Can the government provide the quantity of cameras and NVRs at each site? If an exact count isn’t available, can a general range be provided?

Answer: At the moment we have a total of 700 cameras installed. We have a total of 4 NVR3 and 8 NVR4 server platforms. The individual site report will state all the details for each site of the NVR.

19. Solicitation B.2, CLIN 0001 - Is the quantity of 200 required in this CLIN representative of 200 total service visits or 200 total service hours?

Answer: See Item #1.

20. Solicitation B.2, CLIN 0002 – Is the tech support required as part of this CLIN inclusive only of remote and/or phone tech support or is additional on-site tech support to be include in this CLIN pricing as well?

Answer: Yes, remote/phone tech will be used at first and if unable to be resolved Vender will need to come on-site for assistance up to 200 hours per year.