This document is a set of answers to questions submitted by vendors regarding RFQ 36C26224Q0641 for Water Treatment Services at the Northern Arizona VA Medical Health Facility.

The RFQ requires water treatment services, testing, and repairs for the facility's cooling towers, chilled water loops, and hot/steam loops. It provides details on the equipment specifications, including the GPM of the cooling tower pumps, chilled water loops, and hot water/steam loops, as well as the total tonnage and number of chillers. The RFQ also states the expected operating parameters, such as the required glycol percentage in the chilled and heating water loops, the maximum calcium and alkalinity levels in the cooling towers, and the expected boiler operation. Additionally, the document addresses the required services for the water softeners and reverse osmosis equipment, indicating that the boiler plant handles its own repairs and purchases, while the HVAC shop manages the RO/DI system. The solicitation also notes that the contract will not cover the purchase of these items. The RFQ was originally issued on 03/15/2024, but has been amended to extend the solicitation date to 04/19/2024.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 36C26224Q0641 ANSWERS TO QUESTIONS

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

0001 36C26224Q0641

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

To all Offerors/Bidders

36C26224Q0641

03-15-2024

X

X X

04/19/2024 / 16:00 PST

X

The purpose of this Amendment is to:

1.) Provide answers for questions asked by multiple vendors.

2.) Extend the solicitation date.

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

1. What is the GPM of the cooling tower pumps and how many in total – (2) Pumps, 75 GPM each

2. What is the GPM of the chilled loop or any other cold or hot closed loop pumps?

GPM of the Chilled Loop

Bldg 70 – 110 GPM Bldg 107 – 350 GPM Bldg 108 – 250 GPM Bldg 117 – 250 GPM Bldg 148 – 250 GPM Bldg 151 – 66 GPM Bldg 155 – 135 GPM Bldg 158 – 150 GPM Bldg 160 – 250 GPM Bldg 162 – 250 GPM Bldg 164 – 250 GPM

GPM of the Hot or Steam Loop

Bldg 70 – 33 GPM Bldg 107 – 60 GPM Bldg 108 – 60 GPM Bldg 117 – 60 GPM Bldg 148 – 60 GPM Bldg 151 – 66 GPM Bldg 155 – 66 GPM Bldg 158 – 60 GPM Bldg 160 – 60 GPM Bldg 162 – 60 GPM Bldg 164 – 60 GPM

3. Is there an approximate volume known on any of the closed loops?

Volume of the Chilled Loop Main Chiller - Approx. 900 tons, total 3 chillers – air cooled, approx. total CW volume 20- 25k gallons. Bldg’s 107, 108, 117, 148, 158, 160, 162, & 164. (approx. 2500 to 3000 gallons per building) Bldg 70 – 1500 Gallons Bldg 151 – 3000 Gallons Bldg 155 – 2000 Gallons

Volume of the Hot or Steam Loop Bldg 70 – 99 Gallons Bldg 107 – 135 Gallons Bldg 108 – 135 Gallons Bldg 117 – 180 Gallons Bldg 148 – 180 Gallons Bldg 151 – 200 Gallons Bldg 155 – 200 Gallons

Bldg 158 – 180 Gallons

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

Bldg 160 – 180 Gallons Bldg 162 – 180 Gallons Bldg 164 – 180 Gallons

4. What is the total tonnage of the chillers/towers and how many?

7 Chillers total 1-96 ton, 1-70 ton, 1-40 ton, 1-75 ton, 1-295 ton & 2-309 ton

5. What is the % steam condensate return? Approximately 70% condensate return.

6. We are unclear on what is required for the softeners and reverse osmosis equipment. Please explain the required service for this equipment other than chemistry testing? If repairs are needed for this equipment, will it be purchased outside of this contract?

The boiler plant dose its own repairs on the water softeners.

All purchase will outside of the contract. The plant currently purchases salt from Home Depot by the pallet for the softener system.

For the RO/DI system the HVAC Shop purchases the replacement filters and tanks (canister bottles) and currently plans on having these items available in our normal shop stock.

From the SOW:

The following are the expected operating parameters:

a. Chilled Water loop required to maintain 30% glycol.

b. Heating (hot) Water loop required to maintain 30% glycol.

c. Cooling Tower to have no more than 700ppm of calcium and alkalinity.

d. Boilers are expected to operate continuously or at random at 70% load.

e. Water softeners are required to operate at <0.3ppm total hardness.

The testing and analyzation should include testing for the following as applicable to the systems previously identified above:

1. Conductivity

2. Total Dissolved Solids

3. pH Balance

4. P/M Alkalinity

5. Calcium Hardness

6. Total Hardness

7. Iron

8. Copper

9. Dissolved Oxygen

10. Hydroxide

11. Ultra‐Mien

12. Aluminum

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

Chemicals provided and/or stored on facility location will be required to have SDS sheets to accompany product and to be on hand for inspection purposes.

7. Can an approximate % chiller load for the winter and summer be provided?

80% Load for Summer 20% to 25% Load for Winter

8. Is there any existing equipment for the water treatment program such as chemical pumps, controllers, monitoring equipment, etc. that is owned by the VA and will be available for use in the new contract period?

Biocide Treatment, CT140, and CMB-6. Building 111

9. Are there any other pieces of equipment that must be serviced under this contract?

a. Main Chiller Plant – (3) Chillers and components.

b. Bldg 111 Main Boiler Plant – to include (3) Steam Boilers and Dealkalyzer Water Softener System, DA Tank, Condensate Tank

c. Bldg 70 Chilled & Hot Water Loop – (1) Chiller and components, steam coils multiple

d. Bldg 107 Hot and Chilled Water Loop – to include Primary & Secondary Loops Multiple steam coils

e. Bldg 108 Hot and Chilled Water Loop & Cooling Tower – to include Primary & Secondary Loops Multiple steam coils

f. Bldg 117 Hot and Chilled Water Loop – to include Primary & Secondary Loops Multiple steam coils

g. Bldg 148 Hot and Chilled Water Loop – to include Primary & Secondary Loops

h. Bldg 151 Hot and Chilled Water Loop – (2) Chillers and components, steam coils multiple

i. Bldg 155 Hot and Chilled Water Loop – (1) Chiller and components, steam coiles multiple

j. Bldg 158 Hot and Chilled Water Loop – to include Primary & Secondary Loops Multiple steam coils

k. Bldg 160 Hot and Chilled Water Loop – to include Primary & Secondary Loops Multiple steam coils

l. Bldg 162 Hot and Chilled Water Loop – to include Primary & Secondary Loops Multiple steam coils

m. Bldg 164 Hot & Chilled Water Loop and RO/DI Water & Humidifier Systems – there are (3) RO/DI systems in the penthouse and (1) RO/DI system in the basement of Bldg 164 & to include Primary & Secondary Loops and Multiple steam coils

10. Please define specifically the "hydroxide" and "ultra mien" chemistry tests?

See below, screen shot document.

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

11. Can a recent service report with all of the required testing results be provided prior to submitting a proposal?

What document is this? Is this the “Closed Loop Survey 2-6-24”? No – see below, 2 page document screen shots.

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

Main Chiller Plant:

Q1-Please confirm number of cooling tower controllers? None Q2-How many controllers are owned by VA? No controllers Q3-Are all chemical feed pumps in confirmed working order? No chemical pumps installed Q4-How many chemical feed pumps need replacement? We have none Q5-Are chemical tanks owned by VA? Yes, only glycol makeup.

Q6-Estimated chiller/cooling tower tonnage? Approx. 900 tons, total 3 chillers – air cooled, approx. total CW volume 20-25k gallons.

Main Boiler Plant:

Q1-Please confirm number of Boiler controllers? None, the Boilers are still an analog system Q2-How many controllers are owned by VA? None Q3-Are all chemical feed pumps in confirmed working order? Yes at this time Q4-How many chemical feed pumps need replacement? None at this timeWATER TREATMENT

VICES RFQ# 36C26224Q0641

Q5-Are chemical tanks owned by VA? Prescott VA receives 33 gallon barrels. No Tanks.

Q6-What is Boiler Horse power of the 3 boilers? 350 hp per boiler, 12,000 lb/hr, DA Tank 1100 gallons – 50 GPM, Condensate Tank 700 gallons – 50 GPM.

Bldg 70:

Q1-Chilled Volume? Approx 330 gallons, 110 gpm Q2-Hot Water Volume? Approx 99 gallon, pump is variable set at 33 gpm.

Bldg 107:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 135 gallon, 60 gpm Bldg 108:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 135 gallon, 60 gpm Q2-Is cooling tower controller owned by VA? Yes Q3-Are all chemical feed pumps in confirmed working order? Yes Q4-How many chemical feed pumps need replacement? None at this time. These pumps are 75 gpm pumps and we have two pumps.

Q5-Are chemical tanks owned by VA? Yes Q6-Estimated cooling tower tonnage? Approx 50 ton Bldg 117:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 180 gallons, 60 gpm Bldg 148:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 180 gallons, 60 gpm Bldg 151:

Q1-Chilled Volume? Approx 200 gallons, 66 gpm Q2-Hot Water Volume? Approx 200 gallons, 66 gpm Bldg 155:

Q1-Chilled Volume? Unknown, Approx 450 gallons of glycol, 135 gpm Q2-Hot Water Volume? Approx 200 gallons, 66 gpm Bldg 158:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 180 gallons, 60 gpm

Bldg 160:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 180 gallons, 60 gpm Bldg 162:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System

WATER TREATMENT SERVICES RFQ# 36C26224Q0641

Q2-Hot Water Volume? Approx 180 gallons, 60 gpm Bldg 164:

Q1-Chilled Volume? CW volume 20-25k gallons, part of the main Chiller System Q2-Hot Water Volume? Approx 180 gallons, 60 gpm RO/DI Water & Humidifier Systems -Bldg 164 – Penthouse (3) DI/RO Systems:

Q1 How many DI Bottle changeouts are typical per year? Estimating 1 under current conditions Q2 Please confirm DI bottle tank dimensions 66 cu Basement of Bldg 164:

Q1 How many DI Bottle changeouts are typical per year? Estimating 1 under current conditions Q2 Please confirm DI bottle tank dimensions 66 cu

File details come from the government source that posted it. Updated .