BUILDING-7.pdf
PDF 2 MB Posted
- Attached to
- Site-Wide HVAC Compliance Upgrade for RME
- Solicitation number
- 36C26224B0009
About this file
This document provides the details of a federal solicitation for a site-wide HVAC compliance upgrade at a Department of Veterans Affairs medical center. The solicitation seeks proposals to upgrade the reusable medical equipment HVAC systems at the Veterans Integrated Service Network 22 facility to meet compliance standards. Offerors should provide pricing and plans to upgrade existing HVAC systems as needed to properly maintain, filter, and exchange air in areas where reusable medical equipment is processed, stored, or used. Proposals are due by the date specified in the solicitation, and the contract will be awarded thereafter. The opportunity is set aside for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BUILDING-161.pdf | ||
| BUILDING-1.pdf | ||
| BUILDING-2.pdf | ||
| BUILDING-126.pdf | ||
| 36C26224B0009 0001.pdf | ||
| RFIs Final.docx | DOCX document | |
| P01 Drawings 600-17-118.pdf | ||
| P07 WRD.pdf | ||
| P01 Specifications 600-17-118.pdf | ||
| S02 Solicitation 36C26224B0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIENNIAL ASBESTOS REINSPECTION REPORT
BUILDING 7 – OUTPATIENT PHARMACY & CLINIC
PREPARED FOR
Mr. James Bachman & Ms. Olivia Parducho
Department of Veterans Affairs VA Long Beach Healthcare System
5901 East 7th St.
Long Beach CA 90815
Contract Number: GS-10F-0229U - Order Number: VA262-14-F-7064
PREPARED BY
Millennium Consulting Associates 620 Contra Costa Boulevard, Suite 102
Pleasant Hill, CA 94523
January, 2015 Millennium Project No. 22015.2033
Millennium Consulting Associates 1 Project No. 22015.2033
Table of Contents
1.0 EXECUTIVE SUMMARY
2.0 INTRODUCTION
2.1 SCOPE OF WORK
2.2 SAMPLING METHODS, PROCEDURES AND PERSONNEL
2.2.1 Review of Procedures: Asbestos Inspection, Bulk Sampling, Laboratory Information and Risk Assessment ... 6
3.0 BUILDING SUMMARY
4.0 SURVEY RESULTS
4.1.1 Summary of Previous Sampling Events
4.1.2 FINDINGS OF MILLENNIUM 2014 TRIENNIAL SURVEY & ASSESSMENT
5.0 CONCLUSIONS AND RECOMMENDATIONS
6.0 LIMITING CONDITIONS
Appendices Asbestos Laboratory Sample Data ............................................................................................................... Appendix A
Asbestos Finish schedule & Hazard Assessment ...................................................................................... Appendix B
Sample Location Maps .................................................................................................................................... Appendix C
Millennium Consulting Associates 2 Project No. 22015.2033
1.0 EXECUTIVE SUMMARY
Millennium Consulting Associates (Millennium) performed comprehensive triennial asbestos survey for the VA Medical Center in Long Beach, California under Contract No. VA262-14-F-7064. The objective of this project is to support the Operations & Maintenance Program be conducting the following tasks:
Review VA-supplied previous Asbestos Survey, Assessment and abatement records;
Conduct a comprehensive site evaluation of accessible locations within each specified building to, identify, assess & evaluate condition(s) and collect representative bulk samples of previously un-sampled or newly observed PACM, suspect ACCM, and suspect ACM;
Provide an asbestos health risk assessment and determine location and quantity estimates of ACCM and ACM.
A summary of the survey final results are incorporated into this report, providing a means for the VA to more efficiently plan for repairs, renovations and/or demolition projects.
Table 1, below, summarizes the positive Asbestos survey results from this project for Building 7 Engineering.
This is only a list of sample locations. See attached Finish Schedule for all locations of all materials.
Table 1. Survey Summary of Positive Asbestos ACM Results reported by Millennium for Building 7.
No samples collected by Millennium were reported to contain asbestos.
Table 2. Summary of Previously Reported Asbestos Containing Materials for Building 7 as reported by others. The presence of ACM materials noted in this table is NOT indicative of the current presence as many of these components have been abated. Please refer to Appendix B.
Data Source Location Asbestos Type
Asbestos Quantity
Material Description Color
Friable
ACBM
Environmental Engineering, Basement Corridor, Rooms 11 &
Amosite Chrysotile
20 LF
Thermal system
Insulation (6” and 8” fittings)
Unreported Friable
Environmental Engineering, Basement Corridor
Chrysotile 900 SF Floor Tile
Mastic Black Damaged
Environmental Engineering, 1st Floor Pharmacy/Non Pharmacy Area
Chrysotile 4,000 SF Sheet flooring mastic Unreported Non Friable
Environmental Engineering, 1st Floor Room
Chrysotile 100 SF 12” Floor tile mastic Unreported Non Friable
Millennium Consulting Associates 3 Project No. 22015.2033
Data Source Location Asbestos Type
Asbestos Quantity
Material Description Color
Friable
ACBM
Environmental Engineering, 3rd Floor waiting room
Chrysotile
1,400 SF
Carpet Mastic Unreported Non Friable
Environmental
Engineering, 3rd Floor rooms 303, 314, 320, 323
Chrysotile Unreported
12” Floor tile mastic (under light green and beige 12” tile)
Black Non Friable
Environmental
Engineering, 3rd Floor Corridor, Room 304
Chrysotile Unreported 9” Floor tile and mastic Beige/Black Non Friable
Environmental
Engineering, 3rd Floor, room 330F
Chrysotile Unreported
12” floor tile mastic (uner 12” tan floor tile patch_
Unreported Non Friable
Environmental
Engineering, Roof Chrysotile 340 SF Roof Flashing
Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 328 (likely a remnant from past abatement
– similar samples were
“ND”)
Chrysotile 600 SF Carpet Mastic (under blue carpet)
Yellow/Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 328, 326, CC7-3-1, CC7-1-4
Chrysotile 2,000 SF
Floor tile mastic (under 12” off-white & brown tile)
Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 102, 103B, 103C, 103F
Chrysotile 2,600 SF Resilient Sheet Floor adhesive
Black, white Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 103B, 103F
Chrysotile 560 SF Carpet Mastic Black/Yellow Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 300, 307 & 309
Chrysotile 3,000 SF 9” Floor tile and mastic
Cream/Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 12A Chrysotile 80 SF Boiler Insulation Wrap
White Friable
Millennium Consulting Associates 4 Project No. 22015.2033
Type
Asbestos Quantity
Material Description Color
Friable
ACBM
H2 Environmental, Report
13545210AS
March 2011
CC7-2-204,
Room 206, CC7-2-225, Room 100, 103, CC7-1-3
Chrysotile 20,000 SF 12” Ceiling Tile
White Friable
H2 Environmental, Report
13545210AS
March 2011
CC7-2-204,
Room 206, CC7-2-225, Room 100, 103, CC7-1-3
Chrysotile Amosite Crocidolite
20,000 SF
Ceiling Tile Substrate
Black, White Non Friable
H2 Environmental, Report
13545210AS
March 2011
CC7-1-3,
Basement Fan Room, CC7-B-
Chrysotile Amosite
1,000 SF
Duct Insulation
Brown, white Friable
Please refer to Section 3 for details.
Materials Not Sampled per COTR Request:
1. All Doors
2. “Welded” Sheet Vinyl flooring except if specifically instructed by COTR.
3. All Electrical Wiring
4. All other materials specifically called out in provided Finish Schedule.
Millennium Consulting Associates 5 Project No. 22015.2033
2.0 INTRODUCTION
Millennium Consulting Associates (Millennium) performed a Comprehensive Triennial Asbestos Survey for the VA Medical Center in Long Beach, California under Contract No. VA262-14-F-7064. The project was conducted to determine the existence and condition of Asbestos Containing Materials (ACM) in specified buildings. A summary of the survey final results are incorporated into this report providing a means for the VA to more efficiently plan for repairs, renovations and/or demolition projects. In addition, a comprehensive Access database was developed specifically to manage the asbestos and lead data obtained for this project.
2.1 SCOPE OF WORK
The objective of this limited asbestos and lead survey is to provide the following information:
1. Identify, document and sample previously un-sampled suspect ACM;
2. Report, assess, and quantify all ACM discovered during the survey;
3. Provide comprehensive spreadsheet (finish schedule) of asbestos-containing materials identified.
The asbestos survey tasks included a review of previous asbestos surveys, abatement response action records, a thorough walk-thru of accessible areas within each building within the contract to identify accessible suspect asbestos finish/material, collection of representative samples for asbestos, assessment of the condition of the materials and quantification of the asbestos-containing materials throughout the specified buildings.
In accordance with the project requirements, samples were not taken if it rendered the material unstable, had the potential to cause leaking or other deterioration of the base material or if the sampling posed a hazard to those working in and around the building. The sampling of specific materials identified by the client, newly or recently renovated areas was omitted per the direction of the client.
2.2 SAMPLING METHODS, PROCEDURES AND PERSONNEL
A detailed sampling and analysis plan was prepared to facilitate sampling of homogeneous materials for asbestos. These are materials that are similar in appearance and texture, based on the substrate and/or suspect material. The asbestos survey was performed using general procedures and protocols defined in EPA 40 CFR, part 763.
The asbestos analyses were performed at an independent 3rd party accredited laboratory (EMSL Laboratory, San Diego, CA.) using the EPA 600/R-93/116 method. All locations within the scope of work were physically inspected and categorized by homogeneous area, to determine the presence of ACM.
Millennium personnel held valid licenses for the respective type of work they performed. These asbestos specific licenses include: Certified Asbestos Consultants (CAC) and Site-Surveillance Technicians (SST).
The project team members and their respective certifications that performed site assessment activities are:
1. Mr. Jack McCubbin (CAC No. 93-0894),
2. Mr. Jeremy Malson, CIH, CSP (CAC No. 07-4183)
Millennium Consulting Associates 6 Project No. 22015.2033
3. Ms. Lee Anne Norman (CAC No. 11-4779), and
4. Mr. Todd Reed (CSST No. 06-4032).
Physical Inspection, material sampling and physical assessment of the materials within Building 7 was conducted in December 2014 and by the personnel above.
2.2.1 Review of Procedures: Asbestos Inspection, Bulk Sampling, Laboratory Information and Risk Assessment
The asbestos inspection and bulk sampling procedures were based on the guidelines established by the U.S. EPA in the Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, DOC #560/5-85-024 and 40 CFR Part 763, Asbestos Hazard Emergency Response Act (AHERA). Field information was organized according to the AHERA concept of Homogeneous Areas (HA). A HA is defined as a suspect material of similar age, appearance, function, and texture. Each homogeneous material was grouped together as a specific HA, sampled, and then assessed for condition.
The AHERA guidelines represent an industry standard sampling protocol and as such was utilized during the inspection and sampling.
The locations within the buildings were physically inspected on a space-by-space and homogeneous area-by-homogeneous area basis, to determine the presence of ACM. Core samples of friable and non-friable suspect materials were collected by penetration of the suspect material to its substrate where allowed by the client. The bulk samples collected were placed in individual sealed containers and labeled with unique sample identification numbers. Representative samples of each homogeneous sampling area were then submitted to the laboratory to be analyzed for asbestos content.
Specifically, the inspection involved the following tasks:
1. Visual determination as to the extent of visible and accessible suspect materials and conditions of the material;
2. Collection and analyses of suspect building materials for asbestos content;
3. Determining condition (i.e., friable or non-friable) of suspect materials by physically touching, assessing, and placing the material into the correct ACM category (i.e., Physical Condition Assessment);
4. Quantification of the amount of ACM friable and non-friable materials along with their location;
5. Identification of all suspect materials sampled on the appropriate building floor plan diagram with the sample number; and
6. Preparation of a Chain-of-Custody form that accompanied the samples to the laboratory.
2.2.1.a Sample Chain of Custody and Contract Laboratory:
Chain-of-Custody procedures and records provide a means of tracing each sample from the time of collection through the shipment and final analyses. Proper Chain-of-Custody procedures also provide a written record of all persons handling the samples. The information necessary to relate sample locations for reporting purposes is documented with each sample. This information is essential to proper completion of a sample results report and typically includes client and facility information; unique sample identification
Millennium Consulting Associates 7 Project No. 22015.2033 number; date and time sampled; sampler name and signature; sample location including the room/area;
and field sketches of sample locations.
All sample analyses were performed by EMSL Laboratory, located in San Diego, CA. EMSL is a laboratory which is certified by the State of California Environmental Laboratory Accreditation Program (2713), the U.S. Department of Commerce, National Institute of Standards and Technology (NIST) and is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP No. 200855-0) for bulk asbestos analyses.
2.2.1.b Asbestos Material Physical/Condition Assessment:
The U.S. EPA AHERA specifies that a physical assessment of all friable suspect material must be performed during the inspection. The physical condition assessment consists of determining the condition of the ACM, and the potential for future disturbance. AHERA lists seven categories in which to assess the current condition and potential for damage for those asbestos materials having an asbestos content greater than 1%. These are considered Asbestos Containing Materials (ACM). These categories are as follows:
1. Damaged or Significantly Damaged Friable Thermal System Insulation;
2. Damaged Friable Surfacing Material;
3. Significantly Damaged Friable Surfacing Material;
4. Damaged or Significantly Damaged Friable Miscellaneous Material;
5. ACM with potential for damage;
6. ACM with the potential for significant damage; and
7. Any remaining Friable ACM or Assumed Friable ACM.
Additionally, as part of the assessment and categorization of materials, the ACMs are further defined by the current condition of the ACM, and the potential for future damage. These are defined as follows:
1. Current Condition of ACM: Intact, damaged or significantly damaged. The criteria for determining the damaged and significantly damaged conditions are as follows:
a. Damaged: The overall damage is up to ten percent (≤10%) and/or any localized damage is up to twenty-five percent (≤25%).
b. Significantly damaged: The overall damage is greater than ten percent (>10%) and/or any localized damage is greater than (>25%).
2. Potential for Future Damage of ACM: Another step in the assessment process is to determine the potential for future damage or deterioration for material classified as good or fair. The potential for future damage was classified as High, Moderate, or Low for Human Contact, Vibration and Air Erosion.
3. Friability Rating: All material were given a friability rating and classified as either Friable ACM or Non-Friable ACM. Friable ACM is defined as any material that contains more than one percent (>1%) asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure. It is a description of risk and refers to a material’s likeliness to release airborne fibers.
Millennium Consulting Associates 8 Project No. 22015.2033
3.0 BUILDING SUMMARY
BUILDING 7 – ADMINISTRATION
Building No. 7 is the Outpatient Pharmacy & Clinic Building and was built in 1943. The building has three floors and is approximately 36,000 ft2 in size. The structure is reinforced concrete, and the roofs are rolled bituminous asphalt. The building is considered to be in good overall condition.
Extensive renovation has occurred over time; abatement records were noted for some past abatement activities, but not all. That is, abatement is likely to have occurred in which documentation is not available.
4.0 SURVEY RESULTS
4.1 ACM Data Results
4.1.1 Summary of Previous Sampling Events:
Millennium reviewed six (6) documents detailing previous asbestos-related inspections and abatement activities associated with Building 7. The documents include the following:
1. Asbestos Abatement Event – H2 Project #188001AM (March 2001) – Abatement of HVAC duct cover insulation in the Linen Room – quantity not reported;
2. Asbestos Abatement Event – H2 Project #599404AM (October 2004) – Abatement of five (5) thermal system insulated elbows from Mechanical Room 218;
3. Asbestos Abatement Event – H2 Project #1610313AM (March 2013) – Abatement of thermal system insulation/HVAC duct work from the basement;
4. Asbestos Abatement Event – H2 Project #1647613AM (September 2013) – Abatement of 4,500 SF of floor tile and mastic from 1st floor rooms 102 through 103;
5. Asbestos Survey – Environmental Engineering, June 2006’
6. Asbestos Survey, H2 Environmental, February 2011.
Type
Asbestos Quantity
Material Description Color
Friable
ACBM
Environmental Engineering, Basement Corridor, Rooms 11 &
Amosite Chrysotile
20 LF
Thermal system
Insulation (6” and 8” fittings)
Unreported Friable
Environmental Engineering, Basement Corridor
Chrysotile 900 SF Floor Tile
Mastic Black Damaged
Environmental Engineering, 1st Floor Pharmacy/Non Pharmacy Area
Chrysotile 4,000 SF Sheet flooring mastic Unreported Non Friable
Data Source Location Asbestos Type
Asbestos Quantity
Material Description Color
Friable
ACBM
Millennium Consulting Associates 9 Project No. 22015.2033
Environmental Engineering, 1st Floor Room
Chrysotile 100 SF 12” Floor tile mastic
Unreported Non Friable
Environmental Engineering, 3rd Floor waiting room
Chrysotile
1,400 SF
Carpet Mastic Unreported Non Friable
Environmental
Engineering, 3rd Floor rooms 303, 314, 320, 323
Chrysotile Unreported
12” Floor tile mastic (under light green and beige 12” tile)
Black Non Friable
Environmental
Engineering, 3rd Floor Corridor, Room 304
Chrysotile Unreported 9” Floor tile and mastic Beige/Black Non Friable
Environmental
Engineering, 3rd Floor, room 330F
Chrysotile Unreported
12” floor tile mastic (uner 12” tan floor tile patch_
Unreported Non Friable
Environmental
Engineering, Roof Chrysotile 340 SF Roof Flashing
Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 328 (likely a remnant from past abatement
– similar samples were
“ND”)
Chrysotile 600 SF Carpet Mastic (under blue carpet)
Yellow/Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 328, 326, CC7-3-1, CC7-1-4
Chrysotile 2,000 SF
Floor tile mastic (under 12” off-white & brown tile)
Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 103B, 103F
Chrysotile 560 SF Carpet Mastic Black/Yellow Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 300, 307 & 309
Chrysotile 3,000 SF 9” Floor tile and mastic
Cream/Black Non Friable
H2 Environmental, Report
13545210AS
March 2011
Room 12A Chrysotile 80 SF Boiler Insulation Wrap
White Friable
Millennium Consulting Associates 10 Project No. 22015.2033
Type
Asbestos Quantity
Material Description Color
Friable
ACBM
H2 Environmental, Report
13545210AS
March 2011
CC7-2-204,
Room 206, CC7-2-225, Room 100, 103, CC7-1-3
Chrysotile 20,000 SF 12” Ceiling Tile
White Friable
H2 Environmental, Report
13545210AS
March 2011
CC7-2-204,
Room 206, CC7-2-225, Room 100, 103, CC7-1-3
Chrysotile Amosite Crocidolite
20,000 SF
Ceiling Tile Substrate
Black, White Non Friable
H2 Environmental, Report
13545210AS
March 2011
CC7-1-3,
Basement Fan Room, CC7-B-
Chrysotile Amosite
1,000 SF
Duct Insulation
Brown, white Friable
Environmental Engineering, Basement Corridor, Rooms 11 &
Amosite Chrysotile
20 LF
Thermal system Insulation (6” and 8” fittings)
Unreported Friable
Environmental Engineering, Basement Corridor
Chrysotile 900 SF Floor Tile Mastic
Black Damaged
Environmental Engineering, 1st Floor Pharmacy/Non Pharmacy Area
Chrysotile 4,000 SF Sheet flooring mastic
Unreported Non Friable
Environmental Engineering, 1st Floor Room
Chrysotile 100 SF 12” Floor tile mastic
Unreported Non Friable
Environmental
Engineering, 3rd Floor rooms 303, 314, 320, 323
Chrysotile Unreported
12” Floor tile mastic (under light green and beige 12” tile)
Black Non Friable
Environmental
Engineering, 3rd Floor Corridor, Room 304
Chrysotile Unreported 9” Floor tile and mastic Beige/Black Non Friable
Environmental
Engineering, 3rd Floor, room 330F
Chrysotile Unreported
12” floor tile mastic (under 12” tan floor tile patch_
Unreported Non Friable
Please refer to the Environmental Engineering and H2 Reports for the complete listing of materials previously sampled and reported to not contain detectable levels of asbestos.
4.1.2 FINDINGS OF MILLENNIUM 2015 TRIENNIAL SURVEY & ASSESSMENT
Millennium conducted a site inspection and assessment of Building 7 in December 2014. At the time of the survey, Millennium was informed that the roofing materials were replaced since the previous survey.
A total of seven (7) bulk samples were collected within building 7 and then analyzed on a layer-by-layer basis using polarized light microscopy (PLM).
Millennium Consulting Associates 11 Project No. 22015.2033
The results of the December 2014 sampling event are as follows:
Sample No.
Sample
Location Material Type Color
Approx.
Qty.
Asbestos Content /
Type
VALB-7-C1.1 CC7-1-3 Ceiling Wallboard Joint
Compound/Acoustic
Ceiling Tile - Drywall White N/A ND
VALB-7-C1.1 CC7-1-3 Ceiling Wallboard Joint
Compound/Acoustic
Ceiling Tile - Joint
Compound White N/A ND
VALB-7-C2.1 CC7-1-2 Acoustic Ceiling Tile 1x1 w/ Mastic - Ceiling Tile White/Brown N/A ND
VALB-7-C2.1 CC7-1-2 Acoustic Ceiling Tile 1x1 w/ Mastic - Glue White/Brown N/A ND
VALB-7-M1.1 CC7-1-2 FIRE STOP Red N/A ND
VALB-7-M1.2 CC7-1-3 FIRE STOP Red N/A ND
VALB-7-M1.3 CC7-3-3 FIRE STOP Red N/A ND
VALB-7-M1.4 CC7-2-3 FIRE STOP Red N/A ND
VALB-7-M1.5 BASEMENT
ROOM 17 FIRE STOP Red N/A ND
5.0 CONCLUSIONS AND RECOMMENDATIONS
CONCLUSIONS
Based on this survey and a review of previous surveys, the following materials are present within Building 7 which contain asbestos:
Building 7:
Mastic under carpet at select areas;
Floor tile mastic under 12” gray, beige and brown floor tile;
9” floor tile and mastic;
HVAC duct insulation in ceiling cavities;
Note: Asbestos-Containing thermal insulation is anticipated to exist in concealed or otherwise limited access areas throughout.
Millennium Consulting Associates 12 Project No. 22015.2033
Please refer to the Asbestos Laboratory Data in Appendix A in Appendix B for the complete Finish Schedule.
6.0 LIMITING CONDITIONS
Millennium Consulting conducted the survey in December 2014, in accordance with industry standards in existence at the time of the project. The conclusions and recommendations presented in this report are based on the applicable standards of our profession at the time this report was prepared. Copies of this report are furnished to provide factual data that were gathered and summarized in the report.
The data, analysis and recommendations submitted in this report are solely for use of the Client. It may not be relied upon for third party use. This report has been prepared for the exclusive use of the Client for specific application to the survey performed on the property; this Report is not a construction document and is not intended to replace a NESHAP’s pre-renovation assessment and investigation. Destructive investigation methods were part of this scope of work. This report may not be copied (except by our client) without the written permission of the Client. No other representation, expressed or implied, is made.
Millennium appreciated having the opportunity to provide you with our asbestos-related services. Should you have any questions regarding this report or require assistance in the design, specification, management, and/or clearance testing for any future repairs, renovations and/or demolition projects, please do not hesitate to contact us.
Appendix A
Asbestos Laboratory Data
EMSL Analytical, Inc.
7916 Convoy Court,Building 4, Suite A, San Diego, CA 92111
Phone/Fax: 858-499-1303 / (858) 499-1304 http://www.EMSL.com sandiegolab@emsl.com
431500082
CustomerID: MECA62
CustomerPO: 9356
ProjectID:
EMSL Order:
Attn: Jack McCubbin
Millennium Consulting Associates, Inc.
620 Contra Costa Blvd.
Suite 102
Pleasant Hill, CA 94523
Received: 01/08/15 1:10 PM
VALB ASB SURVEY BUILDING 7/22015.2033
Fax: (925) 808-6708
Phone: (925) 808-6700
Project:
1/13/2015Analysis Date:
Collected:
Sample Description Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
VALB-7-C1.1-
Drywall
431500082-0001
BUILDING 7 CC7-
1-3 HARDLID
WBJC ABOVE
ACT
White None Detected
Fibrous
Homogeneous
Cellulose<1%
Glass<1%
Non-fibrous (other)100%
VALB-7-C1.1-Joint
Compound
431500082-0001A
BUILDING 7 CC7-
1-3 HARDLID
WBJC ABOVE
ACT
White None Detected
Non-Fibrous
Homogeneous
Non-fibrous (other)100%
VALB-7-C2.1-
Ceiling Tile
431500082-0002
BUILDING 7 CC7-
1-2 ACT 1X1
WHITE WITH
HOCKEY PUCK
Tan/White None Detected
Fibrous
Homogeneous
Cellulose80% Non-fibrous (other)20%
VALB-7-C2.1-Glue
431500082-0002A
BUILDING 7 CC7-
1-2 ACT 1X1
WHITE WITH
HOCKEY PUCK
Brown None Detected
Non-Fibrous
Homogeneous
Non-fibrous (other)100%
VALB-7-M1.1
431500082-0003
BUILDING 7 CC7-
1-2 FIRE STOP
RED
Red None Detected
Fibrous
Homogeneous
Glass3% Non-fibrous (other)97%
VALB-7-M1.2
431500082-0004
BUILDING 7 CC7-
1-3 FIRE STOP
RED
Red None Detected
Fibrous
Homogeneous
Glass2% Non-fibrous (other)98%
VALB-7-M1.3
431500082-0005
BUILDING 7 CC7-
3-3 FIRE STOP
RED
Red None Detected
Non-Fibrous
Homogeneous
Non-fibrous (other)100%
VALB-7-M1.4
431500082-0006
BUILDING 7 CC7-
2-3 FIRE STOP
RED
Red None Detected
Fibrous
Homogeneous
Glass<1% Non-fibrous (other)100%
1Test Report PLM-7.28.9 Printed: 1/14/2015 12:09:59 PM
Derrick Tanner, Laboratory Manager or other approved signatory
Analyst(s)
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. San Diego, CA NVLAP Lab Code 200855-0, CA ELAP 2713
Initial report from 01/14/2015 12:09:59
Natalia Toscano (9) http://www.EMSL.com mailto:sandiegolab@emsl.com
EMSL Analytical, Inc.
7916 Convoy Court,Building 4, Suite A, San Diego, CA 92111
Phone/Fax: 858-499-1303 / (858) 499-1304 http://www.EMSL.com sandiegolab@emsl.com
431500082
CustomerID: MECA62
CustomerPO: 9356
ProjectID:
EMSL Order:
Attn: Jack McCubbin
Millennium Consulting Associates, Inc.
620 Contra Costa Blvd.
Suite 102
Pleasant Hill, CA 94523
Received: 01/08/15 1:10 PM
VALB ASB SURVEY BUILDING 7/22015.2033
Fax: (925) 808-6708
Phone: (925) 808-6700
Project:
1/13/2015Analysis Date:
Collected:
Sample Description Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
VALB-7-M1.5
431500082-0007
BUILDING 7
BASEMENT
ROOM 17 FIRE
STOP RED
Red None Detected
Fibrous
Homogeneous
Glass<1% Non-fibrous (other)100%
2THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 1/14/2015 12:09:59 PM
Derrick Tanner, Laboratory Manager or other approved signatory
Analyst(s)
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. San Diego, CA NVLAP Lab Code 200855-0, CA ELAP 2713
Initial report from 01/14/2015 12:09:59
Natalia Toscano (9) http://www.EMSL.com mailto:sandiegolab@emsl.com
OrderID: 431500082
Appendix B
Asbestos Finish Schedule & Hazard Assessment
VA Long Beach - Building __________7_____________
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Basement CC7 B-1 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-1 Wall(s) Wallboard withJoint Compound / Concrete Beige
Basement CC7 B-1 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-1 Door/Door Frame Metal and Metal Beige/Beige Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement CC7 B-1 Misc Fire Caulk Red N M1.1-M1.5 N M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-1 Misc Cloth wrap on fiber glass (HVAC Tape /Newer Wrap) Off White Not Suspect
Basement CC7 B-1 Wall(s) Stucco (Plaster) ND N/A Y NO Good N/A N/A N/A N/A N/A N/A N/A
Basement 12A Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12A Wall(s) Plaster / Concrete Tan ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12A Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12A Door/Door Frame Chain Link Fence Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12A Roof Fire Caulk Red N M1.1-M1.5 N M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12A Misc TSI / Pipe Lagging White Y (3%) N/A Y Yes Good N/A N/A Yes Yes N/A N/A N/A
Basement 12A Misc
Basement 12 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12 Wall(s) Wallboard withJoint Compound / Concrete Beige ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12 Door/Door Frame Wood and Metal Blue/Blue Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 12 Misc Ceramic Tile 4x4 Off White Not sampled N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 12 Misc
Basement 12 Misc
Basement TELE Ceiling Wallboard withJoint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement TELE Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement TELE Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement TELE Door/Door Frame Wood and Metal Blue/Blue Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement TELE Misc
Basement TELE Misc
Basement TELE Misc
Basement 18 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 18 Wall(s) Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 18 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 18 Door/Door Frame Fence Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 18 Misc TSI / Pipe Lagging Yes N/A Y Y Yes N/A N/A Yes Yes N/A N/A
Basement 18 Misc
Basement 18 Misc
Basement 11 Ceiling Plaster Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11 Wall(s) Plaster Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11 Door/Door Frame Wood and Metal Blue/Blue Not Suspect
Core may contain asbestos
Basement 11 Misc Ceramic Tile 4x4 Off White Not sampled
Basement 11 Misc
Basement 11 Misc
Basement 11A Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11A Wall(s) Plaster Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11A Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11A Door/Door Frame Metal and Metal Blue/Blue Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 11A Misc
Basement 11A Misc
Basement 11A Misc
Basement 11B Ceiling Concrete Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11B Wall(s) Wallboard with Joint Compound /Concrete ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11B Floor Concrete Blue Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11B Door/Door Frame Wood and Metal Blue/Off White Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 11B Misc Fire Caulk Red ND M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 11B Misc
Basement 11B Misc
Basement FEC B-1 Ceiling Wallboard with Joint Compound ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement FEC B-1 Wall(s) Wallboard with Joint Compound ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement FEC B-1 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement FEC B-1 Door/Door Frame Wood and Metal Blue/Blue Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
Basement CC7 B-2 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-2 Wall(s) Wallboard withJoint Compound / Concrete Beige ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-2 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement CC7 B-2 Door/Door Frame Metal and Metal Beige/Beige Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement CC7 B-2 Misc Fire Caulk Red ND M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 17 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 17 Wall(s) Plaster Beige ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 17 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 17 Door/Door Frame Wood and Metal Brown/Beige Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 17 Misc TSI /F (elbow /run) 3" Yes N/A Y Y Yes N/A N/A Yes Yes N/A N/A
Basement 17 Misc Fire Caulk Red ND M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 17 Misc Caulk White
Basement 17 Misc HVAC Sealant Gray
Basement 16 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 16 Wall(s) Plaster Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 16 Floor Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 16 Door/Door Frame Wood and Metal Brown/Beige Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 16 Misc TSI /F (elbow ruin 3" Yes N/A Y Y Yes N/A N/A Yes Yes N/A N/A
Basement 16 Misc Fire Caulk Red N M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 16 Misc Caulk White
Basement 16 Misc HVAC Sealant Gray
Basement 15 Ceiling
Basement 15 Wall(s)
Basement 15 Floor
Basement 15 Door/Door Frame
Basement 15 Misc
Basement 15 Misc
Basement 15 Misc
Basement 19 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 19 Wall(s) Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 19 Floor Concrete with Mastic Black/Yellow Yes N/A Y NF No Yes No Yes No No Yes Exposed
Basement 19 Door/Door Frame Metal and Metal White/Off White Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 20 Ceiling Concrete Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 20 Wall(s) Concrete Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 20 Floor Concrete with Mastic Black/Yellow Y N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 20 Door/Door Frame Metal and Metal White/Off White Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 20 Misc
Basement 20 Misc
Basement 20 Misc
Basement 14 Ceiling Concrete Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 14 Wall(s) Concrete Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 14 Floor Concrete / Non Skid Gray Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 14 Door/Door Frame Metal and Metal Tan/Brown Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 14 Misc Fire Caulk Red N M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 14 Misc
Basement 14 Misc
Basement 13 Ceiling Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 13 Wall(s) Concrete Bare Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 13 Floor Non Skid Gray Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Basement 13 Door/Door Frame Metal and Metal Beige/Beige Not Suspect N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Core may contain asbestos
Basement 13 Misc HVAC Sealant Green N N/A Y N N/A N/A N/A N/A N/A N/A N/A N/A
Basement 13 Misc Fire Caulk Red N M1.1-M1.5 N/A M1 N/A N/A N/A N/A N/A N/A N/A N/A
Basement 13 Misc
Basement 13A Ceiling
Basement 13A Wall(s)
Basement 13A Floor
Basement 13A Door/Door Frame
Basement 13A Misc
Basement 13A Misc
Basement 13A Misc
No Access
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
Basement 12 Storage Ceiling
Basement 12 Storage Wall(s)
Basement 12 Storage Floor
Basement 12 Storage Door/Door Frame
Basement 12 Storage Misc
Basement 12 Storage Misc
Basement 12 Storage Misc
1st Floor CC7-1-3 Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-3 Wall(s) Wallboard with Joint Compound /Concrete Beige
1st Floor CC7-1-3 Floor Resilient Flooring Tile 12x12 Gray Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
1st Floor CC7-1-3 Door/Door Frame
1st Floor CC7-1-3 Misc Acoustic Ceiling Tile Pinhole 12" N Y Y Y N/A N/A N/A N/A N/A N/A N/A N/A
Tile is ND;
previous data indicates presence of
ACM between tile and substrate
1st Floor CC7-1-3 Misc Cove Base 4" Beige
1st Floor CC7-1-3 Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-3 Misc Cove Base 6" Black Y Y
1st Floor CC7-1-3 Wall(s) Ceramic Tile and Grout 4x4 Off White/Off White Not Suspect
1st Floor CC7-1-3 Misc Window Putty Beige
1st Floor CC7-1-1 Ceiling Plaster White N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-1 Wall(s) Concrete/ Wallboard with Joint Compound Green/Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-1 Floor Resilient Flooring Tile 12x12 Gray Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
1st Floor CC7-1-1 Door/Door Frame
1st Floor CC7-1-1 Misc Cove Base 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-1 Misc Ceramic Tile and Grout 4x4 Off White/Off White
1st Floor CC7-1-1 Misc Window Putty Beige
1st Floor CC7-1-1 Misc Cove Base - Terrazo
1st Floor CC7-1-2 Ceiling Plaster White ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Wall(s) Plaster / Concrete Beige/Green ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Floor Resilient Flooring Tile 12x12 Gray Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
1st Floor CC7-1-2 Door/Door Frame N/A Y N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Misc Wallboard with Joint Compound Beige ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Misc Resilient Flooring Tile 12x12 Pink ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Misc Cove Base 4" Beige ND N/A Y N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Misc Cove Base Terrazo 6" Green ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor CC7-1-2 Misc Acoustic Ceiling Tile Pinhole Big Worm 12" Y Y Y N/A N/A N/A N/A N/A N/A N/A N/A
Tile is ND;
previous data indicates presence of
ACM between tile and substrate
1st Floor CC7-1-2 Misc Acoustic Ceiling Tile Pinhole 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 105 Ceiling Acoustic Ceiling Tile Pinhole 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 105 Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 105 Floor Carpet Brown
Mastic underneath may contain asbestos
1st Floor 105 Door/Door Frame Wood and Metal Beige/Off White
Core may contain asbestos
1st Floor 105 Misc Cove Base 6" Beige
1st Floor 105 Misc
1st Floor 105 Misc
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
1st Floor 104 Ceiling Acoustic Ceiling Tile Pinhole 2x4 N ND Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 104 Wall(s) Wallboard with Joint Compound Beige ND N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 104 Floor Carpet Brown
Mastic underneath may contain asbestos
1st Floor 104 Door/Door Frame Wood and Metal Beige/Off White
Core may contain asbestos
1st Floor 104 Misc Cove Base 6" Beige
1st Floor 104 Misc
1st Floor 104 Misc
1st Floor 101HAC Ceiling
1st Floor 101HAC Wall(s)
1st Floor 101HAC Floor
1st Floor 101HAC Door/Door Frame
1st Floor 101HAC Misc
1st Floor 101HAC Misc
1st Floor 101HAC Misc
1st Floor 100A Ceiling
1st Floor 100A Wall(s)
1st Floor 100A Floor
1st Floor 100A Door/Door Frame
1st Floor 100A Misc Cove Base / Mastic 4" Gray Y N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 100A Misc
1st Floor 100A Misc
1st Floor 100B Ceiling
1st Floor 100B Wall(s)
1st Floor 100B Floor
1st Floor 100B Door/Door Frame
1st Floor 100B Misc
1st Floor 100B Misc
1st Floor 100B Misc
1st Floor 100C Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 100C Wall(s) Concrete/ Wallboard with Joint Compound Green/Beige
1st Floor 100C Floor Resilient Flooring Tile 12x12 Gray N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 100C Door/Door Frame
1st Floor 100C Misc Resilient Flooring Tile 12x12 Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
1st Floor 100C Misc Resilient Flooring Tile 12x12 Tan N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 223 Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 223 Wall(s) Wallboard with Joint Compound Beige/Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 223 Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 223 Door/Door Frame Wood and Metal Beige/Beige
Core may contain asbestos
2nd Floor 223 Misc Cove Base 4" Beige
2nd Floor 223 Misc Cove Base - Terraza 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 223 Misc
2nd Floor 214C Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214C Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214C Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214C Door/Door Frame Wood Beige
Core may contain asbestos
2nd Floor 214C Misc Cove Base 4" Beige
2nd Floor 214C Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214C Misc Cove Base - Terrazo 6" Green
2nd Floor 214E Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214E Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214E Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214E Door/Door Frame Wood Beige
Core may contain asbestos
2nd Floor 214E Misc Cove Base 4" Beige
2nd Floor 214E Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214E Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 223C Ceiling
2nd Floor 223C Wall(s)
2nd Floor 223C Floor
2nd Floor 223C Door/Door Frame
2nd Floor 223C Misc
2nd Floor 223C Misc
2nd Floor 223C Misc
No Access
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
2nd Floor 214D Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214D Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214D Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214D Door/Door Frame Wood Beige
2nd Floor 214D Misc Cove Base 4" Beige
2nd Floor 214D Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214D Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214B Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214B Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214B Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214B Door/Door Frame Wood Beige
Core may contain asbestos
2nd Floor 214B Misc Cove Base 4" Beige
2nd Floor 214B Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214B Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214F Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214F Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214F Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214F Door/Door Frame Wood Beige
2nd Floor 214F Misc Cove Base 4" Beige
2nd Floor 214F Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214F Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 219 Ceiling Aciustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 219 Wall(s) Wallboard with Joint Compound N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 219 Floor Resilient Flooring Tile 12x12 Beige with Brown Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 219 Door/Door Frame
2nd Floor 219 Ceiling Hard Lid / Wallboard with Joint Compound Beige
2nd Floor 219 Misc Cove Base 4" Beige
2nd Floor 219 Misc
2nd Floor 220 Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x2 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 220 Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 220 Floor Carpet Brown
2nd Floor 220 Door/Door Frame
2nd Floor 220 Misc Cove Base & Mastic 4" Beige
2nd Floor 220 Misc
2nd Floor 220 Misc
2nd Floor 214H Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214H Wall(s) Wallboard with Joint Compound Beige N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214H Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214H Door/Door Frame Wood Beige
Core may contain asbestos
2nd Floor 214H Misc Cove Base 4" Beige
2nd Floor 214H Misc Ceramic Tile and Grout 4x4 Off White/Off White
2nd Floor 214H Misc Cove Base - Terrazo 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214K Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214K Wall(s) Wallboard with Joint Compound /Concrete Beige
2nd Floor 214K Floor Resilient Flooring Tile 12x12 Tan Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214K Door/Door Frame Wood and Metal Beige/Beige
Core may contain asbestos
2nd Floor 214K Misc Cove Base 6" Beige
2nd Floor 214K Misc
2nd Floor 214K Misc
2nd Floor 214L Ceiling Acoustic Ceiling Tile Pinhole Big Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214L Wall(s) Wallboard with Joint Compound Beige/Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214L Floor Resilient Flooring Tile 12x12 Beige Yes* N/A Y N/A Y N/A N/A N/A N/A N/A Y *Mastic is
ACM
2nd Floor 214L Door/Door Frame Wood and Metal Beige/Beige
Core may contain asbestos
2nd Floor 214L Misc Cove Base 4" Beige
2nd Floor 214L Misc Cove Base - Terraza 6" Green N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor 214L Misc
VALB ACM Finish Haz Assess Schedule Date of Survey:_______12/4/14__________
Size Color
Asbestos Present Millennium
Sample No.
Previously
Sampled (Y/N) Friable
Good -
No
Damage
Damaged (10% overall or 25% localized)
SignificantlyDamaged
>10% overall OR >25% localized)
Potential for Damage
(vibration, Access, Erosion)
TSI Surfacing Misc
Current Rm Name/No. Surface
Sample Info
Comment
HAZARD ASSESSMENT
Material
2nd Floor 217 Ceiling Acoustic Ceiling Tile Pinhole Worm 2x4 N N/A Y N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2nd Floor…