Attached to
36C26220Q0029, SERVICE to PERFORM Roof Repairs at Buildings 7, 126, 128 & 136
Solicitation number
36C26220Q0029
Issued by

About this file

36C26220Q0029 0001 36C26220Q0029 0001.docx

View the file

Other files

File Type Posted
36C26220Q0029-0001003.pdf PDF
36C26220Q0029-0001002.docx DOCX document
36C26220Q0029-0001001.pdf PDF
36C26220Q0029-0001000.docx DOCX document
36C26220Q0029-0001001.pdf PDF
36C26220Q0029-0001003.pdf PDF
36C26220Q0029-0001002.docx DOCX document
36C26220Q0029-004.pdf PDF
36C26220Q0029-003.docx DOCX document
36C26220Q0029-003.docx DOCX document
36C26220Q0029-004.pdf PDF
36C26220Q0029-001.pdf PDF
36C26220Q0029-002.pdf PDF
36C26220Q0029-000.docx DOCX document
36C26220Q0029-000.docx DOCX document
36C26220Q0029-002.pdf PDF
36C26220Q0029-001.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 10-10-2019 600-20-1-5667-0006 None 36C262

DEPARTMENT OF VETERANS AFFAIRS

Network Contracting Office (NCO) 22 4811 Airport Plaza Drive, Suite 600 Long Beach CA 90815 36C262

DEPARTMENT OF VETERANS AFFAIRS

Network Contracting Office (NCO) 22 4811 Airport Plaza Drive, Suite 600 Long Beach CA 90815 To all Offerors/Bidders

36C26220Q0029 10-07-2019

X X X N/A

AMENDMENT 0001

IS ISSUED TO PROVIDE THE FOLLOWING:

1) JOB WALK-SITE VISIT SIGN-IN SHEET

2) SUBMIT A REVISED STATEMENT OF WORK FOR INCLUSION WITH RFQ 36C26220Q0029. CHANGES ARE INDENTIFIED BY BOLD

TEXT,

ITALICIZED, AND HIGHLIGHTED.

NICHOLS, CECIL S.

Contracting Officer

VA-VHA-RPOW-2019-0259A6E1

CONTINUATION PAGE

STATEMENT OF WORK (SOW) revised SERVICE TO Perform roof repairs at buildings 7, 126, 128, and 136 tibor rubin VA long beach HEALTHCARE SYSTEM 600-20-1-5667-0006

1. TITLE:

SERVICE to PERFORM Roof Repairs at Buildings 7, 126, 128, and 136.

2. PLACE OF PERFORMANCE:

Tibor Rubin VA Long Beach Healthcare System

5901 East 7th Street
Long Beach, CA 90822-5201

3. PERIOD OF PERFORMANCE:

Ninety (90) calendar days.

4. CONTRACT TYPE:

Firm Fixed Price (FFP).

5. BACKGROUND:

Several roofs need repair work throughout the campus in Buildings 7, 126, 128, and 136. Water leaks have been reported at these locations. Treatments and patchwork are needed to mitigate wear and tear before inclement weather can penetrate roofs and cause internal building damage.

6. OBJECTIVES / SCOPE:

Contractor shall provide all manner, means, methods, equipment, expertise, incidentals, labor, materials, parts, services, supervision, supplies, tools, transportation, and qualified personnel necessary to perform required roof repairs at Buildings 7, 126, 128, and 136 in accordance / compliance with current code(s), directives, regulations, industry guidelines / standards, and this statement of work (SOW) at/for the Tibor Rubin VA Long Beach Healthcare System.

GENERAL REQUIREMENTS:

A. Contractor shall conduct a thorough walkthrough of each area with the VA COR prior to performing any work.

B. Contractor will be responsible for providing all prep work and cleaning entire surface area of each location prior to conducting repairs.

C. Contractor will provide VA COR with an electronic digital schedule prior to starting any work.

D. Contractor shall check-in with the VA COR or Carpenter Shop Supervisor every day prior to performing any work.

E. All damages incurred during the performance of work will be repaired by Contractor at no additional cost to the Government (VA).

F. Building 7, Room 300:

I. Remove all gravel and debris from damaged sections of roof.

II. Transport and dispose of all scrap and unused material at a City / County / State authorized landfill.

III. Install one (1) approximately 16’ x 35’ LF section of roofing using three (3) course application process.

IV. Apply modified mastic and fiberglass webbing to the entire section of the existing roof cracks / splits and damaged areas.

V. Apply cold adhesive and imbed the existing material into the adhesive.

VI. Once complete, Contractor will restore existing gravel to match décor on remaining surface of roof.

G. Building 126, Room 1W138:

I.Install one (1) approximately 15’ x 15’ LF section of roofing located near the main drain using three (3) course application process.
II.Apply modified mastic and fiberglass webbing to the entire section of the existing roof cracks / splits and damaged areas.
III.Apply cold adhesive and imbed the existing material into the adhesive.
IV.Remove designated metal panel and install approximately 45” x 25” section of brand-new GAF modified torch-down membrane roofing system brand name or equal and three (3) course base flashing corners.
V.ALL WORK IN THIS AREA WILL BE CONDUCTED ON WEEKENDS BETWEEN THE HOURS OF 7:00AM TO 4:30PM WITH PRIOR APPROVAL FROM THE VA COR.
VI.Once complete, Contractor will restore existing gravel to match décor on remaining surface of roof.
H.Building 128, Room J209:
I.Install one (1) approximately 25’ x 30’ LF section of roofing located at A/C duct using three (3) course application process.
II.Repair will be administered using white mastic and roof fabric reinforcement webbing.
III.Once complete, Contractor will replace existing gravel to match décor on remaining surface of roof.
I.Building 136, Pier Center:
I.Repair one (1) leaking vent at designated location with thermoplastic polyolefin single-ply roofing membrane.
II.Contractor will ensure repair around vent is curved to prevent water from accumulating around perimeter.
III.Contractor will remove existing cover from additional unit located on roof and install an approximately 28” x 28” x 7” metal cap around exposed area.
IV.Contractor will remove (L) metal, replace flashing, and apply finish to all open areas extending across front section to seal all exposed area.
V.Contractor will install rain gutter at front location adjacently extending from existing gutter to end of roof with matching material and same dimensions.
VI.New gutter will be properly secured and fastened to ensure structural integrity during inclement weather.
J.Contractor will contact VA COR upon completion and a walkthrough shall be performed to ensure quality of work.
K.Contractor will dispose of all excess materials and ensure entire roof and all other affected areas within the vicinity of work performed are left clean and orderly before departing the work site.

7. NOTIFICATION:

Contractor shall notify and coordinate ALL work activities / site access with the VA POC / COR – LIAM BOCCIA (562) 826-8000 x3306.

8. PERFORMANCE MONITORING, INSPECTION AND ACCEPTANCE:

Routine inspections to include acceptance / certification work was completed in accordance with the SOW will be performed by VA POC / COR – LIAM BOCCIA and Facilities Personnel. The VA POC / COR can perform inspection of the work performed without the Contractor presence and determine whether or not work performed is within standards expressed in this scope of work. It is the VA’s prerogative to hire an independent qualified third party to check the validity of the work conducted.

9. CHANGES:

A.The awarded Contractor is advised that only the Contracting Officer, acting within the scope of the contract has the authority to make changes which affect the contract in terms of quality, quantity, price or delivery.
B.In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment shall be made in the contract terms or price to cover any increase in costs incurred as a result thereof.

10. SECURITY REQUIREMENTS:

N/A. Contractor WILL NOT have access to patient records, data, or VA computer systems.

11. GOVERNMENT FURNISHED EQUIPMENT (GFE) / GOVERNMENT FURNISHED INFORMATION (GFI):

N/A. NO GFE or GFI will be provided to or used by the Contractor.

12. RISK CONTROL:

Submission of VA “Infection Control Risk Assessment” (ICRA) permit(s) NOT REQUIRED. Medical services / support services at the designated locations will remain operational during the execution of this work. Contractor shall take all precautions to minimize disruption to daily routine tasks performed in those services. Patient care shall remain a top concern for the Contractor and their employees while performing contracted work.

13. IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

A.Contractor personnel shall ALWAYS wear visible identification issued by VA Police during the entire time they are on the VA Healthcare System campus / grounds. I.D. badges must have an identification picture and shall state the name of the individual and the company represented.
B.Parking information is available from the VA Police & Security Service Office. It is the responsibility of Contractor personnel to park only in appropriately designated parking areas. The VA shall not validate, invalidate, or make reimbursement for parking violations of the Contractor’s personnel under any circumstances.
C.SMOKING IS STRICTLY PROHIBITED on the grounds of any VHA facility and throughout the VA Healthcare System campuses. Per VHA Directive 1085 dated March 5, 2019, it is VHA policy that all VHA health care facilities, including hospitals, community clinics, administrative offices and Vet Centers, will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019. THERE WILL NO LONGER BE DESIGNATED SMOKING AREAS.
D.Possession of weapons is prohibited while on ANY VA Healthcare System campus / grounds. Enclosed containers, including tool kits, shall be subject to search and/or seizure.
E.Violations of VA regulations may result in citation answerable in the United States Federal District Court, not at/in the local district, municipal, county or state court.

14. POINT OF CONTACT (POC):

TIBOR RUBIN VA LONG BEACH HEALTHCARE SYSTEM POC / COR:

Name:
LIAM BOCCIA
Department:
Engineering (138)
Address:
5901 East 7th Street, Long Beach CA 90822
Phone:
(562) 826-8000 x3306
Email:
liam.boccia@va.gov

15. WORK HOURS:

Work will be performed during normal business hours EXCEPT FOR Building 126, Room – 1W138, which will be completed on weekends only between the hours of 7:00AM to 4:30PM.

16. OVERTIME AND NATIONAL FEDERAL HOLIDAYS:

Any overtime or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government. When one of the holidays fall on a Sunday, the following Monday will be observed as a National Federal Holiday. When one of the holidays fall on a Saturday, the preceding Friday will be observed as a National Federal Holiday. National Federal Holiday schedule:

New Year’s Day
January 1
Martin Luther King ‘s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Independence Day
July 4
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
November 11
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25

17. INFORMATION SECURITY:

In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements DO NOT apply to this requirement, and a Security Accreditation Package IS NOT required. The nature of this requirement is technical; however, there is no information to be protected.

18. INVOICE AND PAYMENT:

A. Vendor will be paid monthly upon submission of a proper invoice for work completed and accepted. Final payment will be withheld until all noted discrepancies are corrected and as-build drawings are approved by the Government (VA). VA-FSC processes / pays all associated transactions for / on VA orders. To successfully submit an invoice to VA-FSC please review “How to Create an Invoice” within the how to guides. All invoices submitted to the VA-FSC should mirror your current submission of invoice, with the below items required. The VA-FSC requires specific information in compliance with the Prompt Pay Act and Business Requirements.

1. Your firm’s Tax Payer ID Number (TIN)

2. Your firm’s “Remit Address” information

3. The VA Purchase Order (PO) number

4. Your firm’s contact information: (Personal Name, Email, and Phone)

5. Your VA point of contact information: (Personal Name, Email, and Phone)

6. The Period of Performance dates (Beginning and Ending)

7.All discount information if applicable (Percent and Date Terms)
For additional information, please contact:
Department of Veteran Affairs Financial Service Center
Phone:
1-877-353-9791
Email:
vafsccshd@va.gov

- - - END STATEMENT OF WORK - - -

See attached document: Job Walk-Site Visit sign-in sheet_2019.10.10.