Amendment 0003 Attachment 3 Racks and Flooring Chart.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Z2DA--Project 605-20-420 Electronic Health Record Modernization (EHRM) Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C26220B0004
About this file
This document contains an amendment to a federal contract opportunity for infrastructure upgrades at a Veterans Affairs medical center. The amendment provides a chart detailing flooring and racking requirements across multiple buildings and rooms. The contractor will replace racks and install new two-post racks in various shared technical and server rooms according to drawings. Flooring will generally remain the same except in specific server rooms. The federal contract opportunity involves construction services for an electronic health record modernization project at the VA Loma Linda Healthcare System in California. The work includes general construction, alterations, mechanical, electrical and utility upgrades, and demolition. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification code is 236220 and the project value is estimated between $10 million to $20 million. The solicitation will be issued on September 15th via beta.sam.gov and include a mandatory site visit.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Building | Floor | Room | Function | Flooring | New floor type? | Current rack type | New rack type |
| 1 | 1 | 1C04E/1C15B | Server Room | Raised Flooring over concrete | Flooring to remain | Mix | All racks outside of cage are outside of scope. All racks inside cage are to be replaced. Drawings exist detailing new racks in cage on page AE-1.06 with the mark that all rack placement will require coordination with COR. |
| 1 | 1 | 1SB1 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB2 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB3 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB4 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB5 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB6 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB7 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1SB8 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 1 | 1E75 | TR | Concrete | Flooring to remain | 2-post | Vendor to install 2-Post rack in addition to existing 2-post rack |
| 1 | 1 | 1G110 | TR | Concrete | Flooring to remain | 2-post | Racks to remain |
| 1 | 1 | 1H114 | TR | Concrete | Flooring to remain | 2-post | Racks to remain |
| 1 | 2 | 2SB1 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB2 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB3 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB4 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB5 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB6 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB7 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 2 | 2SB8 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3E18 | Server Room | Raised Flooring over concrete | Flooring to remain | Mixed | VA will remove 4 post racks on left side. Contractor will install 2-post racks on left side. All racks on right side are out of scope. |
| 1 | 3 | 3SB1 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB2 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB3 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB4 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB5 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB6 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB7 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 3 | 3SB8 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB1 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB2 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB3 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB4 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB5 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB6 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB7 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 1 | 4 | 4SB8 | TR/Shared Space | Concrete | Flooring to remain | Wall-mounted | Contractor will install 2-post racks per drawings |
| 20 | 1 | 1A107 | TR | Tile on concrete | Flooring to remain | 2-Post | Racks to Remain |
| 29 | 1 | BUILDING OUT OF SCOPE | NA | NA | NA | NA | |
| 30 | 1 | 116 | Tile on concrete | 2-Post | Racks to remain | ||
| 31 | 2 | 2B104 | Tile on concrete | 2-Post | Vendor to install 2-Post rack in addition to existing 2-post rack | ||
| 32 | 1 | 1A102 | Tile on concrete | 2-Post | Racks to remain | ||
| 32 | 2 | 2C103A | Tile on concrete | 2-Post | Racks to remain | ||
| 51 | 1 | Building in process of demolition | NA | NA | NA | NA |
File details come from the government source that posted it. Updated .