About this file

36C26219R0147 Attachment 1 -- PRICE WORKSHEET.docx

View the file

Other files

File Type Posted
36C26219R0147-0002000.docx DOCX document
36C26219R0147-0002001.docx DOCX document
36C26219R0147-0001000.docx DOCX document
36C26219R0147-0001002.docx DOCX document
36C26219R0147-0001001.pdf PDF
36C26219R0147-001.pdf PDF
36C26219R0147-003.pdf PDF
36C26219R0147-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – TRASH PICK-UP DISPOSAL SCHEDULE AND PRICE WORKSHEET

BASE YEAR: September 1, 2019 through August 31, 2020

Item Number
DESCRIPTION OF SUPPLIES/SERVICES
ANNUAL ESTIMATED QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
Solid Waste Pickup at VA Long Beach Healthcare System
52
WK
$
$
0002
Solid Waste Pickup at VA Long Beach Healthcare System (Water Tower close to Bldg.88 and Per Interior Design Section Instruction)
52
WK
$
$
0003
Quarterly Steam Cleaning of TWO (2) Contractor-owned Compactors (Location: Bldg. 2 Basement and Bldg. 2 Canteen Loading Dock.)
4
QT
$
$
0004
Tonnage: Approx. 143 ton per month.

(NOTE: Contractor shall charge a pick-up Charge separate from the price per actual ton charge.)

3,432
TON
$
$
BASE YEAR TOTAL AMOUNT
$

OPTION PERIOD ONE (1): September 1, 2020 through August 31, 2021

Item Number
DESCRIPTION OF SUPPLIES/SERVICES
ANNUAL ESTIMATED QUANTITY
UNIT
UNIT PRICE
AMOUNT
1001
Solid Waste Pickup at VA Long Beach Healthcare System
52
WK
$
$
1002
Solid Waste Pickup at VA Long Beach Healthcare System (Water Tower close to Bldg.88 and Per Interior Design Section Instruction)
52
WK
$
$
1003
Quarterly Steam Cleaning of TWO (2) Contractor-owned Compactors (Location: Bldg. 2 Basement and Bldg. 2 Canteen Loading Dock.)
4
QT
$
$
1004
Tonnage: Approx. 143 ton per month.

(NOTE: Contractor shall charge a pick-up Charge separate from the price per actual ton charge.)

3,432
TON
$
$
OPTION PERIOD ONE (1) TOTAL AMOUNT
$

OPTION PERIOD TWO (2): September 1, 2021 through August 31, 2022

Item Number
DESCRIPTION OF SUPPLIES/SERVICES
ANNUAL ESTIMATED QUANTITY
UNIT
UNIT PRICE
AMOUNT
2001
Solid Waste Pickup at VA Long Beach Healthcare System
52
WK
$
$
2002
Solid Waste Pickup at VA Long Beach Healthcare System (Water Tower close to Bldg.88 and Per Interior Design Section Instruction)
52
WK
$
$
2003
Quarterly Steam Cleaning of TWO (2) Contractor-owned Compactors (Location: Bldg. 2 Basement and Bldg. 2 Canteen Loading Dock.)
4
QT
$
$
2004
Tonnage: Approx. 143 ton per month.

(NOTE: Contractor shall charge a pick-up Charge separate from the price per actual ton charge.)

3,432
TON
$
$
OPTION PERIOD TWO (2) TOTAL AMOUNT
$

OPTION PERIOD THREE (3): September 1, 2022 through August 31, 2023

Item Number
DESCRIPTION OF SUPPLIES/SERVICES
ANNUAL ESTIMATED QUANTITY
UNIT
UNIT PRICE
AMOUNT
3001
Solid Waste Pickup at VA Long Beach Healthcare System
52
WK
$
$
3002
Solid Waste Pickup at VA Long Beach Healthcare System (Water Tower close to Bldg.88 and Per Interior Design Section Instruction)
52
WK
$
$
3003
Quarterly Steam Cleaning of TWO (2) Contractor-owned Compactors (Location: Bldg. 2 Basement and Bldg. 2 Canteen Loading Dock.)
4
QT
$
$
3004
Tonnage: Approx. 143 ton per month.

(NOTE: Contractor shall charge a pick-up Charge separate from the price per actual ton charge.)

3,432
TON
$
$
OPTION PERIOD THREE (3) TOTAL AMOUNT
$

OPTION PERIOD FOUR (4): September 1, 2023 through August 31, 2024

Item Number
DESCRIPTION OF SUPPLIES/SERVICES
ANNUAL ESTIMATED QUANTITY
UNIT
UNIT PRICE
AMOUNT
4001
Solid Waste Pickup at VA Long Beach Healthcare System
52
WK
$
$
4002
Solid Waste Pickup at VA Long Beach Healthcare System (Water Tower close to Bldg.88 and Per Interior Design Section Instruction)
52
WK
$
$
4003
Quarterly Steam Cleaning of TWO (2) Contractor-owned Compactors (Location: Bldg. 2 Basement and Bldg. 2 Canteen Loading Dock.)
4
QT
$
$
4004
Tonnage: Approx. 143 ton per month.

(NOTE: Contractor shall charge a pick-up Charge separate from the price per actual ton charge.)

3,432
TON
$
$
OPTION PERIOD FOUR (4) TOTAL AMOUNT
$
GRAND TOTAL (BASE & 4 OPTION PERIODS)
$