This document is a technical specification and design package for a 300 kVA Uninterruptible Power Supply (UPS) system intended for healthcare facility applications, specifically OSHPD (California Office of Statewide Health Planning and Development) compliance. The drawing set was prepared by CPN Power, Inc. and dated October 4, 2019, with Revision I.
The 300 kVA UPS system is designed to provide continuous power to critical medical equipment including Cath Labs, MRI systems, and CT scanners in healthcare facilities. The system includes a main 300 kVA UPS landing cabinet (55.1"W x 32.7"D x 80.6"H, 2,250 lbs), an optional maintenance bypass cabinet or panel (MBC/MBP), and battery cabinet options. Standard battery backup provides 31 minutes at 75 kVA, 12 minutes at 150 kVA, and 5 minutes at 200 kVA using Enersys 12HX505 or Deka HR5500ET batteries. The UPS generates heat rejection of 40,800 Btu/Hr at 100% load and 19,400 Btu/Hr at 50% load, requiring mechanical cooling to maintain battery temperature below 77°F. Input and output operate at 480V, 3-phase, with 500A main breaker sizing. The system accepts a single 480V source with field-installed jumpers to enable the static bypass circuit. Optional components include a 300 kVA Delta/Wye transformer, isolation transformer, remote status alarm panel (RSAP), and various battery monitoring systems including Modbus TCP/IP and SNMP communications adapters. The UPS operates at 73 dBA @ 1 meter and requires 40 inches minimum front service access with 1-inch side clearance for airflow. The document specifies two proposed OSHPD-compliant room layouts requiring 175-197 inches of width and includes detailed electrical interconnection notes, grounding requirements, and installation specifications for use by electrical contractors and MEP engineers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SSN Install UPS at Building 700 SOW.pdf | ||
| 36C26127Q0081.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cath Lba #1
CathCath Lab #1 Lba #1 Cath Lab #1
Cath Lab #2
1A-216
Location of NEW UPS System and HVACDRAFT
QH12A Panel Data:
DRAFT
NL12B Panel Data:
KGL
Drawn By: Drawing Number:
CPN Power-1039-99
Title: Sub Title:
SHEET 1 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application
Typical One-Line Arrangement with (1) 300 kVA UPS
500A
Main
Switchboard
Input
Distribution
CPN Power
300 kVA UPS
Simplified drawing of the 300 kVA
UPS. See the 300 kVA One-Line
Wiring Diagram for better detail.
ATS
480 V
ATS
480 V
Emergency GeneratorEmergency Generator
The Generator and ATS are optional items included in some projects. They are displayed as one approach toward providing complete power protection.
UPS Heat Rejection Specifications Heat Rejection at 100% load 40,800 Btu/Hr Sensible
Heat Rejection at 50% load 19,400 Btu/Hr Sensible
Optional Transformer Heat Rejection Specifications Heat Rejection at 100% load 14,400 Btu/Hr Sensible
Heat Rejection at 50% load 7,200 Btu/Hr Sensible
The AC unit could be sized to meet the 50% load requirement of the UPS, plus any other heat loads in the space, and any other heat gains through the walls or ceiling.
Batteries require a temperature not exceeding 77ºF. Mechanical cooling is required in most areas to accomplish this temperature control.
150A
500A
Distribution
Panelboard
125A
1.5T MRI
64 Slice CT Scanner
NOTE: The loads could also be (4-5) Cath Labs, (3-4) MRI’s, or (3-4) 16-64 Slice CT Scanners as a few examples of possible configurations.
RAD Room
150A
R&F Room
100A
NOTE: Breaker sizes noted are typical for the medical equipment being supported. The exact model was not known when this document was prepared. The final breaker size may vary slightly.
NOTE: The medical equipment noted is typical of commonly supported suites. The 300 kVA UPS typically supports 5-6 major suites in Radiology, Cardiology, and Hybrid OR Suites.
Provided by Others
Optional
Isolation
Transformer
300 kVA UPS Generic One-Line
Provided by Others
Provided by Others
Provided by Others
125A
64 Slice CT Scanner
RAD Room 150A
NOTE: The audible noise level of the UPS system is 73 dBA @ 1 meter. Locate the UPS in the appropriate location based on the audible noise level.
❶ NOTE: The transformer(s) may require disconnects before and/or after the transformer(s) as required to meet CEC or local electrical codes.
❶
HCAi is the new department name formerly know as OSHPD. Verify the updated documents related to the transfer.
CPN Power-1039-99
Title: Sub Title:
SHEET 2 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS One-Line with Batteries
NOTE: Low voltage wiring from the UPS to the Remote Status Alarm Panel and the
120 volt local power feed to be provided by the electrical contractor for the RSAP.
NOTE: DC breaker control wires required for energizing the UVR and for auxiliary breaker contact position. Four (4) wires - 16 gauge minimum wire size
480V500A
Low voltage wiring
Power Wiring Legend
3 wire
+ Ground3
The number in the square designates the quantity of conductors and the neutral wire, if required. The ground wire must be added to the count.
480V
Fourteen (14) low voltage wires. #14 minimum wire size.
Low Voltage Wiring Strip
Optional Remote
Status Alarm Panel
120 volt power feed from a UPS circuit
Optional Remote
Status Alarm Panel
120 volt power feed from a UPS circuit
Battery
Cabinet
Battery
Cabinet
600A
Battery
Cabinet
600A
NOTE: All interconnecting wires between the UPS and other components (Battery
Cabinet, Maintenance Bypass Cabinet, Remote Status Panel, etc.) and the field installed jumper wires between the UPS input and bypass terminals are to be supplied and installed by the electrical contractor.
NOTE: The field installed jumpers from the main UPS input to the UPS bypass input are also provided by the electrical contractor.
Input
Distribution
Provided by Others
Two (2) 120V wires.
#12 minimum wire size.
Field Installed
Jumpers
Landing Cabinet
300 kVA UPSStatic Bypass
DC-DC
Converter
SS
Converter Inverter
300 kVA UPSStatic Bypass
DC-DC
Converter
SS
Converter Inverter
500A
500A
500A
UPS Input UPS Output
Maintenance
Bypass
Panel or
Cabinet
MB Input MB Output
Tie Breaker
Normally Open
SW1
SW2
SW3SKRU
RS232
Port
Modbus
TCP/IP
Located on front door behind LCD Display
NOTE: Batt-Safe is optional in the Battery
Cabinet. A drawing is provided in this drawing set.
NOTE: If the transformer is provided, a disconnect may be required before the transformer as required to meet NEC or local electrical codes. Neutral-Ground bond and GEC are to be supplied and installed by the electrical contractor. Breakers can be installed in lieu of disconnects.
480/
277V
NOTE: The Maintenance Bypass can be fault current rated for 35, 65 or 100 kAIC as required
300 kVA UPS with Batteries
120V
Disconnect
NOTE: Refer to the previous page for detailed distribution from this panel.
Optional
Isolation
Transformer
150A
500A
Distribution
Panelboard
125A
150A
100A
Provided by Others
125A
150A
Disconnect
CPN Power-1039-99
Title: Sub Title:
SHEET 3 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS Power and Low Voltage Wiring Diagram
Battery Cabinet
Size DC conductors based on 600A breaker in the battery cabinet. Apply (2) two conductors per polarity for positive and negative conductors to match lug configuration in the
DC breaker. Include single ground conductor.
MBC Output Wiring
Size AC conductors based on 500A breaker, 3 phase, 3 wire design + ground.
UPS Input Wiring
UPS Output Wiring
Wiring from Input
Distribution
MBC
Transformer
Output Wiring
DC breaker control wires required for energizing the UVR and for auxiliary breaker contact position. Four (4) wires - 16 gauge minimum wire size. Wiring shown out the bottom of the cabinets for clarity. Actual routing to be determined in the field.
Two (2) 120V #12 wires from MBC to the UPS for the SKRU circuit. Wiring shown out the bottom of the cabinets for clarity.
Actual routing to be determined in the field
300 kVA UPS Landing
Cabinet
300 kVA UPS Power and Low Voltage Wiring Diagram
300 kVA UPS Power and Low Voltage Wiring Diagram
Ethernet Cable from battery monitoring system
500A Panel
NG Bond
Parity Sized
Grounding Electrode to appropriate grounding point
(Optional)
300 kVA
Transformer
Fourteen (14) low voltage wires. #14 minimum wire size.
Remote Status
Alarm Panel
12VDC
LV
480V480V 480V
480V 480V 480V
480V
E
480V
120V
120V
A
B
B
A D
D
E
E
CE
G
Line Type Legend
120V Power Wiring
Low Voltage Wiring 12-24VDC
Ground Wire
120V
LV
G
480V Power Wiring 480V
Ethernet Cabling E
120V
24VDCLV (24VDC)
120V
SKRU
Size AC conductors based on 500A breaker, 3 phase, 4 wire design + ground.
C
RS-485
Modbus RTU Via
RS-485 serial communication
RS-485 Cabling RS-485120V (hot, Neutral and ground conductors) Provide power via receptacles in each battery cabinet for Batt-Safe monitoring F
F
NOTE: All wiring displayed to be provided by the electrical contractor.
NOTE: The wiring for the MBC to the landing cabinet is shown overhead just for clarity. The routing can be between the cabinets through the glands plates provided with the equipment.
Ethernet Cable from battery monitoring system for
Modbus TCP/IP or WEB/
SNMP communication
500A/480V/3 PHASE CB IN A
WALL MOUNTED NEMA 1
ENCLOSURE (TYP. FOR 2)
NOTE: A ground conductor is required between the
MBC ground bus and the
Landing Cabinet ground bus. Match the input ground conductor sizing.
G
CPN Power-1039-99
Title: Sub Title:
SHEET 4 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application
NOTE: Maintain 1" air gap on both ends and the rear of the entire system to allow for better air flow. Top clearance of 24" is recommended.
NOTE: The MBC, Landing Cabinet, UPS, and Battery Cabinet must be butted and bolted together and/or to the floor (depending on seismic requirements).
NOTE: The equipment dimensions and weights are subject to change.
Verify information with CPN Power prior to design.
NOTE: Wiring from the MBC to the UPS and from the UPS to the MBC to be supplied by the electrical contractor. Wiring from the UPS to the Battery Cabinet to be supplied by the electrical contractor. Wiring between all Cabinets can be internal to the Cabinets
NOTE: The Landing Cabinet must be located to the left side of the UPS system.
The Landing Cabinet is part of the complete UPS system. The UPS input, bypass, output, and DC busbar extend from the UPS into the Landing Cabinet.
NOTE: Some applications may require an additional output Δ/Υ transformer (as displayed) to generate the required neutral.
Static
Bypass
DC
300 kVA UPS Layout Drawing with MBC and Batteries (OSHPD)
300 kVA UPS with MBC & Batteries 125.1" Overall Width
80.6"
78.75"
3.9375"
55.1"W x 32.7"D x
80.6"H
2,250 lbs
300 kVA UPS Landing
Cabinet
Landing
Cabinet
Battery Cabinet
40"W x 29.5"D x
78.75"H
5,050 lbs
Service Access Area
Size &
Weight
Included in
UPS module
MBC
24.0"W x
32.7"D x
78.75"H
700 lbs
MBC
300 kVA
Transformer
300 kVA
Transformer
(Optional)
46"W x 33"D x 60"H
2,100 lbs
(Optional)
40"
Service
Access Area
NOTE: The transformer requires approx. 8-12" clearance on the sides. Verify with the room layout
Min. 3"Min. 3"
NOTE: The 3" spacing between cabinets is most likely required for proper anchoring. The structural engineer will make the final determination.DRAFT
CPN Power-1039-99
Title: Sub Title:
SHEET 5 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application
117.1" Overall Width
300 kVA UPS
Landing
Cabinet
Landing
Cabinet
80.6"
78.75"
3.9375"
MBP
M B
P
NOTE: The Landing Cabinet, UPS, and Battery Cabinet must be butted and bolted together and/or to the floor (depending on seismic requirements).
NOTE: The equipment dimensions and weights are subject to change. Verify information with CPN Power prior to design.
NOTE: Wiring from the MBP to the UPS and from the UPS to the
MBP to be supplied by the electrical contractor. Wiring from the
UPS to the Battery Cabinet to be supplied by the electrical contractor. Wiring between the UPS/Landing Cabinet and the
Battery Cabinet(s) can be internal to the Cabinets
NOTE: The Landing Cabinet must be located to the left side of the UPS system. The Landing Cabinet is part of the complete
UPS system. The UPS input, bypass, output, and DC busbar extend from the UPS into the Landing Cabinet.
NOTE: Maintain 1" air gap on both ends and the rear of the entire system to allow for better air flow. Top clearance of 24" is recommended.
NOTE: Some applications may require an additional output
Δ/Υ transformer (as displayed) to generate the required neutral.
Battery Cabinet
40"W x 29.5"D x
78.75"H
5,050 lbs
Service Access Area
Static
Bypass
DC
55.1"W x 32.7"D x
80.6"H
2,250 lbsSize &
Weight
Included in
UPS module
300 kVA UPS with MBP & Batteries NOTE: The MBP is not placed next to the Battery
Cabinet, but rather in front of the
Battery Cabinet in the Service
Access space.
See Plan View
300 kVA UPS Layout Drawing with MBP and Batteries (OSHPD)
300 kVA
Transformer
300 kVA
Transformer
(Optional)
46"W x 33"D x 60"H
2,100 lbs
(Optional)
40"
Service
Access Area
MBP
Three Breaker
Side View
38"W x 14"D x
78.75"H
700 lbs
Min. 3"
NOTE: The transformer requires approx. 8-12" clearance on the sides.
Verify with the room layout
Min. 3"
CPN Power-1039-99
Title: Sub Title:
SHEET 6 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS Battery Cabinet Options
NOTE: The battery sizing is based on medical equipment loads. Medical equipment typically draw very low continuous power or fluoro power demands. The equipment will have short bursts in peak power. Therefore, it is common to size battery capacity on a load lower than the UPS capacity. The UPS system is typically operating at the UPS full rating for only several cycles to several seconds maximum.
NOTE: Batteries require a temperature not exceeding 77ºF. Mechanical cooling is required in most areas to accomplish this temperature control.
NOTE: The equipment dimensions and weights are subject to change. Verify information with CPN Power prior to design.
NOTE: Additional Battery Cabinet options are available to meet the project requirements.
Consult CPN Power, Inc. for more details. Common options are different watt per cell battery ratings, front terminal batteries, or premium design battery for longer life.
300 kVA UPS Battery Cabinet Details
Standard Battery Details
One (1) Matching Battery Cabinet(s) complete with the following:
• BC55 Battery Cabinet with (40) 12HX505 Batteries
• 31 Minute battery back up at 75 kVA
• 12 Minute battery back up at 150 kVA
• 5 Minute battery back up at 200 kVA
• Backup times based on 0.9 output PF
• 40 Sealed, flame-retardant Enersys 12V 12HX505 series battery jars per cabinet
• Valve Regulated Lead-Acid (VRLA)
• Batteries installed and pre-wired
• Cabinet mounted circuit breaker – 600A
• Three year warranty against manufacturing defects, one year labor
• 1612.80 Wh per battery jar (@20hr rating) x 40 jars x 1 cabinet(s) = 64.51 kWh
• 1.66 gallons of electrolyte per battery jar x 40 jars x 1 cabinet(s) = 66.25 gallons of electrolyte
• Per Cabinet Dimensions / Weight: 40.0”W x 29.5”D x 78.7”H, 5,050 lbs
NOTE: It is recommended to use two conductors per polarity as displayed in the picture to the left – white oval.
Low voltage control wires are landed above the breaker. See picture aboveDRAFT
CPN Power-1039-99
Title: Sub Title:
SHEET 7 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS Premium Battery Cabinet Options
NOTE: Maintain 1" air gap on both ends and the rear of the entire system to allow for better air flow. Top clearance of 24" is recommended.
NOTE: The MBC, Landing Cabinet, UPS, and Battery Cabinet must be butted and bolted together and/or to the floor (depending on seismic requirements).
NOTE: The equipment dimensions and weights are subject to change.
Verify information with CPN Power prior to design.
NOTE: For some applications, the MBC can be reduced to 16.5" width.
Consult with CPN Power for more details on this option.
NOTE: Wiring from the MBC to the UPS and from the UPS to the MBC to be supplied by the electrical contractor. Wiring from the UPS to the Battery Cabinet to be supplied by the electrical contractor. Wiring between all Cabinets can be internal to the Cabinets
NOTE: The Landing Cabinet must be located to the left side of the UPS system.
The Landing Cabinet is part of the complete UPS system. The UPS input, bypass, output, and DC busbar extend from the UPS into the Landing Cabinet.
NOTE: Some applications may require an additional output Δ/Υ transformer
(not displayed) to generate the required neutral.
300 kVA UPS Premium Battery Cabinet Option
131.6" Overall Width
78.75"
3.9375"
300 kVA UPS
Landing
Cabinet
Landing
Cabinet
80.6" 55.1"W x 32.7"D x
80.6"H
2,250 lbsSize &
Weight
Included in
UPS module
Service Access Area
Optional
Premium
Battery Cabinet
46.5"W x 31.5"D x 82"H
6000 lbs
Optional
Premium
Battery Cabinet
Min. 3"Min. 3"
MBC
MBC
NOTE: The 3" spacing between cabinets is most likely required for proper anchoring. The structural engineer will make the final determination.
24.0"W x
32.7"D x
78.75"H
700 lbs
300 kVA
Transformer
300 kVA
Transformer
(Optional)
46"W x 33"D x 60"H
2,100 lbs
(Optional)
40"
Service
Access Area
NOTE: The transformer requires approx. 8-12" clearance on the sides. Verify with the room layout
CPN Power-1039-99
Title: Sub Title:
SHEET 8 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application
NOTE: The battery sizing is based on medical equipment loads. Medical equipment typically draw very low continuous power or fluoro power demands. The equipment will have short bursts in peak power. Therefore, it is common to size battery capacity on a load lower than the UPS capacity. The
UPS system is typically operating at the UPS full rating for only several cycles to several seconds maximum.
NOTE: Batteries require a temperature not exceeding 77ºF. Mechanical cooling is required in most areas to accomplish this temperature control.
NOTE: The equipment dimensions and weights are subject to change. Verify information with
CPN Power prior to design.
NOTE: Additional Battery Cabinet options are available to meet the project requirements. Consult
CPN Power, Inc. for more details. Common options are different watt per cell battery ratings, front terminal batteries, or premium design battery for longer life.
300 kVA UPS Premium Battery Cabinet Option
300 kVA UPS Premium Battery Cabinet Option Details
Optional Premium Battery Details
One (1) Battery Cabinet(s) complete with the following:
• UBC64 Battery Cabinet with (40) HR5500ET Batteries
• 39 Minute battery back up at 75 kVA
• 13 Minute battery back up at 150 kVA
• 5 Minute battery back up at 225 kVA
• Backup times based on 0.9 output PF
• Battery Cabinet designed to meet IFC 608 compliance
• 40 Sealed, flame retardant battery jars per cabinet
• Deka 12V HR5500ET Front terminal series batteries
• Battery design includes ≈13% more lead in the plates for longer life
• Valve Regulated Lead-Acid (VRLA) batteries with self-resealing flame arresting caps
• Batteries installed and pre-wired
• Cabinet mounted circuit breaker – 600A
• Four (4) year warranty against manufacturing defects, one year labor
• 2040.00 Wh per battery jar (@20hr rating) x 40 jars x 1 cabinet(s) = 81.60 kWh
• 2.31 gallons of electrolyte per battery jar x 40 jars x 1 cabinet(s) = 92.40 gallons of electrolyte
• Per Cabinet Dimensions / Weight: 46.5”W x 31.5”D x 82.0”H, 6,000 lbs
CPN Power-1039-99
Title: Sub Title:
SHEET 9 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application Optional 300 kVA Delta/Wye OSHPD Transformer
Optional
300 kVA
Transformer
Optional Transformer Heat Rejection Specifications Heat Rejection at 100% load 14,400 Btu/Hr Sensible
Heat Rejection at 50% load 7,200 Btu/Hr Sensible
The AC unit could be sized to meet the 50% load requirement of the
Transformer, plus any other heat loads in the space, and any other heat gains through the walls or ceiling.
CPN Power-1039-99
Title: Sub Title:
SHEET 10 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS Proposed OSHPD Layout 1
300 kVA UPS Room OSHPD Layout 1
Landing
Cabinet
MBC
300 kVA
Transformer
Wall behind equipment
NOTE: This drawing displays one example of potential layouts. The equipment can be moved around with a few exceptions. It is strongly recommended to keep the MBC next to the UPS for easy inter-cabinet power wiring (input, output). If required, the MBC could be moved from this position.
NOTE: This drawing displays one of several potential system layouts for OSHPD installations. Installations outside of OSHPD and
Seismic Category D territory do not require the same clearances or restraints.
The final design and system configuration shall be determined by the Architect, MEP Engineer, and Structural Engineer.
NOTE: The layout drawings assume that the A/C is ceiling mounted. A floor mounted unit would increase the room space requirements. All wall mounted electrical distribution panels required may also increase room space.
NOTE: UPS System layout 1 displays a typical clearance between all equipment being installed, including the UPS, Maintenance Bypass Cabinet, and Battery Cabinet. The final distance should be based on code, the structural design, and spacing required in order to anchor the rear of the cabinets.
Service Access Area
175.1" to 197.1"
Equipment spacing to be determined by the Structural and MEP Engineers. The Electrical
Contractor should also be involved in the layout. Common spacing is 3"-12".
A
AA
33"
NOTE: The transformer requires approx. 8-12" clearance on the sides. Verify with the Final room layout
CPN Power-1039-99
Title: Sub Title:
SHEET 11 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application 300 kVA UPS Proposed OSHPD Layout 2
300 kVA UPS Room OSHPD Layout 2
9' Overall Width
Service Access Area
Min. 3"
Min. 3"
Battery Cabinet
Min. 3"
300 kVA
Transformer
Landing
Cabinet
MBC
46"
33"
Min. 75.1"
NOTE: This drawing displays one example of potential layouts. The equipment can be moved around with a few exceptions. It is strongly recommended to keep the MBC next to the UPS for easy inter-cabinet power wiring
(input, output). If required, the MBC could be moved from this position.
NOTE: This drawing displays one of several potential system layouts for OSHPD installations. Installations outside of
OSHPD and Seismic Category D territory do not require the same clearances or restraints.
The final design and system configuration shall be determined by the Architect, MEP Engineer, and
Structural Engineer.
NOTE: The layout drawings assume that the A/C is ceiling mounted. A floor mounted unit would increase the room space requirements. All wall mounted electrical distribution panels required may also increase room space.
NOTE: UPS System layout 1 displays a typical clearance between all equipment being installed, including the UPS, Maintenance Bypass Cabinet, and Battery Cabinet. The final distance should be based on code, the structural design, and spacing required in order to anchor the rear of the cabinets.
Equipment spacing to be determined by the Structural and
MEP Engineers. The Electrical Contractor should also be involved in the layout. Common spacing is 3"-12".
CPN Power-1039-99
Title: Sub Title:
SHEET 12 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application
GROUND WIRE SIZING NOTE:
It is important to size the ground wire per the medical equipment manufacturers recommendation. That wire size is larger than NEC requirements. The ground wire sizing is often parity sized to assure that the ground can pass high frequency noise generated by the medical equipment. High frequency noise travels on the circumference of the wire, therefore requiring the larger ground wire.
WIRING NOTES:
The UPS is designed for dual input. The UPS is commonly operated in the medical industry with a single input. Therefore, it is required to field install jumpers internal to the UPS from the input busbar to the bypass busbar. This assures availability of the static bypass circuit included in the UPS design.
All interconnecting wires between the UPS and other components (Battery Cabinet, Maintenance
Bypass Cabinet, Remote Status Alarm Panel, etc.) and the field installed jumper wires between the
UPS input and bypass terminals are to be supplied and installed by the electrical contractor.
The battery cabinets have several jumpers removed to lower the DC potential during shipping. The
Start-up service technician will install these wires at the time of start-up.
MAINTENANCE BYPASS NOTES:
The Maintenance Bypass can also be optionally configured with output distribution breakers.
This approach may increase the dimensions.
The Maintenance Bypass breakers can be thermal magnetic, or electronic trip (LSI) when upstream and downstream coordination is required.
The Maintenance Bypass fault current rating can be 35, 65, or 100 kAIC to match the potential fault current rating in the facility.
ELECTRICAL TERMINATION NOTES:
The UPS input, bypass, output, ground, and DC terminals are copper bus with holes. Bolts, washers, and nuts are included. The ground busbar holes are 12.5mm (0.49") diameter. All other busbar holes are 14.0mm (0.55") diameter. Tinned copper compression lugs are recommended to assure the best possible connection between the wire and the bus. The lugs are to be provided by the electrical contractor.
MONITORING NOTE:
The Remote Status Alarm Panel is displayed as one option for monitoring the UPS system.
Other monitoring options are available such as Dry contacts, SNMP protocol converters, and Modbus. Consult with CPN Power to learn available options. It is strongly recommended to provide remote monitoring of the UPS system.
UPS SYSTEM SIZE & WEIGHT NOTES:
Be aware that the UPS is of a size and weight that often requires a loading dock and special equipment for handling. Weight and dimensions for the specific unit are noted within this drawing set.
SERVICE ACCESS NOTE:
The unit requires 40” minimum service access on the front of the unit only. No rear or side access is required. It is always a good idea to leave 1" space between the UPS system and the surrounding walls for airflow and to minimize any vibration transfer. Service clearance of 20" above the unit is recommended.
GENERAL NOTE:
If unsure about any details, then call CPN Power at 617-628-2622
ELECTRICAL SERVICE NOTES:
Many Medical Equipment Vendors require a Wye service fed to the equipment, but do not bring the neutral to the equipment. If a Wye service is feeding the UPS, and the neutral is not used in the equipment, then a transformer is not required with this UPS system. If a Delta service is feeding the UPS, then a Delta/Wye
(∆/Y) transformer is required on the output of the UPS in order to generate the required neutral. DO NOT feed the UPS with a Corner-Grounded Delta (Grounded B Phase) System.
This UPS provides 3 phase, 3 wire power. If the load requires a neutral, then a Delta/Wye (∆/Y) transformer is required on the output of the UPS. It is preferable to feed the UPS from a Wye source.
The Maintenance Bypass includes mechanical lugs on the input and output terminals. The breakers include lugs within the breaker for the wire connections. The Battery Cabinet Breaker includes lugs within the breaker
300 kVA UPS Notes
300 kVA UPS Notes
CPN Power-1039-99
Title: Sub Title:
SHEET 13 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application UPS Monitoring Options
Remote Status Alarm Panel (RSAP) (Optional)
The Remote Status Alarm Panel is a small monitoring panel that displays normal and alarm status information for the DCPC or UPS system. Green lights are used to indicate normal operation, yellow lights indicate caution, and red lights indicate a problem that most likely requires a call to the service engineer. The panel is equipped with an audible alarm horn. 8.5"W x 4.5"D x 8.5"H, 10 lbs
UPS Module Monitoring Options
DRY Contacts (Standard)
Dry Contacts are available as standard on the CPN Power UPS system. There is one set of dry contacts. An optionally available second set can be used with a building monitoring or security system, and the standard set can be used with the Remote Status Alarm Panel (RSAP). Output contacts consist of form “A” dry type contacts. Rated capacity of all output contacts is NEC Class2 (30Vdc/
1Adc). All dry contacts should be operated at their rated values or lower.
The dry contacts monitor by default:
Load on Bypass
Load on Inverter
Battery Operation
Rectifier Operation
Battery Low Voltage
UPS Overload
Summary Alarm
Several spares for optional alarms
CPN Power-1039-99
Title: Sub Title:
SHEET 14 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application UPS Monitoring Options
UPS Module Monitoring Options (continued)
Web/SNMP/Modbus Communications Adapter
CPN Power-1039-99
Title: Sub Title:
SHEET 15 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application Remote Status Alarm Panel Power Options
120 Volt Power fed from UPS Power Source
Fourteen (14) low voltage wires. #14 minimum wire size.
120 volt power feed from the MBC
120 Volt Power fed from the MBC (UPS Power Source)
UPS Input
UPS
Output
MB Input MB Output
SW1
SW2
SW3
UPS Input
UPS
Output
MB Input MB Output
SW1
SW2
SW3
Maintenance Bypass
Panel or Cabinet
Transformer
Static Bypass
DC-DC
Converter
SS
Converter Inverter
Static Bypass
DC-DC
Converter
SS
Converter Inverter
Landing Cabinet
CPN Power
UPS
480V 120/208V
Distribution
Panel for
120/208V loads in the given
Suites
Fourteen (14) low voltage wires. #14 minimum wire size.
CPN Power
UPS
Fourteen (14) low voltage wires. #14 minimum wire size.
Power supplied from a local
120/208V distribution, Verify available distribution in the field
120 Volt Power fed from Local Power Source
CPN Power UPS
Transformer
120V power feed
120V power feed
TN2
TN2
TN2
Option 1
Option 2
Option 3
Optional Remote
Status Alarm Panel
Optional Remote
Status Alarm Panel
Optional Remote
Status Alarm Panel
Optional Remote
Status Alarm Panel
Optional Remote
Status Alarm Panel
Optional Remote
Status Alarm Panel
Remote Status Alarm Panel 120 Volt Power Options
NOTE: The remote status panel includes six AA batteries to provide minimal amount of back up power.
Our experience shows that these batteries are not replaced as required. Therefore, our preference is to power the remote status panel from a UPS power source as displayed in the 2 options above.
NOTE: All wiring shall be provided by electrical contractor
Provided by Others
CPN Power-1039-99
Title: Sub Title:
SHEET 16 OF 16 10/04/2019 Rev I www.cpnpower.com
(800) 491-1210 Visio 2013 Initial Drawing Date:Drawing Program: Drawing Revision Date:
Copyright © 2022 CPN Power, Inc. All Rights Reserved
Healthcare OSHPD Application Batt-Safe Monitoring System
Battery Monitoring System
Battery Cabinet # 1
CAT 5
Ethernet Cable
NOTE: Batt-Safe factory mounted and wired inside the Battery Cabinet
To Site
Network
Primary Unit
AC Power Out
AC Power In
Outlet
Primary Unit
NOTE: All interconnecting wires between the Battery
Cabinet, Maintenance Bypass Cabinet, Remote Status
Alarm Panel, BMS, Batt-safe, etc.) are to be supplied and installed by the electrical contractor.
To BMS or RSAP
(2) #12 wires
120V
Control Cubicle Located inside
Maintenance Bypass Cabinet (MBC)
File details come from the government source that posted it. Updated .