36C26126R0012 - Correction of Pre-Solicitation Notice.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C26126R0012
About this file
This document is a Pre-Solicitation Notice for a Design-Build construction project by the Department of Veterans Affairs (VA) Network Contracting Office (NCO 21) to replace a diesel fuel storage tank at the Veterans Affairs Pacific Islands Healthcare Systems (VAPIHCS). The project, identified as Solicitation No. 36C26126R0012, is a total Small Business set-aside with a NAICS code of 236220 and a small business size standard of $45M. The scope involves comprehensive design and construction services to replace an existing 200kW emergency generator's fuel storage tank in Building 110, necessitated by a leak discovered during annular testing.
Potential offerors must be verified and registered in the System for Award Management (SAM) and the Small Business Administration's Veteran Small Business Certification (VetCert) as a Small Business. The project requires design and construction that adheres to VA design guides, current building codes, and specific healthcare standards. The total project timeline is 365 consecutive days, with 178 days allocated for design phase and 180 days for construction phase, including multiple design submittal and review stages. The project's estimated value falls between $250,000 and $500,000, and will require compliance with Davis-Bacon Wage Rates and various safety and design standards including International Building Code, NFPA, OSHA, and VA healthcare directives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126R0012_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Solicitation No. 36C26126R0012 Project No. 459-25-002 Title: CFA Fuel Tank Replacement This Pre-solicitation No. 36C26126R0012 is in conjunction with sources sought notice number 36C26126R0012 posted in SAM.gov Contract Opportunity on 11/18/2025.
All information in this pre-solicitation announcement is preliminary, as well as subject to modification, and is no way binding on the Government.
Department of Veterans Affairs, Network Contracting Office (NCO 21) will be issuing a request for proposal to procure Design-build construction to replace the CFA Fuel Tank.
A request for proposal will be issued as a total Small Business set-aside.
The applicable North American Industry Classification System (NAICS) code is 236220-Commercial and Institutional Building Construction, and the Small Business Size Standard is $45M. PSC code is Z1DZ, Maintenance of Other Hospital Buildings Pursuant to FAR 36.204(d) – Disclosure of the magnitude of construction projects is between $250,000 and $500,000.
Proposals will only be requested and accepted from Vendors that are verified and registered in the System for Award Management (SAM) and be verified in the Small Business Administration’s (SBA) Veteran Small Business Certification (VetCert) as a Small Business.
Potential Offerors must be registered in the System for Award Management (SAM) to be eligible for an award (See https://www.sam.gov/SAM/pages/public/index.jsf). Potential Offerors must also have a current Online Representations and Certification Application on file with SAM. Small Businesses shall have their ownership and control verified by the Department of Veterans Affairs (VA) and be listed in the Small Business Administration (SBA) Veteran Small Business Certification (VetCert) Veteran Small Business Certification (sba.gov). **In addition to or in place of (VetCert), VA may also use the SBA Dynamic Small Business Search (DSBS) as another official source for Small Business verifications.
General Description of the work includes, but not limited to, the following:
This project shall provide comprehensive Design Build services to replace the existing generator diesel fuel storage tank and associated system components at Veterans Affairs Pacific Islands Healthcare Systems (VAPIHCS) CFA Building 110. The existing 200kW Emergency Generator provides power to critical circuits in the event of a natural disaster or power outage. During tank annular testing, a leak into the secondary wall of the fuel storage tank was identified. The existing equipment is over 25 years old, replacement of equipment is required.
The Design Build (DB) contractor must furnish: Design: all design Architect Engineer (A.E) services, equipment, materials, supplies, investigations and project supervision, and construction period services associated with this contract. Design must meet Veterans Affairs Design Guides and Design Criteria and Veterans Affairs Master Specifications at the technical information library TIL (www.cfm.va.gov/TIL). Design must follow all current applicable codes, including:
International Building Code (I.B.C) National Fire Protection Association (N.F.P.A) Occupational Safety and Health Administration (O.S.H.A) Veterans Affairs Plumbing Design Manual.
Veterans Affairs Health Directive 1061 design standard for protection against Health Care Associated (H.C.A) Legionella Disease (L.D)
Contractor shall provide all the equipment, labor, materials, tools and supplies required for construction of the project in accordance with the drawings and specifications including Davis Bacon Wage Rate.
The Design Build contractor will be responsible for providing a complete set of construction specifications along with design drawings and engineering calculations for this project.
Schedule for Design Build & Construction Time:
| ACTION |
| CALENDAR DAYS |
| Kick-Off Meeting and Preliminary Site Review |
| 10 |
| Notice to Proceed |
| 35% Design Submittal & Meeting |
| 28 |
| Kick Off Meeting |
| 35% Veteran Affairs Comments |
| 14 |
| 35% Design Submittal & Meeting |
| 65% Design Submittal and Meeting |
| 35 |
| 35% VA Comments |
*Start Site Preparation for Trailer after 65% turn in
| 65% Veterans Affairs Comments |
| 21 |
| 65% Design Submittal & Meeting |
| 100% Design Submittal & Meeting |
| 35 |
| 65% Veteran Affairs Comments |
| 100% Veteran Affairs comments |
| 14 |
| 100% Design Submittal & Meeting |
| 100% Final Documents Submittal |
| 14 |
| 100% Veterans Affairs comments |
| Mobilization |
| 7 |
| For the Design phase |
| 178 |
| For the Construction Phase |
| 180 |
VA Acceptance of 100% Final Documents
| De-mobilization |
| 7 |
| Project Construction Completed and Operational |
| TOTAL CONSECTUTIVE DAYS |
| 365 |