This is a Shutdown Report documenting electrical maintenance, testing, and inspection services completed at VA Central California Health Care System in Fresno, California by Veteran Electrical Power Systems. The report covers work performed from February through September 2023 on electrical equipment including automatic transfer switches (ATS), transformers, and circuit breakers across multiple buildings at the facility.
The inspection and testing procedures followed comprehensive visual, mechanical, and electrical protocols aligned with industry standards. Key findings indicate that most automatic transfer switches and transformers are suitable for continued use. However, several circuit breakers require attention: NUC-MED and PNL Z Main (2nd floor) failed contact resistance tests; Radiology 4 (spare) is missing a lug bolt for the B phase; EDP Main failed contact resistance testing; EBAC-ATS has an incorrect rating plug reading; UPS failed contact resistance testing; NDP3 and Riser A+B failed short time pickup tests and require replacement; and Elevator S3 had a burnt wire due to loose connection, which was repaired during the inspection. The contractor recommends triennial testing for all breakers going forward. Detailed test data, contact resistance measurements, insulation resistance results, and equipment specifications are documented throughout the report for compliance and maintenance records.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q1088 0002 - Amendment 0002 Document.pdf | ||
| Amendment 0002 - Questions and Answers Document.docx | DOCX document | |
| Amendment 0002 - Attachment 1 - Fresno One-line Diagrams PDF-Glen.pdf | ||
| 36C26126Q1088 - Solicitation Document - Amended.docx | DOCX document | |
| S06 - 36C26126Q1088 0001 - Amendment 0001.docx | DOCX document | |
| 36C26126Q1088_1.docx | DOCX document | |
| Attachment 1 - Electrical Equipment Inventory.xlsx | XLSX spreadsheet | |
| Attachment 3 - Quality Assurance Surveillance Plan.docx | DOCX document | |
| Attachment 4 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2 - Specific Tasks.docx | DOCX document | |
| 36C26126Q1088 - Solicitation Document.docx | DOCX document | |
| Wage Determination 2015-5609 Rev 29 dated 05-13-2026.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHUTDOWN REPORT
Prepared For:
VA Central California Health Care System
2615 E Clinton Ave Fresno, CA 93703
Prepared By:
Veteran Electrical Power Systems
8837 Lankershim Blvd Los Angeles, CA 91352
Office: (818) 861-7610
VETERAN ELECTRICAL POWER SYSTEMS 8837 LANKERSHIM BLVD LOS ANGELES, CA 91352 (818) 861-7610
Table of Content
Work Summary…………………………………………….. Page 2-12
ATS Test………………………………………………………..Page 13-17
Transformer Test…..……….…………………………... Page 18-39
Circuit Breaker Test.…………………………………….. Page 40
Job#: 22575 September 26, 2023
Summary Report ATTN: VA Central California Health Care System
At the request of the VA Central California Health Care System, Veteran Electrical Power Systems performed electrical maintenance, testing and inspection at 2615 E Clinton Ave.
1.0 Purpose
1.1 The purpose of maintenance testing is to ensure that electrical equipment and components are safe and operational within their original design and manufacturers specifications.
Comprehensive testing allows your company to safely identify defective or severely aged equipment prior to electrical failure. When necessary, repairs may be scheduled, thus avoiding costly and unexpected interruptions to normal production
2.0 Equipment Listed:
Automatic Transfer Switches
Equipment Identification Location Make _ ATS-1 1B09/Bldg. 27 Cummins ATS-A Main Elec. Rm/ Bldg. OPC Square D ATS-B Main Elec. Rm/ Bldg. OPC Square D ATS-C Main Elec. Rm/ Bldg. OPC Square D ATS-D Main Elec. Rm/ Bldg. OPC Square D
Transformer List
T-6 Chiller Yard/ Bldg. 2 Standard T-11 Outside/Bldg. CLC Square D T-1 Main Elec. Rm/Bldg. 34 GE T-8 Bldg. 25 Standard NX Main Central Plant/ Bldg. 24 GE T-9 Outside/Bldg. 24 Standard XFMR 75KVA 3A19 Elec. Rm/Bldg. 24 Square D XFMR 112.5KVA 3A19 Elec. Rm/Bldg. 24 Square D T-1 2A21 Elec. Rm/Bldg. 24 Square D T-1 Basement/Elev. Rm/Bldg. 24 Square D XFMR 300KVA Bldg. 22 GE
Circuit Breakers
Equipment Identification Location Make _
N-E-1E 1st FL Hallway/Bldg. 1 GE N-E-1F 1st FL Hallway/Bldg. 1 GE N-E-1C 1st FL Pharmacy/Bldg. 1 GE N-W-1D 1st FL Pharmacy/Bldg. 1 Square D NUC-MED 2nd FL/Bldg. 1 Square D P3 P6 2nd FL/Bldg. 1 Square D PNL BA 2nd FL/Bldg. 1 Square D PNL BCP 2nd FL/Bldg. 1 GE PNL LP 2nd FL/Bldg. 1 GE PNL D Feeder 2nd FL/Bldg. 1 GE PNL PLI 2nd FL/Bldg. 1 GE PNL Z Feeder 2nd FL/Bldg. 1 GE PNL Z Main 2nd FL/Bldg. 1 Square D PNL Z MRI 2nd FL/Bldg. 1 Square D Cannon CT 2A18 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D MRI Water Chiller 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D PNL P Main 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D PNL P Spare 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D PNL Z Spare 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D Radiology 1 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D Radiology 2 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D Radiology 3 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D Radiology 4 (Spare) 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D Special Procedure Toshiba E212 2nd FL 2A07A Elec. Rm. /Bldg. 1 Square D N-E-4E 4th FL 4A27 Hallway /Bldg. 1 GE N-EQ-4C Main 4th FL 4B08 Mech. Rm. /Bldg. 1 Siemens N-W-4B Main 4th FL 4B31/Bldg. 1 GE N-E-4F 4th FL Stair 1/Bldg. 1 GE N-C-4C 4th FL Stair 2/Bldg. 1 GE N-E-5E 5th FL Nurse St. Hallway/Bldg. 1 GE N-E-5F 5th FL Stair 1/Bldg. 1 GE ATS-1 (EDP) Basement/Bldg. 1 GE ATS-2 (EDP) Basement/Bldg. 1 GE ATS-3 (EDP) Basement/Bldg. 1 GE ATS-4 (EDP) Basement/Bldg. 1 GE EDP Main Basement/Bldg. 1 GE Riser C Basement/Bldg. 1 GE XRDP Basement/Bldg. 1 GE 1A/2A Basement 1B1B6A Hlwy/Bldg. 1 GE 1B/2B/3B Basement 1B1B6A Hlwy/Bldg. 1 GE 3A/4A Basement 1B1B6A Hlwy/Bldg. 1 GE 4B/5B Basement 1B1B6A Hlwy/Bldg. 1 GE BB Basement 1B1B6A Hlwy/Bldg. 1 GE LL Basement 1B1B6A Hlwy/Bldg. 1 GE PNL Riser A+B Spare Basement 1B1B6A Hlwy/Bldg. 1 GE
1D/2D Basement Kit-A/Bldg. 1 GE 2DA Basement Kit-A/Bldg. 1 GE 3B/4D/5D Basement Kit-A/Bldg. 1 GE 6B/7B Basement Kit-A/Bldg. 1 GE BD1 Basement Kit-A/Bldg. 1 GE N-C-BD1 Main Basement Kit-A/Bldg. 1 Square D PNL BD Basement Kit-A/Bldg. 1 GE 1E/2E Basement Kitchen/Bldg. 1 GE 1F/2F/3F Basement Kitchen/Bldg. 1 GE 3E/4E Basement Kitchen/Bldg. 1 GE 4F/5F/6D/7D Basement Kitchen/Bldg. 1 GE 5E/6C/7C Basement Kitchen/Bldg. 1 GE N-E-BE1 Main Basement Kitchen/Bldg. 1 GE N-E-K Basement Kitchen/Bldg. 1 Westinghouse PNL BE Basement Kitchen/Bldg. 1 GE PNL BR Basement Kitchen/Bldg. 1 GE PNL FC Basement Kitchen/Bldg. 1 GE PNL N-E-FC Main Basement Kitchen/Bldg. 1 Westinghouse Riser E+F-R Spare Basement Kitchen/Bldg. 1 GE N-W-LP (Washer Disc. BKR) Basement Laundry Rm. /Bldg. 1 GE 1C/2C/3C/4C Basement Stair 2/Bldg. 1 GE 5C/6A/7A Basement Stair 2/Bldg. 1 GE B-C Basement Stair 2/Bldg. 1 GE NCCS Basement Stair 2/Bldg. 1 GE WHB-B Basement Stair 2/Bldg. 1 Westinghouse N-W-1A Cafeteria/Bldg. 1 GE EBAC-ATS EDP1/Bldg. 1 GE EDPA EDP1/Bldg. 1 GE PNL 1X EDP1/Bldg. 1 GE PNL 1Y EDP1/Bldg. 1 GE PNL 1YY EDP1/Bldg. 1 GE PNL 2YY EDP1/Bldg. 1 GE PNL 4X EDP1/Bldg. 1 GE PNL 5Y EDP1/Bldg. 1 GE PNL 5Z EDP1/Bldg. 1 GE PNL 6Y EDP1/Bldg. 1 GE PNL DL EDP1/Bldg. 1 GE PNL SP EDP1/Bldg. 1 GE PNL E1 EDP2/Bldg. 1 GE PNL LSBE/LSIE EDP2/Bldg. 1 GE PNL LSBW/LSIW EDP2/Bldg. 1 GE PNL PX EDP2/Bldg. 1 GE PNL TE EDP2/Bldg. 1 GE PNL TR EDP2/Bldg. 1 GE UPS EDP2/Bldg. 1 GE E-E-3W EDP3/Bldg. 1 GE Gen Compound EDP3/Bldg. 1 GE PNL EBAC EDP3/Bldg. 1 GE
PNL RF EDP3/Bldg. 1 GE PNL Vault EDP3/Bldg. 1 GE SURG MCC EDP3/Bldg. 1 GE BE1 MSS-A/Bldg. 1 GE EDP3 MSS-A/Bldg. 1 GE Elevator MSS-A/Bldg. 1 GE Elevator S3 MSS-A/Bldg. 1 Square D Riser E+F MSS-A/Bldg. 1 GE ATS-1 MSS-B/Bldg. 1 GE ATS-2 MSS-B/Bldg. 1 GE Chiller Panel MSS-B/Bldg. 1 GE N-EQ-4C MSS-B/Bldg. 1 Eaton NDP1 MSS-B/Bldg. 1 GE NDP3 MSS-B/Bldg. 1 GE PNL DHA MSS-B/Bldg. 1 GE PNL K1 K2 MSS-B/Bldg. 1 GE PNL KH MSS-B/Bldg. 1 GE PNL NPA MSS-B/Bldg. 1 GE Riser A+B MSS-B/Bldg. 1 GE Riser D MSS-B/Bldg. 1 GE Solar Output MSS-B/Bldg. 1 Eaton Temp Dehumidifier MSS-B/Bldg. 1 Cutler Hammer Elevator P1 Roof/Elevator Rm/Bldg. 1 Square D Elevator P2 Roof/Elevator Rm/Bldg. 1 Square D Elevator S3 Roof/Elevator Rm/Bldg. 1 Square D Elevator S4 Roof/Elevator Rm/Bldg. 1 Square D PNL 1EM Roof/Elevator Rm/Bldg. 1 Square D ATS-2B 250A Boiler Plant/Bldg. 2 ITE ATS-2B 600A Boiler Plant/Bldg. 2 ITE Deep Well Boiler Plant/Bldg. 2 ITE Emergency Main Boiler Plant/Bldg. 2 ITE Fire Pump Disc Boiler Plant/Bldg. 2 ITE LVDP Boiler Plant/Bldg. 2 ITE LVDP Main Boiler Plant/Bldg. 2 Eaton LVDP Spare Boiler Plant/Bldg. 2 Eaton MCC 1-2A Boiler Plant/Bldg. 2 ITE MCC 2 Boiler Plant/Bldg. 2 ITE SWBD 1-2 Main Boiler Plant/Bldg. 2 ITE
SWBD EDP2 Main Boiler Plant/Bldg. 2 Eaton XFMR T6 Main Disc Chiller Yard/Bldg. 2 ITE EDP4 ATS-22 Street side/Bldg. 2 Eaton EDP4 Main Street side/Bldg. 2 Eaton EDP4 ATS-31 Street side/Bldg. 2 Eaton L1 Main Breaker 1A-7 Workshop/Bldg. 24 Square D
L1 PNL P1 100A 1A-7 Workshop/Bldg. 24 Square D P1 Main Breaker 1A-7 Workshop/Bldg. 24 Square D DP Main Dist. SW 1st FL Elec. Rm/Bldg. 24 Square D MDP Main Breaker 1st FL Elec. Rm/Bldg. 24 Square D
DP Panel Main Breaker 2nd FL Elec. Rm/Bldg. 24 Square D ISO XFMR Main 3A19 Elec. Rm/Bldg. 24 Square D Panel L3 Main 3A19 Elec. Rm/Bldg. 24 Square D Panel P3 Main 3A19 Elec. Rm/Bldg. 24 Square D S. Penthouse Main 3A19 Elec. Rm/Bldg. 24 Square D T-3 Main 3A19 Elec. Rm/Bldg. 24 Square D Panel P3B-3 Main 3A19 Elec. Rm/Bldg. 24 Square D LB Main Breaker Bsmnt/Elev. Machine Rm/Bldg. 24 Square D LE1 Main Breaker 1X01 Main Elec. Rm/Bldg. 25 Eaton MSB Elev. Control 1X01 Main Elec. Rm/Bldg. 25 Eaton MSB Main Breaker 1X01 Main Elec. Rm/Bldg. 25 Eaton CB-EDP-02 Main Grounds/Bldg. 25 Eaton EDP-02 Main Grounds/Bldg. 25 Eaton T-BEMD Grounds/Bldg. 25 Eaton T-BSB Grounds/Bldg. 25 Eaton T-EDP4 Grounds/Bldg. 25 Eaton A1 AHU1 1st FL Elec. Rm/Bldg. 34 GE A1 Main Breaker 1st FL Elec. Rm/Bldg. 34 GE B1 Main Breaker 1st FL Elec. Rm/Bldg. 34 GE B1 Panel B1-1 1st FL Elec. Rm/Bldg. 34 GE B1-1 Main Breaker 1st FL Elec. Rm/Bldg. 34 GE MSB Elevator 1st FL Elec. Rm/Bldg. 34 GE MSB Main 1st FL Elec. Rm/Bldg. 34 GE MSB Panel A1 Breaker 1st FL Elec. Rm/Bldg. 34 GE MSB Panel A2 Breaker 1st FL Elec. Rm/Bldg. 34 GE MSB Spare 1st FL Elec. Rm/Bldg. 34 GE MSB XFMR T1 1st FL Elec. Rm/Bldg. 34 GE A2 Main Breaker 2nd FL Elec. Rm/Bldg. 34 GE A2 XFMR T2 2nd FL Elec. Rm/Bldg. 34 GE B2 Main Breaker 2nd FL Elec. Rm/Bldg. 34 GE B2 Panel B2-1 2nd FL Elec. Rm/Bldg. 34 GE B2 Main Breaker 2nd FL Elec. Rm/Bldg. 34 GE B2-1 Main Breaker 2nd FL Elec. Rm/Bldg. 34 GE JC-1 Panel E Elec. Rm/Bldg. LC2 Square D JC-1 Panel G Elec. Rm/Bldg. LC2 Square D JC-1 Panel H Elec. Rm/Bldg. LC2 Square D JC-1 Panel I Elec. Rm/Bldg. LC2 Square D TB2 Panel A Elec. Rm/Bldg. LC2 Square D TB2 Panel B Elec. Rm/Bldg. LC2 Square D TB2 Panel C Elec. Rm/Bldg. LC2 Square D TB2 Panel D Elec. Rm/Bldg. LC2 Square D Panel A Main Outside/Bldg. LC2 Siemens Panel B Main Outside/Bldg. LC2 Siemens Panel C Main Outside/Bldg. LC2 Siemens Panel D Main Outside/Bldg. LC2 Siemens Panel E Main Outside/Bldg. LC2 Siemens Panel F Main Outside/Bldg. LC2 Siemens Panel G Main Outside/Bldg. LC2 Siemens
Equipment Identification Location Make Panel H Main Outside/Bldg. LC2 Siemens JC1 Main Disc Trailer/Bldg. LC2 Square D TB2 Main Disc Trailer/Bldg. LC2 Square D 2NLDP 2NLB 2C15E/Bldg. OPC Square D 2NLDP 2NLC 2C15E/Bldg. OPC Square D 2NLDP 2NLD 2C15E/Bldg. OPC Square D 2NLDP 2SL 2C15E/Bldg. OPC Square D 2NLDP 3NLA 2C15E/Bldg. OPC Square D 2NLDP 3NLB 2C15E/Bldg. OPC Square D 2NLDP Main Breaker 2C15E/Bldg. OPC Square D 1-BPH Main Basement/Bldg. OPC Square D 1-BPH MCC2 Basement/Bldg. OPC Square D BECD Main Disc Basement/Bldg. OPC Square D BECD PNL 2ECLA+3E Basement/Bldg. OPC Square D BECD PNL 3ECLA Basement/Bldg. OPC Square D BECD PNL BE-2 Basement/Bldg. OPC Square D BECD PNL BE-3 Basement/Bldg. OPC Square D BECD Unknown Basement/Bldg. OPC Square D MSB Main Basement/Bldg. OPC Westinghouse MSB Panel 2NLP Basement/Bldg. OPC Westinghouse T-BEMD ATS A Basement/Bldg. OPC Square D T-BEMD ATS B Basement/Bldg. OPC Square D T-BEMD ATS C Basement/Bldg. OPC Square D T-BEMD Main Basement/Bldg. OPC Square D T-BEMD Spare Basement/Bldg. OPC Square D ECBB MCC-3 SO-G14A Mech. Rm/Bldg. OPC Square D
Location (OPC) SWBD ID V A Make
B1C17A 1BPH PNL BESD 480 225 SQUARE D
B1C17A 1BPH 2NHA/3NHA 480 125 SQUARE D
B1C17A 1BPH MCCB-N 480 100 SQUARE D
B1C17A 1BPH ATS-D 480 150 SQUARE D
B1C17A 1BPH ATS-B 480 150 SQUARE D
B1C17A 1BPH ATS-A 480 225 SQUARE D
B1C17A 1BPH MCC-2 480 400 SQUARE D
B1C17A 1BPH ATS-C 480 225 SQUARE D
B1C17A 1BPH SOLAR OUTPUT 480 150 SQUARE D
B1C17A MS-B DA 480 225 WESTING
B1C17A MS-B 1-B 480 150 WESTING
B1C17A MS-B 1A 480 100 WESTING
B1C17A MS-B SPARE 480 200 WESTING
B1C17A MS-B MCC1 480 150 WESTING
B1C17A BEMD ATS A 480 225 SQUARE D
B1C17A BEMD ATS C 480 175 SQUARE D
B1C17A BEMD ATS B 480 150 SQUARE D
ED RAMP CHILLER PNL CH1 208 175 SQUARE D
ED RAMP CHILLER PNL CH2 208 175 SQUARE D
ED RAMP CHILLER PNL CH3 208 175 SQUARE D
ED RAMP CHILLER PNL SPARE 208 200 SQUARE D
ED RAMP CHILLER PNL SHELTER 208 100 SQUARE D
B1C17A MRI TRAILER 480 200 SQUARE D
2C15E 2NLDP 3NLB 208 150 SQUARE D
2C15E 2NLDP 3NLA 208 150 SQUARE D
2C15E 2NLDP 2NLA 208 100 SQUARE D
2C15E 2NLDP 2NLC 208 150 SQUARE D
2C15E 2NLDP 2NLD 208 100 SQUARE D
2C15E 2NLDP 2SL 208 200 SQUARE D
2C15E 2NLDP 2NLB 208 150 SQUARE D
B1C17A 1BPH MAIN 480 1200 SQUARE D
B1C17A MS-B MAIN 480 1600 WESTING
B1C17A MS-B NLDP-2NLDP 480 600 WESTING
B1C17A MS-B XMAS TREE PNL 480 400 WESTING
B1C17A BEMD MAINS 480 450 SQUARE D
B1C17A BECD MAINS 480 400 SQUARE D
2C15E 2NLDP MAIN 208
ED RAM CH PNL MAIN 208 800 SQUARE D
3.0 Inspection and Test Procedures
The contractor performed the following visual and mechanical inspections on the Circuit Breaker:
• Compare equipment nameplate data with drawings and specifications.
• Inspect physical and mechanical condition.
• Inspect anchorage and alignment.
• Verify the unit is clean.
• Operate the circuit breaker to insure smooth operation.
• Inspect bolted electrical connections for high resistance using one or more of the following methods:
o Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer’s published data.
• Inspect operating mechanism, contacts, and arc chutes in unsealed units.
• Perform adjustments for final protective device settings in accordance with the coordination study.
The contractor performed the following electrical tests on Circuit Breaker:
• Measure the system neutral-to-ground insulation resistance with the neutral disconnect link temporarily removed. Replace neutral disconnect link after testing.
• Perform ground fault protective device pickup tests using primary current injection.
• For summation type systems utilizing phase and neutral current transformers, verify correct polarities by applying current to each phase-neutral current transformer pair.
This test also applies to molded-case breakers utilizing an external neutral current transformer.
• Measure time delay of the ground fault protective device at a value equal to or greater than 150 percent of the pickup value.
• Verify that reduced control voltage tripping capability is 55 percent for ac systems and 80 percent for dc systems.
The contractor performed the following visual and mechanical inspections on the Automatic Transfer Switches
• Inspect physical and mechanical condition.
• Inspect anchorage, alignment, grounding, and required clearances.
• Prior to cleaning the unit, perform as-found tests.
• Clean the unit.
• Use appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
• Verify that manual transfer warnings are attached and visible.
• Verify tightness of all control connections.
The contractor performed the following electrical tests on the Automatic Transfer Switches
• Perform resistance measurements through bolted connections with a low-resistance ohmmeter, if applicable, in accordance with Section 7.22.3.1.
• Perform insulation resistance tests on all control wiring with respect to ground. The applied potential shall be 500 volts dc for 300-volt rated cable and 1000 volts dc for 600-volt rated cable. Test duration shall be one minute. For units with solid-state components or for control devices that cannot tolerate the applied voltage, follow manufacturer’s recommendation.
• Perform a contact/pole-resistance test.
• Verify settings and operation of control devices.
• Calibrate and set all relays and timers in accordance with Section 7.9.
• Perform automatic transfer tests:
o Simulate loss of normal power.
o Return to normal power.
o Simulate loss of emergency power.
o Simulate all forms of single-phase conditions.
• Verify correct operation and timing of the following functions:
o Normal source voltage-sensing relays.
o Engine start sequence.
o Time delay upon transfer.
o Alternate source voltage-sensing relays.
o Automatic transfer operation.
o Interlocks and limit switch function.
o Time delay and retransfer upon normal power restoration.
o Engine cool down and shutdown feature
Transformers, Dry Type, Air-Cooled, Large
NOTE: This category consists of power transformers with windings rated higher than 600 volts and low-voltage transformers larger than 167 kVA single-phase or 500 kVA three-phase.
Visual and Mechanical Inspection
Inspect physical and mechanical condition including evidence of moisture and corona.
Inspect anchorage, alignment, and grounding.
Prior to cleaning the unit, perform as-found tests, if required.
Clean the unit.
Verify that cooling fans operate correctly.
Inspect bolted electrical connections for high resistance using one or more of the following methods:
o Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer’s published data.
Perform specific inspections and mechanical tests as recommended by the manufacturer.
Perform as-left tests.
Verify that as-left tap connections are as specified.
Verify the presence of surge arresters.
Electrical Tests
Perform insulation-resistance tests winding-to-winding and each winding-to-ground. Apply voltage in accordance with manufacturer’s published data.
Perform insulation power-factor or dissipation-factor tests on all windings in accordance with the test equipment manufacturer’s published data.
Perform turns-ratio tests at the designated tap position.
Perform an excitation-current test on each phase.
Measure core insulation resistance at 500 volts dc if the core is insulated and if the core ground strap is removable.
Verify correct secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading.
Transformers, Liquid-Filled
Visual and Mechanical Inspection
Inspect physical and mechanical condition.
Inspect anchorage, alignment, and grounding.
Verify the presence of PCB labeling.
Prior to cleaning the unit, perform as-found tests, if required.
Clean bushings and control cabinets.
Verify that cooling fans and/or pumps operate correctly.
Inspect bolted electrical connections for high resistance using one or more of the following methods:
o Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer’s published data.
Verify correct liquid level in tanks and bushings.
Verify that positive pressure is maintained on gas-blanketed transformers.
Perform inspections and mechanical tests as recommended by the manufacturer.
Verify the presence of transformer surge arresters.
Perform as-left tests.
Verify de-energized tap-changer position is left as specified.
B. Electrical Tests
Perform insulation-resistance tests, winding-to-winding and each winding-to-ground. Apply voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.5. Calculate polarization index.
Perform turns-ratio tests at the designated tap position.
Perform insulation power-factor or dissipation-factor tests on all windings in accordance with test equipment manufacturer’s published data.
Perform power-factor or dissipation-factor tests on each bushing equipped with a power-factor/ capacitance tap. In the absence of a power-factor/ capacitance tap, perform hot-collar tests.
These tests shall be in accordance with the test equipment manufacturer’s published data.
Perform excitation-current tests in accordance with the test equipment manufacturer’s published data.
Measure the resistance of each winding at the designated tap position.
Remove a sample of insulating liquid in accordance with ASTM D 923. The sample shall be tested for the following.
o Dielectric breakdown voltage: ASTM D 877 and/or ASTM D 1816 o Acid neutralization number: ANSI/ASTM D 974 o Specific gravity: ANSI/ASTM D 1298 o Interfacial tension: ANSI/ASTM D 971 or ANSI/ASTM D 2285 o Color: ANSI/ASTM D 1500 o Visual Condition: ASTM D 1524
Test the instrument transformers in accordance with Section 7.10.
Test the surge arresters in accordance with Section 7.19.
4.0 Findings and Recommendations
Automatic Transfer Switches are suitable for continued use.
Transformers are suitable for continued use.
Circuit breaker is suitable for continued use.
o It is recommended that breakers be tested every three years.
2nd floor circuit breaker NUC-MED is not suitable for continued use, contact resistance test failed to meet requirements.
o Recommend observing circuit breaker for any further anomalies.
2nd floor circuit breaker PNL Z Main is not suitable for continued use, contact resistance test failed to meet requirements.
o Recommend observing circuit breaker for any further anomalies.
2nd floor 2A07A Electrical Room circuit breaker Radiology 4 (Spare) B phase is missing lug bolt.
o Recommend installing lug bolt for B phase for future use of circuit breaker.
Basement circuit breaker EDP Main is not suitable for continued use, contact resistance test failed to meet requirements.
o Recommend observing circuit breaker for any further anomalies.
EDP1 circuit breaker EBAC-ATS rating plug read as 125A but LO indications the plug should read
225A.
o Recommend checking and labeling rating plug accordingly.
EDP2 circuit breaker UPS is not suitable for continued use, contact resistance failed to meet requirements.
o Recommend observing circuit breaker for any further anomalies.
MSS-B circuit breaker NDP3 is not suitable for continued use, short time pick up failed to meet requirements.
o Recommend replacing unit.
MSS-B circuit breaker Riser A+B is not suitable for continued use, short time pick up failed to meet requirements o Recommend replacing unit.
Roof/Elevator Room circuit breaker Elevator S3 A0 Lug is bad. Wire burnt due to loose connection. Our technicians replaced the lug and fixed the wire.
Thank you for the opportunity to service to your electrical needs.
Respectfully, Sergio Rangel President Veteran Electrical Power Systems, Inc.
Default AdministratorTESTED BY:
Form Schema 0, REVISED 4/18/2023COPYRIGHT © 2002-2023 POWERDB, INC. www.powerdb.com
Catalog #
Manufacturing
Wire Diag:
Amps:
Inst. Bk:
Serial #
Parts Bk.
Voltage:
Op. Coil:
Bul #
Time Range "Transfer to Emergency" ToFrom
Time Range "Retransfer to Normal" From To
Transfer Time to Emergency
TEST OPERATIONS
As Found As Left
Type:
Phase: 3
Power Generation
Retransfer Time to Normal As Found As Left
NORMAL EMERGENCY
A B CVoltage Drop in Millivolts:
B-N A-NC-NVoltage Readings: A-N
B-C A-BC-A B-CA-B
A B CAC BAmperage Readings:
Contacts:
Megger:
Cleaned:
Lubrication:
OK
N/A
Circuit Properly Tagged:
Bolted Connections:
Mechanical Operation:
Unusual Conditions:OK
OK
276.6
478.8
276.4
479.1
0 sec
0 sec
1800 sec
1800 sec
478.4
276.5
B C
-C
A
B
C-N
A
B-N
C-A
A BContact Resistance in Microhms: C- --
OK
OK
N/A
OKOK
Cummins
BTPCB-AU52U347
G15M850139
8837 Lankershim Blvd Los Angeles CA 91352 Office: (818) 861-7610 C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSAUTOMATIC TRANSFER SWITCH
PAGE
22575JOB #
DATE 2/28/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
84 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 27
1B09
ATS-1
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 41
Arc Chutes:
COMMENTS: ATS is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:1 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
Fluke1 1/1/2023 1/1/2023117 Other1
Catalog #
Manufacturing
Wire Diag:
Amps:
Inst. Bk:
Serial #
Parts Bk.
Voltage:
Op. Coil:
Bul #
Time Range "Transfer to Emergency" ToFrom
Time Range "Retransfer to Normal" From To
Transfer Time to Emergency
TEST OPERATIONS
As Found As Left
Type:
Phase: 3
Class 8902
Retransfer Time to Normal As Found As Left
NORMAL EMERGENCY
A B CVoltage Drop in Millivolts:
B-N A-NC-NVoltage Readings: A-N
B-C A-BC-A B-CA-B
A B CAC BAmperage Readings:
Contacts:
Megger:
Cleaned:
Lubrication:
OK
N/A
Circuit Properly Tagged:
Bolted Connections:
Mechanical Operation:
Unusual Conditions:OK
OK
271.5
471.1
0 sec
0 sec
1800 sec
1800 sec
247.4
478.6
276.2
474.2
B C
-C
A
B
C-N
A
B-N
C-A
A BContact Resistance in Microhms: C1808 16191501
OK
OK
N/A
OKOK
Square D
8902IG260-3-48
8837 Lankershim Blvd Los Angeles CA 91352 Office: (818) 861-7610 C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSAUTOMATIC TRANSFER SWITCH
PAGE
22575JOB #
DATE 3/21/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
84 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building OPC
Main Electrical Room
ATS-A
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 41
Arc Chutes:
COMMENTS: ATS is suitable for continued use.
DEFICIENCIES:
Catalog #
Manufacturing
Wire Diag:
Amps:
Inst. Bk:
Serial #
Parts Bk.
Voltage:
Op. Coil:
Bul #
Time Range "Transfer to Emergency" ToFrom
Time Range "Retransfer to Normal" From To
Transfer Time to Emergency
TEST OPERATIONS
As Found As Left
Type:
Phase: 3
Class 8902
Retransfer Time to Normal As Found As Left
NORMAL EMERGENCY
A B CVoltage Drop in Millivolts:
B-N A-NC-NVoltage Readings: A-N
B-C A-BC-A B-CA-B
A B CAC BAmperage Readings:
Contacts:
Megger:
Cleaned:
Lubrication:
OK
N/A
Circuit Properly Tagged:
Bolted Connections:
Mechanical Operation:
Unusual Conditions:OK
OK
271.9
471.7
0 sec
0 sec
1800 sec
1800 sec
274.6
479.1
276.1
474.2
B C
-C
A
B
C-N
A
B-N
C-A
A BContact Resistance in Microhms: C- --
OK
OK
N/A
OKOK
Square D
8902IG150
8837 Lankershim Blvd Los Angeles CA 91352 Office: (818) 861-7610 C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSAUTOMATIC TRANSFER SWITCH
PAGE
22575JOB #
DATE 3/21/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
84 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building OPC
Main Electrical Room
ATS-B
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 41
Arc Chutes:
COMMENTS: ATS is suitable for continued use.
DEFICIENCIES:
Catalog #
Manufacturing
Wire Diag:
Amps:
Inst. Bk:
Serial #
Parts Bk.
Voltage:
Op. Coil:
Bul #
Time Range "Transfer to Emergency" ToFrom
Time Range "Retransfer to Normal" From To
Transfer Time to Emergency
TEST OPERATIONS
As Found As Left
Type:
Phase: 3
Class 8902
Retransfer Time to Normal As Found As Left
NORMAL EMERGENCY
A B CVoltage Drop in Millivolts:
B-N A-NC-NVoltage Readings: A-N
B-C A-BC-A B-CA-B
A B CAC BAmperage Readings:
Contacts:
Megger:
Cleaned:
Lubrication:
OK
N/A
Circuit Properly Tagged:
Bolted Connections:
Mechanical Operation:
Unusual Conditions:OK
OK
276.5
471.6
0 sec
0 sec
1800 sec
1800 sec
274.6
479.2
276.3
474.3
B C
-C
A
B
C-N
A
B-N
C-A
A BContact Resistance in Microhms: C- --
OK
OK
N/A
OKOK
Square D
8902IG260
8837 Lankershim Blvd Los Angeles CA 91352 Office: (818) 861-7610 C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSAUTOMATIC TRANSFER SWITCH
PAGE
22575JOB #
DATE 3/21/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
84 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building OPC
Main Electrical Room
ATS-C
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 41
Arc Chutes:
COMMENTS: ATS is suitable for continued use.
DEFICIENCIES:
Catalog #
Manufacturing
Wire Diag:
Amps:
Inst. Bk:
Serial #
Parts Bk.
Voltage:
Op. Coil:
Bul #
Time Range "Transfer to Emergency" ToFrom
Time Range "Retransfer to Normal" From To
Transfer Time to Emergency
TEST OPERATIONS
As Found As Left
Type:
Phase: 3
Class 8902
Retransfer Time to Normal As Found As Left
NORMAL EMERGENCY
A B CVoltage Drop in Millivolts:
B-N A-NC-NVoltage Readings: A-N
B-C A-BC-A B-CA-B
A B CAC BAmperage Readings:
Contacts:
Megger:
Cleaned:
Lubrication:
OK
N/A
Circuit Properly Tagged:
Bolted Connections:
Mechanical Operation:
Unusual Conditions:OK
OK
272.3
472.2
0 sec
0 sec
1800 sec
1800 sec
279.2
479.5
276.1
475.4
B C
-C
A
B
C-N
A
B-N
C-A
A BContact Resistance in Microhms: C- --
OK
OK
N/A
OKOK
Square D
8901AG150-3-480
8837 Lankershim Blvd Los Angeles CA 91352 Office: (818) 861-7610 C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSAUTOMATIC TRANSFER SWITCH
PAGE
22575JOB #
DATE 3/21/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
84 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building OPC
Main Electrical Room
ATS-D
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 41
Arc Chutes:
COMMENTS: ATS is suitable for continued use.
DEFICIENCIES:
8837 Lankershim Blvd Los Angeles CA 91352
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
67 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
2A21 Electrical Room
T-1
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 34
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0014
PHASE B
4.0001
PHASE C
4.0014
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
3 3AL
Fixed
WINDING RESISTANCE TEST IN OHMS
/150 -
4.8 -
NAMEPLATE DATA
150T3HSERIAL NO.
Volts
Square D YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
SO
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X11.32T 813G 845G
ELECTRICAL TESTS
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
MEGGER2 12/7/2022 12/7/2023MIT515 Other101473840
MEGGER3 5/12/2023 5/12/2024MTO210 OtherMN6156
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
67 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
3A19 Electrical Room
XFMR 112.5KVA
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 34
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0026
PHASE B
4.0028
PHASE C
4.0028
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
3 3AL
WINDING RESISTANCE TEST IN OHMS
/113 95
5.5 -
NAMEPLATE DATA
112T3HEESERIAL NO.
Volts
Square D YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
SO
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X168.7G 54.6G 50.4G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
67 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
3A19 Electrical Room
XFMR 75KVA
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 34
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0042
PHASE B
4.0042
PHASE C
4.0045
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
3 3AL
WINDING RESISTANCE TEST IN OHMS
/75 95
5.5 -
NAMEPLATE DATA
75T3HEESERIAL NO.
Volts
Square D YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
SO
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X146.9G 39.8G 44.2G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
67 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
Basement/Elevator Machine Room
T-1
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 34
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0
PHASE B
4.0
PHASE C
3.99
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
3 3AL
WINDING RESISTANCE TEST IN OHMS
/45 -
4.6 -
NAMEPLATE DATA
SG3A0045KBSERIAL NO.
Volts
Hammond Power YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
SO
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X152.2G 48.0G 61.4G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
65 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 25
Building 25
XFMR T-8
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 33
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
100.03
PHASE B
100.04
PHASE C
100.04
CALC
TRANSFORMER TURN RATIO TEST
TAP
- -AL
3.183
3.197
3.182
.000512
.000521
.000521
C
WINDING RESISTANCE TEST IN OHMS
/300 95
5.7 263
NAMEPLATE DATA
3359284811SERIAL NO.
Volts
Howard Ind. YR MFR N/A
KVA
IMPEDANCE //OA
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Sealed
TAP SETTING
TAP VOLTAGES
Oil Filled
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
Mineral Oil
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X127.4G 18.8G 23.2G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
76 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 22
Buildng 22
XFMR 300KVA
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 29
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
45.044
PHASE B
45.030
PHASE C
45.036
CALC
44.997
TRANSFORMER TURN RATIO TEST
TAP
E-G E-GAL
0.2402
0.2409
0.2386
0.1819
0.1693
0.1593
E-G
WINDING RESISTANCE TEST IN OHMS
/300 -
5.93 -
NAMEPLATE DATA
SG3A0045KBSERIAL NO.
Volts
GE YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
VPI
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.48
DRY TYPE CONSERVATOR
WYE
12.47
0.277/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X1311G 302G 313G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
72 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 2
Chiller Yard
T-6
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 30
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
44.382
PHASE B
44.394
PHASE C
44.386
CALC
43.301
TRANSFORMER TURN RATIO TEST
TAP
- -AL
C
WINDING RESISTANCE TEST IN OHMS
/750 95
5.44 -
NAMEPLATE DATA
PJG-3002SERIAL NO.
Volts
Standard Transformer YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
S
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.48
DRY TYPE CONSERVATOR
WYE
0.277/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X14.26G 3.46G 3.91G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
72 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
Main Central Plant
NX
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 30
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0016
PHASE B
4.0018
PHASE C
4.0018
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
- -AL
WINDING RESISTANCE TEST IN OHMS
/45 -
4.5 -
NAMEPLATE DATA
9T83C9873SERIAL NO.
Volts
GE YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
QL
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X111G 10.6G 13.2G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
72 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 34
Main Electrical Room
T-1
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 30
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
4.0012
PHASE B
4.0012
PHASE C
4.0016
CALC
3.997
TRANSFORMER TURN RATIO TEST
TAP
- -AL
WINDING RESISTANCE TEST IN OHMS
/75 -
4.5 -
NAMEPLATE DATA
9T83C9874615SERIAL NO.
Volts
GE YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
QL
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.48
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X140.56G 36.46G 3
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
72 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building CLC
Outside
T-11
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 30
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
100.05
PHASE B
100.06
PHASE C
100.06
CALC
99.926
TRANSFORMER TURN RATIO TEST
TAP
- -AL
Fixed
WINDING RESISTANCE TEST IN OHMS
/75 -
5 -
NAMEPLATE DATA
N/ASERIAL NO.
Volts
Square D YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
N/A
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV 0.208
DRY TYPE CONSERVATOR
WYE
0.12/
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X15.37G 3.87G 5.37G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
22575JOB #
DATE 9/26/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
67 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
Outside
T-9
Incomplete
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 34
VISUAL AND MECHANICAL INSPECTION
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY FANS OPERATE
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
INSPECTION REPORT
FAIL
FAIL
FAIL
PASS
PASS
PASS
INSPECTION REMARKS
Dusty/Cleaned
2,500 1,000 2,500
MINUTES
PRIMARY TO
GROUND
SECONDARY TO
GROUND
PRIMARY TO
SECONDARY
INSULATION RESISTANCE IN MEGOHMS
Test kV
1.00
PHASE A
44.998
PHASE B
44.990
PHASE C
44.988
CALC
44.997
TRANSFORMER TURN RATIO TEST
TAP
- -AL
1.155
1.157
1.152
950.5
1.910
1041.7
Fixed
WINDING RESISTANCE TEST IN OHMS
/0 -
0 -
NAMEPLATE DATA
-SERIAL NO.
Volts
Standard YR MFR N/A
KVA
IMPEDANCE //-
WINDING MATERIAL °CCOPPER
CLASSTYPECAPACITY
B.I.L. RATINGTEMPERATURE RISE
PRIMARY KV
TAP POSITION Free Breathing
TAP SETTING
TAP VOLTAGES
MANUFACTURER
INSULATING MEDIUM
TANK TYPE
SECONDARY KV
DRY TYPE CONSERVATOR
WYE
DELTA
GALLONS
WORKING TAP AF
H1-H2
H2-H3
H3-H1
X0-X2
X0-X3
X0-X17.48G 2.61G 6.69G
ELECTRICAL TESTS
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMS TRANSFORMER MAINTENANCE TEST
PAGE
56700, Form Schema 0, REVISED 10/6/2022COPYRIGHT © 2002-2022 POWERDB, INC. www.powerdb.com
COMMENTS: Transformer is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
RAYTECH1 5/12/2023 5/12/2024TR-MARK III Other321-165
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSBREAKER INSPECTION & TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
82 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
1A-7 Workshop
L1 Main Breaker
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 32
Default AdministratorTESTED BY:
16107, Form Schema 0, REVISED 8/1/2023COPYRIGHT © 2002-2023 POWERDB, INC. www.powerdb.com
AMPACITY0.600
BIL kV
LL LL-1565
kV kA
N/A
0.480
N/ASquare D SERIAL NUMBER
MANUFACTURER
TYPE
MAXIMUM VOLTAGE
INTERRUPTING CAPACITY
MODEL NO. DATE MANUFACTURED
kV
OPERATING VOLTAGE
SETTINGS
LONG TIME (PICK UP)
LONG TIME (DELAY)
SHORT TIME (PICK UP)
SHORT TIME (DELAY)
SHORT TIME I2T (ST I SQ T)
GROUND FAULT (DELAY)
GROUND FAULT I2T (GF I SQ T)
PHASE UNBALANCE (U/B) (PICK UP)
PHASE UNBALANCE (U/B) (DELAY)
GF QT (PICK UP)
I QT (PICK UP)
Fixed
100 100
Fixed
RATING PLUG
AS LEFTAS FOUND AS FOUND AS LEFT
GROUND FAULT (PICK UP)
THERMAL MEMORY- - - -INSTANTANEOUS PICK UP
THERMAL MAGNETIC (O/L)
VISUAL AND MECHANICAL INSPECTION
OK N/ACHECKLIST NOTES
OK
OK
OK
GENERAL PHYSICAL CONDITION OK
ARC CHUTES
TRIP MECHANISM
MECHANICAL OPERATION
CONTACT RESISTANCE (MICRO-OHMS)
811 AF / AL 811 AF / AL 827827 821 821AF / AL
PASSC PHASEA PHASE FAILB PHASE
CURRENT INJECTION
FAILPASS
TIME DELAY / CURRENTCURRENT
Secondary
CURRENT
Primary
TIME DELAY / CURRENT
FUNCTION
TEST
SETTINGS
1.0 PASS63s300LONG TIME
SHORT TIME -
INSTANTANEOUS -
GROUND FAULT -
>2200
>2200 >2200
>2200VDC
Closed ( Ph. - Ph. )
INSULATION RESISTANCE
Open ( Line - Load )
Gigaohms B-G
C-G
>2200
>2200
>2200
C-A
Closed ( Ph. - Gnd. )
A-BA-G
B-B'B-C
C-C'
>2200 A-A' >2200 1000@
PASS PASS
COMMENTS: Breaker is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
AVO1 9/5/2023 9/5/2024DDA-6000 Other121086-001
MEGGER2 4/10/2023 4/10/2024DLRO Other101433317
MEGGER3 5/12/2023 5/12/2024MIT515 Other101720062
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSBREAKER INSPECTION & TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
82 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
1A-7 Workshop
L1 Panel P1 100A
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 32
Default AdministratorTESTED BY:
16107, Form Schema 0, REVISED 8/1/2023COPYRIGHT © 2002-2023 POWERDB, INC. www.powerdb.com
AMPACITY0.600
BIL kV
FA FA26100AC
kV kA
N/A
0.480
N/ASquare D SERIAL NUMBER
MANUFACTURER
TYPE
MAXIMUM VOLTAGE
INTERRUPTING CAPACITY
MODEL NO. DATE MANUFACTURED
kV
OPERATING VOLTAGE
SETTINGS
LONG TIME (PICK UP)
LONG TIME (DELAY)
SHORT TIME (PICK UP)
SHORT TIME (DELAY)
SHORT TIME I2T (ST I SQ T)
GROUND FAULT (DELAY)
GROUND FAULT I2T (GF I SQ T)
PHASE UNBALANCE (U/B) (PICK UP)
PHASE UNBALANCE (U/B) (DELAY)
GF QT (PICK UP)
I QT (PICK UP)
Fixed
100 100
Fixed
RATING PLUG
AS LEFTAS FOUND AS FOUND AS LEFT
GROUND FAULT (PICK UP)
THERMAL MEMORY- - - -INSTANTANEOUS PICK UP
THERMAL MAGNETIC (O/L)
VISUAL AND MECHANICAL INSPECTION
OK N/ACHECKLIST NOTES
OK
OK
OK
GENERAL PHYSICAL CONDITION OK
ARC CHUTES
TRIP MECHANISM
MECHANICAL OPERATION
CONTACT RESISTANCE (MICRO-OHMS)
804 AF / AL 804 AF / AL 923923 874 874AF / AL
PASSC PHASEA PHASE FAILB PHASE
CURRENT INJECTION
FAILPASS
TIME DELAY / CURRENTCURRENT
Secondary
CURRENT
Primary
TIME DELAY / CURRENT
FUNCTION
TEST
SETTINGS
1.0 PASS45.6s300LONG TIME
SHORT TIME -
INSTANTANEOUS -
GROUND FAULT -
>2200
>2200 >2200
>2200VDC
Closed ( Ph. - Ph. )
INSULATION RESISTANCE
Open ( Line - Load )
Gigaohms B-G
C-G
>2200
>2200
>2200
C-A
Closed ( Ph. - Gnd. )
A-BA-G
B-B'B-C
C-C'
>2200 A-A' >2200 1000@
PASS PASS
COMMENTS: Breaker is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
AVO1 9/5/2023 9/5/2024DDA-6000 Other121086-001
C10 Lincense #987407
VETERAN ELECTRICAL POWER SYSTEMSBREAKER INSPECTION & TEST
PAGE
22575JOB #
DATE 3/1/2022
VA Central California Health Care System
2615 E Clinton Ave; Fresno CA USA 93703
VA Central California Health Care SystemOWNER
ADDRESS
CUSTOMER
82 °F
TEST STATUSSITE
SUBSTATION
EQUIPMENT %
Building 24
1A-7 Workshop
P1 Main Breaker
Pass
ASSET ID N/A
HUMIDITYAMBIENT TEMPERATURE 32
Default AdministratorTESTED BY:
16107, Form Schema 0, REVISED 8/1/2023COPYRIGHT © 2002-2023 POWERDB, INC. www.powerdb.com
AMPACITY0.600
BIL kV
LK LK-3023
kV kA
N/A
0.480
N/ASquare D SERIAL NUMBER
MANUFACTURER
TYPE
MAXIMUM VOLTAGE
INTERRUPTING CAPACITY
MODEL NO. DATE MANUFACTURED
kV
OPERATING VOLTAGE
SETTINGS
LONG TIME (PICK UP)
LONG TIME (DELAY)
SHORT TIME (PICK UP)
SHORT TIME (DELAY)
SHORT TIME I2T (ST I SQ T)
GROUND FAULT (DELAY)
GROUND FAULT I2T (GF I SQ T)
PHASE UNBALANCE (U/B) (PICK UP)
PHASE UNBALANCE (U/B) (DELAY)
GF QT (PICK UP)
I QT (PICK UP)
Fixed
150 150
Fixed
RATING PLUG
AS LEFTAS FOUND AS FOUND AS LEFT
GROUND FAULT (PICK UP)
THERMAL MEMORY- - - -INSTANTANEOUS PICK UP
THERMAL MAGNETIC (O/L)
VISUAL AND MECHANICAL INSPECTION
OK N/ACHECKLIST NOTES
OK
OK
OK
GENERAL PHYSICAL CONDITION OK
ARC CHUTES
TRIP MECHANISM
MECHANICAL OPERATION
CONTACT RESISTANCE (MICRO-OHMS)
517 AF / AL 517 AF / AL 478478 519 519AF / AL
PASSC PHASEA PHASE FAILB PHASE
CURRENT INJECTION
FAILPASS
TIME DELAY / CURRENTCURRENT
Secondary
CURRENT
Primary
TIME DELAY / CURRENT
FUNCTION
TEST
SETTINGS
1.0 PASS43.8s450LONG TIME
SHORT TIME -
INSTANTANEOUS -
GROUND FAULT -
>2200
>2200 >2200
>2200VDC
Closed ( Ph. - Ph. )
INSULATION RESISTANCE
Open ( Line - Load )
Gigaohms B-G
C-G
>2200
>2200
>2200
C-A
Closed ( Ph. - Gnd. )
A-BA-G
B-B'B-C
C-C'
>2200 A-A' >2200 1000@
PASS PASS
COMMENTS: Breaker is suitable for continued use.
DEFICIENCIES:
EQUIPMENT USED:3 Manufacturer# Calibration Date Calibration DueModel TypeSerial / ID Number
AVO1 9/5/2023…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .