Attachment A Annual TB Testing Room List.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 36C26126Q0725
About this file
This is an attachment listing the annual tuberculosis (TB) testing room requirements for the VA Sierra Nevada Health Care System across multiple buildings and facilities.
The document specifies minimum air change (ACH) requirements, tested CFM values, room volumes, air balance requirements, and testing frequencies for isolation rooms, procedure rooms, operating rooms, and specialized facilities throughout Buildings B, C, F, G, H, and J. Testing is required annually for most rooms, with quarterly testing mandated for Building G's Sterile Processing Services (SPS) areas including decontamination, cart wash/storage, sterile prep, and clean/sterile storage rooms. Key ISO rooms include isolation and ante rooms with 12 ACH and 10 ACH requirements respectively across multiple floors in Building B (primary care, ICU, and medical-surgical units), procedure rooms in Buildings C and F requiring 15-25 ACH, and specialized areas such as chemotherapy rooms (30 ACH), operating rooms (20 ACH), and bronchoscopy/cardiac catheterization labs (15 ACH) in Building G. Air balance requirements are specified directionally (positive or negative pressure) between connected spaces such as corridors, ante rooms, and isolation rooms. Note (1) specifies that certain ante rooms must maintain 0.01 inches of water column negative air pressure with airflow from corridor to ante room to isolation room, with the ante room positive relative to the isolation room but negative relative to the corridor. This attachment serves as the technical specification for the Test and Balance service contract requiring contractors to verify compliance with these HVAC design specifications in accordance with the VA HVAC Design Manual 2011.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1- Questions.pdf | ||
| WD 2015-5623 Revision 27 Dated 07-08-2025.pdf | ||
| VA HVAC Design Manual.pdf | ||
| S02 - 36C26126Q0725.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISO Rooms
| Room # | Room Name | Minimum Total ACH | Tested CFM | Tested ACH | Room Volume (ft³) | Room Air Balance Requirement | Testing Requirement Frequency | |
| BUILDING B (12) | ||||||||
| 1st Floor Primary Care | ||||||||
| B1242 | Women's Health | 15 ACH, | 1377 ft³ | (+ .002) | Annually | |||
| B142? | Women's Health | 15 ACH, | (+ .002) | Annually | ||||
| 3rd Floor ICU | ||||||||
| B3629 | ISO Room | 12 ACH, (6-91) | Annually | |||||
| B3629 | Ante Room | 10 ACH, (6-91) | Annually | |||||
| B3639 | ISO Room | 12 ACH, (6-91) | Annually | |||||
| B3639 | Ante Room | 10 ACH, (6-91) | Annually | |||||
| 4th Floor Med Surg | ||||||||
| B4131 | Ultrasound | 6 ACH, (6-44) | 396 | 1677 ft³ | (+) | Annually | ||
| B4135 | Ultrasound | 6 ACH, (6-44) | 503 | 1676 ft³ | (+) | Annually | ||
| B4188 | ISO Room | 12 ACH, (6-91) | 450 | 1623 ft³ | Corridor to Ante | (-) | Annually | |
| B4188A | Ante Room | 10 ACH, (6-91) | 87 | 448 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B4192 | ISO Room | 12 ACH, (6-91) | 523 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B4192A | Ante Room | 10 ACH, (6-91) | 56 | 441 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| 5th Floor Med Surg | ||||||||
| B5131 | ISO Room | 12 ACH, (6-91) | 405 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B5131A | Ante Room | 10 ACH, (6-91) | 83 | 448 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5135 | ISO Room | 12 ACH, (6-91) | 426 | 1676 ft³ | Corridor to Ante | (-) | Annually | |
| B5135A | Ante Room | 10 ACH, (6-91) | 78 | 433 ft³ | Corridor to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5188 | ISO Room | 12 ACH, (6-91) | 414 | 1676 ft³ | Corridor to Ante | (-) | Annually | |
| B5188A | Ante Room | 10 ACH, (6-91) | 52 | 433 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5192 | ISO Room | 12 ACH, (6-91) | 527 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B5192A | Ante Room | 10 ACH, (6-91) | 97 | 448 ft³ | Ante to Isolation | (-) Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| 6th Floor Inpatient Mental Health |
| BUILDING C (1) | |||||
| C2400 | Non-hazardous | ||||
| Compounding | 25 ACH | 1053 ft³ | (+ .002) | Annually |
| BUILDING F (6) | |||||
| F1490 | Procedure | 15 ACH | 2260 ft³ | (+ .002) | Annually |
| F1496 | Procedure | 15 ACH | 2160 ft³ | (+ .002) | Annually |
| F1513 | Procedure | 15 ACH | 1440 ft³ | (+ .002) | Annually |
| BUILDING G (1D) | ||||||||
| 1st Floor | ||||||||
| SPS | SPS Decon | 6 ACH, (6-76) | 1193 | 4521 ft³ | Decon to Corridor | (--) | Quarterly | |
| Decon to Corridor | (-) | Quarterly | ||||||
| Decon to Sterile Prep | (-) | Quarterly | ||||||
| SPS | Cart Wash / Storage | 10 ACH, (6-76) | 450 | 3688 ft³ | Cart wash to Decon | (-) | Quarterly | |
| Cart Wash to Clean Storage | (-) | Quarterly | ||||||
| Decon | Hall Restrooms | 10 ACH, (6-76) | 475 | 1916 ft³ | Decon Hall to Main Corridor | (-) | Quarterly | |
| Decon Hall to Decon | (-) | Quarterly | ||||||
| SPS | Sterile Prep | 4 ACH (6-74) | 1050 | 6346 ft³ | Sterile Prep to Clean Storage | (+) | Quarterly | |
| Sterile Prep to Decon | (+) | Quarterly | ||||||
| SPS | Clean Storage | 4 ACH (6-74) | 1113 | 5.58 | 12090 ft³ | Clean Storage to Office Area | (+) | Quarterly |
| Clean Storage to Cart Wash | (-) | Quarterly | ||||||
| Clean Storage to Sterile Storage | (+) | Quarterly | ||||||
| SPS | Sterile Storage | 4 ACH, (6-75) | 609 | 6978 ft³ | Sterile Storage to Sterile Prep | (-) | Quarterly | |
| Sterile Storage to Clean Storage | (+) | Quarterly | ||||||
| 2nd Floor | ||||||||
| G2538 | Bronchoscopy | 15 (6-43) | 719 | 18.4 | 2681.3 | (-) | Annually | |
| G2559 | Cardiac Cath Lab | 15 (6-43) | 1459 | 11.1 | 7876.26 | Room to Hallway | (-) | Annually |
| Room to Control Room | (-) | Annually | ||||||
| G2589 | IR Special Procedure | 15 (6-43) | 6007 ft³ | (+) | Annually | |||
| G2642 | Chemo | 30 (6-57) | 493 | 914 ft³ | Chemo To Ante Room | (-) | Annually | |
| G2642 | IV | 30 (6-56) | 909 | 1362 ft³ | IV To Ante Room | (-) | Annually | |
| G2642 | Ante | 30 (6-56) | 801 | 1444 ft³ | Ante to Pharmacy | (+) | Annually | |
| Ante to Chemo | (-) | Annually | ||||||
| Ante to IV | (+) | Annually | ||||||
| 3rd Floor | ||||||||
| G3547 | Clean Supply | 4 | 3519 ft³ | (+ .002) | Annually | |||
| G3549 | Clean Equipment Storage | 4 | 1440 ft³ | (+ .002) | Annually | |||
| G3554 | Sterile Storage | 4 | 801 ft³ | (+ .002) | Annually | |||
| G3555 | Sterile Storage | 4 | 2124 ft³ | (+ .002) | Annually | |||
| G3563 | Clean Supply | 4 | 342 ft³ | (+ .002) | Annually | |||
| G3566 | OR #1 | 20 (6-84) | 877 | 3479 ft³ | OR 1 to Center Core | (+) | Annually | |
| OR 1 to Corridor | (+) | Annually | ||||||
| G3568 | OR #2 | 20 (6-84) | 957 | 3750 ft³ | OR 2 to Center Core | (+) | Annually | |
| OR 2 to Corridor | (+) | Annually | ||||||
| G3578 | OR #3 | 20 (6-84) | 1331 | 5116 ft³ | OR 3 to Center Core | (+) | Annually | |
| OR 3 to Corridor | (+) | Annually | ||||||
| G3594 | PAR Ex Storage | 4 | 495 ft³ | (+ .002) | Annually | |||
| G3607 | Sterile Storage | 4 | 1764 ft³ | (+ .002) | Annually | |||
| ?? | OR #4 | 20 (6-84) | 1260 | 3747 ft³ | OR 4 to Center Core | (+) | Annually | |
| OR 4 to Corridor | (+) | Annually | ||||||
| OR 4 to Storage | (+) | Annually | ||||||
| G3603 | Cysto 1 | 20 (6-83) | 964 | 3681 ft³ | To Corridor | (+) | Annually | |
| To Corridor | (+) | Annually | ||||||
| To Center Storage | (+) | Annually | ||||||
| G3601 | Cysto 2 | 20 (6-83 | 674 | 2641 ft³ | To Corridor West | (+) | Annually | |
| G3610 | Soiled Utility | 10 | 1368 ft³ | (- .01) | Annually | |||
| G3612 | Clean Storage | 4 | 873 ft³ | (- .002) | Annually | |||
| G3617, G3619, G3628 | OR Equipment / Davinci Robot Storage | 4 | 6912 ft³ | Connecting corridor | (+ -.002) | Annually | ||
| To Corridor East | (+) | Annually | ||||||
| To Center Storage | (+) | Annually | ||||||
| To Bathroom | (+) | Annually | ||||||
| G4550 | IR Special Procedure | 15 (6-43) | 1335 | 4349 ft³ | To Corridor | (+) | Annually | |
| To Control Room | (+) | Annually | ||||||
| Building H (1D) | ||||||||
| H3680 | Endoscopy: EDG Procedure | 15 ACH, (6-93) | 748 | 2856 ft³ | Endo to Corridor | (+) | Annually | |
| Endo to Center Core | (+) | Annually | ||||||
| H3686 | Endoscopy: EDG Procedure | 15 ACH, (6-93) | 729 | 2515 ft³ | Endo to Corridor | (+) | Annually | |
| Endo to Center Office | (+) | Annually | ||||||
| H3672 | Endoscopy: Gastro Procedure | 15 ACH, (6-93) | 843 | 3076 ft³ | Endo to Corridor | (+) | Annually | |
| Endo to Center Office | (+) | Annually | ||||||
| Building J (4 - Emergency Department) | ||||||||
| J1416 | ISO Room ED | 12 | 154 | 1470.7 ft³ | (-) | Annually | ||
| J1721 | ISO Room ED | 12 | (-) | Annually |
NOTES:
(1) Ante room is required to be at 0.01 in wc negative air pressure. Air shall transfer from the corridor into the Ante room and then into the Isolation Room. The Ante Room is positive (+) in respect to the Isolation Room and negative (-) with respect to the corridor.
(2) OR and CYSTO Rooms are grandfathered in to have 15 ACH as an acceptable ACH as long as they are positve (+).
ATTACHMENT A &"-,Bold"&12Indoor Air Quality &16ISO and Critical Environment Room Minimum Air Change and Pressure Requirements&12 &"-,Regular"&8in accordance with&"-,Bold"&12 VA HVAC Design Manual 2011 1-27-2025
4/3/2019 image1.jpg
File details come from the government source that posted it. Updated .