36C26126Q0500.docx
DOCX document 113 KB Posted
- Solicitation number
- 36C26126Q0500
About this file
This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (SF 1449) issued by the Department of Veterans Affairs Network Contracting Office (NCO) 21 for the design and installation of GH3 Ceiling Patient Lift Systems in two CT rooms at VA Southern Nevada Healthcare System. The solicitation number is 36C26126Q0500, with an offer due date of March 20, 2026 at 3:30 PM PDT and an award/effective date of March 17, 2026. This is a Small Business Set-Aside acquisition under FAR 13.106, with a firm-fixed-price contract type anticipated. The contract will be administered by Contracting Officer Alex Hernandez at the Department of Veterans Affairs Network Contracting Office.
The contractor must provide a 4x4 meter B-rail room covering system with a 770-pound hoist capacity, including design, installation, and clinical training for two separate installations in CT rooms 1D252 and 1D244. The patient lift system must meet specific technical requirements including automatic hands-free dynamic body weight support, wireless Wi-Fi connectivity, internal Class III scale, minimum 2.2 inches per second lifting speed, 15-year expected lifespan, UL certification, and minimum three-year warranty on lift units with five-year battery warranty. The contractor shall furnish all materials, labor, equipment, and services for installation, with work scheduled between March 24, 2026 and September 30, 2026, performed during standard daytime hours (8:00 AM to 5:00 PM Monday-Friday). The lift motors will be provided by VA Southern Nevada Healthcare System from stored stock. Payment will be made quarterly in arrears upon receipt and acceptance by the Government. Invoices must be submitted electronically through VA's Electronic Invoice Presentment and Payment System. The Contracting Officer Representative is Yaren Usul at VA Southern Nevada Healthcare System, located at 6900 N. Pecos Road, North Las Vegas, Nevada 89086.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26126Q0500
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
593-26-2-140-0028
36C261-26-AP-2421
36C26126Q0500 03-17-2026 Jason Olliff 916-923-4398 03-20-2026 15:30
PDT
612MCP
Department of Veterans Affairs Network Contracting Office (NCO) 21
X X 339113 800 Employees N/A X
"SEE DELIVERY SCHEDULE"
612MCP
FMS VA-9(101) Financial Services Center PO Box 149971 Austin
TX
78714-9971 See CONTINUATION Page Design and Installation of the GH3 Ceiling Patient Lift System (2) ea .
This will be a Small Business Set-Aside IAW FAR 13.106 Quote shall be submitted to Jason Olliff at jason.olliff@va.gov by: See Block 8 Questions shall be submitted NLT 24 hours before the closing date, See CONTINUATION Page X X Alex Hernandez Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| STATEMENT OF WORK | 4 |
| RECORDS MANAGEMENT LANGUAGE | 12 |
| B.2 PRICE/COST SCHEDULE | 17 |
| ITEM INFORMATION | 17 |
| B.3 DELIVERY SCHEDULE | 18 |
| SECTION C - CONTRACT CLAUSES | 20 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) | 20 |
| C.2 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 26 |
| C.3 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 26 |
| C.4 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 26 |
| C.5 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 27 |
| C.6 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018) | 27 |
| C.7 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018) | 28 |
| C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION FEB 2025) | 28 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 38 |
| SECTION E - SOLICITATION PROVISIONS | 39 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023) | 39 |
| E.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 43 |
| E.3 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 43 |
| E.4 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 44 |
| E.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 44 |
| E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 48 |
| E.7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION FEB 2025) | 49 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C261 Alex Hernandez
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Upon receipt and acceptance by the Government. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Tungsten Network www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Veterans Affairs Southern Nevada Healthcare System
STATEMENT OF WORK
1. CONTRACT TITLE: Track and Infrastructure Support Installation for Patient Lift Systems in CT Rooms (1D252, 1D244)
2. REQUIREMENTS/SCOPE: The purpose of this project is to install Ceiling Patient Lifts in CT rooms 1D252 and 1D244 as required by Safe Patient Handling and Mobility (SPHM) at the VA Southern Nevada Healthcare System (VASNHS). Lift equipment is stored at the VASNHS, but ceiling tracks must be purchased and installed while CT replacement construction occurs in these areas. This will be a Limited Source award.
3. SPECIFIC TASKS:
1. The contractor shall be a specialized medical device provider. The contractor will provide initial setup materials and installation. Prior to any material ordering, there will be a mandatory multi-discipline site walkthrough to assess site conditions, after award. The CT rooms that will have the tracks installed are in the location of Building 1, Main Hospital, 1st Floor, Rooms 1D252 and 1D244.
2. Electrical
a. The charging system for the lift system shall include a class 1 transformer requiring 110 v AV power. Any electrical connections in the ceiling plenum or above the ACT must be hardwired (no plugin allowed). Contractor will be responsible for making the final electrical connection.
3. Preparation of Space and Return to Use
a. Work to prepare the space for installation of patient lift system, or return of space for use after, that is not specifically related to patient lift use is outside the scope of work for the contractor, nor is the contractor responsible for hiring specific contractors/trades to perform such work.
4. Contractor shall provide appropriate infection control measures that follow VASNHS regulations provided by the Infection Control team.
5. The facility will be responsible for the storage of the equipment and materials on the worksite; open access to vacant rooms for installation; the provision of clear pathways; use of electric power and lights within the building at no cost must be provided to the contractor by the facility.
Project Phases
1. Design
a. The contractor will provide shop drawings of each installation. The facility will provide the necessary as-builts/drawings for the scope of this project (CT rooms).
b. Contractor standard design shall be approved by the VA prior to installation. Contractor shall revise their drawings until such approval is granted.
c. When required, the attachment detail for the specific application will be stamped by structural engineer.
2. Shipments and Lead Time
a. Installation planning begins once Purchase Orders are received and is generally scheduled to begin six to eight weeks after receipt of P.O. unless otherwise indicated
3. Installation
a. Standard installation is based on Single Phase (1 mobilization) for non-recessed systems, or Two-Phase (2 mobilizations) for recessed systems
b. Labor is Non-Union, unless specified
c. Installers are insured and contracted and will comply with requirements and regulations as provided by the Facility
d. Systems will be engineered with a weight rating of 550-1100 Ibs, as per quotation specifications and drawings
e. The patient lift rail support attachment is a standalone attachment for the sole use in supporting patient lift rails only. It does not add, remove, or modify the existing building structure
f. Completed systems shall support at 1.5 x rated working load per hoist specification.
g. System is inspected for full functionality, signed off by technician and facility representative, and turned over for use,
4. Contractor Furnished Material:
a. The Contractor shall furnish all parts, labor, materials and equipment necessary for this service and for installation. No Government property will be provided.
b. The Contractor shall be responsible for cleaning and removal of all trash and debris created during installation or maintaining the system. The Contractor shall provide their own dumpster, labeled “[CONTRACTOR’S NAME] USE ONLY – NOT FOR VA USE” and shall coordinate the removal of all trash, waste, and debris as needed (i.e., when dumpster is full and/or installation is complete) from the site.
c. The Contractor shall provide all safety equipment and personal protective equipment for their employees.
d. The Contractor shall be responsible for the deinstallation and disposal of current SPS and Dialysis Carbon filter tanks. Site planning and equipment setup, including delivery, installation and configuration, shall also be performed by the Contractor.
e. The Contractor shall provide two (2) sets of clinical (user) and technical (service) manuals and preventive maintenance schedule
5. Product Training. In-service training will be scheduled by the contractor and Facility and will take place after Final Sign off and Acceptance.
Change Orders. Change orders shall be in writing and signed by the contractor. and the Facility. Changes in Work shall be performed under applicable provisions of the Contract Documents and shall be attached to the quotation as an addendum.
4. PERIOD OF PERFORMANCE/SCHEDULE:
A. The POP for this contract shall be: The date of award (start) through the completion of installation, including certification and testing (end)
B. Normal daytime working hours will be adhered to. Normal daytime work hours are 0800 to 1700 Monday through Friday. If the contractor wishes to work at nighttime or during other unscheduled times, they must first get permission from the Contracting Officer.
5. PARTICIPATING FACILITY: Veterans Affairs Southern Nevada Healthcare System (VASNHS), located at 6500 N Pecos Rd, North Las Vegas, NV 890
6. CONTRACTING OFFICER REPRESENTATIVE:
The Contracting Officer Representative (COR) shall provide general instructions and shall be responsible for administrating the contract and ensuring invoices are certified for payment in a timely manner.
| Location |
| VA Southern Nevada Healthcare System |
6900 N. Pecos Rd. North Las Vegas, NV 89086
| COR: |
| Yaren Usul |
| Phone: |
| (702) 209 - 7637 |
| e-mail: |
| Yaren.Usul@va.gov |
| Location |
| VA Southern Nevada Healthcare System |
6900 N. Pecos Rd. North Las Vegas, NV 89086
| POC |
| Jason D. Reese (SPHM Program Manager) |
| Phone: |
| 702-791-9000 |
| e-mail: |
| Jason.Reese2@va.gov |
7. CONTRACTOR POINT OF CONTACT:
a. Contractor shall designate one employee as the Point of Contact (POC) responsible for administrative matters in the performance of services under this contract. The POC shall have full authority to act for the Contractor on all matters relating to the daily performance of this contract.
b. The POC shall be available by telephone Monday through Friday, between 7:30 a.m. and 4:00 p.m. excluding national holidays.
c. Contractor shall provide the name and telephone number of the person designated as Point of Contact, Alternate Point of Contact, and the name, location and telephone number of the office where normal and emergency service calls are to be placed:
Point of Contact (Full Name):
Telephone Number:
E-mail Address:
Alternate Point of Contact (Full Name):
Telephone Number:
E-mail Address:
Emergency Service Contact Information:
Emergency Service Telephone Number:
8. U.S. GOVERNMENT FURNISHED MATERIALS AND SERVICES:
The contractor shall be responsible for the receipt and handling of all equipment and materials. The contractor shall coordinate proposed delivery areas with the Engineer.
9. CONTRACTOR FURNISHED ITEMS AND SERVICES:
The contractor shall furnish all necessary supplies, fuels, lubricants, solvents, parts, materials, equipment, products, tools, and any other items and services to perform all delivery and pick-up operations required by this statement of work.
The contractor shall provide fully qualified on-site personnel who shall be responsible for the performance of the work. The name of the person and all alternates shall be designated in writing to the Contracting Officer. The project manager shall be on-site during normal work hours and for contingencies requiring work beyond normal work hours.
The contractor shall certify in writing that all employees operating equipment are trained and qualified.
10. CONTRACTOR RESPONSIBILITIES:
Contractor Employees. The contractor shall not employ personnel for work on this contract if such employee is identified to the contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
The Contractor shall furnish service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring the appropriate equipment, parts and/or supplies necessary to complete the work as required. The Contractor shall be familiar and follow maintenance guidelines contained in current technical service manuals for all equipment and sub-assemblies listed. Manuals shall include but not be limited to schematics, diagrams, written procedures and parts lists.
All work shall be performed, and equipment shall function in conformance with all VA safety standards, manufacturer’s/industry standards, the latest published edition of NFPA-99, FDA, OSHA, Joint Commission, and other applicable national standards. The COR may facilitate a copy of VA safety standards to the Contractor upon request.
Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or company ID badge. Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract.
Personnel performing maintenance and repair services must be fully qualified, competent, technicians. “Fully qualified and competent” is defined as factory trained and verified by Polar Leasing.
11. RE-PERFORMANCE:
a. If performance does not conform to the contract specifications, the VA Healthcare Center’s COR or the Contracting Officer shall require the Contractor to perform the service again to conform to the contract specifications, at no cost to the Government. When the defects in service cannot be corrected by re-performance, the VA Medical facility may require the Contractor to call in a senior technical engineer from the manufacturer or from a different company. The Contractor shall incur and absorb all expenses for consultation outside the Contractor’s organization.
b. Repeated malfunctions of any system component or subsection more than three (3) times within one (1) quarter is not acceptable. The Contractor is responsible for repairing all faulty equipment and identifying the nature and cause of repeated failures.
a. The Contractor in this situation must either:
a. Make repairs in such a manner that the identified problems are corrected to the extent that repeated failures are eliminated.
b. Prove that the equipment is not faulty and an external cause for the problem exists and provide recommendations for resolution.
c. Provide repair services from the original equipment manufacturer at the Contractor’s
12. NO SERVICE CALLS AT THE VA FACILITIES:
No service calls should be performed under this contract. Service call work shall be defined in a separate contract.
13 NATIONAL HOLIDAYS:
The Contractor is not required to provide delivery or pick up services on the following National Holidays.
| New Year’s Day |
| January 1 |
| Martin Luther King‘s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Juneteenth |
| June 19 |
| Independence Day |
| July 4 |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veterans Day |
| November 11 |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25 |
When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday by U.S. Government agencies. When a holiday falls on a Saturday, the preceding Friday shall be observed as a legal holiday by U.S. Government agencies. Also included would be any other day specifically declared by the President of the United States as a National Holiday.
14 OVERTIME AND HOLIDAYS:
Any overtime or holiday pay that may be entitled to Contractor personnel performing under this contract shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.
15 PARKING POLICY:
It is the responsibility of Contractor personnel to park only in designated parking areas. Parking information is available from the VA Police. The VA shall not invalidate or make reimbursement for parking violations of Contractor's personnel under any circumstances.
16 SMOKING POLICY:
Contractor personnel may not smoke on VA property.
17 ORDERING ACTIVITY:
Contractor shall not accept any instructions issued by any person other than the CO or COR acting within the limits of his/her authority.
18 CHANGES TO CONTRACT:
Only those services specified herein are authorized. Before performing any service of a non-contractual nature, Contractor shall advise the CO of the reason(s) for the additional work and/or service.
19 COMPLAINTS:
Contractor shall promptly and courteously respond to complaints within 3 working days. Including complaints brought to Contractor’s attention by the CO. Contractor shall maintain a written record of all complaints, both written and oral showing the identity of the individual, the nature of the complaint, and Contractor’s response. Contractor shall permit the Government to inspect such records upon reasonable notice.
20 BADGES:
All Contractor personnel shall be required to wear company ID badges.
21 INVOICE REQUIREMENTS:
a. Payments will be broken into four quarterly payments and paid in arrears.
b. No advance payments will be authorized.
c. The Government shall pay the Contractor, upon the submission of a properly prepared invoice for prices stipulated in this contract for services and supplies delivered and accepted.
d. Payment of invoices may be delayed if appropriate field service reports are not completed and submitted as specified herein.
e. The invoice shall be itemized to include the following minimum information:
1) Invoice Number and Date.
2) Contract Number.
3) Purchase Order/Obligation Number (to be assigned upon task order award).
4) Date of service.
5) Line item from Schedule of Service associated with each charge.
22 POST-AWARD PERFORMANCE CONFERENCE: The CO may schedule a post-award performance conference with Contractor, if deemed necessary, for contract orientation purposes.
23 SECURITY REQUIRMENTS:
A. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. The contractor shall follow the VHA Healthcare Environment and Facilities Program’s “Safe Patient Handling and Mobility Guidebook”.
B. A prohibition on unauthorized disclosure: "Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA." See VA Handbook 6500.6, Appendix C, paragraph 3.a.
C. A requirement for data breach notification: Upon discovery of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access, the contractor/subcontractor shall immediately and simultaneously notify the COR, the designated ISO, and Privacy Officer for the contract. The term 'security incident' means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. See VA Handbook 6500.6, Appendix C, paragraph 6.a.
D. A requirement to pay liquidated damages in the event of a data breach: "In the event of a data breach or privacy incident involving any SPI the contractor processes or maintains under this contract, the contractor shall be liable to VA for liquidated damages for a specified amount per affected individual to cover the cost of providing credit protection services to those individuals." See VA Handbook 6500.6, Appendix C, paragraph 7.a., 7.d.
E. A requirement for annual security/privacy awareness training: "Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall complete on an annual basis either: (i) the VA security/privacy awareness training (contains VA's security/privacy requirements) within 1 week of the initiation of the contract, or (ii) security awareness training provided or arranged by the contractor that conforms to VA's security/privacy requirements as delineated in the hard copy of the VA security awareness training provided to the contractor. If the contractor provides their own training that conforms to VA's requirements, they will provide the COR or CO, a yearly report (due annually on the date of the contract initiation) stating that all applicable employees involved in VA's contract have received their annual security/privacy training that meets VA's requirements and the total number of employees trained. See VA Handbook 6500.6, Appendix C, paragraph 9.
F. A requirement to sign VA's Rules of Behavior: "Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall sign on an annual basis an acknowledgment that they have read, understand, and agree to abide by VA's Contractor Rules of Behavior which is attached to this contract." See VA Handbook 6500.6, Appendix C, paragraph 9, Appendix D. Note: If a medical device vendor anticipates that the services under the contract will be performed by 10 or more individuals, the Contractor Rules of Behavior may be signed by the vendor's designated representative. The contract must reflect by signing the Rules of Behavior on behalf of the vendor that the designated representative agrees to ensure that all such individuals review and understand the Contractor Rules of Behavior when accessing VA's information and information systems.
G. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the vendor at the end of lease, for trade-in, or other purposes." See VA Handbook 6500.6, Appendix C, paragraph 5.h., for the specific options.
RECORDS MANAGEMENT LANGUAGE
Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. Chapters. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
In accordance with 36 CFR 1222.32, the contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
The VA Southern Nevada Healthcare System (VASNHS) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VASNHS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.
In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report to VASNHS. The agency must report promptly to NARA in accordance with 36 CFR 1230.
The contractor shall immediately notify the appropriate Contracting Officer (CO) upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract documents. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VASNHS control or the contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the CO or address prescribed in the contract documents. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
The contractor is required to obtain the CO's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The contractor (and any sub-contractor) is required to abide by Government and VASNHS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
The contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VASNHS policy.
The contractor shall not create or maintain any records containing any non-public VASNHS information that are not specifically tied to or authorized by the contract.
The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the FOIA.
VASNHS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VASNHS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
Training:
All contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The contractor is responsible for confirming that training has been completed according to agency policies, including initial training and any annual or refresher training.
Flowdown of requirements to Subcontractors:
The contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract document, and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the contractor.
25 COVID-19 SUPPLEMENT:
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors statement inclusion to Statement of Work (SOW).
1. Contractor employees who work in or travel to VHA locations must comply with the following:
1. Documentation requirements:
0. If fully vaccinated, shall show proof of vaccination
0. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination
0. If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.
0. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
0. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
1. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the following website: COVID-19 Screening Tool. Regularly check the website for updates.
1. Contractor employees who work away from VA locations, but who will have direct patient contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
1. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.”
1. For indefinite delivery contracts: Contractor agrees to comply with FAR 52.232-99 and VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.
36C26126Q0500
Page 1 of Page 1 of
Brand Name Item:
1) Essential/significant physical, functional, or performance characteristics.
The patient lift system being considered for award must meet the following specifications:
Note: “hoist” and “lift” are used here interchangeably
1. Supplier must be able to provide a patient lift with automatic, hands free, dynamic body weight support and fall protection in real time during any selected patient care activity, rehab/therapy session or mobility sessions; clinical staff must be able to enter a specified “offload” weight, appropriate for the patient and particular task, directly into the hand control, after which the lift must continually offload the specified weight as patient moves and their center of gravity changes, without the need for staff to continue operating the hand control. Offload weight must be adjustable during a single session so that a patient can progress during that session or if a patient requires more or total assistance. At all other times the lift must be able to be used as a normal ceiling lift system for standard transfers and repositioning, as well as weighing patients without the need for an external scale system.
1. Lifting speed must be minimum 2.2 inches per second at maximum load capacity, with a soft/slow start and stop.
1. Must have a wireless interface that connects to the existing Wi-Fi network infrastructure.
Usage analytics and maintenance analytics software must have capability to be monitored remotely via web access, without the need for a physical connection cable with usage data displayed on LCD screen integrated into hand control.
1. The track rails must be capable of accommodating stationary lock for lift unit and/or stationary lock for Traverse Rail with user capability via hand control to separately position and lock the lift motor and/or the traverse rail in designated location(s) when indicated for patient care activity.
1. The hand control must be wired, with LCD screen capable of displaying patient weight (if scale option is purchased) and lift usage information.
1. Scale must be internal; with patient weight displayed on a screen located on the hand control.
1. Class III internal scale must be available as an option; with patient weight displayed on a screen located on the hand control.
1. The lift must not have an external scale attachment.
1. The track rail system must allow for seamless transition to a second rail system using a non-motorized gate system. The gate system must be automatic, non-electric, and require no external activation via pull cord or switch. The gate system must open upon alignment of rails and remain locked when rails are out of alignment.
1. Supplier must be able to provide lift systems from a manufacturer that has had no FDA recalls in company history, and that has been manufacturing patient lifts for over 40 years.
1. The lift must charge anywhere on the track via continuous AC charging.
1. The lift must have an expected lifespan of fifteen (15) years, without lift usage limits, on the condition of correct use and maintenance as stated in the manufacturer’s official user manual.
1. In addition to compliance with ISO 10535 (Hoists for the transfer of disabled persons – Requirements and test methods), the entire lift unit (not only the transformer) must be UL (Underwriters Laboratory) certified to meet requirements for user safety. Copy of certificate must be provided and copies of independent (third party) test reports should be made available upon request.
1. Must have a minimum three (3) year warranty on lift units, including lifting straps and washable slings; minimum five (5) year warranty on batteries. Warranty shall include both ISO 10535 Inspections & Preventative Maintenance (PMs) as well as parts, labor and shipping associated with PMs or warranty repair in between annual scheduled service.
1. Supplier must be able to provide an optional extended warranty package for up to 7 additional years, for a total warranty of 10 years, which must include both ISO 10535 Inspections & Preventative Maintenance (PMs) as well as parts and labor in between annual scheduled service.
1. In addition to end-user training, which must be offered for all staff on all shifts at no cost to the VA, supplier must offer, also at no charge to the VA facility, an additional one (1) week per year for five (5) years of Clinical SPHM Training.
2) Complete generic identification – x2 4x4 meter B rail room covering system installed for 770# hoist including design, installation, and clinical training. [Guldmann GH3+ motors to be provided by VASNHS from stored stock).
3) Applicable model/make/catalog number – Catalog number NA: quote for MD01072026MDR
4) Manufacturer name – Guldmnann Inc.
Per VAAR 811.104 and 811.105, I certify the following regarding the above information:
· The salient characteristics listed above are essential to the Government’s requirements.
· To my knowledge, the restrictions listed above will not limit the acquisition to an item peculiar to one manufacture.
Name, Date: Jason Daivd Reese DC MSN RN CSPHA, 01/08/2026
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| EA |
| __________________ |
| __________________ |
Patient Lift System for CT Rooms 1D252, INCLUDES DESIGN, INSTALLATION, AND CLINICAL TRAINING ONLY Contract Period: Base POP Begin: 03-24-2026 POP End: 09-30-2026 PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies
MANUFACTURER PART NUMBER (MPN): CT
Guldman 4x4 Meter B Rail Room Covering System Installed for 770lb Motors to be provided by the VA. Includes Design, Installation, Clinical Training.
| 1.00 |
| EA |
| __________________ |
| __________________ |
Patient Lift System for CT Rooms 1D244, INCLUDES DESIGN, INSTALLATION, AND CLINICAL TRAINING ONLY Contract Period: Base POP Begin: 03-24-2026 POP End: 09-30-2026 PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VA Southern Nevada Healthcare System |
6900 N. Pecos Rd North Las Vegas, NV 89086
USA
| 1.00 |
| 9/30/2026 |
| MARK FOR: |
| Yaren Usul |
702-209-7637 yaren.usul@va.gov
| FOB: |
| DESTINATION |
| 0002 |
| SHIP TO: |
| VA Southern Nevada Healthcare System |
6900 N. Pecos Rd North Las Vegas, NV 89086
USA
| 1.00 |
| 9/30/2026 |
| MARK FOR: |
| Yaren Usul |
702-209-7637 yaren.usul@va.gov
| FOB: |
| DESTINATION |
Brand Name or Equal Worksheet (“Salient Characteristics”) v 2.0
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .