This is a Quality Assurance Surveillance Plan (QASP) for kitchen exhaust hood and fan maintenance and repair services at a Veterans Affairs facility under solicitation 36C26126Q0428. The QASP establishes the government's systematic approach to monitoring and evaluating contractor performance against defined performance standards and acceptable quality levels (AQLs) outlined in the associated Performance Work Statement (PWS).

The contractor is responsible for implementing a quality control program that addresses work quality, timeliness, responsiveness, and customer satisfaction. Government surveillance is conducted by the Contracting Officer's Representative (COR) using methods including random monitoring, on-site surveillance, review of reports and photographic documentation, and customer feedback assessment. Key performance requirements include maintaining current certifications at 100% compliance, submitting management reports on time with 98% accuracy, limiting call-backs to no more than three per month, ensuring 100% accuracy of report documents and photos, maintaining no deviation from local VA facility masking protocols, meeting all safety and personal protective equipment (PPE) standards with zero deviation, and maintaining proper housekeeping in work areas with zero deviation. The COR prepares quarterly written reports documenting surveillance results, and the contractor may be required to develop corrective action plans if minimum performance requirements are not met. Performance reviews occur at defined intervals to discuss assessment data, address issues, and establish courses of action, with any changes to metrics or service levels incorporated through formal contract modification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 –

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The Contractor will be evaluated in accordance with the following:

1. INTRODUCTION

1.1. This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Kitchen Exhaust Hood and Fan Maintenance / Repairs. This plan sets forth the procedures and guidelines VAPIHCS will use in ensuring the required performance standards or services levels are achieved by the Contractor.

2. PURPOSE

2.1. The purpose of the Quality Assurance Surveillance Plan (QASP) is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor’s Quality Control Plan (QCP), and to ensure that the government pays only for the level of services received.

2.2. This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

3. PERFORMANCE MANAGEMENT APPROACH

3.1. The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by VAPIHCS to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.

3.2. Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

4. PERFORMANCE MANAGEMENT STRATEGY

4.1. The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in PWS. This QASP enables the government to take advantage of the Contractor’s QC program.

4.2. The government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the Contractor of those decisions. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

5. GOVERNMENT ROLES AND RESPONSIBILITIES

5.1. The Contracting Officer

5.1.1. The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer Representative (COR) and the Contractor. The CO will designate COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor’s performance, and must be identified and designated by the CO.

5.2. The Contracting Officer’s Representative

5.2.1. The Contracting Officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

6. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

6.1. The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract and will receive recommendations for exercising options. Failure to meet the required service or performance level will result in low performance ratings and possible recommendation not to exercise option.

7. METHODOLOGIES TO MONITOR PERFORMANCE

7.1. Surveillance Techniques

7.1.1. In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:

7.1.1.1. Random monitoring, which shall be performed by the COR/COR designated inspector.

7.1.1.2. On-site Surveillance/Escorting, which shall be performed by the COR, Facilities Operations Specialist (FOS), or Maintenance and Operations (M&O) personnel.

7.1.1.3. Reviewing reports and photos of before and after cleanings shall be performed by the COR and or compliance officer.

7.1.1.4. Accuracy of reports and photos provided to the COR.

7.1.1.5. Customer Feedback

7.1.2. The Contractor is expected to establish and maintain professional communication between its employees and customers. The Contractor and its subContractors shall be dressed in a professional uniform. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

7.1.3. Performance management drives the Contractor to be customer focused initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO and/or COR, as opposed to the Contractor.

7.1.4. Customer complaints, to be considered valid, must be set forth clearly and in writing the detailed nature of the complaint must be signed, and must be forwarded to CO/COR. The CO/COR will accept those customer complaints and investigate and then document by using the Contract Discrepancy Report (CDR) (Attachment 3) which is also attached to the COR designation letter.

7.1.5. Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

7.2. Acceptable Quality Levels

7.2.1. The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for Contractor performance are structured to allow the Contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving direct patient care, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at VAPIHCS.

8. QUALITY ASSURANCE DOCUMENTATION

8.1. The Performance Management Feedback Loop

8.1.1. The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the SOW and are assessed using the performance monitoring techniques shown in Attachment 1.

8.2. Monitoring Forms

8.2.1. The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the Contractor’s performance under the contract to ensure that the required results and acceptable quality levels are being achieved.

8.2.2. The COR will retain a copy of all completed QA surveillance forms and CDR forms.

9. ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

9.1. Determining Performance

9.1.1. Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

9.2. Reporting

9.2.1. At the end of each quarter, the COR will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted quarterly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

9.3. Reviews and Resolution

9.3.1. The COR may require the Contractor’s project manager, or a designated alternate, to meet with the COR and/or CO and/or other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency or in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the CO and/or COR as often as required or per the Contractor’s request. The agenda of the review may include:

9.3.1.1. Quarterly performance assessment data trend analysis

9.3.1.2. Issues and concerns of both parties

9.3.1.3. Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

9.3.1.4. Recommendations for improved efficiency and/or effectiveness

9.3.1.5. Any other issues arising from the performance monitoring processes

9.3.2. The COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.

9.3.3. The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

10. PERFORMANCE REQUIREMENTS SUMMARY

Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
Methods of Surveillance
Incentive (Positive and/or Negative)
Certifications-Current
Meet PWS
100% (no deviation)
COR random review
Failure affects performance evaluations
Inspections (timeliness) Submit management reports as required
Meet PWS
98% (slight deviation)
COR random review
Failure affects performance evaluations
Communications
Meet PWS
No more than 3 call backs per month

100% (no deviation)

COR random review
Failure affects performance evaluations
Accuracy of report documents and photos
Meet PWS
100% (no deviation)
COR review
Failure affects performance evaluations
Follow local VA facilities masking protocols while in the building
Meet PWS
No deviation
COR random review
Failure affects performance evaluations
Safety and PPE
Meet PWS
No deviation
COR random review
Failure affects performance evaluations
Housekeeping for area of work
Meet PWS
No deviation
COR or a COR representative shall inspect area
Failure affects performance evaluations