About this file

This Quality Assurance Surveillance Plan (QASP) is for a contract between the VA Pacific Islands Healthcare System and Arxium, covering maintenance and support for the Optifill and FastPak medical equipment systems. The document outlines performance standards and surveillance methods, with key requirements including: maintaining a point of contact, ensuring 99.9% system uptime monthly, and resolving 95% of technical support inquiries within 24 hours. The primary contractor representative is Eyal Pertman (Sales Executive), while the government representatives are Brandy Gastinell (Contracting Officer) and Landon Castellano (Contracting Officer's Representative).

The QASP establishes a comprehensive evaluation framework with two surveillance methods: periodic meetings with the program manager and user feedback surveys. Performance will be rated on a five-tier scale from Exceptional to Unsatisfactory, with quarterly performance reports submitted to the Contracting Officer. If performance does not meet acceptable quality levels, the government may issue a Contract Discrepancy Report (CDR) requiring corrective action. The document emphasizes the government's objective to provide fair and consistent evaluation while holding the contractor accountable for meeting all contractual requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Page 1 of 5 Revised 10/31/2012

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored.

• How monitoring will take place.

• Who will conduct the monitoring.

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Brandy Gastinell

Organization or Agency: VA Pacific Islands Healthcare System

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Landon Castellano

Organization or Agency: VA Pacific Islands Healthcare System

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary: Eyal Pertman, Sales Executive

Email: epertman@arxium.com

Phone: 416-716-3404 mailto:epertman@arxium.com

Page 2 of 5 Revised 10/31/2012

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.

Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. INCENTIVES/DEDUCTS

The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards.

6. METHODS OF QA SURVEILLANCE

Method 1 - Periodic Surveillance by the COR

• The COR will periodically meet with the program manager to ensure the services rendered are as intended and according to the performances outlined in the contract.

Method 2 – User Feedback and Satisfaction Surveys

• Gather feedback from end-users (VA staff) who utilize the medical equipment to assess their satisfaction with the maintenance and repair services provided, and identify any issues or areas for improvement. User feedback is critical to ensure the system meets the needs of the VA and its end users.

PERFORMANCE MEASURES

Measures Performance

Requirement

Standard Acceptable Quality Level

Surveillance

Method

Incentive Disincentive/Deduct

Key Personnel/ General duties

Appoint/designate a point of contact and an alternate point of contact to coordinate and communicate contract activities.

Communicate and coordinate with the VA facility’s point of contact, contracting officer representative (COR) and/or designated alternate as appropriate.

100% Method 1 - Perodic Surveillance by the COR

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation

System Uptime and Availability

The Optifill and FastPak operational and accessible to users.

Monitor system logs and uptime reports on a regular basis. Document any instances of unplanned downtime and ensure

99.9% of the time each month

Method 2 - User Feedback and Satisfaction Surveys

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation

Page 3 of 5 Revised 10/31/2012 corrective actions are taken promptly.

Response Time for Technical Support

Technical support inquiries should be resolved within 24 hours of submission.

Require the contractor to maintain a log of support inquiries and resolutions.

Review logs periodically.

If 95% of technical support inquiries are resolved within 24 hours each month

Method 1 - Perodic Surveillance by the COR

Favorable contractor performance evaluation.

Unfavorable contractor performance evaluation

7. RATINGS

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY:

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being

Page 4 of 5 Revised 10/31/2012 assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

8. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and perparing annual past performance using

CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor.

This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Reporting.

The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.

10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

Page 5 of 5 Revised 10/31/2012

Landon Castellano

SIGNED:

Brandy Gastinell

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and perparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
a. Frequency of Measurement.
b. Frequency of Performance Reporting.
2025-12-04T16:13:27-1000
LANDON CASTELLANO

File details come from the government source that posted it. Updated .