This document appears to be a divisional cost breakdown template for a federal contract opportunity to replace a roll-up garage door. The solicitation number is 36C26124R0080, and the project is to replace a roll-up door. The template requires the contractor to provide a complete divisional cost breakdown for the entire project, with line items for various construction divisions such as general requirements, concrete, metals, doors and windows, and electrical. The total cost, as well as line items for bonds, insurance, overhead, and profit, must be provided. This document is to be used for price analysis purposes only and is not a response to the solicitation.

View the file

Other files

File Type Posted
REQUEST FOR INFORMATION FORM- 1.docx DOCX document
36C26124R0080.docx DOCX document
Wage Determination 20230040 8.18.23.pdf PDF
010000 General Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26124R0080 SOLICITATION: 36C26124R0080 PROJECT: Replace Roll Up door

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 0-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE
Not Required under $30,000.00
$

OVERHEAD

PROFIT

TOTAL

__________________________________________________________