This document is a Solicitation for a Task Order Proposal Request to replace the roll-up garage door for the Pipe Shop at the VA Sierra Nevada Healthcare Facility in Reno, Nevada. The work involves removing the existing roll-up door and operator, and installing a new commercial roll-up door and operator to ensure the door functions properly. The project is set-aside for contractors who were previously awarded a MACC contract under VISN 21's Multiple Award Construction Contract (MACC) program. A site visit is scheduled for August 15, 2024. Proposals are due by August 29, 2024 at 10:00 AM PDT. The contract will be awarded to the lowest priced, responsible offeror. The project has a value of less than $25,000. Performance and payment bonds are required.

View the file

Other files

File Type Posted
REQUEST FOR INFORMATION FORM- 1.docx DOCX document
DIVISION CONSTRUCTION COSTS- Roll Up Door.docx DOCX document
Wage Determination 20230040 8.18.23.pdf PDF
010000 General Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26124R0080 Attachments

NCO 21 MACC

GROUP 1

TASK ORDER PROPOSAL REQUEST

Replace Roll Up Door Pipe Shop

PLACE OF PERFORMANCE

VA Sierra Nevada Healthcare Facility 975 Kirman Avenue Reno, Nevada 89502

NOTICE TO VETERANS INTGRATED SERVICE NETWORK 21 (VISN 21)

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) HOLDERS

Description: THE RESULTING SOLCITATION IS TASK ORDER PROPOSAL REQUEST. Proposals will only be requested and accepted from contractors who were awarded a Veterans Integrated Service Network 21 (VISN 21) Multiple-Award Construction Contract (MACC) from Network Contracting Office 21 (NCO 21).

Point of Contact: Dawn Graham, Contract Specialist; edwin.rivera@va.gov

Project Title: Bldg. Replace Roll Up Door Pipe Shop

Project specifications and all associated project documents shall be incorporated into the Task Order Bid Request which shall be posted electronically through https://sam.gov

Questions regarding this notice shall be submitted via e-mail to: dawn.graham2@va.gov.

Site Visit: A Site Visit is schedule for Thursday, August 15, 2024 at 9:00 AM, Bldg. 1D lobby coffee bar, 975 Kirman Avenue, Reno, NV 89502

The following firms are eligible for award of the resulting task order:

MACC GROUP 1

Acierto, LLC
Patriot Construction
2053 North 2000 West
4646 Qantas Lane
Farr West, UT 84404
Stockton, CA 95206
Anchor 41 Construction
Sentinel Builders, LLC
310 Murray Avenue
5945 Los Altos Parkway
Visalia, CA 93291
Sparks, NV 89436

Ayko Group, LLC

95-1238 Wikao

Mililani, HI 96789

Bexar Advanced Solutions Group
Strategic Industry
47 E. Crestwood Road
1440 Draper Street
Kaysville, UT 84037
Kingsburg, CA 93631

Talion Construction

819 Moowaa Street, Suite 209

Honolulu, HI 96817

Hawk Contracting
West Point Contractors
P.O. Box 490
2915 E. Weiding Road
Montrose, CO 81402
Tucson, AZ 85706

**Any offers received from contractors not mentioned above will not be accepted.

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26124R0080 X 08-08-2024 N/A Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno

NV

89502 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno

NV

89502 Charee Harris 775-788-5511 Project Title: Replace Roll Up Door Pipe Shop Project Number: N/A Project Location: VA Sierra Nevada Healthcare Systems, 975 Kirman Avenue, Reno, Nevada 89502

Contractor shall replace metal roll up door in accordance with the Statement of Work.

In accordance with VAAR 836.204 disclosure of the magnitudeof construction projects, the magnitude of construction is less than $25,000.00.

The NAICS code for this solicitation is 236220 with a smallbusiness size standard of $39.5 million.

Bid, Payment, and Performance Bonds shall be required underthis solicitation and any resultant contract.

A site Visit is scheduled for Thursday August 15, 2024 at 9:00 AM Pacific Time.

See section 52.236-27 Site Visit for details.

Requests for Information (RFIs) are due Thursday, August 22, 2024, and must be emailed to charee.harris@va.gov

This procurement is 100% set-aside for selected contractorson the NCO 21 Multiple Award Construction Contract (MACC) Group 1, All terms and conditions of the MACC apply to this Task Order.

Offerors must be verified in the VA Vendor's Information Page (VIP/ VET BIZ) when the offer is submitted and, if the apparent awardee, prior to award.

X 52.211-10 X Zero (0)

10:00 AM

PDT

08-29-2024 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno

NV

89502 Department of Veterans Affairs FMS VA-9(101) Financial Services Center PO Box 149971 Austin

TX

78714-9971 Charee Harris Contracting Officer NCO 21

Part 1

General Information

1. General: This is a service contract to upgrade and/or replace the roll-up garage door and components leading to the Pipe shop (C0330) in Bldg.1, ensuring the door is fully functioning and operational as designed by the manufacturer for use at VA Sierra Nevada Health Care System (VASNHCS). The contractor shall work directly with the Contracting Officer’s Representative (COR) and designated subject matter expert (SME) on all matters related to this service once awarded the contract.

1.1 Description of Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items, and non-personal services necessary to upgrade and/or replace the roll-up garage door and components leading to the Pipe shop in Bldg.1, also ensuring the units are fully functioning and operational as designed by the manufacturer for use at VASNHCS as defined in this Statement of Work (SOW), except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The roll-up garage door to the Pipe shop needs to be upgraded and/or replaced as it can only be opened manually due to worn, damaged, and malfunctioning components. This door is original to the building and due to age, many of the components for the door is now obsolete and no longer manufactured. This door is the only door leading to the Pipe shop that can accommodate large material, tools, carts, etc., in and out of the Pipe shop. Other than the door and mechanisms related to the operation of the door, the building surrounding the door shall not be affected.

1.3 Objectives: To ensure the roll-up garage door is reliable and safe for use, security of the space is maintained, and has parts and service available to keep the door functioning.

1.4 Scope:

1. Place of work and period of performance:

a. VASNHCS, 975 Kirman Ave, Reno, NV 89502; Bldg. 1, C0330/C0XD02 Pipe shop Roll-up Garage Door

b. To be conducted during normal business hours only (0730 to 1600). All work must be completed, and security to the Pipe shop is maintained by 1600 of each day.

c. To begin within 30 days of award of contract.

2. Equipment:

a. Complete rolling steel commercial door with heavy duty guides, bottom bar and hood. Operator, 115 V, 1 phase with photo eyes and necessary controls to maintain current control configuration.

3. Codes & Standards: (most current and stringent applies)

a. American National Standards Institute (ANSI) 90.1

b. International Code Council (ICC) A117.1: Accessible and Usable Buildings and Facilities

c. International Building Code (IBC) sections 714, 104.11, 1609, 1714.5 and all applicable codes

d. National Fire Protection Agency (NFPA) 101: Life Safety Code

e. NFPA 80: Standard for Fire Doors and Other Opening Protectives

f. UL 325 2010

g. Occupational Safety and Health Administration (OSHA): 29 CFR §1910.47

h. NFPA 70E: Standard for Electrical Safety in the Workplace

4. Overview (Site visit may be required)

a. The contractor shall:

i. Identify site conditions, material/labor, and/or electrical requirements for repair.

ii. Obtain necessary permits.

b. Lock-out/Tag-out (LOTO) shall be performed to isolate power to the operator and ensure zero energy on any energized system prior to any work conducted on the equipment.

i. The installing contractor and one maintenance person, at minimum, will be onsite at all times.

ii. The LOTO will be installed with full isolation before beginning any work. The contractor(s) will check the LOTO sheet and Energy Control Procedure, placing their locks in the lock box.

iii. Each person working on the system shall have their own lock and identifiable tag. (i.e., if two contractors and one VA employee are working on the system, there shall be three identifiable locks and three tags)

iv. All documents related to the LOTO shall be provided to the COR or SME.

v. The LOTO process shall be followed in reverse once the installation/repairs have been completed prior to re-energizing the system to verify the operation of the door.

c. All work listed below is to be conducted by an installer/technician with required experience and competencies to ensure correct installation.

d. If any welding, torches, or use of flame-type equipment will be used, the contractor must notify the COR to ensure that a Hot Work Permit for the day has been generated prior to beginning the work.

i. A fully charged fire extinguisher shall be within arm’s reach during the welding/soldering/brazing.

e. Work must be coordinated with the COR to determine any scheduling conflicts with any operations within the area of the work site.

f. The contractor is responsible to ensure any excess material/debris is removed and disposed of from the site. At no time, shall the contractor use the waste bins located on the hospital campus.

g. All documentation, certification, manuals, instructions, etc., will be provided to the COR at the completion of the work, unless awaiting state/regulatory finalization of the documents. Documentation shall be provided within seven business days upon completion of work.

5. General

a. The contractor will perform the following service to upgrade and/or replace the roll-up garage door and operator for the Pipe shop C0330, Bldg. 1:

i. All material and labor shall be ready and in place for the removal/installation/service prior to beginning work. Work will be conducted during normal business hours only (0730 to 1600). All work must be completed, and security to the Pipe shop is maintained by 1600 of each day.

1. Service to include, but is not limited to:

a. Coordinating the service with the COR/SME.

i. Identify an estimated time frame for service.

b. Remove existing roll-up garage door, operator, guide tracks, and directly associated components that are not being reused. Install new roll-up garage door, operator, guides, and associated components to ensure door functions as required. Reconnect existing exterior open/close Key Switch to operator. Adjust and tune door to manufacturers specs and codes/standards.

i. Follow the LOTO process as per OSHA 29 CFR §1910.47 and NFPA 70E and sec 1.4, para 4b of this SOW.

ii. Protect from damage, all upgraded and existing items/property.

iii. No modifications of existing property without prior notification, in writing and verification from the COR/SME.

c. Test the door, operator, and switches, ensuring proper function.

d. Contractor is responsible to ensure that the work area has been cleaned and all material properly disposed of to the contractor’s approved dumpster. The material will not be disposed at the hospital’s waste dumpster.

2. Inspections: At any time, the work may be inspected by the COR/SME, a member of VASNHCS’ Safety Department, or an OSHA team member.

b. All material, tools, ladders, and equipment used in the performance of the service shall be in compliance with industry standards, local, state, and federal laws and will be used in accordance with the manufacturer’s recommendations.

c. Any safety related deficiencies must be immediately reported to the COR or Maintenance Supervisor.

d. The contractor, without additional expense to the Government, shall obtain all licenses, permits, and insurance required to perform the work in this contract. The contractor shall comply with all current, applicable federal, state, and local laws. Evidence of insurance, licenses, and permits shall be provided to the Contracting Officer (CO) and COR before work commences.

e. The contractor shall execute a test on the roll-up garage door, operator, safety sensors, and controls manufacturer’s standards and all required codes & standards. If the test fails, further diagnostics shall be conducted to determine the cause of the failure.

i. The contractor shall provide a quote for any additional repairs or needed parts that is outside the contract. Work may only be performed after a modification and authorization by the CO to the contract.

ii. Warranty: The contractor, without further expense from the Government shall make adjustments/tuning to the door for a period of 60 days upon completion of the work to ensure that it is operating as designed.

iii. The contractor shall provide training and documentation of the garage door, after completion of the work, to the COR and/or SME. All related documents shall be provided to the COR and/or SME at this time.

6. Qualifications:

a. Contractor personnel shall be licensed and certified to work on commercial garage doors and operators per local, State of Nevada, and Federal requirements.

b. The government will inspect for any safety and environmental compliance at their discretion and will notify the CO and/or COR of any discrepancies found.

7. The contractor shall ensure that their personnel comply with all VASNHCS policies to include but is not limited to:

a. Parking in the appropriate/authorized spaces, with special consideration to ensure that they are not parking in veteran/patient spaces.

i. Parking is only available on the 2nd deck of the two-story parking garage off Belli Drive, the four-story parking garage south of the two-story parking garage, or on the streets surrounding the hospital.

b. No tobacco (not authorized on any part of the hospital property).

c. Contractor personnel must check-in with the designated Maintenance personnel, COR and/or the VASNHCS Police every day (during the duration of the service) to receive a visitor badge (which is only good for 24 hours).

d. VASNHCS may demand that the contractor remove any person(s) who pose a threat to the health, safety, or security of the hospital, employees, or patients.

8. Security and records management disclaimer:

a. The Certification and Accreditation requirements do not apply as the contractors will not be doing work inside the hospital or will work in or around any VA computer system. A Security Accreditation Package is not required.

b. Applicability

i. This clause applies to all contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.

c. Definitions

i. “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.

1. The term Federal record:

a. includes VA records.

b. does not include personal materials.

c. applies to records created, received, or maintained by contractors pursuant to the VA contract.

d. may include deliverables and documentation associated with deliverables.

d. Requirements

i. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

ii. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

iii. In accordance with 36 CFR 1222.32, contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

iv. The VA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of the VA or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the contracting activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, contractor must report to the VA. The agency must report promptly to NARA in accordance with 36 CFR 1230.

v. The contractor shall immediately notify the appropriate CO and/or COR upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA control, or the contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the CO or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

vi. The contractor is required to obtain the CO's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The contractor (and any sub-contractor) is required to abide by Government and VA’s guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

vii. The contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA’s policy.

viii. The contractor shall not create or maintain any records containing any non-public VA information that are not specifically tied to or authorized by the contract.

ix. The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the FOIA.

x. The VA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which the VA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

e. Flow down of requirements to subcontractors

i. The contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract, and require written subcontractor acknowledgment of same.

STATEMENT OF WORK

VA SIERRA NEVADA HEALTH CARE SYSTEM

654-24-4-6090-0633 Pipe shop Roll-up Garage Door Upgrade/Replacement

ii. Violation by a subcontractor of any provision set forth in this clause will be attributed to the contractor.

Table of Contents

PART I - THE SCHEDULE3
SECTION A - SOLICITATION/CONTRACT FORM3
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)3
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK4
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS14
2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)19
2.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)19
2.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)23
GENERAL CONDITIONS25
4.1 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023)25
1.1 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)30
1.2 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)33

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

OFFER SUBMISSION:

The following documents are to be included in the solicitation submission:

One (1) original completed Offer amount entered in block 17 of the SF1442 Offer page;

One (1) fully completed Supplemental Price Breakdown by Division Sheet

One (1) fully completed and signed SF 1442 Offer page, acknowledgment of all amendments either via entering data in block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 Offer page.

One (1) Documentation of Safety & Environmental Record and Documentation of Experience Modification Rate (EMR) (See below instructions).

Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for quotation will result in a nonresponsive quotation.

OFFERS ARE TO BE SENT TO:

One (1) electronic copy via email of the price offer are to be sent to arrive on or before the due date/time at the following email address:

Offers have been authorized and are to be sent by email to Edwin Rivera Edwin.rivera@va.gov and Charee Harris, charee.harris@va.gov.

Solicitation number and title must be in the title of the email. Faxed quotations are not permitted under any circumstances.

REQUESTS FOR INFORMATION (RFI):

To obtain clarifications and/or additional information concerning the contract requirements or specifications, submit a written RFI utilizing the RFI Form included in this Solicitation, which is to be sent via email to Edwin.rivera@va.gov and charee.harris@va.gov. See RFI form for specifics.

RFI responses will be responded to as necessary in amendment format, which will posted/e-mailed to all concerned.

Deadline for submission of RFIs for this solicitation is August 22, 2024, at 1:00 PM Pacific Time. No questions will be answered after this date/time unless determined to be in the best interest of the Government as determined by the Contracting Officer. Telephone requests for information will not be accepted or returned.

OFFER DUE DATE SCHEDULE:

All offers with the electronic copy are due by the date and time set for the receipt of offers shown in Block 13 of the SF 1442.

INSTRUCTIONS TO OFFERORS:

Offers received after August 29, 2024, at 1:00 PM Pacific Time may be rejected.

Any exception to the terms and conditions of this solicitation will result in a nonresponsive offer.

Failure to provide a definitive price or conditioned price will result in a nonresponsive quotation. Receipt of an Offer must be in accordance with terms and conditions of this solicitation. Offerors must acknowledge (in writing only) amendments to this solicitation, otherwise an offer may be determined nonresponsive.

The apparent successful offeror must be determined as “responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.

SITE VISIT:

Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing construction services. Failure to inspect the site shall not constitute grounds for a claim after contract award.

See Provision 52.236-27 for specific information regarding the project pre-offer site visit, which will be the only opportunity for potential Offerors to visit the site. All potential Offerors, subcontractors, and suppliers are strongly encouraged and expected to attend the pre-offer site visit.

PERFORMANCE & PAYMENT BONDS:

In accordance with FAR 28.102-1 and Contract Clause 52.228-15, offerors are reminded that any award amount over $35,000 shall require a Payment Bond (or other acceptable protection – see clause FAR 52.228-13), and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 calendar days after award.

LIQUIDATED DAMAGES: N/A

WAGE DETERMINATION APPLICABLE TO THIS PROJECT:

General Decision Number: NV20230040 dated 8.18.23 per MACC Option Year 3.

PER VHA DIRECTIVE 7715 (06 April 2017) SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR):

To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.

All contractor shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their quotation.

1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

1. EMR: All contractors shall submit information regarding their current EMR. This information shall be obtained from the contractor’s insurance carrier and be furnished on the insurance carrier’s letterhead. Must have an EMR of equal to or less than 1.0.

PRIVACY TRAINING:

All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative (COR).

TRAINING:

All employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s Competent Person/Superintendent shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.

PRIVACY AND CONFIDENTIALITY:

Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.

The C&A requirements do not apply, and a Security Accreditation Package is not required. If the contractor opts to use a computer or computer system for processing contract documents, the requirements of FIPS 140-2 for encryption of contract documents must be met.

SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made unless the contractor is registered. Contractors are encouraged to ensure that they are registered in SAM prior to submitting their quotation.

ADDITIONAL VETBIZ INFORMATION:

1. Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.

2. At the time of submission of offer, the offeror must represent to the contracting officer that it is a—

a. SDVOSB concern

b. Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and

c. Verified for eligibility in the VIP database.

3. A joint venture may be considered an SDVOSB or VOSB concern if,

a. At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section;

b. Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement;

c. The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and

d. The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.

4. Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.

JOINT VENTURES: See 13 C.F.R. § 121.103 Affiliation based on joint ventures: A joint venture is an association of individuals and/or concerns with interests in any degree or proportion consorting to engage in and carry out no more than three specific or limited-purpose business ventures for joint profit over a two year period, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally.

This means that a specific joint venture entity generally may not be awarded more than three contracts over a two-year period, starting from the date of the award of the first contract, without the partners to the joint venture being deemed affiliated for all purposes. Once a joint venture receives one contract, SBA will determine compliance with the three awards in two years rule for future awards as of the date of initial offer including price.

As such, an individual joint venture may be awarded more than three contracts without SBA finding general affiliation between the joint venture partners where the joint venture had received two or fewer contracts as of the date it submitted one or more additional offers which thereafter result in one or more additional contract awards. The same two (or more) entities may create additional joint ventures, and each new joint venture entity may be awarded up to three contracts in accordance with this section. At some point, however, such a longstanding inter-relationship or contractual dependence between the same joint venture partners will lead to a finding of general affiliation between and among them.

For purposes of this provision and in order to facilitate tracking of the number of contract awards made to a joint venture, a joint venture must be in writing and must do business under its own name, and it may (but need not) be in the form of a separate legal entity, and if it is a separate legal entity it may (but need not) be populated (i.e., have its own separate employees). SBA may also determine that the relationship between a prime contractor and its subcontractor is a joint venture, and that affiliation between the two exists, pursuant to paragraph (h)(4) of this section.

RESPONSIBILITY REQUIREMENTS:

A responsibility check will be accomplished for the apparent awardee prior to award. Checks of the VIP database (to insure apparently successful offeror is a verified Service Disabled Veteran Owned Small Business), System for Award Management (SAM) database (Central Contractor Registration, Online Representations and Certifications, and Excluded Parties List System to insure registrations are current, valid, and no debarment records exist). Any information retrieved or received by the Government that would be cause for negative or unsatisfactory responsibility rating may result in the offeror being determined ineligible for award.

CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS:

The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for your contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer’s Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.

REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER, and PROJECT MANAGER:

Any reference contained within solicitation documents, and any resultant contract, the terms Contracting Officer's Technical Representative (COTR), Contracting Officer's Representative (COR), Project Engineer (PE), Resident Engineer (RE), and Project Manager (PM), all denote the same engineering official and may be used equally and interchangeably as described by the Contracting Officer (CO).

SMOKE AND CARBON MONOXIDE MONITORING REQUIREMENTS:

Contractor, his employees, his subcontractors, and their employees shall adhere to VA, VHA, and VASNHCS Policies for smoke and carbon monoxide monitoring requirements. They are available upon request from COR.

NOTICE TO PROCEED (NTP):

A notice to proceed shall be issued after award of a fully executed contract. The NTP date and time “to be determined” after award to a successful contractor. Primary factor in determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents

BASIS FOR AWARD

INTRODUCTION:

This is a price only selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 16.505(b), Orders under multiple-award contracts, supplemented by the Department of Veterans Affairs Acquisition Regulation (VAAR). These regulations are available electronically at https://www.acquisition.gov/ and https://www.va.gov/oal/library/vaar/

EVALUATION:

Price Only -- The Government will evaluate the lowest price offer to determine if the price is fair and reasonable for the work to be performed. To be considered fair and reasonable for the work performed, the evaluators will also check for appearance of unbalanced line-item prices. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluation described above. Offers which are materially unbalanced as to prices for the basic requirement and the option quantities are not fair and reasonable. An Offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— Thursday August 15, 2024 at 09:00 AM Pacific Time.

(c) Participants will meet at—

VA Sierra Nevada Healthcare System, 975 Kirman Avenue, Lobby Coffee Bar, Reno, Nevada 89502 (End of Provision)

FAR Number
Title
Date
852.239-75
INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE
FEB 2023

2.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $45 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation. This provision applies to solicitations that include the clause at 52.204-7.

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates II and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.

(C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .