AMDT 36C26123Q0403 0004 Water Testing.pdf

PDF 184 KB Posted

Attached to
H168--Water Treatment Services (HVAC) | RFQ Posting due 05/01/2023 Federal contract opportunity
Solicitation number
36C26123Q0403
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This document is an amendment to a solicitation for water treatment services at multiple Department of Veterans Affairs medical centers. The amendment provides additional questions and answers to clarify requirements. Services include monthly heterotrophic plate count testing of cooling tower sumps by an accredited laboratory, annual cleaning and passivation of corrosion buildup on one cooling tower, and pricing for supplemental disinfection. The solicitation seeks a contractor to treat the closed loop systems and cooling towers at VA facilities in Mather, McClellan, Martinez, and Mare. The amendment specifies the sites operate their chillers and cooling towers at varying loads from 30% to 70% annually. Responses are due by May 1, 2023. Pricing should be provided per method unit such as cost per 1,000 gallons treated for closed loops.

View the file

Other files for this federal contract opportunity

Other files attached to H168--Water Treatment Services (HVAC) | RFQ Posting due 05/01/2023, newest first.
File Type Posted
36C26123Q0403 0004_1.docx DOCX document
AMDT 36C26123Q0403 0003 Water Testing_.pdf PDF
36C26123Q0403 0003_1.docx DOCX document
ADMT_36C26123Q0403 0002_Water Testing.pdf PDF
36C26123Q0403 0002_1.docx DOCX document
AMDT_36C26123Q0403 0001_Water Testing.pdf PDF
36C26123Q0403 0001_1.docx DOCX document
WD2015_5631_REV18_Sacramento.pdf PDF
WD2015_5655_REV17_Solano.pdf PDF
Self Performance Worksheet.docx DOCX document
S02 RFQ 36C26123Q0403 Water Testing.pdf PDF
WD2015_5623_REV20_Contra Costa.pdf PDF
36C26123Q0403_1.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

05-16-2023

612-23-2-6133-0043

None

612MCP

Department of Veterans Affairs

Network Contracting Office (NCO) 21

5342 Dudley Blvd., Bldg. 209

McClellan CA 95652-2609

612MCP

Department of Veterans Affairs

Network Contracting Office (NCO) 21

3230 Peacekeeper Way, Bldg. 209

McClellan CA 95652-1012

To all Offerors/Bidders

36C26123Q0403

X

X X

See CONTINUATION Page

X 1

Solicitation 36C26123Q0403 is amended as follows:

a. The following Questions and Answers have been included in this amendment and attached.

Angela Gerlitzki

Contracting Officer

CONTINUATION PAGE

QUESTIONS AND ANSWERS

1. Can you also check with your folks regarding what fuel testing parameters they are requiring sediments, water content, and bacteria and boiling point at various concentrations are normal.

Tank Mid-Level Sample

Description ASTM Standard

Cetane Index D976

Cloud Point D2500

Density D1298

Distillation D86

Flash Point D93

Sediment and Water D2709/D1796

Sulfur Content D4294/D5453

Oxidative Stability ISO 12205

Particle Contamination D5452 / D7619

Tank Bottom Sample

Description ASTM Standard

Microorganism Culture Test Kit

Sediment and Water D7111

Trace Metals D7111

2. Do you have any further guidance on what to do about the supplemental disinfection pricing?

ANSWER: I am unsure what this question is asking to provide an answer, incomplete question to respond to.

3. Cooling Tower annual water usage or Total Tones, Average Load (Tons), Operating time (24/7, comfort cooling, etc.?)

a. VA Mather - Condenser Water System: Do you have annual water usage on the Condenser water system? If not do you have an estimated run time: 30% average load (600 tons), 24/7 operation for example?

ANSWER: Operations are 24/7 for our chillers were running 2 of 3 units mostly except in extreme weather times where all 3 units are in operation.

b. VA McClellan – Cooling Tower: Do you have annual water usage on the Condenser water system? If not do you have an estimated run time: 30% average load (47 tons), 8 hours / day operation for example?

ANSWER: Operates 24/7 and is at 70% load during summer averages.

c. VA Martinez: Do you have annual water usage on the Cooling Towers? If not do you have and the sizes (tonnages) as well as estimated run time: Average load, hours / day?

d. VA Mare: Do you have annual water usage on the Cooling Tower? If not do you have the size (tonnages) as well as estimated run time: Average load, hours / day?

4. Closed Loops - For closed loop systems with no sizing, should we make an assumption on volume and a $/1,000 gallon to treat?

ANSWER: Provide detail in your pricing for evaluation of your proposed pricing for comparisons of treatment. Vendor should attempt the most practical pricing for their proposal to support the system based on their experience performing this work routinely for similar facilities.

5. Coupon Racks - Do all closed loops and towers have Coupon Racks or are we providing racks to all systems post bid if they don’t have them?

ANSWER: Chiller systems already have coupon rack in place for service.

6. 1.5.3.11. HPC testing shall be performed once a month for each cooling tower sump in accordance with the following criteria: 1.5.3.11.1. The laboratory that is performing HPC analysis must be accredited by either NELAP or AALA. Is this saying you want to make sure a Heterotrophic plate count (dip slide) is pulled every month, or you want a full independent lab analysis on all the Cooling

Towers every month?

ANSWER: We want a lab testing report each month to ensure correct results are received for samples taken.

7. Contractor/Vendor shall provide labor, material and supplies necessary to complete service for corrosion build up on (1) cooling tower. This work will include removal of all corrosives building up material or white rust from the system component to improve efficiency and life span. The contractor/vendor shall provide a protective layer of protective corrosion inhibitor on the metal surfaces of the component to improve sustainment of future buildup of material from occurring. All products used should be within the cooling tower’s manufacturers recommendation and be submitted for approval by the Contracting Officer’s Representative (COR) before utilizing or service to occur. Is this a 1-time white rust cleaning, and repassivation on 1 tower (which tower? Model #, type)? Or is this a service that needs to be provided 1 per year within the contract?

ANSWER: Yes, we will have one colling tower per year where this service will be provided.

That cooling tower will be identified at the time with the awarded vendor. Price out this service to be completed on one cooling tower per service year/ option year. See item C.10 as well for additional scope related.

File details come from the government source that posted it. Updated .