36C26121R0087.docx

DOCX document 260 KB Posted

Attached to
Y1DA--NRM: 654-18-807; Water Monitoring and Treatment
Solicitation number
36C26121R0087
Issued by

About this file

This is a solicitation for water monitoring and treatment services. The Department of Veterans Affairs is seeking proposals to install monitoring systems and sensors, remove plumbing dead legs, provide insulation, and install mixing valves in three buildings on its Reno, Nevada campus. Proposals are due by September 13, 2021 and the contract will be awarded using best value tradeoff procedures. The work must be completed within 300 days of the notice to proceed. The solicitation is set aside for service-disabled veteran-owned small businesses. The contractor will be responsible for coordination, project management, and complying with safety and infection control requirements while working on the medical center campus.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26121R0087

X 08-13-2021

654-21-2-6350-0001

654-18-807

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Electronic proposals have been authorized and shall be sent to Charee Harris via email to charee.harris@va.gov with subject line: Proposal Response 36C26121R0087 CHaree Harris 775-788-5511 Project: 654-18-807 Water Monitoring and Treatment NAICS Code: 236220 Commercial and Institutional Building Construction Small Business Size Standard: $39.5M IAW VAAR 836.204, magnitude of construction is between $500,000.00 and $1,000,000.00.

Project description: The contractor shall provide all tools, labor, materials, equipment, project management, supervision, and transportation to complete the project both within schedule and within budget as awarded. This project calls for the contractor to install water monitoring and treatment system per the Statement of Work, Specifications, and drawings.

Place of performance is 975 Kirman Avenue, Reno, Nevada 89502

Site Visit: A site visit is scheduled for Monday, August 23, 2021 at 10:00 AM Pacific Time.

Participants will meet at VASNHCS 975 Kirman Avenue, Flagpole, Reno Nevada 89502.

In accordance with established public law, all offerors are required to be registered and current in System for award Management (SAM) at the time of award. The offical website of the U.S. Government at www.sam.gov

This is a total Service-Disabled Veteran Owned Small business (SDVOSB) set aside under public law 109-461.

This requirement will be awarded in accordance with FAR Part 15 Contract by Negotiaton Best Value Tradeoff (BVTO)

Prime SDVOSB shall comply with subcontracting limitation as defined in 13 CFR 125.6.

Bid, Payment and Performance bonds are required.

X X

52.211-10 X

Zero (0) 10:00

PDT

09-13-2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Healthcare System 975 Kirman Avenue Reno NV 89502

Department of Veterans Affairs FMS-VA-2(101) Financial Services Center

PO Box 149971 Austin TX 78714-9971

Charee Harris Contracting Officer NCO 21

DEPARTMENT OF VETERANS AFFAIRS

VA MEDICAL CENTER

RENO, NEVADA

PROJECT NO. 654-18-807

WATER MONITORING AND TREATMENT

Statement of Work

This construction project will perform modifications to the domestic water piping system and install water monitoring systems for compliance with the VA directive on Legionella mitigation in several buildings at the Reno VA Medical Center under project number 654-18-807. All work will be in buildings 1-D, 10, and 12.

1. Construction Summary:

A. Provide and install monitoring and telemetry of real-time, building domestic water conditions related to pressure and temperature, as well as the status of critical domestic hot water generation and distribution equipment (generators, pumps, etc.). This will require connection and integration into the facility building management system (BMS).

B. Identify, quantify, and coordinate removal of domestic water “dead legs”. This will involve domestic water outages to remove piping in occupied areas of the medical center. Work will not be continuous. The contractor will need to coordinate and manage infection control issues and will not be able to work more than 2 or 3 days per week in areas of medical center occupied by patients and staff with 10 to 15 work days between off hour work for coordination with Facility Engineering Staff.

C. Identify, quantify, and coordinate the installation of insulation on existing domestic water piping. Work will not be continuous. The contractor will need to coordinate and manage infection control issues and will not be able to work more than 2 or 3 days per week in areas of medical center occupied by patients and staff with 10 to 15 work days between off hour work for coordination with Facility Engineering Staff.

D. Provide point of use mixing valves, to allow maintained hot water temperatures closer to the recommended 127°F distribution temperatures as per VHA 1061.

2. Detailed Construction Items:

A. Building 1-D List of Corrective Action:

• Prepare and implement ICRA measures and containment in work area.

• Remove dead legs** as required.

• Provide water quality monitoring panel and associated sensors for floor domestic CW, HW, and HWR and pumps. Interface into building management system.

• Insulate piping identified as “uninsulated” during the survey. Insulate the piping to meet the current VA Plumbing Design Guideline requirements.

• Provide hose-end atmospheric vacuum breaker on all outside spigots/hose bibbs.

• Provide hose-end atmospheric vacuum breaker on all service sink faucets.

• Any sink, lavatory or any other fixture served by the hot water system, and there is a potential for contact is required by Code and VHA 1061 to have mixing valves.

B. Building 10 List of Corrective Action:

• Prepare and implement ICRA measures and containment in work area.

• Remove dead legs as required.

• Provide water quality monitoring panel and associated sensors for floor domestic CW, HW, and HWR and pumps. Interface into building management system.

• Insulate piping identified as “uninsulated” during the survey. Insulate the piping to meet the current VA Plumbing Design Guideline requirements.

• Provide hose-end atmospheric vacuum breaker on all outside spigots/hose bibbs.

• Provide hose-end atmospheric vacuum breaker on all service sink faucets.

• Any sink, lavatory or any other fixture served by the hot water system, and there is a potential for contact is required by Code and VHA 1061 to have mixing valves.

C. Building 12 List of Corrective Action:

• Prepare and implement ICRA measures and containment in work area.

• Remove dead legs as required.

• Provide water quality monitoring panel and associated sensors for floor domestic CW, HW, and HWR and pumps. Interface into building management system.

• Insulate piping identified as “uninsulated” during the survey. Insulate the piping to meet the current VA Plumbing Design Guideline requirements.

• Provide hose-end atmospheric vacuum breaker on all service sink faucets.

• Provide hose-end atmospheric vacuum breaker on all outside spigots/hose bibbs.

• Any sink, lavatory or any other fixture served by the hot water system, and there is a potential for contact is required by Code and VHA 1061 to have mixing valves.

General The contractor shall furnish all services, materials, supplies, equipment, investigations, and project supervision as required in connection with this Statement of Work and referenced design instructions.

Should any questions or concerns arise during construction, a Request for Information (RFI) shall be submitted to the Contracting Officer Representative (COR) for further clarification, prior to proceeding with work.

The Hospital campus is fully operational throughout the intended contract period. The standard Hospital operating hours: 0700 to 1600. Work can be accomplished during normal hours; however, water outages will need to be affected outside the normal hours to reduce impact to patients and staff. The designated COR will assist with coordination of all outages.

Appropriate Interim Life Safety Measures (exits, etc.) and Infection Control Risk Assessments must be considered, to include providing safe passage to patients by removing all materials and hazards at the end of each shift.

Scope The contractor shall furnish all services, materials, supplies, equipment, investigations, and project supervision as required in connection with this Statement of Work and referenced guidelines. This scope of work includes all work associated with the following:

The purpose of this project is to remove all plumbing dead legs throughout three of our buildings. The facility has identified dead legs** of pipe in buildings 1D, 10, and 12.

Work to remove the plumbing dead legs** with de-construction, demolition, piping reconfiguration, pipe insulation, ceiling openings, ceiling closings, wall openings, wall closings, plumbing, pipes, valves and associated structural components.

This project shall be bid as the price to complete all plumbing, insulation, and other work as identified in the drawings and specifications.

Plumbing remediation that takes place anywhere else besides the basement level shall be limited to unoccupied hours from 6:00 PM Friday until 6:00 AM Monday morning, and weekdays from 6:00 PM to 6:00 AM.

General Notes:

Access to above ceiling in the corridors shall be available through suspended acoustical tile ceilings. Access to above ceiling in the Toilet Room shall be through the existing hard cap gypsum board ceiling, as required, with COR approval.

Repair and repaint the entire wall where alteration work is performed. Texture, paint color and sheen to match existing adjacent.

The work comprises the completed construction required by the contract documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

Shop drawings, product data and samples are part of the contract documents. The Owner will review them, but only for conformance with the design concept of the work and with the information given in the contract documents. The contractor shall not be relieved of responsibility for any deviation from the requirements of the contract documents by the Owner’s review of shop drawings, product data or samples.

The Contractor shall carefully study and compare the contract documents and shall at once report to the Owner any error, inconsistency, or omission he/she may discover. The Contractor shall perform no portion of the work at any time without contract documents, or where required, approved shop drawings, product data or samples for such portion of the work.

The Contractor shall supervise and direct the work, using his/her best skill and attention. He/she shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under the contract.

Where any item and/or material is indicated in the contract documents and not necessarily detailed in each specific case but is required for a complete and professional installation, such item and/or material shall be provided as if shown and detailed in full. Provide means to furnish and install.

Contractor is requested to visit the site as part of the pre-bid site visit to compare the drawings and specifications with any work in place and inform himself/herself of all conditions, including the work, if any, being performed. Failure to visit the site will in no way relieve the Contractor from necessity of furnishing any materials or performing any work in accordance with the drawings and specifications that may be required to complete the work without additional cost to the Owner.

Existing conditions including material sizes, configurations, and locations as shown on the contract documents may not be an exact illustration of existing as-built conditions. The Contractor shall include in his bid the cost of furnishing, installing, modifying, existing and/or new materials (minor in nature) required for a complete and professional installation that may be required by minor variations between existing conditions as shown and actual as-built conditions.

The intent of the drawings and specifications is to include all labor, materials, and services necessary for the completion of all the work shown, prescribed, or reasonably implied but not limited to that explicitly indicated in the contract documents.

Unless specifically shown or noted on the drawings, no structural member shall be cut, notched, bored, welded, or otherwise modified without written permission of the Owner.

In the event of a conflict, the specifications take precedence over the drawings.

Demolition Notes:

Contractor shall include in his/her bid all demolition work for the removal of required building materials as necessary for the installation of the new components.

All items to be demolished shall be completely removed from the site and legally disposed of.

Protect from damage all items not scheduled to be modified or demolished during this project. Contractor is to repair or replace all finishes that are damaged or removed due to installation or removal of any materials, fixtures, accessories, or construction as it relates to this scope of work.

Contractor shall remove existing wall finishes as required. Contractor shall be responsible for setting the exact limits of demolition required in order to perform his/her work. All finishes removed shall be patched, repaired, or replaced to match adjacent finishes.

Coordination and Schedule A preliminary coordination meeting at the Reno VA shall be coordinated by the COR. The purpose of this meeting will be to introduce the Project Team to the stakeholders and establish expectations and criteria for this project. It is the intent of the Reno VA that this work be accomplished within 300 days plus equipment lead time from time of the Notice to Proceed (NTP).

The Hospital campus is fully operational throughout the intended contract period. The standard Hospital operating hours: 0700 to 1600. Work can be accomplished during normal hours; however, water outages will need to be affected outside the normal hours to reduce impact to patients and staff, so after hours and/or weekend hours may be required. The designated COR will assist with coordination of all outages.

Deliverables Submittals Schedule of Work Safety Plan Infection Control Plan Life Safety Plan Required SDS’s.

**Dead legs are sections of potable water piping systems that have been altered, abandoned or capped such that water cannot flow through them. This includes isolated branch lines, pipe sections with closed valves and pipes with one end capped. Dead legs experience periods of no flow which leads to stagnation.

Table of Contents

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS9
2.1 52.211-6 BRAND NAME OR EQUAL (AUG 1999)11
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)11
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)12
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)12
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)13
2.6 52.228-1 BID GUARANTEE (SEP 1996)14
2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)15
2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)15
2.9 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)16
2.10 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020)16
2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)19
2.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)19
2.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)19
2.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)20
REPRESENTATIONS AND CERTIFICATIONS21
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)21
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)24
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)27
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021)28
GENERAL CONDITIONS31
4.1 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)31
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)32
4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)32
4.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)35
4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)36
4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS40
4.7 52.236-4 PHYSICAL DATA (APR 1984)40
4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)41
4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)44
4.10 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)44
4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)45
4.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)47
4.13 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)48
4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)49
4.15 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)49
4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)52
4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)53
4.18 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)54
4.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)54
4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019)55
4.21 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)56
4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)56
4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)57
4.24 IT CONTRACT SECURITY57
SECTION M - EVALUATION FACTORS FOR AWARD68
M.1 OTHER ATTACHMENTS75

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION

Questions regarding this Request for Proposal (RFP) shall be submitted in writing in WORD format via electronic mail to charee.harris@va.gov by no later than Tuesday, September 8, 2021 at 10:00 AM Pacific Time. Questions shall reference the drawing/detail and/or the specification section including paragraph number. Verbal queries will not be entertained. Responses to the properly submitted questions will be provided in the form of an Amendment. The Government may not respond to questions submitted less than 5 days before the proposal receipt due date.

PART II. EVALUATION FACTORS AND BASIS OF AWARD

BASIS OF AWARD

The term “technical factors” refers to any non-price factor. In making the best-value award decision, the Government will consider Factor 1 – Technical, Factor 2 – Schedule Phasing Management Factor 3 – Past Performance and Factor 4 - Cost/Price.

The contract resulting from this solicitation will be awarded to the responsible offeror whose offer, conforming to the solicitation, is determined to be the most advantageous to the Government considering price and non-price evaluation factors. Award may be made to other than the lowest priced offeror or other than the highest non-price rated offeror. Best Value Trade Off (BVTO) evaluation method will be used to determine the proposal offering the best value to the Government. In determining the best value to the Government, the Government need not quantify the tradeoffs that led to the best value decision. The responsibility determination will include the offerors safety/EMR and past performance evaluations.

REQUEST FOR PROPOSAL EVALUATON CRITERIA

Definitions for use with the evaluation factor:

· Size is defined as any project over $1,000,000.00 dollars.

· Complexity is defined as a construction project that includes several specialty trades.

· Scope is defined as work closely related to activities outlined in the Statement of Work.

· Recency is defined as a project completed in the last five (5) calendar years.

· Relevancy is defined for purposes of this evaluation as work in an active patient care environment, that relies heavily on phasing and coordination with medical staff to clear workspaces in accordance with the contractor’s proposed schedule.

NON-PRICE FACTOR 1 – Technical:

Provide information of relevant and recent experience on construction contracts of comparable size, scope and complexity within the last three calendar years as described herein. The Offeror shall complete the attached Factor 1 Spreadsheet (Attachment A), which is structured to allow entry of up to 4 projects total. Use of the spreadsheet and all information therein is MANDATORY and SHALL be used to evaluate experience. The Government will evaluate only the information provided in the spreadsheet and all other information provided will not be considered. The Offeror may expand individual cells within the spreadsheet. Technical proposals that do not comply with these requirements WILL NOT be evaluated.

Submit a minimum of two (2) and a maximum of four (4) projects completed that demonstrate the experience and capability of the prime construction contractor; projects must be recent, relevant, and similar in size, scope, and complexity as the project stated in this RFP.

The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing construction projects as defined in the solicitation submittal requirements that are recent and relevant and similar size, scope and complexity. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the solicitation. Offeror’s projects will be rated to achieve an overall factor rating. Offerors that have demonstrated construction experience that is recent and relevant; that were for projects completed within the initial stated period of performance; and/or were for projects completed within the VISN 21 geographical area or other VISNs within the VA may be rated more favorably. Recent and Relevant incorporates construction projects in progress that are at least 75% completed based on progress payments or completed projects in the last five (5) years. Please utilize the experience worksheet attached to this solicitation to fulfill this requirement.

Factor 2 – Schedule/Phasing: Contractor is to provide a schedule that clearly demonstrates the phasing criteria of this project and provide a summary as to how they propose to complete the work in the period of performance of 300 days, not to exceed 3 pages.

Factor 3 – Past Performance: Past performance can be submitted either with the attached questionnaire, or CPARS information. A minimum of three each.

Factor 4 – Price:

Price will be evaluated separately from Technical factors.

(a) Price will be evaluated in accordance with FAR 15.404-1(b).

(b) Vendors shall complete and submit with proposal Attachment B - Price Breakdown.

PART III. PROPOSAL SUBMISSION REQUIREMENTS

All proposals shall be submitted in five (5) parts, each part in a separate electronic file:

1. Technical Proposal (Attachment A – Experience)

2. Price Proposal (Completed SF 1442 and Attachment B – Price Breakdown)

3. Bid Guarantee (scanned with raised seals visible)

4. Safety/EMR documentation (Attachment C – Contractor Certification RE Safety and EMR).

5. Schedule (Attachment D) – A schedule which demonstrates the understanding of the phasing work with a summary of the work.

Proposals shall be emailed to charee.harris@va.gov with the title 36C26121R0087 Water Monitoring and Treatment.

All pages containing text shall be consecutively numbered, type-written to fit paper size indicated in each factor. Submissions shall be made electronically. All technical proposals shall be compatible with Microsoft Office 2010 Microsoft Word or PDF format.

It is the offeror’s responsibility to insure the completeness of the proposal. The evaluation panel for the Government may evaluate solely on the information provided in the initial proposal and will not assume that an offeror possesses any capability that is not specifically identified in the proposal.

Only one technical proposal will be evaluated for each offeror. Alternate methods of accomplishing the work required by this solicitation will not be evaluated.

The VA will NOT pay contractors or its subcontractors for any costs incurred in the preparation and submission of their offer.

SOLICITATION NOTES:

Under subject Solicitation, for any resultant Award, it should be noted that any in-house personnel, subcontractors, outside associates, or consultants shall be limited to individuals or firms that were specifically identified in the Contractor's accepted Offer (An Offer at minimum must consist of Price Proposal, Technical Proposal, Past Performance Information approved by Source Selection Authority (SSA)). The Contractor shall obtain the Contracting Officer's written approval before making any substitution for these designated in-house personnel, subcontractors, outside associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted Offer to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted Offer, or the level required by and mandated in the Solicitation, whichever is greater, is the minimum standard for any substitution.

2.1 52.211-6 BRAND NAME OR EQUAL (AUG 1999)

(a) If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.

(b) To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must—

(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation.

(2) Clearly identify the item by—

(i) Brand name, if any; and

(ii) Make or model number.

(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and

(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.

(c) The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

(d) Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.

(End of Provision)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
8.2 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor.

(2) Employer's identification number of the subcontractor.

(3) Estimated dollar amount of the subcontract.

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Reno, Washoe County, state of Nevada.

2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.6 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.7 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.8 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Charee Harris Hand-Carried Address:

Department of Veterans Affairs Network Contracting Office 21 (NCO 21) 975 Kirman Avenue Reno, NV 89502 Mailing Address:

Department of Veterans Affairs Network Contracting Office 21 (NCO 21) 975 Kirman Avenue Reno, NV 89502

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.9 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— Monday, August 23, 2021 at 10:00 A.M. Pacific Time.

(c) Participants will meet at— Participants will meet at the VA Sierra Nevada Healthcare System, 975 Kirman Avenue, Flagpole at front of hospital, 975 Kirman Avenue, Reno, Nevada 89502.

(End of Provision)

2.10 52.246-26 REPORTING NONCONFORMING ITEMS (JUN 2020)

(a) Definitions. As used in this clause— Common item means an item that has multiple applications versus a single or peculiar application.

Counterfeit item means an unlawful or unauthorized reproduction, substitution, or alteration that has been knowingly mismarked, misidentified, or otherwise misrepresented to be an authentic, unmodified item from the original manufacturer, or a source with the express written authority of the original manufacturer or current design activity, including an authorized aftermarket manufacturer. Unlawful or unauthorized substitution includes used items represented as new, or the false identification of grade, serial number, lot number, date code, or performance characteristics.

Critical item means an item, the failure of which is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the item; or is likely to prevent performance of a vital agency mission.

Critical nonconformance means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission.

Design activity means an organization, Government or contractor, that has responsibility for the design and configuration of an item, including the preparation or maintenance of design documents. Design activity could be the original organization, or an organization to which design responsibility has been transferred.

Major nonconformance means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.

Suspect counterfeit item means an item for which credible evidence (including but not limited to, visual inspection or testing) provides reasonable doubt that the item is authentic.

(b) The Contractor shall—

(1) Screen Government-Industry Data Exchange Program (GIDEP) reports, available at www.gidep.org, as a part of the Contractor’s inspection system or program for the control of quality, to avoid the use and delivery of counterfeit or suspect counterfeit items or delivery of items that contain a major or critical nonconformance. This requirement does not apply if the Contractor is a foreign corporation or partnership that does not have an office, place of business, or fiscal paying agent in the United States.

(2) Provide written notification to the Contracting Officer within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that any end item, component, subassembly, part, or material contained in supplies purchased by the Contractor for delivery to, or for, the Government is counterfeit or suspect counterfeit;

(3) Retain counterfeit or suspect counterfeit items in its possession at the time of discovery until disposition instructions have been provided by the Contracting Officer; and

(4) Except as provided in paragraph (c) of this clause, submit a report to GIDEP at www.gidep.org within 60 days of becoming aware or having reason to suspect, such as through inspection, testing, record review, or notification from another source (e.g., seller, customer, third party) that an item purchased by the Contractor for delivery to, or for, the Government is—

(i) A counterfeit or suspect counterfeit item; or

(ii) A common item that has a major or critical nonconformance.

(c) The Contractor shall not submit a report as required by paragraph (b)(4) of this clause, if—

(1) The Contractor is a foreign corporation or partnership that does not have an office, place of business, or fiscal paying agent in the United States.

(2) The Contractor is aware that the counterfeit, suspect counterfeit, or nonconforming item is the subject of an ongoing criminal investigation, unless the report is approved by the cognizant law enforcement agency; or

(3) For nonconforming items other than counterfeit or suspect counterfeit items, it can be confirmed that the organization where the defect was generated (e.g., original component manufacturer, original equipment manufacturer, aftermarket manufacturer, or distributor that alters item properties or configuration) has not released the item to more than one customer.

(d) Reports submitted in accordance with paragraph (b)(4) of this clause shall not include—

(1) Trade secrets or confidential commercial or financial information protected under the Trade Secrets Act (18 U.S.C. 1905); or

(2) Any other information prohibited from disclosure by statute or regulation.

(e) Additional guidance on the use of GIDEP is provided at http://www.gidep.org/about/opmanual/opmanual.htm.

(f) If this is a contract with the Department of Defense, as provided in paragraph (c)(5) of section 818 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112–81), the Contractor or subcontractor that provides a written report or notification under this clause that the end item, component, part, or material contained electronic parts (i.e., an integrated circuit, a discrete electronic component (including, but not limited to, a transistor, capacitor, resistor, or diode), or a circuit assembly) that are counterfeit electronic parts or suspect counterfeit electronic parts shall not be subject to civil liability on the basis of such reporting, provided that the Contractor or any subcontractor made a reasonable effort to determine that the report was factual.

(g) Subcontracts.

(1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert this clause, including this paragraph (g), in subcontracts that are for—

(i) Items subject to higher-level quality standards in accordance with the clause at FAR 52.246–11, Higher-Level Contract Quality Requirement.

(ii) Items that the Contractor determines to be critical items for which use of the clause is appropriate.

(iii) Electronic parts or end items, components, parts, or materials containing electronic parts, whether or not covered in paragraph (g)(1)(i) or (ii) of this clause, if the subcontract exceeds the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, and this contract is by, or for, the Department of Defense (as required by paragraph (c)(4) of section 818 of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112–81)); or

(iv) For the acquisition of services, if the subcontractor will furnish, as part of the service, any items that meet the criteria specified in paragraphs (g)(1)(i) through (g)(1)(iii) of this clause.

(2) The Contractor shall not insert the clause in subcontracts for—

(i) Commercial items; or

(ii) Medical devices that are subject to the Food and Drug Administration reporting requirements at 21 CFR 803.

(3) The Contractor shall not alter the clause other than to identify the appropriate parties.

(End of Clause)

2.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
AUG 2020
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.204-26
COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION
OCT 2020
52.215-1
INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION
JAN 2017
52.236-28
PREPARATION OF PROPOSALS—CONSTRUCTION
OCT 1997

2.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned…

This is the start of the file's text. The full file is on GovTribe.