Mechanical drawings.pdf

PDF 29 MB Posted

Attached to
R425--36C26121Q0642 | Tri-annual life safety inspections
Solicitation number
36C26121Q0642
Issued by

View the file

Other files

File Type Posted
36C26121Q0642 Amnd 2 Q_A.docx DOCX document
36C26121Q0642_5.docx DOCX document
36C26121Q0642_4.docx DOCX document
36C26121Q0642 Amnd 1 Q_A.docx DOCX document
Drawings - Bldg 2.pdf PDF
Wage Determination.pdf PDF
36C26121Q0642_3.docx DOCX document
Drawings - Bldg 3.pdf PDF
Drawings - Bldg 5.pdf PDF
Drawings - Bldg 8.pdf PDF
Drawings - Bldg 6-7.pdf PDF
36C26121Q0642.docx DOCX document
Drawings - Bldg 1.pdf PDF
Drawings - Bldg 4.pdf PDF
Drawings - PCCs and CBOCs.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

M

3.2

3.7

4.6

3.1

5.4

MECHANICAL ABBREVIATION LIST

(THIS IS A MASTER LIST, NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)

@ AT

AABC AMERICAN AIR BALANCE

COUNCIL

ABBR ABBREVIATION

ACD AUTOMATIC CONTROL DAMPER

AFF ABOVE FINISH FLOOR

AP ACCESS PANEL

AUTO AUTOMATIC

AHU (AH) AIR HANDLING UNIT

AD ACCESS DOOR

APD AIR PRESSURE DROP

AF AIR FOIL

AFMS AIR FLOW MEASURING STATION

ACU (AC) AIR CONDITIONING UNIT

AFUE ANNUAL FUEL UTILIZATION

EFFICIENCY

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

B BOILER

BHP BRAKE HORSE POWER

BTU(/H) BRITISH THERMAL UNIT

(PER HOUR)

BOS BOTTOM OF STEEL

BOD BOTTOM OF DUCT

BMS BUILDING MANAGEMENT

SYSTEM

BI BACKWARD INCLINE

°C DEGREES CELSIUS

CFM CUBIC FEET PER MINUTE

CFH CUBIC FEET PER HOUR

CH CHILLER

CU CONDENSING UNIT

CT COOLING TOWER

CV CONSTANT VOLUME

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

CWP CONDENSER WATER PUMP

CHWP CHILLED WATER PUMP

CF CHEMICAL POT FEEDER

CC COOLING COIL

CD CEILING DIFFUSER

COND CONDENSER

COP COEFFICIENT OF

PERFORMANCE

DIFF DIFFUSER

DB DRY BULB TEMPERATURE

dB DECIBEL

DDC DIRECT DIGITAL CONTROL

DDCFP DIRECT DIGITAL CONTROL FIELD

PANEL

DC DIRECT CURRENT

DIA DIAMETER

DN DOWN

DX DIRECT EXPANSION

DS DUCT SUMP

DOP DISPERSED OIL PARTICULATE

EMCS ENERGY MANAGEMENT

CONTROL SYSTEM

E EXISTING

EAT ENTERING AIR TEMPERATURE

EFF EFFICIENCY

EWT ENTERING WATER

TEMPERATURE

EXH EXHAUST

EC EVAPORATIVE COOLER

EF EXHAUST FAN

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EER ENERGY EFFICIENCY RATIO

EMI ELECTROMAGNETIC

INTERFERENCE

FCU (FC) FAN COIL UNIT

°F DEGREES FAHRENHEIT

FB FAN POWERED BOX UNIT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FM FLOW METER

FLA FULL LOAD AMPS

GA GAUGE

GAL GALLONS

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GR GRILLE V

GBS GALVANIZED BIRD SCREEN

GEF GENERAL EXHAUST FAN

HD HEAD

HP HORSE POWER

HR HOUR

HZ HERTZ

HOA HAND OFF AUTO

HWP HOT WATER PUMP

HX HEAT EXCHANGER

HC HEATING COIL

IN (") INCH

IBC INTERNATIONAL BUILDING CODE

IMC INTERNATIONAL MECHANICAL

BUILDING CODE

IPC INTERNATIONAL PLUMBING

BUILDING CODE

IH INTAKE HOOD

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LWT LEAVING WATER TEMPERATURE

MBH 1000 BRITISH THERMAL UNITS

PER HOUR

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MOCP MAXIMUM OVER CURRENT

PROTECTION

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MA MIXED AIR

MERV MINIMUM EFFICIENCY

REPORTING VALUE

NA NOT APPLICABLE

NC NORMALLY CLOSED

NC NOISE CRITERIA

NO NORMALLY OPEN

NEBB NATIONAL

ENVIRONMENTAL

BALANCING BUREAU

NEC NATIONAL ELECTRIC CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NPT NATIONAL PIPE TAPER

OED OPEN END DUCT

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

PH PHASE

PA PRESSURE AVAILABLE

PRV PRESSURE REDUCING VALVE

PSI POUND PER SQUARE INCH

PSIA POUND PER SQUARE INCH

ABSOLUTE

PSIG POUND PER SQUARE INCH

GAUGE

PCF POUND PER CUBIC FOOT

PD PRESSURE DROP

POS PROVIDE BY OTHER SECTION

P PUMP

PCU POLLUTION CONTROL UNIT

PPM PARTS PER MILLION

RAD RADIATED

RPM REVOLUTIONS PER MINUTE

RH RELATIVE HUMIDITY

RTU ROOF TOP UNIT

REFR REFRIGERANT

RFI RADIO FREQUENCY

INTERFERENCE

SD SMOKE DAMPER

SP STATIC PRESSURE

SS STAINLESS STEEL

SQ FT (SF) SQUARE FEET

SEF SMOKE EXHAUST FAN

SF SUPPLY FAN

SH STATIC HEAD

SOV SHUT-OFF VALVE

TF TRANSFER FAN

TEMP (T) TEMPERATURE

TAB TESTING AND BALANCING

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

TD TEMPERATURE DIFFERENCE

TDH TOTAL DEVELOPED HEAD

TU TERMINAL UNIT

TCP TEMPERATURE CONTROL PANEL

TEL TOTAL EQUIVALENT LENGTH

UMC UNIFORM MECHANICAL CODE

UPC UNIFORM PLUMBING CODE

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UV ULTRA VIOLET

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL)

VFD VARIABLE FREQUENCY DRIVE

V VOLT

VEL VELOCITY

W WATT

WB WET BULB TEMPERATURE

WG WATER GAUGE

WMS WIRE MESH SCREEN

WC WATER COLUMN

WP WATER PRESSURE

WPD WATER PRESSURE DROP

WSHP(WHP)WATER SOURCE HEAT PUMP

WT WEIGHT

SHEET INDEXMECHANICAL SYMBOL LIST

(THIS IS A MASTER LEGEND, NOT ALL SYMBOLS MAY APPEAR ON DRAWING)

ABBR SYMBOL DESCRIPTION

SA

XX"

SHEET NOTE

REVISION NUMBER

ROUND DUCTWORK (INCHES)

RECTANGLE DUCTWORK (INCHES)

SUPPLY AIR

RETURN AIR

EXHAUST AIR

OUTSIDE AIR

SUPPLY AIR DUCT UP

SUPPLY AIR DUCT DOWN

RETURN AIR DUCT UP

RETURN AIR DUCT DOWN

EXHAUST AIR DUCT UP

EXHAUST AIR DUCT DOWN

OUTSIDE AIR DUCT UP

OUTSIDE AIR DUCT DOWN

ACCESS DOOR

SIDEWALL

AIR FLOW DIRECTION

LINED DUCTWORK

DOUBLE LINE RIGID DUCT

DOUBLE LINE RIGID DUCT WITH 1\" ACOUSTICAL LINER

FUSIBLE LINK FIRE DAMPER

DUCT MOUNTED SMOKE DETECTOR

COMBINATION FIRE/SMOKE DAMPER

MOTORIZED DAMPER

MANUAL VOLUME DAMPER

MVD WITH REMOTE CEILING OPERATOR

OPPOSED BLADE DAMPER

BACKDRAFT DAMPER

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HOT WATER SUPPLY

HOT WATER RETURN

DRAIN

INDUSTRIAL COLD WATER

PUMPED CONDENSATE RETURN

LOW PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM RETURN

HIGH PRESSURE STEAM SUPPLY

HIGH PRESSURE STEAM RETURN

PUMPED DRAIN

CONTROL VALVE (2-WAY, 3-WAY)

SHUT-OFF VALVE

THROTTLING VALVE

BALANCING VALVE

CHECK VALVE

RELIEF VALVE

STRAINER WITH BLOWDOWN VALVE

FLEXIBLE PIPE CONNECTION

UNION

AIR VENT

DUCT OR PIPE TRANSITION

PRESSURE GAUGE

THERMOMETER

TEST WELL (PETE'S PLUG)

FLOW SWITCH

PIPE DOWN

PIPE UP

PIPE TEE UP

PIPE TEE DOWN

ANCHOR

GUIDE

FLOW ARROW

THERMOSTAT

SPACE TEMPERATURE SENSOR W/ PLUG-IN PORT

CARBON DIOXIDE SENSOR

POINT OF CONNECTION TO EXISTING

POINT OF DISCONNECTION FROM EXISTING

RA

EA

OA

AD

FD

DD

FSD

MVD

OBD

BDD

CHS

CHR

HS

HR

D

ICW

PDR

LPS

LPR

HPS

HPR

PD

SOV

AV

PG

TH

TW

CHR

HS

HR

D

ICW

PDR

LPS

LPR

HPS

HPR

PD

CHS

XX" / XX"

X

C

T

S

F

F S

DD

M

BDD

X

FS

EQUIPMENT TYPE

EQUIPMENT NUMBER

E = EXISTING

D = DEMOLISH

R = RELOATE

TERMINAL BOX SIZE

TERMINAL BOX TAG

CFM/GPM

SUPPLY DIFFUSER TAG

CFM/DIRECTION

RETURN/EXHAUST GRILLE

CFM

TERMINAL BOX SIZE

CFM/GPM

PLAN

SHEET

MECHANICAL GENERAL NOTES

EXISTING DUCTWORK, PIPING AND EQUIPMENT TO REMAIN IS SHOWN LIGHT. NEW DUCTWORK, PIPING AND EQUIPMENT IS SHOWN HEAVY. EXISTING DUCTWORK PIPING AND EQUIPMENT TO BE REMOVED IS

SHOWN CROSSHATCHED.

1.

ARCHITECTURAL DRAWINGS SHALL BE REVIEWED FOR PROJECT SCOPE AND AREA OF WORK. WORK

SHALL INCLUDE DEMOLITION AND REMOVAL OF EXISTING MECHANICAL SYSTEMS AS REQUIRED.

MECHANICAL SYSTEMS IN EXISTING WALLS AND UNDER GROUND SHALL BE REMOVED AND CAPPED AS REQUIRED. RECONNECT EXISTING PIPING AND DUCTWORK NOT IN DEMOLITION AREA AS REQUIRED TO

MAINTAIN A COMPLETE AND OPERABLE SYSTEM.

2.

THE OWNER RESERVES FIRST CHOICE TO KEEP EXISTING EQUIPMENT AND MATERIALS. COORDINATE WITH OWNER AND DELIVER DESIGNATED EQUIPMENT AND MATERIALS REMOVED UNDER THIS CONTRACT

TO OWNERS DESINATED STORAGE AREA.

3.

UNLESS NOTED OTHERWISE, FLEXIBLE DUCTS TO TERMINAL UNITS, DIFFUSERS AND GRILLES SHALL BE

SAME SIZE AS NECK.

4.

LENGTH OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO 5'-0" MAXIMUM HORIZONTAL RUN WITH ONLY ONE

90° BEND. SECURE FLEXIBLE DUCTWORK WITH SCREWS AND DRAWBANDS.

5.

DUCT SIZES INDICATED ARE NET INSIDE CLEAR DIMENSIONS.6.

PROVIDE GEAR OPERATED CEILING OPERATORS FOR INACCESSIBLE MANUAL VOLUME DAMPERS WITH CEILING ESCUTCHEON AND COVER PLATE. COORDINATE EXACT LOCATION OF COVER PLATE WITH

ARCHITECT.

7.

ITEM DESIGNATIONS INDICATED ARE FOR PURPOSES OF THESE DOCUMENTS ONLY. CONTRACTOR SHALL

VERIFY WITH OWNER ACTUAL "TAGGING" INFORMATION TO BE PROVIDED FOR EACH ITEM OF

MECHANICAL EQUIPMENT PRIOR TO NAMEPLATE ORDER RELEASE.

8.

THE MECHANICAL DETAILS SHALL BE CONSIDERED AS A PART OF THE CONTRACT DOCUMENTS. THESE DETAILS SHALL BE INCORPORATED INTO THE ASSOCIATED WORK AND PROVIDE GENERAL GUIDANCE AS

TO THE INSTALLATION INTENT WHETHER REFERENCED TO OR NOT. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION AND

ENSURE THAT ALL INSTALLATIONS ARE IN ACCORDANCE WITH THE EQUIPMENT'S LISTING AND THE

MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.

9.

REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ACTUAL LOCATION OF GRILLES, DIFFUSERS AND ACCESS PANELS IN CEILING AND FOR DIMENSIONED LENGTHS OF LINEAR DIFFUSERS. COORDINATE

DIFFUSER BORDER TYPES WITH CEILING TYPE SCHEDULED IN ARCHITECTURAL REFLECTED CEILING

PLANS.

10.

TURNING VANES SHALL BE PROVIDED IN ALL SQUARE ELBOW FITTINGS. TURNING VANE RUNNERS SHALL HAVE A VANE IN EVERY SLOT IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND

SMACNA DUCT CONSTRUCTION STANDARDS.

11.

FIELD VERIFY FIT OF DUCTWORK AND PIPING PRIOR TO FABRICATION.12.

COORDINATE AND VERIFY ACTUAL APPROVED EQUIPMENT DIMENSIONS PRIOR TO POURING CONCRETE EQUIPMENT PADS. COORDINATE EQUIPMENT PAD DIMENSIONS WITH VIBRATION/SEISMIC ISOLATION

REQUIREMENT.

13.

REFER TO EQUIPMENT DRAWINGS, SPECIFICATIONS AND SHOP DRAWINGS FOR CONNECTION

REQUIREMENTS TO EQUIPMENT.

14.

MANUAL VOLUME DAMPERS AND VALVES ON INSULATED DUCTWORK AND PIPING SHALL HAVE EXTENDED STEMS TO ALLOW FOR THE INSULATION THICKNESS. PROVIDE MINIMUM 12" LONG RED RIBBON LOCATOR

ON VOLUME DAMPER AND VALVE HANDLES.

15.

PROVIDE HEAT TRAPS FOR ALL WATER HEATING EQUIPMENT.16.

EQUIPMENT START-UP SHALL BE BY MANUFACTURER'S AUTHORIZED REPRESENTATIVE.17.

SEISMIC RESTRAINTS SHALL BE PROVIDED PER THE 2009 IBC VA SPECIFICATIONS SECTION 130541 AND THE SMACNA SEISMIC RESTRAINT MANUAL - GUIDELINES FOR MECHANICAL SYSTEMS. THE CONTRACTOR

SHALL SUBMIT SHOP DRAWINGS OF THE PROPOSED RESTRAINTS, STRUCTURAL ATTACHMENT METHODS

AND RESTRAINT LOCATIONS TO THE ARCHITECT FOR REVIEW AND APPROVAL. THE SUBMITTED

DOCUMENTS SHALL BE PREPARED AND STAMPED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE

OF NEVADA.

18.

INSTALL SPACE SENSORS AT MOUNTING HEIGHT 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. COORDINATE EXACT LOCATION IN FIELD WITH GENERAL CONTRACTOR AND ARCHITECT.

19.

ISSUE

Sheet Number SHEET DESCRIPTION0 -2 -1 C D S U B M

IS

S

IO

N

-9 -1 D D S U B M

IT

T A L

-2 -1 D D S U B M

IS

S

IO

N

• • • M-001 Mechanical Sheet Index, General Notes, Symbol List and Abbreviation List

• • • MD-100 Demo Mechanical Plan - Basement Level - Admin

• • • MH-200A Mechanical Plan - Basement Level - Admin

• • • MH-200C Mechanical Plan - Basement Level - Connector

• • • MH-201A Mechanical Plan - Level 1 - Admin

• • • MH-201B Mechanical Plan - Level 1 - Training

• • • MH-201C Mechanical Plan - Level 1 - Connector

• • • MH-202A Mechanical Plan - Level 2 - Admin

• • • MH-202B Mechanical Plan - Roof - Training

• • • MH-202C Mechanical Plan - Level 2 - Connector

• • • MH-203A Mechanical Plan - Level 3 - Admin

• • • MH-203C Mechanical Plan - Level 3 - Connector

• • • MH-204A Mechanical Plan - Roof - Admin

• • • MP-200A Mechanical Piping Plan - Basement Level - Admin

• • • MP-200C Mechanical Piping Plan - Basement Level - Connector

• • • MP-201A Mechanical Piping Plan - Level 01 - Admin

• • • MP-201B Mechanical Piping Plan - Level 01 - Training

• • • MP-202A Mechanical Piping Plan - Level 02 - Admin

• • • MP-202B Mechanical Piping Roof Plan - Training

• • • MP-203A Mechanical Piping Plan - Level 03 - Admin

• • • MP-204A Mechanical Piping Roof Plan - Admin

• • • MH-301A Mechanical Zoning Plan - Level 1 - Admin

• • • MH-301B Mechanical Zoning Plan - Level 1 - Training

• • • MH-301C Mechanical Zoning Plan - Level 1 - Connector

• • • MH-302C Mechanical Zoning Plan - Level 2 - Connector

• • • MH-302A Mechanical Zoning Plan - Level 2 - Admin

• • • MH-303A Mechanical Zoning Plan - Level 3 - Admin

• • • MH-303C Mechanical Zoning Plan - Level 3 - Connector

• • • M-401 Mechanical - Enlarged Part Plans

• • • M-402 Mechanical - Enlarged Part Plans

• • • M-501 Mechanical - Details

• • • M-502 Mechanical - Details

• • • M-503 Mechanical - Details

• • • M-601 Mechanical - Schedules

• • • M-602 Mechanical - Schedules

• • • M-603 Mechanical - Schedule

• • • M-701 Air Flow Schematic

• • • M-702 Chilled Water Piping Schematic

• • • M-703 Heating Water Piping Schematic

• • • M-711 Mechanical Sections - Penthouse

• • • M-712 Mechanical Sections - Basement

• • • M-721 Mechanical Isometric - AHU-1

• • • M-722 Mechanical Isometric - AHU-2

• • • M-723 Mechanical Isometric - AHU-3

• • • M-724 Mechanical Isometric - AHU-4

• • • M-725 Mechanical Isometric - AHU-5

• • • M-726 Mechanical Isometric - AHU-6

• • • M-727 Mechanical Isometric - AHU-7

• • • M-728 Mechanical Isometric - AHU-8

• • • M-901 Mechanical - Control Diagrams

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

As indicated

M-001 Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Sheet Index, General Notes, Symbol List and Abbreviation List

593CA2202

Checker Author

6"

6"

6"

6"

CHS

CHR

HPS

PCR

3"

2"3"

(E)TU-2-B024

16"ø

16"/14"

"ø

S

"ø

16"/14" 24"/12"

(E) CD-4

(390)

(E) CD-4

(400)

(E) CD-4

(490)

(E) CD-2

(110)

(E) CR-1

(110)

(E) CR-3

(790)

1/8" = 1'-0"1 Demo Mechanical Plan - Basement Level - Admin

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MD-100

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Demo Mechanical Plan - Basement Level

- Admin

UP

T

T

T

A A

B B

C C

A.1 A.1

ELECTRICAL

BH004

ELECTRICAL

BH003

SERVICE WELL

BH005

MECHANICAL

BH002

STAIR 1

S1

ELEV LOBBY

BH001

10.9

10.1

10.1

CORRIDOR

CB-001

CORRIDOR

CB-002

ELEVATOR

P1

STAIR 4

S4

ELEVATOR

P2

FC

B-3

FC

B-4

FC

B-2

FC

B-1

HWP

HWP

CWP

CWP

M-401

M-712

M-712

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-200A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Basement Level - Admin

593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Plan - Basement Level - Admin

10.910.1

10.1

(E)TU-2-B024

16"ø

"ø14 "ø

16"/14"

(E) CD-4

(390)

(E) CD-4

(400)

(E) CD-4

(490)

(E) CR-3

(790)

S

2 110

1 110

24"/12"

NOTES

RE-BALANCE EXISTING VAV BOX TO

INDICATED CFM. MODIFY VAV BOX

DAMPER POSITION AS REQUIRED.

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

As indicated

MH-200C

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Basement Level - Connector

593CA2202

Checker Author

1/8" = 1'-0"1 Mechanical Plan - Basement Level - Connector

B A

C

DN

UP

UP

A A

10 11 12

B B

C C

D D

E E

A.1 A.1

D.9 D.9

TOILET

1H109

WOMEN

1H106

MEN

1H105

TELECOM

1H103

FACILITIES

1H104

ELEVATOR LOBBY

1H102

WORK / FILE ROOM

1H116A

ELECTRICAL

1H107

HAC

1H108

OFFICE

1H110F

OFFICE

1H117M

OFFICE

1H117K

OFFICE

1H117H

OFFICE

1H117F

OFFICE

1H117G

INTERVIEW

1H117J

INTERVIEW

1H117L

INTERVIEW

1H117N

OFFICE

1H117A

OFFICE

1H117B

OFFICE

1H117C

OFFICE

1H117D

WORKROOM

1H110C

OFFICE

1H110D

CONFERENCE

1H110A

OPEN OFFICE

1H117

LOBBY

1H101

OPEN OFFICE

1H110

OFFICE

1H110E

MAILROOM

1H112A

WORKROOM

1H112B

OFFICE

1H112G

OFFICE

1H112F

OFFICE

1H112E

WORKROOM

1H114C

OFFICE

1H114D

OFFICE

1H114E

OFFICE

1H115B

OFFICE

1H115C

OFFICE

1H115D

OFFICE

1H115F

OFFICE

1H115G

OFFICE

1H115H

OFFICE

1H115JOFFICE

1H114A

OFFICE

1H112D

OFFICE

1H116E

OFFICE

1H116D

OFFICE

1H116C

HALL

1H116B

OPEN OFFICE

1H116

HALL

1H117E

HALL

1H116F

HALL

1H115E

OFFICE

1H115

LOBBY

1H113B

OPEN OFFICE

1H112

CORRIDOR

C1-102

OPEN OFFICE

1H114

RECEPTION

1H114B

RECEPTION

1H110B

B.3

C.8

10.1

10.1

STAIR 1

S1CORRIDOR

C1-105

RECEPTION

1H101A

WELLNESS CENTER

1H111

ELEVATOR

P1

CORRIDOR

C1-103

VESTIBULE

1H113A

MEN

1H111A

WOMEN

1H111B

OFFICE

1H115A

RECEPTION

1H112C

STAIR 4

S4

ELEVATOR

P2

CORRIDOR

C1-101

CORRIDOR

C1-104

36"/20"

40"/18" 24"/12" 18"ø

14"ø

20"/18"36"/20"36"/24"36"/30"30"/24"

14"ø

10"ø

60"/30"

54"/30"

48"/30" 48"/20" 40"/20"

48"/24" 40"/24"

18"ø 30"/20"

24"/24"

14"ø

18"ø

14"ø

14"ø

7"ø 16"ø

20"/18"

10"ø

30"/18"

12"ø

12"ø

10"ø

12"ø

12"ø

12"ø

14"ø

"ø

14"ø 10"ø

18"ø

14"ø

10"ø 10"ø

12"ø

48"/20"

18"ø

16"ø

10"ø

8"ø

10"ø

10"ø

10"ø

16"ø

12"ø

16"ø

12"ø

10"ø

20"/16"

12"ø

40"/20"30"/18"18"ø

20"/16" 14"ø

12"ø

16"ø

16"ø

10"ø

8 3- 1

(1000)

4 3- 2

(500)

8 3- 3

(1000)

5 3- 4

(600)

5 3- 5

(600) 8 3- 6

(1000)

4 3- 7

(400)

4 2- 5

(500)

4 4- 2

(500) 6 4- 1

(700)

10 4- 3

(2000)

8 4- 4

(1200)

8 4- 5

(1200)

10 4- 6

(2000)

4 3- 8

(400)

2 3- 9

(200)

2 3- 11

(200)

4 3- 12

(500)

3 3- 13

(300)

10 3- 15

(2000)

10 3- 14

(1800)

2 3- 16

(200)

7 3- 20

(800)

2 3- 19

(200)

5 3- 21

(600)

3 3- 17

(300)

1 3- 18

(100)

4 3- 22

(450)

8 3- 23

(1050)

11 3- 26

(2500) 3 3- 24

(300)

3 3- 25

(300)

8 2- 3

(1200)

8 2- 4

(1200)

FC

1-4

FC

1-5

FC

1-6

4 4- 9

(400)

7 4- 10

(800)

4 4- 8

(450)

4 4- 7

(450)

4 4- 12

(450) 8 4- 13

(1200)

4 4- 11

(450)

2 4- 14

(200)

5 4- 15

(600)

2 4- 17

(200) 4 4- 20

(500)

7 4- 16

(800)

8 4- 19

(950)2 4- 18

(200)

M-712

M-712

SF

SF

SF

SF

SF

14"ø

20"/18"

30"/18"

6 7 8 9 10 11 12

A

B

C

D

E

A.1

D.9

10.1

10.9

16"ø

F

F

F

FF

F

SF

SF

SF

SF

F

12"ø

1 4- 21

(75)

10"ø

1/8" = 1'-0"1 Mechanical Plan - Level 01 - Admin

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-201A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 1 - Admin 593CA2202

A A

5 6

B B

C C

D D

E E

A.1 A.1

D.9 D.9

MAIN LOBBY

1H121

OFFICE

1H137

OFFICE

1H136

OFFICE

1H135

OFFICE

1H131

OFFICE

1H130

STORAGE

1H129B

STORAGE

1H122A CLASSROOM

1H123

STORAGE

1H123A

STORAGE

1H124A

STORAGE

1H125A

EDUCATION

1H133

A.2

A.3

B.3

C.8

4.8

CLASSROOM

1H122

CLASSROOM

1H125

CLASSROOM

1H124

TELECOM

1H127

SIMULATION LAB

1H129A

COMPUTER TRAINING ROOM

1H141

STORAGE

1H140

ELECTRICAL

1H139

TRAINING ROOM

1H138

CORRIDOR

C1-108

CORRIDOR

C1-107 CORRIDOR

C1-106

SANDWICH SHOP

1H142

POLICE TRAINING

1H126

HAC

1H145TOILET

1H146

MEN

1H147

WOMEN

1H144

VESTIBULE

1H143

VESTIBULE

1H120

WORKROOM

1H132

WORK AREA

1H134

STORAGE

1H129D

CONTROL ROOM

1H128A

SIMULATION ROOM

1H129C

ACCESS

1H128B

48"/24"

48"/24"

4 1- 16

(500) 5 1- 15

(575)

4 1- 19

(400)

10 1- 20

(2000)

10 1- 1

(2000)

4 1- 3

(400)

11 1- 2

(2100)

8 1- 6

(1000) 3 1- 5

(275)

3 1- 4

(300) 9 1- 7

(1500)

9 1- 8

(1500)

8 1- 9

(1000)

"ø

24"ø

8 2- 1

(1000)

10 1- 17

(2000)

4 1- 18

(400)

8 1- 13

(1100)

6 1- 14

(700)

4 2- 2

(500)

6 1- 12

(675)

3 1- 10

(300)

4 1- 11

(400)

24"/20"

"ø

16"ø

12"ø

12"ø

14"ø

EF

12"ø

EF

16"ø

18"ø

40"/20"

7 1- 22

(800)

7 1- 21

(800)

7 1- 24

(800)

7 1- 23

(800)

8 2- 3

(1200)

8 2- 4

(1200)

20"/18" 18"/18"

30"/12" 14"/12"

12"ø

14"/12"

20"/12"

16"ø

20"/18" 30"/18"

12"ø

36"/18"

12"ø

36"/16"

24"/12"

FC

1-1

FC

1-2

FC

1-3

1 2 3 4 5 6

A

B

C

D

E

5.1

B.3

C.8

A.2

2.5

A.1

A.8

D.9

4.8

24"/12"

"16"ø

16"ø

16"ø

16"ø

50"/30"

3 400

2 275

3 3503 350

3 350 3 350

3 400

5 350

1 50

2 300

1 50

3 325

3 350

2 250 2 250

(TYP-4)

3 350

1 175

1 50

1 50

1 150

2 300

NOTES

24"/24" EXHAUST DUCT UP TO ROOF

HOOD.

50"/30" SUPPLY UP TO AHU-1.2

42"/30" RETURN UP TO AHU-1.3

40"/22" RETURN UP TO AHU-2.5

34/16" SUPPLY UP TO AHU-2.4

1/8" = 1'-0"1 Mechanical Plan - Level 01 - Training

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

As indicated

MH-201B

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 1 - Training 593CA2202

CONFERENCE

1H110A

10.1

10.1

STAIR 3

S3

CONNECTOR

C1-109

VESTIBULE

1H148

VESTIBULE

1H149

7 8 9 10

R

4.0

10.1

5.0

R.1

3.6

P

R

4 5

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-201C

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 1 - Connector 593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Plan - Level 01 - Connector

DNUP

A A

B B

C C

D D

E E

A.1 A.1

D.9 D.9

WOMEN

2H206

MEN

2H205

TELECOM

2H203

FACILITIES

2H204

ELEVATOR LOBBY

2H202

FILE ROOM

2H218B

CONFERENCE

2H218D

OFFICE

2H210X

OFFICE

2H210W

OFFICE

2H210V

OFFICE

2H210U

OFFICE

2H210T

OFFICE

2H210S

OFFICE

2H213J

OFFICE

2H213K

OFFICE

2H213L

OFFICE

2H213H

OFFICE

2H213G

OFFICE

2H213E

OFFICE

2H213D

OFFICE

2H213C

OFFICE

2H213B

FILE ROOM

2H210L

FILE ROOM

2H210M

FILE ROOM

2H210N

CONFERENCE

2H212

BREAKROOM

2H211

OFFICE

2H210J

OFFICE

2H210H

HALL

2H210G

OFFICE

2H210E

OFFICE

2H210D

WORKROOM

2H210C

WORKROOM

2H219H

HALL

2H219F

OFFICE

2H219E

OFFICE

2H219D

OFFICE

2H218J

OFFICE

2H218H

OFFICE

2H219C

OFFICE

2H219B

OFFICE

2H219A

OFFICE

2H218K

OFFICE

2H218L

OFFICE

2H217F

OFFICE

2H217G

OFFICE

2H217H

OFFICE

2H217JOFFICE

2H217K

OFFICE

2H213N

OFFICE

2H213M

CONFERENCE

2H215

OFFICE

2H217B

HALL

2H217C

OFFICE

2H217D

OFFICE

2H217E

OFFICE

2H218E

OFFICE

2H218C

ELECTRICAL

2H207

HAC

2H208

RECEPTION

2H219J

INTERVIEW

2H210A

LIBRARY

2H219K

RECEPTION

2H213A

WAITING

2H217A

HALL

2H216

HALL

2H218G

HALL

2H218A

HALL

2H218F

CORRIDOR

C2-102

CORRIDOR

C2-103

CORRIDOR

C2-104

CORRIDOR

C2-101

HALL

2H210P

HALL

2H210R

HALL

2H210K

LOBBY

2H201

OPEN OFFICE

2H210

OPEN OFFICE

2H217

OPEN OFFICE

2H213

LOBBY

2H214

OPEN OFFICE

2H219

B.3B.3

C.8C.8

10.9

10.9

10.1

10.1

5.8

5.8

D.3 D.3

STAIR 1

S1

ELEVATOR

P1

RECEPTION

2H210B

ELEVATOR

P2

STAIR 2

S2

OFFICE

2H219G

OFFICE

2H210F

TOILET

2H209

HALL

2H213F

OFFICE

2H218

48"/30"42"/24"30"/24"

30"/24" 12"ø

54"/30"

24"/20"

48"/36"

36"/24"36"/20"30"/20"

14"ø

"/3 6"

48"/36"48"/30"

24"/20"

12"ø

20"/18"

" 14 "ø

14"ø

18"ø 16"ø

12"ø 10"ø

8"ø

10"ø

14"ø

10"ø

12"ø

14"ø 10"ø

14"ø

18"ø

10"ø

10"ø

14"ø

14"ø

18"ø

5 6- 8

(600)

10 6- 5

(2000)

9 6- 4

(1600)

2 6- 6

(200)

2 6- 7

(200)

5 6- 10

(600)

5 6- 13

(600)1 6- 11

(150) 3 6- 12

(300)

3 6- 15

(230)

2 6- 16

(200)

8 6- 17

(1200)

5 6- 18

(600)

5 6- 19

(600)

5 6- 20

(600)

2 6- 21

(200) 8 6- 22

(1000)

1 6- 24

(150)

4 6- 23

(500)

10 6- 25

(2000)

5 6- 26

(600)

4 5- 27

(500)

1 5- 26

(150)

1 5- 25

(150)

8 5- 24

(1080)

1 5- 23

(150)

6 5- 22

(750) 6 5- 21

(750)

3 5- 20

(300)

4 5- 19

(450)

7 5- 18

(900)

4 5- 17

(450)

3 5- 16

(300)

1 5- 15

(150)

5 5- 14

(650)

3 5- 13

(250)

4 5- 29

(400)

6 5- 12

(700)

5 5- 11

(600)

3 5- 10

(300)

10 5- 9

(1800) 7 5- 8

(900)

7 5- 7

(900)

3 5- 6

(300)

11 5- 5

(2400)

1 5- 4

(75)

1 5- 3

(125)

5 5- 2

(650)

3 5- 1

(350)

3 6- 2

(250)

5 6- 3

(650)

3 6- 1

(350)

4 6- 14

(400) 4 5- 28

(400)

FC

2-2

2 6- 27

(200)

FC

2-1

SF

SF

SF

SF

6 7 8 9 10 11 12

A

B

C

D

E

A.1

D.9

10.1

10.9

48"/36"

SFF

F

F

F

F

12"ø

3 3353 3353 330

(TYP-4)

(TYP-3)

(TYP-2)

12"ø

12"ø 18"/12"

12"ø

(TYP-2)

(TYP-4)

3 350

1 150

1 150

(TYP-2)

2 250

(TYP-2)

1 100

3 3753 330

3 375

5 6- 9

(600)

14"ø

20"/18"

14"ø

1/8" = 1'-0"1 Mechanical Plan - Level 02 - Admin

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-202A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 2 - Admin 593CA2202

B B

C C

D D

E E

D.9 D.9

A.2

A.3

B.3

C.8

4.8 5.1 5.8

5.8

MECHANICAL PENTHOUSE

2H220

AHU

AHU

36"/78"

42"/30"

50"/30"

30"/54"

18"/36"

36"/24"

1/8" = 1'-0"

Mehanical Roof Plan - Training

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-202B

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Roof - Training 593CA2202

UP DN

10.1

10.1

STAIR 3

S3

CONNECTOR

C2-105

7 8 9 10

R

4.0

10.1

5.0

R.1

3.6

P

R

4 5

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-202C

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 2 - Connector 593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Plan - Level 02 - Connector

DN UP

A A

10 11 12

B B

C C

D D

E E

A.1 A.1

D.9 D.9

10.1

10.1

STAIR 1

S1

OFFICE

3H314J

TOILET

3H314K

TOILET

3H309

WOMEN

3H306

MEN

3H305

TELECOM

3H303

FACILITIES

3H304

LOBBY

3H302

CONFERENCE

3H314C

OFFICE

3H310P

OFFICE

3H310N

OFFICE

3H310M

OFFICE

3H310K

OFFICE

3H310J

OFFICE

3H310F

OFFICE

3H310E

OFFICE

3H310D

WORKROOM

3H310C

INTERVIEW

3H310A

LIBRARY

3H320L

WORKROOM

3H320J

OFFICE

3H320H

OFFICE

3H320F

OFFICE

3H320E

OFFICE

3H320C

OFFICE

3H320B

OFFICE

3H320A

UNASSIGNED OFFICE

3H319

OFFICE

3H316C

OFFICE

3H316D

OFFICE

3H316E

OFFICE

3H316F

WORKROOM

3H316A

OPEN OFFICE

3H316

OFFICE

3H315

KIOSK

3H315E

WORKROOM

3H315D

OFFICE

3H315C

OFFICE

3H315B

OFFICE

3H315A

BREAK

3H314U

OFFICE

3H314T

OFFICE

3H314R

OFFICE

3H314D

OFFICE

3H314E

OFFICE

3H314F

OFFICE

3H314G

OFFICE

3H314L

WORKROOM

3H314M

OFFICE

3H314N

WAITING

3H314B

RECEPTION

3H314A

OPEN OFFICE

3H320

RECEPTION

3H320K

RECEPTION

3H310B LOBBY

3H301

CORRIDOR

C3-103

CORRIDOR

C3-101

CORRIDOR

C3-102

ELECTRICAL

3H307

HAC

3H308

BREAKROOM

3H311

CONFERENCE

3H312

UNASSIGNED OFFICE

3H313

CONFERENCE

3H318

OPEN OFFICE

3H310

OPEN OFFICE

3H314

CORRIDOR

C3-104

ELEVATOR

P1

HALL

3H320D

HALL

3H310L

HALL

3H310H

HALL

3H314P

HALL

3H320G

HALL

3H316B

HALL

3H315F

RECEPTIONIST

3H314H

CONFERENCE

3H317

OFFICE

3H314S

ELEVATOR

P2

OFFICE

3H310G

CLOSET

3H314I

20"/16"

"ø

14"ø

5"ø

3 8- 8

(300)

20"/16" 16"/16"

4 8- 14

(400)

5 8- 15

(550)

4 8- 16

(450)

9 8- 13

(1400)

9 8- 12

(1400)

3 8- 22

(290)

3 8- 23

(290)

3 8- 24

(290)

8 8- 21

(1000)

4 8- 20

(400) 5 8- 19

(600)

1 8- 18

(100)

9 8- 17

(1500)

6 7- 28

(700)

7 7- 25

(800)

3 7- 16

(300)

6 7- 15

(700)

4 7- 21

(400)

4 7- 22

(450)

6 7- 13

(700)

3 7- 12

(350)

5 7- 11

(600)

5 7- 10

(550)

2 7- 9

(200)

8 7- 8

(1000)

5 7- 7

(600) 5 7- 6

(600)

2 7- 5

(200)

8 7- 4

(1000)

2 7- 3

(200)

1 7- 2

(150)

5 7- 1

(550)

6 8- 2

(700)

5 8- 3

(550)

2 8- 4

(175)

11 8- 5

(3000)

9 8- 6

(1600) 3 8- 7

(300)

7 8- 9

(800)

4 8- 10

(450)

5 8- 11

(525)

3 8- 1

(350)

FC

3-1

FC

3-22

M-711

6 7 8 9 10 11 12

A

B

C

D

E

A.1

D.9

10.1

10.9

7 7- 19

(800)

22"/16"36"/16"

9 7- 17

(1600)

9 7- 20

(1550)

8 7- 26

(1275)

9 7- 27

(1600)

3 7- 18

(240) 3 7- 24

(350)

3 7- 14

(300)

16"ø

28"/24"

"/3 0"

"/3 0"

14"ø8"ø

10"ø

10"ø

14"ø

8"ø

8"ø

30"/16"

12"ø

18"/16"

14"ø

16"ø

10"ø

10"ø

28"/20"

9"ø

14"ø

14"ø

10"ø

12"ø

12"ø

14"ø

14"ø16"ø

8"ø

60"/30"

40"/24"

14"/12"

36"/24"

12"ø

8"ø 16"ø

8"ø

20"/16"

10"ø

10"ø

20"/16"

30"/30"

16"ø

24"/18"

14"ø

14"ø

24"/18"

40"/36"

18"ø

10"ø

8"ø

10"ø

16"ø

8"ø

12"ø

18"ø

16"ø 8"ø

28"/20"

6"ø

18"ø

48"/30"

F

F

(TYP-2)

12"ø 10"ø

(TYP-2)

3 340

3 33012"ø

10"ø

8"ø

(TYP-3)

12"ø

(TYP-4)

(TYP-4)

16"ø

(TYP-3)

12"ø

2 2602

(TYP-2)

1 160

12"ø 8"ø

12"ø

10"ø

"ø

14"ø

14"ø

"/3 0"

20"/16"

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-203A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 3 - Admin 593CA2202

Checker Author

1/8" = 1'-0"1 Mechanical Plan - Level 03 - Admin

10.1

10.1

STAIR 3

S3

CONNECTOR

C2-106

7 8 9 10

R

4.0

10.1

5.0

R.1

3.6

P

R

4 5

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-203C

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Level 3 - Connector 593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Plan - Level 03 - Connector

A A

10 11 12

B B

C C

D D

E E

A.1 A.1

D.9 D.9

10.1

10.1

STAIR 1

S1

MECHANICAL

MH402

ELEVATOR

P1

ELEVATOR

P2

STAIR 2

S2

VESTIBULE

MH401

VESTIBULE

MH403

VESTIBULE

MH404

CONTROL ROOM

MH401A

M-402

AHU

AHU

AHU

M-711

M-711

6 7 8 9 10 11 12

A

B

C

D

E

A.1

D.9

10.1

10.9

60"/18"

AHU

AHU

AHU

1/8" = 1'-0"

Mechanical Roof Plan - Admin

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MH-204A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Plan - Roof - Admin 593CA2202

A A

B B

C C

A.1 A.1

ELECTRICAL

BH004

ELECTRICAL

BH003

SERVICE WELL

BH005

MECHANICAL

BH002

STAIR 1

S1

ELEV LOBBY

BH001

10.9

10.1

10.1

CORRIDOR

CB-001

CORRIDOR

CB-002

ELEVATOR

P1

STAIR 4

S4

ELEVATOR

P2

HPS

PCR

HS

HR

3"

2"

2"

2"

2"

2"

2"

P C

R

CHS

FC

B-4

FC

B-1

FC

B-2

FC

B-3

CWP

CWP

HWP

HWP

M-712

M-712

3"

3" 3"

H P

S

P C

R

C H

S

6"

C H

R

6"

3"

3"CHR

6" 6"

PRV

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MP-200A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Piping Plan - Basement Level

- Admin

593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Piping Plan - Basement Level - Admin

10.910.1

10.1

H P S

P C R

3"

2"

6"

6"

6"

6"

CHS

CHR

HPS

PCR

3"

2"3"

C H S

6"

C H R

6"

HPS

3"

PCR

2"

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MP-200C

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Piping Plan - Basement Level

- Connector

593CA2202

Checker Author

1/8" = 1'-0"

Mechanical Piping Plan - Basement Level - Connector

UP

UP

T

T T

A A

10 11 12

B B

C C

D D

E E

A.1 A.1

D.9 D.9

TOILET

1H109

WOMEN

1H106

MEN

1H105

TELECOM

1H103

FACILITIES

1H104

ELEVATOR LOBBY

1H102

WORK / FILE ROOM

1H116A

ELECTRICAL

1H107

HAC

1H108

OFFICE

1H110F

OFFICE

1H117M

OFFICE

1H117K

OFFICE

1H117H

OFFICE

1H117F

OFFICE

1H117G

INTERVIEW

1H117J

INTERVIEW

1H117L

INTERVIEW

1H117N

OFFICE

1H117A

OFFICE

1H117B

OFFICE

1H117C

OFFICE

1H117D

WORKROOM

1H110C

OFFICE

1H110D

CONFERENCE

1H110A

OPEN OFFICE

1H117

LOBBY

1H101

OPEN OFFICE

1H110

OFFICE

1H110E

MAILROOM

1H112A

WORKROOM

1H112B

OFFICE

1H112G

OFFICE

1H112F

OFFICE

1H112E

WORKROOM

1H114C

OFFICE

1H114D

OFFICE

1H114E

OFFICE

1H115B

OFFICE

1H115C

OFFICE

1H115D

OFFICE

1H115F

OFFICE

1H115G

OFFICE

1H115H

OFFICE

1H115JOFFICE

1H114A

OFFICE

1H112D

OFFICE

1H116E

OFFICE

1H116D

OFFICE

1H116C

HALL

1H116B

OPEN OFFICE

1H116

HALL

1H117E

HALL

1H116F

HALL

1H115E

OFFICE

1H115

LOBBY

1H113B

OPEN OFFICE

1H112

CORRIDOR

C1-102

OPEN OFFICE

1H114

RECEPTION

1H114B

RECEPTION

1H110B

B.3

C.8

10.1

10.1

STAIR 1

S1CORRIDOR

C1-105

RECEPTION

1H101A

WELLNESS CENTER

1H111

ELEVATOR

P1

CORRIDOR

C1-103

VESTIBULE

1H113A

MEN

1H111A

WOMEN

1H111B

OFFICE

1H115A

RECEPTION

1H112C

STAIR 4

S4

ELEVATOR

P2

CORRIDOR

C1-101

CORRIDOR

C1-104

8 3- 1

(1.5)

4 3- 2

(0.5)

8 3- 3

(1.0)

5 3- 4

(1.0)

5 3- 5

(1.0) 8 3- 6

(1.0)

4 3- 7

(0.5)

4 2- 5

(0.5)

4 4- 2

(0.5)6 4- 1

(1.0)

10 4- 3

(1.5)

8 4- 4

(1.5)

8 4- 5

(1.5)

10 4- 6

(1.5)

4 3- 8

(0.5) 2 3- 9

(0.5)

2 3- 11

(0.5)

4 3- 12

(0.5)

3 3- 13

(0.5)

10 3- 15

(2.5)

10 3- 14

(1.5)

2 3- 16

(0.5)

7 3- 20

(1.0)

2 3- 19

(0.5)

5 3- 21

(0.5)

3 3- 17

(0.5)

1 3- 18

(0.5)

4 3- 22

(0.5)

8 3- 23

(1.5)

11 3- 26

(3.0) 3 3- 24

(0.5)

3 3- 25

(0.5)

4 4- 8

(0.5)

4 4- 7

(0.5) 7 4- 10

(0.5)

4 4- 9

(0.5)

4 4- 11

(0.5) 2 4- 14

(0.5)

8 4- 13

(1.0)

4 4- 12

(0.5)

FC

1-6

5 4- 15

(1.0)

2 4- 18

(0.5)

8 4- 19

(1.0)

4 4- 20

(0.5)

7 4- 16

(0.5)

2 4- 17

(0.5)

FC

1-4

FC

1-5

8 2- 4

(1.0)

8 2- 3

(1.0)

6 7 8 9 10 11 12

A

B

C

D

E

A.1

D.9

10.1

10.9

2"4"

3"

3"

2"4"

CHS

CHR

HR

CHS

CHR

HS

HR

(TYP)

2"

HS

1 4- 21

(0.5)

2"

NOTES

PROVIDE EXPANSION PIPE FITTING

AT BUILDING EXPANSION JOINTS.

1/8" = 1'-0"1 Mechanical Piping Plan - Level 01 - Admin

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

As indicated

MP-201A

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Piping Plan - Level 01 - Admin

TT

A A

5 6

B B

C C

D D

E E

A.1 A.1

D.9 D.9

MAIN LOBBY

1H121

OFFICE

1H137

OFFICE

1H136

OFFICE

1H135

OFFICE

1H131

OFFICE

1H130

STORAGE

1H129B

STORAGE

1H122A CLASSROOM

1H123

STORAGE

1H123A

STORAGE

1H124A

STORAGE

1H125A

EDUCATION

1H133

OFFICE

1H110F

OFFICE

1H110E

OFFICE

1H112G

OFFICE

1H112F

OFFICE

1H112E

A.2

A.3

B.3

C.8

4.8

CLASSROOM

1H122

CLASSROOM

1H125

CLASSROOM

1H124

TELECOM

1H127

SIMULATION LAB

1H129A

COMPUTER TRAINING ROOM

1H141

STORAGE

1H140

ELECTRICAL

1H139

TRAINING ROOM

1H138

CORRIDOR

C1-108

CORRIDOR

C1-107 CORRIDOR

C1-106

SANDWICH SHOP

1H142

POLICE TRAINING

1H126

HAC

1H145TOILET

1H146

MEN

1H147

WOMEN

1H144

VESTIBULE

1H143

VESTIBULE

1H120

WORKROOM

1H132

WORK AREA

1H134

STORAGE

1H129D

CONTROL ROOM

1H128A

SIMULATION ROOM

1H129C

ACCESS

1H128B

4 1- 16

(1.5)

5 1- 15

(1.5)

4 1- 19

(0.5)

10 1- 20

(2.0)

10 1- 1

(2.5)

4 1- 3

(0.5)

11 1- 2

(2.5)

8 1- 6

(1.5) 3 1- 5

(1.0)

3 1- 4

(0.5) 9 1- 7

(1.0)

9 1- 8

(1.0)

8 1- 9

(1.5)

8 2- 1

(1.0)

10 1- 17

(2.0)

4 1- 18

(0.5)

8 1- 13

(1.5)

6 1- 14

(0.5)

4 2- 2

(1.5)

6 1- 12

(1.0)

3 1- 10

(0.5)

4 1- 11

(0.5)

7 1- 22

(0.5)

7 1- 21

(0.5)

7 1- 24

(0.5)

7 1- 23

(0.5)

8 2- 3

(1.0)

FC

1-2

FC

1-3

FC

1-1

1 2 3 4 5 6

A

B

C

D

E

5.1

B.3

C.8

A.2

2.5

A.1

A.8

D.9

4.8

HR

HS

CHR

CHS

CHS

HS

HR

CHR

(TYP)

2"

4" 2"

3"

2" 2"

3"

3"

1/8" = 1'-0"1 Mechanical Piping Plan - Level 01 - Training

B A

C

Drawing Title

Scale

Approved: Project Director

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number of

CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118

LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146

MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118

STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104

GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119

FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090

ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of

ConstructionConstructionConstructionConstruction andandandand

FacilitiesFacilitiesFacilitiesFacilities

ManagementManagementManagementManagement

Revisions: Date:

North Las Vegas, NV

BUILDING IS FULLY SPRINKLERED

N

TRUE

CONSTRUCTION DOCUMENTS

KEY PLAN

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

10.0264

1/8" = 1'-0"

MP-201B

Mar 28, 2012

VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition

Mechanical Piping Plan - Level 01 - Training

DNUP

T

T

T

T

A A

B B

C C

D D

E E

A.1 A.1

D.9 D.9

WOMEN

2H206

MEN

2H205

TELECOM

2H203

FACILITIES

2H204

ELEVATOR LOBBY

2H202

FILE ROOM

2H218B

CONFERENCE

2H218D

OFFICE

2H210X

OFFICE

2H210W

OFFICE

2H210V

OFFICE

2H210U

OFFICE

2H210T

OFFICE

2H210S

OFFICE

2H213J

OFFICE

2H213K

OFFICE

2H213L

OFFICE

2H213H

OFFICE

2H213G

OFFICE

2H213E

OFFICE

2H213D

OFFICE

2H213C

OFFICE

2H213B

FILE ROOM

2H210L

FILE ROOM

2H210M

FILE ROOM

2H210N

CONFERENCE

2H212

BREAKROOM

2H211

OFFICE

2H210J

OFFICE

2H210H

HALL

2H210G

OFFICE

2H210E

OFFICE

2H210D

WORKROOM

2H210C

WORKROOM

2H219H

HALL

2H219F

OFFICE

2H219E

OFFICE

2H219D

OFFICE

2H218J

OFFICE

2H218H

OFFICE

2H219C

OFFICE

2H219B

OFFICE

2H219A

OFFICE

2H218K

OFFICE

2H2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .