Mechanical drawings.pdf
PDF 29 MB Posted
- Solicitation number
- 36C26121Q0642
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26121Q0642 Amnd 2 Q_A.docx | DOCX document | |
| 36C26121Q0642_5.docx | DOCX document | |
| 36C26121Q0642_4.docx | DOCX document | |
| 36C26121Q0642 Amnd 1 Q_A.docx | DOCX document | |
| Drawings - Bldg 2.pdf | ||
| Wage Determination.pdf | ||
| 36C26121Q0642_3.docx | DOCX document | |
| Drawings - Bldg 3.pdf | ||
| Drawings - Bldg 5.pdf | ||
| Drawings - Bldg 8.pdf | ||
| Drawings - Bldg 6-7.pdf | ||
| 36C26121Q0642.docx | DOCX document | |
| Drawings - Bldg 1.pdf | ||
| Drawings - Bldg 4.pdf | ||
| Drawings - PCCs and CBOCs.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
M
3.2
3.7
4.6
3.1
5.4
MECHANICAL ABBREVIATION LIST
(THIS IS A MASTER LIST, NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)
@ AT
AABC AMERICAN AIR BALANCE
COUNCIL
ABBR ABBREVIATION
ACD AUTOMATIC CONTROL DAMPER
AFF ABOVE FINISH FLOOR
AP ACCESS PANEL
AUTO AUTOMATIC
AHU (AH) AIR HANDLING UNIT
AD ACCESS DOOR
APD AIR PRESSURE DROP
AF AIR FOIL
AFMS AIR FLOW MEASURING STATION
ACU (AC) AIR CONDITIONING UNIT
AFUE ANNUAL FUEL UTILIZATION
EFFICIENCY
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
B BOILER
BHP BRAKE HORSE POWER
BTU(/H) BRITISH THERMAL UNIT
(PER HOUR)
BOS BOTTOM OF STEEL
BOD BOTTOM OF DUCT
BMS BUILDING MANAGEMENT
SYSTEM
BI BACKWARD INCLINE
°C DEGREES CELSIUS
CFM CUBIC FEET PER MINUTE
CFH CUBIC FEET PER HOUR
CH CHILLER
CU CONDENSING UNIT
CT COOLING TOWER
CV CONSTANT VOLUME
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
CF CHEMICAL POT FEEDER
CC COOLING COIL
CD CEILING DIFFUSER
COND CONDENSER
COP COEFFICIENT OF
PERFORMANCE
DIFF DIFFUSER
DB DRY BULB TEMPERATURE
dB DECIBEL
DDC DIRECT DIGITAL CONTROL
DDCFP DIRECT DIGITAL CONTROL FIELD
PANEL
DC DIRECT CURRENT
DIA DIAMETER
DN DOWN
DX DIRECT EXPANSION
DS DUCT SUMP
DOP DISPERSED OIL PARTICULATE
EMCS ENERGY MANAGEMENT
CONTROL SYSTEM
E EXISTING
EAT ENTERING AIR TEMPERATURE
EFF EFFICIENCY
EWT ENTERING WATER
TEMPERATURE
EXH EXHAUST
EC EVAPORATIVE COOLER
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EER ENERGY EFFICIENCY RATIO
EMI ELECTROMAGNETIC
INTERFERENCE
FCU (FC) FAN COIL UNIT
°F DEGREES FAHRENHEIT
FB FAN POWERED BOX UNIT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FM FLOW METER
FLA FULL LOAD AMPS
GA GAUGE
GAL GALLONS
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR
GR GRILLE V
GBS GALVANIZED BIRD SCREEN
GEF GENERAL EXHAUST FAN
HD HEAD
HP HORSE POWER
HR HOUR
HZ HERTZ
HOA HAND OFF AUTO
HWP HOT WATER PUMP
HX HEAT EXCHANGER
HC HEATING COIL
IN (") INCH
IBC INTERNATIONAL BUILDING CODE
IMC INTERNATIONAL MECHANICAL
BUILDING CODE
IPC INTERNATIONAL PLUMBING
BUILDING CODE
IH INTAKE HOOD
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
MBH 1000 BRITISH THERMAL UNITS
PER HOUR
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
MOCP MAXIMUM OVER CURRENT
PROTECTION
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MA MIXED AIR
MERV MINIMUM EFFICIENCY
REPORTING VALUE
NA NOT APPLICABLE
NC NORMALLY CLOSED
NC NOISE CRITERIA
NO NORMALLY OPEN
NEBB NATIONAL
ENVIRONMENTAL
BALANCING BUREAU
NEC NATIONAL ELECTRIC CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NPT NATIONAL PIPE TAPER
OED OPEN END DUCT
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
PH PHASE
PA PRESSURE AVAILABLE
PRV PRESSURE REDUCING VALVE
PSI POUND PER SQUARE INCH
PSIA POUND PER SQUARE INCH
ABSOLUTE
PSIG POUND PER SQUARE INCH
GAUGE
PCF POUND PER CUBIC FOOT
PD PRESSURE DROP
POS PROVIDE BY OTHER SECTION
P PUMP
PCU POLLUTION CONTROL UNIT
PPM PARTS PER MILLION
RAD RADIATED
RPM REVOLUTIONS PER MINUTE
RH RELATIVE HUMIDITY
RTU ROOF TOP UNIT
REFR REFRIGERANT
RFI RADIO FREQUENCY
INTERFERENCE
SD SMOKE DAMPER
SP STATIC PRESSURE
SS STAINLESS STEEL
SQ FT (SF) SQUARE FEET
SEF SMOKE EXHAUST FAN
SF SUPPLY FAN
SH STATIC HEAD
SOV SHUT-OFF VALVE
TF TRANSFER FAN
TEMP (T) TEMPERATURE
TAB TESTING AND BALANCING
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
TD TEMPERATURE DIFFERENCE
TDH TOTAL DEVELOPED HEAD
TU TERMINAL UNIT
TCP TEMPERATURE CONTROL PANEL
TEL TOTAL EQUIVALENT LENGTH
UMC UNIFORM MECHANICAL CODE
UPC UNIFORM PLUMBING CODE
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UV ULTRA VIOLET
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL)
VFD VARIABLE FREQUENCY DRIVE
V VOLT
VEL VELOCITY
W WATT
WB WET BULB TEMPERATURE
WG WATER GAUGE
WMS WIRE MESH SCREEN
WC WATER COLUMN
WP WATER PRESSURE
WPD WATER PRESSURE DROP
WSHP(WHP)WATER SOURCE HEAT PUMP
WT WEIGHT
SHEET INDEXMECHANICAL SYMBOL LIST
(THIS IS A MASTER LEGEND, NOT ALL SYMBOLS MAY APPEAR ON DRAWING)
ABBR SYMBOL DESCRIPTION
SA
XX"
SHEET NOTE
REVISION NUMBER
ROUND DUCTWORK (INCHES)
RECTANGLE DUCTWORK (INCHES)
SUPPLY AIR
RETURN AIR
EXHAUST AIR
OUTSIDE AIR
SUPPLY AIR DUCT UP
SUPPLY AIR DUCT DOWN
RETURN AIR DUCT UP
RETURN AIR DUCT DOWN
EXHAUST AIR DUCT UP
EXHAUST AIR DUCT DOWN
OUTSIDE AIR DUCT UP
OUTSIDE AIR DUCT DOWN
ACCESS DOOR
SIDEWALL
AIR FLOW DIRECTION
LINED DUCTWORK
DOUBLE LINE RIGID DUCT
DOUBLE LINE RIGID DUCT WITH 1\" ACOUSTICAL LINER
FUSIBLE LINK FIRE DAMPER
DUCT MOUNTED SMOKE DETECTOR
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
MANUAL VOLUME DAMPER
MVD WITH REMOTE CEILING OPERATOR
OPPOSED BLADE DAMPER
BACKDRAFT DAMPER
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
DRAIN
INDUSTRIAL COLD WATER
PUMPED CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM RETURN
HIGH PRESSURE STEAM SUPPLY
HIGH PRESSURE STEAM RETURN
PUMPED DRAIN
CONTROL VALVE (2-WAY, 3-WAY)
SHUT-OFF VALVE
THROTTLING VALVE
BALANCING VALVE
CHECK VALVE
RELIEF VALVE
STRAINER WITH BLOWDOWN VALVE
FLEXIBLE PIPE CONNECTION
UNION
AIR VENT
DUCT OR PIPE TRANSITION
PRESSURE GAUGE
THERMOMETER
TEST WELL (PETE'S PLUG)
FLOW SWITCH
PIPE DOWN
PIPE UP
PIPE TEE UP
PIPE TEE DOWN
ANCHOR
GUIDE
FLOW ARROW
THERMOSTAT
SPACE TEMPERATURE SENSOR W/ PLUG-IN PORT
CARBON DIOXIDE SENSOR
POINT OF CONNECTION TO EXISTING
POINT OF DISCONNECTION FROM EXISTING
RA
EA
OA
AD
FD
DD
FSD
MVD
OBD
BDD
CHS
CHR
HS
HR
D
ICW
PDR
LPS
LPR
HPS
HPR
PD
SOV
AV
PG
TH
TW
CHR
HS
HR
D
ICW
PDR
LPS
LPR
HPS
HPR
PD
CHS
XX" / XX"
X
C
T
S
F
F S
DD
M
BDD
X
FS
EQUIPMENT TYPE
EQUIPMENT NUMBER
E = EXISTING
D = DEMOLISH
R = RELOATE
TERMINAL BOX SIZE
TERMINAL BOX TAG
CFM/GPM
SUPPLY DIFFUSER TAG
CFM/DIRECTION
RETURN/EXHAUST GRILLE
CFM
TERMINAL BOX SIZE
CFM/GPM
PLAN
SHEET
MECHANICAL GENERAL NOTES
EXISTING DUCTWORK, PIPING AND EQUIPMENT TO REMAIN IS SHOWN LIGHT. NEW DUCTWORK, PIPING AND EQUIPMENT IS SHOWN HEAVY. EXISTING DUCTWORK PIPING AND EQUIPMENT TO BE REMOVED IS
SHOWN CROSSHATCHED.
1.
ARCHITECTURAL DRAWINGS SHALL BE REVIEWED FOR PROJECT SCOPE AND AREA OF WORK. WORK
SHALL INCLUDE DEMOLITION AND REMOVAL OF EXISTING MECHANICAL SYSTEMS AS REQUIRED.
MECHANICAL SYSTEMS IN EXISTING WALLS AND UNDER GROUND SHALL BE REMOVED AND CAPPED AS REQUIRED. RECONNECT EXISTING PIPING AND DUCTWORK NOT IN DEMOLITION AREA AS REQUIRED TO
MAINTAIN A COMPLETE AND OPERABLE SYSTEM.
2.
THE OWNER RESERVES FIRST CHOICE TO KEEP EXISTING EQUIPMENT AND MATERIALS. COORDINATE WITH OWNER AND DELIVER DESIGNATED EQUIPMENT AND MATERIALS REMOVED UNDER THIS CONTRACT
TO OWNERS DESINATED STORAGE AREA.
3.
UNLESS NOTED OTHERWISE, FLEXIBLE DUCTS TO TERMINAL UNITS, DIFFUSERS AND GRILLES SHALL BE
SAME SIZE AS NECK.
4.
LENGTH OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO 5'-0" MAXIMUM HORIZONTAL RUN WITH ONLY ONE
90° BEND. SECURE FLEXIBLE DUCTWORK WITH SCREWS AND DRAWBANDS.
5.
DUCT SIZES INDICATED ARE NET INSIDE CLEAR DIMENSIONS.6.
PROVIDE GEAR OPERATED CEILING OPERATORS FOR INACCESSIBLE MANUAL VOLUME DAMPERS WITH CEILING ESCUTCHEON AND COVER PLATE. COORDINATE EXACT LOCATION OF COVER PLATE WITH
ARCHITECT.
7.
ITEM DESIGNATIONS INDICATED ARE FOR PURPOSES OF THESE DOCUMENTS ONLY. CONTRACTOR SHALL
VERIFY WITH OWNER ACTUAL "TAGGING" INFORMATION TO BE PROVIDED FOR EACH ITEM OF
MECHANICAL EQUIPMENT PRIOR TO NAMEPLATE ORDER RELEASE.
8.
THE MECHANICAL DETAILS SHALL BE CONSIDERED AS A PART OF THE CONTRACT DOCUMENTS. THESE DETAILS SHALL BE INCORPORATED INTO THE ASSOCIATED WORK AND PROVIDE GENERAL GUIDANCE AS
TO THE INSTALLATION INTENT WHETHER REFERENCED TO OR NOT. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO PROVIDE ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION AND
ENSURE THAT ALL INSTALLATIONS ARE IN ACCORDANCE WITH THE EQUIPMENT'S LISTING AND THE
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
9.
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ACTUAL LOCATION OF GRILLES, DIFFUSERS AND ACCESS PANELS IN CEILING AND FOR DIMENSIONED LENGTHS OF LINEAR DIFFUSERS. COORDINATE
DIFFUSER BORDER TYPES WITH CEILING TYPE SCHEDULED IN ARCHITECTURAL REFLECTED CEILING
PLANS.
10.
TURNING VANES SHALL BE PROVIDED IN ALL SQUARE ELBOW FITTINGS. TURNING VANE RUNNERS SHALL HAVE A VANE IN EVERY SLOT IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND
SMACNA DUCT CONSTRUCTION STANDARDS.
11.
FIELD VERIFY FIT OF DUCTWORK AND PIPING PRIOR TO FABRICATION.12.
COORDINATE AND VERIFY ACTUAL APPROVED EQUIPMENT DIMENSIONS PRIOR TO POURING CONCRETE EQUIPMENT PADS. COORDINATE EQUIPMENT PAD DIMENSIONS WITH VIBRATION/SEISMIC ISOLATION
REQUIREMENT.
13.
REFER TO EQUIPMENT DRAWINGS, SPECIFICATIONS AND SHOP DRAWINGS FOR CONNECTION
REQUIREMENTS TO EQUIPMENT.
14.
MANUAL VOLUME DAMPERS AND VALVES ON INSULATED DUCTWORK AND PIPING SHALL HAVE EXTENDED STEMS TO ALLOW FOR THE INSULATION THICKNESS. PROVIDE MINIMUM 12" LONG RED RIBBON LOCATOR
ON VOLUME DAMPER AND VALVE HANDLES.
15.
PROVIDE HEAT TRAPS FOR ALL WATER HEATING EQUIPMENT.16.
EQUIPMENT START-UP SHALL BE BY MANUFACTURER'S AUTHORIZED REPRESENTATIVE.17.
SEISMIC RESTRAINTS SHALL BE PROVIDED PER THE 2009 IBC VA SPECIFICATIONS SECTION 130541 AND THE SMACNA SEISMIC RESTRAINT MANUAL - GUIDELINES FOR MECHANICAL SYSTEMS. THE CONTRACTOR
SHALL SUBMIT SHOP DRAWINGS OF THE PROPOSED RESTRAINTS, STRUCTURAL ATTACHMENT METHODS
AND RESTRAINT LOCATIONS TO THE ARCHITECT FOR REVIEW AND APPROVAL. THE SUBMITTED
DOCUMENTS SHALL BE PREPARED AND STAMPED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE
OF NEVADA.
18.
INSTALL SPACE SENSORS AT MOUNTING HEIGHT 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. COORDINATE EXACT LOCATION IN FIELD WITH GENERAL CONTRACTOR AND ARCHITECT.
19.
ISSUE
Sheet Number SHEET DESCRIPTION0 -2 -1 C D S U B M
IS
S
IO
N
-9 -1 D D S U B M
IT
T A L
-2 -1 D D S U B M
IS
S
IO
N
• • • M-001 Mechanical Sheet Index, General Notes, Symbol List and Abbreviation List
• • • MD-100 Demo Mechanical Plan - Basement Level - Admin
• • • MH-200A Mechanical Plan - Basement Level - Admin
• • • MH-200C Mechanical Plan - Basement Level - Connector
• • • MH-201A Mechanical Plan - Level 1 - Admin
• • • MH-201B Mechanical Plan - Level 1 - Training
• • • MH-201C Mechanical Plan - Level 1 - Connector
• • • MH-202A Mechanical Plan - Level 2 - Admin
• • • MH-202B Mechanical Plan - Roof - Training
• • • MH-202C Mechanical Plan - Level 2 - Connector
• • • MH-203A Mechanical Plan - Level 3 - Admin
• • • MH-203C Mechanical Plan - Level 3 - Connector
• • • MH-204A Mechanical Plan - Roof - Admin
• • • MP-200A Mechanical Piping Plan - Basement Level - Admin
• • • MP-200C Mechanical Piping Plan - Basement Level - Connector
• • • MP-201A Mechanical Piping Plan - Level 01 - Admin
• • • MP-201B Mechanical Piping Plan - Level 01 - Training
• • • MP-202A Mechanical Piping Plan - Level 02 - Admin
• • • MP-202B Mechanical Piping Roof Plan - Training
• • • MP-203A Mechanical Piping Plan - Level 03 - Admin
• • • MP-204A Mechanical Piping Roof Plan - Admin
• • • MH-301A Mechanical Zoning Plan - Level 1 - Admin
• • • MH-301B Mechanical Zoning Plan - Level 1 - Training
• • • MH-301C Mechanical Zoning Plan - Level 1 - Connector
• • • MH-302C Mechanical Zoning Plan - Level 2 - Connector
• • • MH-302A Mechanical Zoning Plan - Level 2 - Admin
• • • MH-303A Mechanical Zoning Plan - Level 3 - Admin
• • • MH-303C Mechanical Zoning Plan - Level 3 - Connector
• • • M-401 Mechanical - Enlarged Part Plans
• • • M-402 Mechanical - Enlarged Part Plans
• • • M-501 Mechanical - Details
• • • M-502 Mechanical - Details
• • • M-503 Mechanical - Details
• • • M-601 Mechanical - Schedules
• • • M-602 Mechanical - Schedules
• • • M-603 Mechanical - Schedule
• • • M-701 Air Flow Schematic
• • • M-702 Chilled Water Piping Schematic
• • • M-703 Heating Water Piping Schematic
• • • M-711 Mechanical Sections - Penthouse
• • • M-712 Mechanical Sections - Basement
• • • M-721 Mechanical Isometric - AHU-1
• • • M-722 Mechanical Isometric - AHU-2
• • • M-723 Mechanical Isometric - AHU-3
• • • M-724 Mechanical Isometric - AHU-4
• • • M-725 Mechanical Isometric - AHU-5
• • • M-726 Mechanical Isometric - AHU-6
• • • M-727 Mechanical Isometric - AHU-7
• • • M-728 Mechanical Isometric - AHU-8
• • • M-901 Mechanical - Control Diagrams
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
M-001 Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Sheet Index, General Notes, Symbol List and Abbreviation List
593CA2202
Checker Author
6"
6"
6"
6"
CHS
CHR
HPS
PCR
3"
2"3"
(E)TU-2-B024
16"ø
16"/14"
"ø
S
"ø
16"/14" 24"/12"
(E) CD-4
(390)
(E) CD-4
(400)
(E) CD-4
(490)
(E) CD-2
(110)
(E) CR-1
(110)
(E) CR-3
(790)
1/8" = 1'-0"1 Demo Mechanical Plan - Basement Level - Admin
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MD-100
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Demo Mechanical Plan - Basement Level
- Admin
UP
T
T
T
A A
B B
C C
A.1 A.1
ELECTRICAL
BH004
ELECTRICAL
BH003
SERVICE WELL
BH005
MECHANICAL
BH002
STAIR 1
S1
ELEV LOBBY
BH001
10.9
10.1
10.1
CORRIDOR
CB-001
CORRIDOR
CB-002
ELEVATOR
P1
STAIR 4
S4
ELEVATOR
P2
FC
B-3
FC
B-4
FC
B-2
FC
B-1
HWP
HWP
CWP
CWP
M-401
M-712
M-712
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-200A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Basement Level - Admin
593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Plan - Basement Level - Admin
10.910.1
10.1
(E)TU-2-B024
16"ø
"ø14 "ø
16"/14"
(E) CD-4
(390)
(E) CD-4
(400)
(E) CD-4
(490)
(E) CR-3
(790)
S
2 110
1 110
24"/12"
NOTES
RE-BALANCE EXISTING VAV BOX TO
INDICATED CFM. MODIFY VAV BOX
DAMPER POSITION AS REQUIRED.
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
MH-200C
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Basement Level - Connector
593CA2202
Checker Author
1/8" = 1'-0"1 Mechanical Plan - Basement Level - Connector
B A
C
DN
UP
UP
A A
10 11 12
B B
C C
D D
E E
A.1 A.1
D.9 D.9
TOILET
1H109
WOMEN
1H106
MEN
1H105
TELECOM
1H103
FACILITIES
1H104
ELEVATOR LOBBY
1H102
WORK / FILE ROOM
1H116A
ELECTRICAL
1H107
HAC
1H108
OFFICE
1H110F
OFFICE
1H117M
OFFICE
1H117K
OFFICE
1H117H
OFFICE
1H117F
OFFICE
1H117G
INTERVIEW
1H117J
INTERVIEW
1H117L
INTERVIEW
1H117N
OFFICE
1H117A
OFFICE
1H117B
OFFICE
1H117C
OFFICE
1H117D
WORKROOM
1H110C
OFFICE
1H110D
CONFERENCE
1H110A
OPEN OFFICE
1H117
LOBBY
1H101
OPEN OFFICE
1H110
OFFICE
1H110E
MAILROOM
1H112A
WORKROOM
1H112B
OFFICE
1H112G
OFFICE
1H112F
OFFICE
1H112E
WORKROOM
1H114C
OFFICE
1H114D
OFFICE
1H114E
OFFICE
1H115B
OFFICE
1H115C
OFFICE
1H115D
OFFICE
1H115F
OFFICE
1H115G
OFFICE
1H115H
OFFICE
1H115JOFFICE
1H114A
OFFICE
1H112D
OFFICE
1H116E
OFFICE
1H116D
OFFICE
1H116C
HALL
1H116B
OPEN OFFICE
1H116
HALL
1H117E
HALL
1H116F
HALL
1H115E
OFFICE
1H115
LOBBY
1H113B
OPEN OFFICE
1H112
CORRIDOR
C1-102
OPEN OFFICE
1H114
RECEPTION
1H114B
RECEPTION
1H110B
B.3
C.8
10.1
10.1
STAIR 1
S1CORRIDOR
C1-105
RECEPTION
1H101A
WELLNESS CENTER
1H111
ELEVATOR
P1
CORRIDOR
C1-103
VESTIBULE
1H113A
MEN
1H111A
WOMEN
1H111B
OFFICE
1H115A
RECEPTION
1H112C
STAIR 4
S4
ELEVATOR
P2
CORRIDOR
C1-101
CORRIDOR
C1-104
36"/20"
40"/18" 24"/12" 18"ø
14"ø
20"/18"36"/20"36"/24"36"/30"30"/24"
14"ø
10"ø
60"/30"
54"/30"
48"/30" 48"/20" 40"/20"
48"/24" 40"/24"
18"ø 30"/20"
24"/24"
14"ø
18"ø
14"ø
14"ø
7"ø 16"ø
20"/18"
10"ø
30"/18"
12"ø
12"ø
10"ø
12"ø
12"ø
12"ø
14"ø
"ø
14"ø 10"ø
18"ø
14"ø
10"ø 10"ø
12"ø
48"/20"
18"ø
16"ø
10"ø
8"ø
10"ø
10"ø
10"ø
16"ø
12"ø
16"ø
12"ø
10"ø
20"/16"
12"ø
40"/20"30"/18"18"ø
20"/16" 14"ø
12"ø
16"ø
16"ø
10"ø
8 3- 1
(1000)
4 3- 2
(500)
8 3- 3
(1000)
5 3- 4
(600)
5 3- 5
(600) 8 3- 6
(1000)
4 3- 7
(400)
4 2- 5
(500)
4 4- 2
(500) 6 4- 1
(700)
10 4- 3
(2000)
8 4- 4
(1200)
8 4- 5
(1200)
10 4- 6
(2000)
4 3- 8
(400)
2 3- 9
(200)
2 3- 11
(200)
4 3- 12
(500)
3 3- 13
(300)
10 3- 15
(2000)
10 3- 14
(1800)
2 3- 16
(200)
7 3- 20
(800)
2 3- 19
(200)
5 3- 21
(600)
3 3- 17
(300)
1 3- 18
(100)
4 3- 22
(450)
8 3- 23
(1050)
11 3- 26
(2500) 3 3- 24
(300)
3 3- 25
(300)
8 2- 3
(1200)
8 2- 4
(1200)
FC
1-4
FC
1-5
FC
1-6
4 4- 9
(400)
7 4- 10
(800)
4 4- 8
(450)
4 4- 7
(450)
4 4- 12
(450) 8 4- 13
(1200)
4 4- 11
(450)
2 4- 14
(200)
5 4- 15
(600)
2 4- 17
(200) 4 4- 20
(500)
7 4- 16
(800)
8 4- 19
(950)2 4- 18
(200)
M-712
M-712
SF
SF
SF
SF
SF
14"ø
20"/18"
30"/18"
6 7 8 9 10 11 12
A
B
C
D
E
A.1
D.9
10.1
10.9
16"ø
F
F
F
FF
F
SF
SF
SF
SF
F
12"ø
1 4- 21
(75)
10"ø
1/8" = 1'-0"1 Mechanical Plan - Level 01 - Admin
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-201A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 1 - Admin 593CA2202
A A
5 6
B B
C C
D D
E E
A.1 A.1
D.9 D.9
MAIN LOBBY
1H121
OFFICE
1H137
OFFICE
1H136
OFFICE
1H135
OFFICE
1H131
OFFICE
1H130
STORAGE
1H129B
STORAGE
1H122A CLASSROOM
1H123
STORAGE
1H123A
STORAGE
1H124A
STORAGE
1H125A
EDUCATION
1H133
A.2
A.3
B.3
C.8
4.8
CLASSROOM
1H122
CLASSROOM
1H125
CLASSROOM
1H124
TELECOM
1H127
SIMULATION LAB
1H129A
COMPUTER TRAINING ROOM
1H141
STORAGE
1H140
ELECTRICAL
1H139
TRAINING ROOM
1H138
CORRIDOR
C1-108
CORRIDOR
C1-107 CORRIDOR
C1-106
SANDWICH SHOP
1H142
POLICE TRAINING
1H126
HAC
1H145TOILET
1H146
MEN
1H147
WOMEN
1H144
VESTIBULE
1H143
VESTIBULE
1H120
WORKROOM
1H132
WORK AREA
1H134
STORAGE
1H129D
CONTROL ROOM
1H128A
SIMULATION ROOM
1H129C
ACCESS
1H128B
48"/24"
48"/24"
4 1- 16
(500) 5 1- 15
(575)
4 1- 19
(400)
10 1- 20
(2000)
10 1- 1
(2000)
4 1- 3
(400)
11 1- 2
(2100)
8 1- 6
(1000) 3 1- 5
(275)
3 1- 4
(300) 9 1- 7
(1500)
9 1- 8
(1500)
8 1- 9
(1000)
"ø
24"ø
8 2- 1
(1000)
10 1- 17
(2000)
4 1- 18
(400)
8 1- 13
(1100)
6 1- 14
(700)
4 2- 2
(500)
6 1- 12
(675)
3 1- 10
(300)
4 1- 11
(400)
24"/20"
"ø
16"ø
12"ø
12"ø
14"ø
EF
12"ø
EF
16"ø
18"ø
40"/20"
7 1- 22
(800)
7 1- 21
(800)
7 1- 24
(800)
7 1- 23
(800)
8 2- 3
(1200)
8 2- 4
(1200)
20"/18" 18"/18"
30"/12" 14"/12"
12"ø
14"/12"
20"/12"
16"ø
20"/18" 30"/18"
12"ø
36"/18"
12"ø
36"/16"
24"/12"
FC
1-1
FC
1-2
FC
1-3
1 2 3 4 5 6
A
B
C
D
E
5.1
B.3
C.8
A.2
2.5
A.1
A.8
D.9
4.8
24"/12"
"16"ø
16"ø
16"ø
16"ø
50"/30"
3 400
2 275
3 3503 350
3 350 3 350
3 400
5 350
1 50
2 300
1 50
3 325
3 350
2 250 2 250
(TYP-4)
3 350
1 175
1 50
1 50
1 150
2 300
NOTES
24"/24" EXHAUST DUCT UP TO ROOF
HOOD.
50"/30" SUPPLY UP TO AHU-1.2
42"/30" RETURN UP TO AHU-1.3
40"/22" RETURN UP TO AHU-2.5
34/16" SUPPLY UP TO AHU-2.4
1/8" = 1'-0"1 Mechanical Plan - Level 01 - Training
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
MH-201B
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 1 - Training 593CA2202
CONFERENCE
1H110A
10.1
10.1
STAIR 3
S3
CONNECTOR
C1-109
VESTIBULE
1H148
VESTIBULE
1H149
7 8 9 10
R
4.0
10.1
5.0
R.1
3.6
P
R
4 5
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-201C
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 1 - Connector 593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Plan - Level 01 - Connector
DNUP
A A
B B
C C
D D
E E
A.1 A.1
D.9 D.9
WOMEN
2H206
MEN
2H205
TELECOM
2H203
FACILITIES
2H204
ELEVATOR LOBBY
2H202
FILE ROOM
2H218B
CONFERENCE
2H218D
OFFICE
2H210X
OFFICE
2H210W
OFFICE
2H210V
OFFICE
2H210U
OFFICE
2H210T
OFFICE
2H210S
OFFICE
2H213J
OFFICE
2H213K
OFFICE
2H213L
OFFICE
2H213H
OFFICE
2H213G
OFFICE
2H213E
OFFICE
2H213D
OFFICE
2H213C
OFFICE
2H213B
FILE ROOM
2H210L
FILE ROOM
2H210M
FILE ROOM
2H210N
CONFERENCE
2H212
BREAKROOM
2H211
OFFICE
2H210J
OFFICE
2H210H
HALL
2H210G
OFFICE
2H210E
OFFICE
2H210D
WORKROOM
2H210C
WORKROOM
2H219H
HALL
2H219F
OFFICE
2H219E
OFFICE
2H219D
OFFICE
2H218J
OFFICE
2H218H
OFFICE
2H219C
OFFICE
2H219B
OFFICE
2H219A
OFFICE
2H218K
OFFICE
2H218L
OFFICE
2H217F
OFFICE
2H217G
OFFICE
2H217H
OFFICE
2H217JOFFICE
2H217K
OFFICE
2H213N
OFFICE
2H213M
CONFERENCE
2H215
OFFICE
2H217B
HALL
2H217C
OFFICE
2H217D
OFFICE
2H217E
OFFICE
2H218E
OFFICE
2H218C
ELECTRICAL
2H207
HAC
2H208
RECEPTION
2H219J
INTERVIEW
2H210A
LIBRARY
2H219K
RECEPTION
2H213A
WAITING
2H217A
HALL
2H216
HALL
2H218G
HALL
2H218A
HALL
2H218F
CORRIDOR
C2-102
CORRIDOR
C2-103
CORRIDOR
C2-104
CORRIDOR
C2-101
HALL
2H210P
HALL
2H210R
HALL
2H210K
LOBBY
2H201
OPEN OFFICE
2H210
OPEN OFFICE
2H217
OPEN OFFICE
2H213
LOBBY
2H214
OPEN OFFICE
2H219
B.3B.3
C.8C.8
10.9
10.9
10.1
10.1
5.8
5.8
D.3 D.3
STAIR 1
S1
ELEVATOR
P1
RECEPTION
2H210B
ELEVATOR
P2
STAIR 2
S2
OFFICE
2H219G
OFFICE
2H210F
TOILET
2H209
HALL
2H213F
OFFICE
2H218
48"/30"42"/24"30"/24"
30"/24" 12"ø
54"/30"
24"/20"
48"/36"
36"/24"36"/20"30"/20"
14"ø
"/3 6"
48"/36"48"/30"
24"/20"
12"ø
20"/18"
" 14 "ø
14"ø
18"ø 16"ø
12"ø 10"ø
8"ø
10"ø
14"ø
10"ø
12"ø
14"ø 10"ø
14"ø
18"ø
10"ø
10"ø
14"ø
14"ø
18"ø
5 6- 8
(600)
10 6- 5
(2000)
9 6- 4
(1600)
2 6- 6
(200)
2 6- 7
(200)
5 6- 10
(600)
5 6- 13
(600)1 6- 11
(150) 3 6- 12
(300)
3 6- 15
(230)
2 6- 16
(200)
8 6- 17
(1200)
5 6- 18
(600)
5 6- 19
(600)
5 6- 20
(600)
2 6- 21
(200) 8 6- 22
(1000)
1 6- 24
(150)
4 6- 23
(500)
10 6- 25
(2000)
5 6- 26
(600)
4 5- 27
(500)
1 5- 26
(150)
1 5- 25
(150)
8 5- 24
(1080)
1 5- 23
(150)
6 5- 22
(750) 6 5- 21
(750)
3 5- 20
(300)
4 5- 19
(450)
7 5- 18
(900)
4 5- 17
(450)
3 5- 16
(300)
1 5- 15
(150)
5 5- 14
(650)
3 5- 13
(250)
4 5- 29
(400)
6 5- 12
(700)
5 5- 11
(600)
3 5- 10
(300)
10 5- 9
(1800) 7 5- 8
(900)
7 5- 7
(900)
3 5- 6
(300)
11 5- 5
(2400)
1 5- 4
(75)
1 5- 3
(125)
5 5- 2
(650)
3 5- 1
(350)
3 6- 2
(250)
5 6- 3
(650)
3 6- 1
(350)
4 6- 14
(400) 4 5- 28
(400)
FC
2-2
2 6- 27
(200)
FC
2-1
SF
SF
SF
SF
6 7 8 9 10 11 12
A
B
C
D
E
A.1
D.9
10.1
10.9
48"/36"
SFF
F
F
F
F
12"ø
3 3353 3353 330
(TYP-4)
(TYP-3)
(TYP-2)
12"ø
12"ø 18"/12"
12"ø
(TYP-2)
(TYP-4)
3 350
1 150
1 150
(TYP-2)
2 250
(TYP-2)
1 100
3 3753 330
3 375
5 6- 9
(600)
14"ø
20"/18"
14"ø
1/8" = 1'-0"1 Mechanical Plan - Level 02 - Admin
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-202A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 2 - Admin 593CA2202
B B
C C
D D
E E
D.9 D.9
A.2
A.3
B.3
C.8
4.8 5.1 5.8
5.8
MECHANICAL PENTHOUSE
2H220
AHU
AHU
36"/78"
42"/30"
50"/30"
30"/54"
18"/36"
36"/24"
1/8" = 1'-0"
Mehanical Roof Plan - Training
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-202B
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Roof - Training 593CA2202
UP DN
10.1
10.1
STAIR 3
S3
CONNECTOR
C2-105
7 8 9 10
R
4.0
10.1
5.0
R.1
3.6
P
R
4 5
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-202C
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 2 - Connector 593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Plan - Level 02 - Connector
DN UP
A A
10 11 12
B B
C C
D D
E E
A.1 A.1
D.9 D.9
10.1
10.1
STAIR 1
S1
OFFICE
3H314J
TOILET
3H314K
TOILET
3H309
WOMEN
3H306
MEN
3H305
TELECOM
3H303
FACILITIES
3H304
LOBBY
3H302
CONFERENCE
3H314C
OFFICE
3H310P
OFFICE
3H310N
OFFICE
3H310M
OFFICE
3H310K
OFFICE
3H310J
OFFICE
3H310F
OFFICE
3H310E
OFFICE
3H310D
WORKROOM
3H310C
INTERVIEW
3H310A
LIBRARY
3H320L
WORKROOM
3H320J
OFFICE
3H320H
OFFICE
3H320F
OFFICE
3H320E
OFFICE
3H320C
OFFICE
3H320B
OFFICE
3H320A
UNASSIGNED OFFICE
3H319
OFFICE
3H316C
OFFICE
3H316D
OFFICE
3H316E
OFFICE
3H316F
WORKROOM
3H316A
OPEN OFFICE
3H316
OFFICE
3H315
KIOSK
3H315E
WORKROOM
3H315D
OFFICE
3H315C
OFFICE
3H315B
OFFICE
3H315A
BREAK
3H314U
OFFICE
3H314T
OFFICE
3H314R
OFFICE
3H314D
OFFICE
3H314E
OFFICE
3H314F
OFFICE
3H314G
OFFICE
3H314L
WORKROOM
3H314M
OFFICE
3H314N
WAITING
3H314B
RECEPTION
3H314A
OPEN OFFICE
3H320
RECEPTION
3H320K
RECEPTION
3H310B LOBBY
3H301
CORRIDOR
C3-103
CORRIDOR
C3-101
CORRIDOR
C3-102
ELECTRICAL
3H307
HAC
3H308
BREAKROOM
3H311
CONFERENCE
3H312
UNASSIGNED OFFICE
3H313
CONFERENCE
3H318
OPEN OFFICE
3H310
OPEN OFFICE
3H314
CORRIDOR
C3-104
ELEVATOR
P1
HALL
3H320D
HALL
3H310L
HALL
3H310H
HALL
3H314P
HALL
3H320G
HALL
3H316B
HALL
3H315F
RECEPTIONIST
3H314H
CONFERENCE
3H317
OFFICE
3H314S
ELEVATOR
P2
OFFICE
3H310G
CLOSET
3H314I
20"/16"
"ø
14"ø
5"ø
3 8- 8
(300)
20"/16" 16"/16"
4 8- 14
(400)
5 8- 15
(550)
4 8- 16
(450)
9 8- 13
(1400)
9 8- 12
(1400)
3 8- 22
(290)
3 8- 23
(290)
3 8- 24
(290)
8 8- 21
(1000)
4 8- 20
(400) 5 8- 19
(600)
1 8- 18
(100)
9 8- 17
(1500)
6 7- 28
(700)
7 7- 25
(800)
3 7- 16
(300)
6 7- 15
(700)
4 7- 21
(400)
4 7- 22
(450)
6 7- 13
(700)
3 7- 12
(350)
5 7- 11
(600)
5 7- 10
(550)
2 7- 9
(200)
8 7- 8
(1000)
5 7- 7
(600) 5 7- 6
(600)
2 7- 5
(200)
8 7- 4
(1000)
2 7- 3
(200)
1 7- 2
(150)
5 7- 1
(550)
6 8- 2
(700)
5 8- 3
(550)
2 8- 4
(175)
11 8- 5
(3000)
9 8- 6
(1600) 3 8- 7
(300)
7 8- 9
(800)
4 8- 10
(450)
5 8- 11
(525)
3 8- 1
(350)
FC
3-1
FC
3-22
M-711
6 7 8 9 10 11 12
A
B
C
D
E
A.1
D.9
10.1
10.9
7 7- 19
(800)
22"/16"36"/16"
9 7- 17
(1600)
9 7- 20
(1550)
8 7- 26
(1275)
9 7- 27
(1600)
3 7- 18
(240) 3 7- 24
(350)
3 7- 14
(300)
16"ø
28"/24"
"/3 0"
"/3 0"
14"ø8"ø
10"ø
10"ø
14"ø
8"ø
8"ø
30"/16"
12"ø
18"/16"
14"ø
16"ø
10"ø
10"ø
28"/20"
9"ø
14"ø
14"ø
10"ø
12"ø
12"ø
14"ø
14"ø16"ø
8"ø
60"/30"
40"/24"
14"/12"
36"/24"
12"ø
8"ø 16"ø
8"ø
20"/16"
10"ø
10"ø
20"/16"
30"/30"
16"ø
24"/18"
14"ø
14"ø
24"/18"
40"/36"
18"ø
10"ø
8"ø
10"ø
16"ø
8"ø
12"ø
18"ø
16"ø 8"ø
28"/20"
6"ø
18"ø
48"/30"
F
F
(TYP-2)
12"ø 10"ø
(TYP-2)
3 340
3 33012"ø
10"ø
8"ø
(TYP-3)
12"ø
(TYP-4)
(TYP-4)
16"ø
(TYP-3)
12"ø
2 2602
(TYP-2)
1 160
12"ø 8"ø
12"ø
10"ø
"ø
14"ø
14"ø
"/3 0"
20"/16"
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-203A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 3 - Admin 593CA2202
Checker Author
1/8" = 1'-0"1 Mechanical Plan - Level 03 - Admin
10.1
10.1
STAIR 3
S3
CONNECTOR
C2-106
7 8 9 10
R
4.0
10.1
5.0
R.1
3.6
P
R
4 5
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-203C
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Level 3 - Connector 593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Plan - Level 03 - Connector
A A
10 11 12
B B
C C
D D
E E
A.1 A.1
D.9 D.9
10.1
10.1
STAIR 1
S1
MECHANICAL
MH402
ELEVATOR
P1
ELEVATOR
P2
STAIR 2
S2
VESTIBULE
MH401
VESTIBULE
MH403
VESTIBULE
MH404
CONTROL ROOM
MH401A
M-402
AHU
AHU
AHU
M-711
M-711
6 7 8 9 10 11 12
A
B
C
D
E
A.1
D.9
10.1
10.9
60"/18"
AHU
AHU
AHU
1/8" = 1'-0"
Mechanical Roof Plan - Admin
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MH-204A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Plan - Roof - Admin 593CA2202
A A
B B
C C
A.1 A.1
ELECTRICAL
BH004
ELECTRICAL
BH003
SERVICE WELL
BH005
MECHANICAL
BH002
STAIR 1
S1
ELEV LOBBY
BH001
10.9
10.1
10.1
CORRIDOR
CB-001
CORRIDOR
CB-002
ELEVATOR
P1
STAIR 4
S4
ELEVATOR
P2
HPS
PCR
HS
HR
3"
2"
2"
2"
2"
2"
2"
P C
R
CHS
FC
B-4
FC
B-1
FC
B-2
FC
B-3
CWP
CWP
HWP
HWP
M-712
M-712
3"
3" 3"
H P
S
P C
R
C H
S
6"
C H
R
6"
3"
3"CHR
6" 6"
PRV
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MP-200A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Piping Plan - Basement Level
- Admin
593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Piping Plan - Basement Level - Admin
10.910.1
10.1
H P S
P C R
3"
2"
6"
6"
6"
6"
CHS
CHR
HPS
PCR
3"
2"3"
C H S
6"
C H R
6"
HPS
3"
PCR
2"
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MP-200C
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Piping Plan - Basement Level
- Connector
593CA2202
Checker Author
1/8" = 1'-0"
Mechanical Piping Plan - Basement Level - Connector
UP
UP
T
T T
A A
10 11 12
B B
C C
D D
E E
A.1 A.1
D.9 D.9
TOILET
1H109
WOMEN
1H106
MEN
1H105
TELECOM
1H103
FACILITIES
1H104
ELEVATOR LOBBY
1H102
WORK / FILE ROOM
1H116A
ELECTRICAL
1H107
HAC
1H108
OFFICE
1H110F
OFFICE
1H117M
OFFICE
1H117K
OFFICE
1H117H
OFFICE
1H117F
OFFICE
1H117G
INTERVIEW
1H117J
INTERVIEW
1H117L
INTERVIEW
1H117N
OFFICE
1H117A
OFFICE
1H117B
OFFICE
1H117C
OFFICE
1H117D
WORKROOM
1H110C
OFFICE
1H110D
CONFERENCE
1H110A
OPEN OFFICE
1H117
LOBBY
1H101
OPEN OFFICE
1H110
OFFICE
1H110E
MAILROOM
1H112A
WORKROOM
1H112B
OFFICE
1H112G
OFFICE
1H112F
OFFICE
1H112E
WORKROOM
1H114C
OFFICE
1H114D
OFFICE
1H114E
OFFICE
1H115B
OFFICE
1H115C
OFFICE
1H115D
OFFICE
1H115F
OFFICE
1H115G
OFFICE
1H115H
OFFICE
1H115JOFFICE
1H114A
OFFICE
1H112D
OFFICE
1H116E
OFFICE
1H116D
OFFICE
1H116C
HALL
1H116B
OPEN OFFICE
1H116
HALL
1H117E
HALL
1H116F
HALL
1H115E
OFFICE
1H115
LOBBY
1H113B
OPEN OFFICE
1H112
CORRIDOR
C1-102
OPEN OFFICE
1H114
RECEPTION
1H114B
RECEPTION
1H110B
B.3
C.8
10.1
10.1
STAIR 1
S1CORRIDOR
C1-105
RECEPTION
1H101A
WELLNESS CENTER
1H111
ELEVATOR
P1
CORRIDOR
C1-103
VESTIBULE
1H113A
MEN
1H111A
WOMEN
1H111B
OFFICE
1H115A
RECEPTION
1H112C
STAIR 4
S4
ELEVATOR
P2
CORRIDOR
C1-101
CORRIDOR
C1-104
8 3- 1
(1.5)
4 3- 2
(0.5)
8 3- 3
(1.0)
5 3- 4
(1.0)
5 3- 5
(1.0) 8 3- 6
(1.0)
4 3- 7
(0.5)
4 2- 5
(0.5)
4 4- 2
(0.5)6 4- 1
(1.0)
10 4- 3
(1.5)
8 4- 4
(1.5)
8 4- 5
(1.5)
10 4- 6
(1.5)
4 3- 8
(0.5) 2 3- 9
(0.5)
2 3- 11
(0.5)
4 3- 12
(0.5)
3 3- 13
(0.5)
10 3- 15
(2.5)
10 3- 14
(1.5)
2 3- 16
(0.5)
7 3- 20
(1.0)
2 3- 19
(0.5)
5 3- 21
(0.5)
3 3- 17
(0.5)
1 3- 18
(0.5)
4 3- 22
(0.5)
8 3- 23
(1.5)
11 3- 26
(3.0) 3 3- 24
(0.5)
3 3- 25
(0.5)
4 4- 8
(0.5)
4 4- 7
(0.5) 7 4- 10
(0.5)
4 4- 9
(0.5)
4 4- 11
(0.5) 2 4- 14
(0.5)
8 4- 13
(1.0)
4 4- 12
(0.5)
FC
1-6
5 4- 15
(1.0)
2 4- 18
(0.5)
8 4- 19
(1.0)
4 4- 20
(0.5)
7 4- 16
(0.5)
2 4- 17
(0.5)
FC
1-4
FC
1-5
8 2- 4
(1.0)
8 2- 3
(1.0)
6 7 8 9 10 11 12
A
B
C
D
E
A.1
D.9
10.1
10.9
2"4"
3"
3"
2"4"
CHS
CHR
HR
CHS
CHR
HS
HR
(TYP)
2"
HS
1 4- 21
(0.5)
2"
NOTES
PROVIDE EXPANSION PIPE FITTING
AT BUILDING EXPANSION JOINTS.
1/8" = 1'-0"1 Mechanical Piping Plan - Level 01 - Admin
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
As indicated
MP-201A
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Piping Plan - Level 01 - Admin
TT
A A
5 6
B B
C C
D D
E E
A.1 A.1
D.9 D.9
MAIN LOBBY
1H121
OFFICE
1H137
OFFICE
1H136
OFFICE
1H135
OFFICE
1H131
OFFICE
1H130
STORAGE
1H129B
STORAGE
1H122A CLASSROOM
1H123
STORAGE
1H123A
STORAGE
1H124A
STORAGE
1H125A
EDUCATION
1H133
OFFICE
1H110F
OFFICE
1H110E
OFFICE
1H112G
OFFICE
1H112F
OFFICE
1H112E
A.2
A.3
B.3
C.8
4.8
CLASSROOM
1H122
CLASSROOM
1H125
CLASSROOM
1H124
TELECOM
1H127
SIMULATION LAB
1H129A
COMPUTER TRAINING ROOM
1H141
STORAGE
1H140
ELECTRICAL
1H139
TRAINING ROOM
1H138
CORRIDOR
C1-108
CORRIDOR
C1-107 CORRIDOR
C1-106
SANDWICH SHOP
1H142
POLICE TRAINING
1H126
HAC
1H145TOILET
1H146
MEN
1H147
WOMEN
1H144
VESTIBULE
1H143
VESTIBULE
1H120
WORKROOM
1H132
WORK AREA
1H134
STORAGE
1H129D
CONTROL ROOM
1H128A
SIMULATION ROOM
1H129C
ACCESS
1H128B
4 1- 16
(1.5)
5 1- 15
(1.5)
4 1- 19
(0.5)
10 1- 20
(2.0)
10 1- 1
(2.5)
4 1- 3
(0.5)
11 1- 2
(2.5)
8 1- 6
(1.5) 3 1- 5
(1.0)
3 1- 4
(0.5) 9 1- 7
(1.0)
9 1- 8
(1.0)
8 1- 9
(1.5)
8 2- 1
(1.0)
10 1- 17
(2.0)
4 1- 18
(0.5)
8 1- 13
(1.5)
6 1- 14
(0.5)
4 2- 2
(1.5)
6 1- 12
(1.0)
3 1- 10
(0.5)
4 1- 11
(0.5)
7 1- 22
(0.5)
7 1- 21
(0.5)
7 1- 24
(0.5)
7 1- 23
(0.5)
8 2- 3
(1.0)
FC
1-2
FC
1-3
FC
1-1
1 2 3 4 5 6
A
B
C
D
E
5.1
B.3
C.8
A.2
2.5
A.1
A.8
D.9
4.8
HR
HS
CHR
CHS
CHS
HS
HR
CHR
(TYP)
2"
4" 2"
3"
2" 2"
3"
3"
1/8" = 1'-0"1 Mechanical Piping Plan - Level 01 - Training
B A
C
Drawing Title
Scale
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number of
CIVIL: SLATER HANIFAN GROUP, 5740 S. ARVILLE ST. #216, LAS VEGAS, NV 89118
LANDSCAPE: J W ZUNINO LANDSCAPE ARCHITECTURE, 3191 S. JONES BLVD., LAS VEGAS, NV 89146
MEP: JBA CONSULTING ENGINEERING, 5155 WEST PATRICK LANE, LAS VEGAS, NV 89118
STRUCTURAL: DEGENKOLB ENGINEERING, 235 MONTGOMERY STREET, SUITE 500, SAN FRANSISCO CA 94104
GEOTECHNICAL: NINYO AND MOORE, 6700 PARADISE ROAD, SUITE E, LAS VEGAS, NV 89119
FIRE & LIFE SAFETY: LASALLE ENGINEERING, 1000 YORK ROAD, WILLOW GROVE, PA 19090
ARCHITECT/ENGINEERS:CONSULTANTS: Office ofOffice ofOffice ofOffice of
ConstructionConstructionConstructionConstruction andandandand
FacilitiesFacilitiesFacilitiesFacilities
ManagementManagementManagementManagement
Revisions: Date:
North Las Vegas, NV
BUILDING IS FULLY SPRINKLERED
N
TRUE
CONSTRUCTION DOCUMENTS
KEY PLAN
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
10.0264
1/8" = 1'-0"
MP-201B
Mar 28, 2012
VA Medical Center - PHASE V, Administration Bldg. & Education Ctr. Addition
Mechanical Piping Plan - Level 01 - Training
DNUP
T
T
T
T
A A
B B
C C
D D
E E
A.1 A.1
D.9 D.9
WOMEN
2H206
MEN
2H205
TELECOM
2H203
FACILITIES
2H204
ELEVATOR LOBBY
2H202
FILE ROOM
2H218B
CONFERENCE
2H218D
OFFICE
2H210X
OFFICE
2H210W
OFFICE
2H210V
OFFICE
2H210U
OFFICE
2H210T
OFFICE
2H210S
OFFICE
2H213J
OFFICE
2H213K
OFFICE
2H213L
OFFICE
2H213H
OFFICE
2H213G
OFFICE
2H213E
OFFICE
2H213D
OFFICE
2H213C
OFFICE
2H213B
FILE ROOM
2H210L
FILE ROOM
2H210M
FILE ROOM
2H210N
CONFERENCE
2H212
BREAKROOM
2H211
OFFICE
2H210J
OFFICE
2H210H
HALL
2H210G
OFFICE
2H210E
OFFICE
2H210D
WORKROOM
2H210C
WORKROOM
2H219H
HALL
2H219F
OFFICE
2H219E
OFFICE
2H219D
OFFICE
2H218J
OFFICE
2H218H
OFFICE
2H219C
OFFICE
2H219B
OFFICE
2H219A
OFFICE
2H218K
OFFICE
2H2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .