36C26121Q0642 Amnd 2 Q_A.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C26121Q0642
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26121Q0642_5.docx | DOCX document | |
| Mechanical drawings.pdf | ||
| 36C26121Q0642_4.docx | DOCX document | |
| 36C26121Q0642 Amnd 1 Q_A.docx | DOCX document | |
| Drawings - Bldg 2.pdf | ||
| Wage Determination.pdf | ||
| 36C26121Q0642_3.docx | DOCX document | |
| Drawings - Bldg 3.pdf | ||
| Drawings - Bldg 5.pdf | ||
| Drawings - Bldg 8.pdf | ||
| Drawings - Bldg 6-7.pdf | ||
| 36C26121Q0642.docx | DOCX document | |
| Drawings - Bldg 1.pdf | ||
| Drawings - Bldg 4.pdf | ||
| Drawings - PCCs and CBOCs.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 36C26121Q0642 Amendment No. 2 Answers and Questions As of 26 May 2021
Question 1: We wanted to confirm the NAICS code selected for this solicitation. Our company has performed this service before, but we are registered under a different NAICS code. Can we still quote on this?
Answer 1: Because the Government has set-aside this procurement as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB), the proposing contractor must be a verified SDVOSB under selected NAICS 541330.
Question 2: Will a Life Safety Technician with at least 5 years of experience and completed 10 or more SOC surveys at healthcare facilities be acceptable as ‘or equal’ in lieu of FPE?
Answer 2: Yes
Question 3: If an engineer is required for the project is the VA’s expectation they will provide project oversight and to review deliverables OR that they will be onsite 100% of the time actually collecting data?
Answer 3: The VA’s expectation is that the engineer will provide project oversight and review deliverables produced by the experienced life safety technician.
Question 4: If an engineering degree is required for the project, will any discipline be acceptable as long as they have at least 5 years of experience and completed 10 or more SOC surveys at healthcare facilities?
Answer 4: Yes.
Question 5: Are the mechanical drawings for the project available?
Answer 5: The mechanical drawings are available and have been attached to the solicitation.