This is a Sources Sought Announcement for a construction project to upgrade the sanitary system on the east side of the VA San Francisco Health Care System campus located in San Francisco, California. The project magnitude is estimated between $2 million to $5 million. Interested offerors must be registered in the System for Award Management and have a current Online Representations and Certification Application on file. Offerors are requested to provide their business name, size, socio-economic status, and DUNS number by May 8, 2020 to the contracting officer. The North American Industry Classification System code for this project is 237110 for water and sewer line construction. This announcement is to gather market research and does not constitute a funding commitment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P07 Wage Determination_CA18_7-24-2020.pdf | ||
| S04 Site Visit Attendees.pdf | ||
| S05 Requests for Information with Responses.pdf | ||
| S06 36C26120R0035 0002_RFIs_Site Walk_Aug 8.pdf | ||
| S06 Meeting Location v3.pdf | ||
| S06 36C26120R0035 0001.pdf | ||
| S02 Project Specifications.pdf | ||
| P07 Wage Determination_CA18_6-26-2020.pdf | ||
| S02 Bid Items Sheet.docx | DOCX document | |
| S02 36C26120R0035_Sanitary System.docx | DOCX document | |
| S02 Pricing Schedule.docx | DOCX document | |
| VHA Directive 7715_D_2017-04-06.pdf | ||
| 36C26120R0035_2.docx | DOCX document | |
| PRE-SOL.docx | DOCX document | |
| 36C26120R0035-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL
CS101 GENERAL NOTES
CS102 EXISTING CONDITIONS
CD101 DEMOLITION PLAN
CU101 UTILITY PLAN AND PROFILE
CU102 UTILITY PLAN AND PROFILE
CU103 LATERAL PROFILES
CU104 LATERAL PROFILE
CU105 EROSION CONTROL PLAN
CU106 DETAILS
CU107 PHASING PLAN
CU108 PHASING PLAN
CU109 PHASING PLAN
GENERAL
GI-000 COVER SHEET
GI-001 ABBREVIATIONS, GENERAL NOTES & APPLICABLE STANDARDS
GI-100 REFERENCE SITE PLAN
GI-101 PHASING CONSTRUCTION CONTROL PLANS
DEPARTMENT OF VETERANS AFFAIRS
VA San Francisco Healthcare System
4150 Clement Street, San Francisco, CA 94121
VA Project No. 662-17-005 | Upgrade Sanitary System on East Side of Campus
PROJECT
SITE
VICINITY MAP
UPGRADE AND SEPARATION OF EXISTING STORM AND SANITARY SYSTEM FOR THE EAST SIDE OF THE VA SAN FRANCISCO MEDICAL CENTER BASED ON AN EXISTING STUDY REPORT NOTATING DEFICIENCIES IN CURRENT
SYSTEM AND UNDERSIZING FOR EXPECTED FUTURE ADDITIONAL LOAD.
PROJECT DESCRIPTION
ARCHITECTURAL
AD-100 DEMOLITION SITE PLAN
AS-100 NEW SITE PLAN
AE-501 SITE DETAILS
AE-502 SITE DETAILS
CLIENT:
Department of Veterans Affairs San Francisco VA Health Care System Engineering Services 4150 Clement St, Bldg. 3 San Francisco, CA 94121
Contact: Kevin Jin P: (415) 221-4810 x22335 E: kevin.jin@va.gov
ARCHITECT
MA|Architects, Inc.
20695 S. Western Ave., Suite #204 Torrance, CA 90501
Contact: Steven A. McCaslin P: 650.485.9012 E: s.mccaslin@ma-architects.net
PROJECT TEAM
CIVIL ENGINEERS:
B.K.F. Enginers 980 9th St. Suite 1770 Sacramento, CA 95814
Contact: Alex Heuer P: 916.556.5851 E: aheuer@bkf.com
SHEET INDEX
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
GI-000
COVER SHEET 100% Submittal
MA ArchSMc08.09.2019
662-17-005Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
08.09.2019 100% Submittal
DEDUCT ALTERNATES
1 . SCOPE OF WORK INCLUDES THE DRAIN LINE IN THE NORTH END OF THE SITE FROM SDDI-4 STORM DRAIN TO
SDCB-4 AS NOTED ON CU102 AND CU104. REFER TO PHASE 5 ON GI-101.
06/24/2020
Exp. 12.31.2021
Stamp
08/12/2019
AB
A
ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ACP
AD
ACOUSTICAL CEILING PANEL
AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
AGGR
ABOVE FINISH SLAB
ALUM
AGGREGATE
ALT
ALUMINUM
ANOD
ALTERNATE
APPROX
ANODIZED
ARCH
APPROXIMATE(LY)
ACS PNL ACCESS PANEL
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
BB
B
BULLETIN BOARD
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
BRG BEARING
BSMT BASEMENT
CAB
C
CABINET
CB CATCH BASIN
CCT
CG
CUBICLE CURTAIN TRACK
CORNER GUARD
CEM
CER
CEMENT, CEMENTITIOUS
CERAMIC
CCTV CLOSED CIRCUIT TELEVISION
CH BD CHALKBOARD
CI CAST IRON
CJ CONTROL JOINT
CL
CLG
CLR
CMU
CNTR
COL
CONC
CONF
CONN
CONSTR
CONT
CONTR
CORR
CPT
CSK
CSP
CSWK
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CONFERENCE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CARPET
COUNTERSUNK
COMBINATION STANDPIPE
CASEWORK
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DBL ACT DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIM PT DIMENSION POINT
DISP DISPENSER
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAPERY TRACK
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EG EDGE GUARD
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXC EXCAVATED
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FURN FURNITURE
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
GVL GRAVEL
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
ID
I
INSIDE DIAMETER
JAN
J
JANITOR
KG
K
KILOGRAM
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
QT
Q
QUARRY TILE
R
R
RISER
S SOUTH
T
T
TREAD
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCAND INCANDESCENT
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
INV INVERT
IVT INTRAVENOUS TRACK
JST JOIST
JT JOINT
KIT KITCHEN
KPL KICK PLATE
KS KNEE SPACE
LAB LABORATORY
LAM LAMINATE, LAMINATION
LAV LAVATORY
LB POUND
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LL LEAD LINED
LPT LOW POINT
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MM MILLIMETERS
MO MASONRY OPENING
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNEU PNEUMATIC
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PORT PORTABLE
PP PUSH PLATE
PPM PARTS PER MILLION
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PTS PNEUMATIC TUBE STATION
PVC POLYVINYL CHLORIDE
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RESIL RESILIENT
RET RETURN
REV REVISION
RF RESILIENT FLOORING
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER LEADER
SAF
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SD STORM DRAIN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SHWR SHOWER
SHV SHELVES, SHELVING
SIM SIMILAR
SK SINK
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SS SANITARY SEWER
SSK SERVICE SINK
SST STAINLESS STEEL
ST STREET
STA STATION
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CONCRETE, TOP OF CURB
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
UC
U
UNDER COUNTER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WC WATER CLOSET OR WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WCHR WHEELCHAIR
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
CCR CARD CONTROL READER
BUR BUILT UP ROOFING SYSTEM
CT CERAMIC TILE
F
F/F FACE TO FACE
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FHY FIRE HYDRANT
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FSB FOLDING SHOWER BENCH
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OFCI
OFOI
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
OZ OUNCE
PART PARTIAL
PBD PARTICLEBOARD
PBX
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
PLAM PLASTIC LAMINIATE
P
PRIVATE TELEPHONE EXCHANGE
OWNER FURNISHED-CONTRACTOR INSTALLED
OWNER FURNISHED-OWNER INSTALLED
VAC
V
VACUUM
VB VALVE BOX
VCT VINYL COMPOSITION TYLE
VERT VERTICAL
VEST VESTIBULE
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
VWC VINYL WALL COVERING
SYMBOLS AS
ABBREVIATIONS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
OH OPPOSITE HAND
HSS HOLLOW STRUCTURAL STEEL
SA SUPPLY AIR
SYMBOLS
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE - SEE
"INDEX OF DRAWINGS".
3. THE SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE
"INDEX OF DRAWINGS". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE. DO NOT
DISTRIBUTE OR UTILIZE PARTIAL SETS OF DRAWINGS. THE WORK DESCRIBED BY THE
DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON
DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURE INSTALLATION REQUIREMENTS.
SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH OTHER, BIDS SHALL BE BASED
ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK INDICATED.
ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED IN
THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING OR PATCHING THAT
MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT TOGETHER.
5. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
6. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE
ARE INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT
DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN
APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.
7. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE
MORE STRINGENT OR RESTRICTIVE REQUIREMENT:
- THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS. WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE
MORE DETAILED, MORE SPECIFIC, AND/OR MORE RESTRICTIVE REQUIREMENTS, THE
CONTRACTOR SHALL COMPLY WITH THOSE REQUIREMENTS.
- WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES, CODES,
REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET FORTH BY
THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL SUCH
MORE RESTRICTIVE REQUIREMENTS - ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURES
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY
THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN" MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU
OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY RESIDENT
ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE
TO THE OWNER) FOR ALL COORDINATION AND REVISIONS TO DIMENSIONS AND/OR DETAILS
NECESSARY TO ACHIEVE THE SAME FUNCTIONAL AND AESTHETIC DESIGN INTENT AS
ILLUSTRATED BY THE "BASIS OF DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.
9. SCHEDULE CONSTRUCTION WORK HOURS TO ACCOMODATE THE OPERATION OF THE
HOSPITAL / CLINIC
10. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES
("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT
UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS.
RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK,
PRODUCTS, AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN
THE CONTRACT DOCUMENTS. **NO EXCEPTION ALLOWED**
11. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURE REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE OWNER AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S
EXPENSE.
THE CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE ARCHITECT
AS DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER
OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT
FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF
CORRECTING SUCH REJECTED WORK, NOT TO BE REIMBURSED, INCLUDING
COMPENSATION FOR THE ARCHITECT'S ADDITIONAL SERVICES MADE NECESSARY
THEREBY.
12. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY
SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT WILL
CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR
SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF MATERIALS AND
EQUIPMENT HAVING LONG LEAD TIMES.
13. PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS; SUBSTITUTIONS
FOR SPECIFIED MATERIALS REQUIRE THE WRITTEN APPROVAL FROM THE ARCHITECT AND
OWNER. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN
WRITING AND WILL BE CONSIDERED ONLY IF BETTER SERVICE FACILITIES, A MORE
ADVANTAGEOUS DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE OWNER /
TENANT WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND FUNCTION.
UNDER NO CIRCUMSTANCES WILL THE ARCHITECT BE REQUIRED TO PROVE THAT A
PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE
PRODUCT SPECIFIED.
14. PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN STATE AND LOCAL CODES AND
PER CONTRACT DOCUMENTS AS NEEDED.
APPLICABLE STANDARDS:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2018 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2018 NFPA 101 Life Safety Code (see notes below)
NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards.
2016 VA Seismic Design Requirements, H-18-8
2014 National Electrical Code (NEC)
International Plumbing Code (IPC)
2016 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2017 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN THE LATEST EDITION OF EACH IN EFFECT AT THE
DATE OF PROJECT SUBMISSION (U.N.O.)
SHEET
x x x x
X
NORTH IDENTIFIER
ELEVATION IDENTIFIER
KEY NOTE TAG
GRID LINES
CALLOUT IDENTIFIER
Ref View Name
+1'-0" CEILING TAG
1i WALL TYPE TAG
X X
Sheet # Ref # On Sheet
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
GI-001
ABBREVIATIONS, GENERAL NOTES &
APPLICABLE STANDARDS
100% Submittal
MA ArchSMc08.09.2019
662-17-005
PROJECT GENERAL NOTESABBREVIATIONS & SYMBOLS APPLICABLE STANDARDS
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
08.09.2019 100% Submittal
T-33
T -3
PARKING LOT
P A
R K
IN
G
L O
T
VETERANS D
RIV
E
PARKING LOT
44th
AVE
CLEMENT STREET
43rd
AVE
FT. MILEY CIRCLE
FT. MILEY CIRCLE
AVE
42nd
P A
R K
IN
G
L O
T B
P A
R K
IN
G
L O
T
V E
T E
R A
N S
D R
IV
E
DRIVE
VETERANS DRIVE
PARKING LOT 8
PARKING
PARKING LOT 5AREA
SLIDE
VETER
ANS
208 203
BUS STOP
T -2
T-24
T-19
T-27
T -3
T-32
T-28
PARKING GARAGE
PARKING GARAGE
PARKING GARAGE
200D
G O
L D
E N
G A
T E
N A
T
IO
N A
L R
E C
R E
A T
IO
N
A R
E A
P R
O P
E R
T Y
L
IN
E
G O
L D
E N
G A
T E
N A
T
IO
N A
L R
E C
R E
A T
IO
N
A R
E A
PROPERTY LINE
PROPERTY LINE
P R
O P
E R
T Y
L
IN
E
D
PROPOSED AREA OF WORK
AS-100
CAMPUS LEGEND: BUILDINGS
No. NAME
1 ORTC CLINIC
2 -
3 ENGINEERING
4 -
5 PROSTHETICS
6 FISCAL /MEDICAL LIBRARY/ ACQUISITION & MATERIAL
MANAGEMENT/ ENGINEERING SHOPS
7 FOOD COURT/ CHAPEL/ AUDITORIUM
8 METAL HEALTH
9 HOPTEL
10 HOPTEL
11 RESEARCH OFFICE
12 -
13 RESEARCH MRI
14 NCIRE
15 - 16 - 17 - 18 - 20 - 21 -
22 HOPTEL
26 - 29 - 30 -
31 HOME BASED HOSPITAL CARE
41 VMU
42 -
200 AMBULATORY CARE CLINICS/ DIAGNOSTIC SERVICES/
PHARMACY
200D -
203 HOSPITAL
204 - 205 - 207 -
208 COMMUNITY LIVING CENTER
209 PARKING GARAGE
210 ADMINISTRATION
211 PARKING GARAGE
212 PATIENT VISITOR PARKING GARAGE
T-19 - T-23 - T-24 - T-27 - T-28 -
T-32 CHILD CARE CENTER
T-33 - T-35 - T-38 -
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
GI-100
REFERENCE SITE PLAN 100% Submittal
MA ArchSMc08.09.2019
662-17-005
Reference Site Plan
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
D
D
D
D
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
PHASE 1
14’−0" 4 5
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
M
IN
PHASE 2APHASE 2B
PHASE 2
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
PHASE 3
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
PHASE 4
4 5
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
PHASE 5
14’−0"
M
IN
4 5
GENERAL CONTROL NOTES:
1. WORK SHALL NOT INTERFERE WITH VA OPERATIONS.
2. COORDINATE ANY NECESSARY SHUTDOWN WITH THE VA AT
LEAST 30 DAYS IN ADVANCE. SHUTDOWN WINDOW SHALL BE 2
WEEKS MAXIMUM PROVIDE ALL NECESSARY LIFE SAFETY,
SECURITY, AND MONITORING DURING A SHUTDOWN.
3. PROTECT ALL EXISTING ITEMS AND FINISHES TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION.
4. PROTECT EXISTING TREES TO REMAIN.
5. PROTECT EXISTING WATER VALVE, IRRIGATION WIRING,
COMMUNICATION AND OTHER SITE ATTRIBUTES AS REQUIRED
DURING DEMOLITION AND NEW CONSTRUCTION.
6. REPLACE ALL EXISTING ITEMS TO REMAIN THAT ARE
DAMAGED/REMOVED BY CONSTRUCTION ACTIVITIES, AT NO
ADDITIONAL COST TO THE VA.
7. PROVIDE ANY NECESSARY OFF-SITE STORAGE AND STAGING.
8. MAINTAIN 7'-0" HIGH CONSTRUCTION BARRIERS (FENCE WITH
VISUAL CONTROLS) AT ALL TIMES. ALL CONSTRUCTION
BARRIERS ARE DIAGRAMMATIC. ADJUST THE LOCATION AND
CONFIGURATION OF CONSTRUCTION BARRIERS DURING THE
PROJECT AS NECESSARY. PROVIDE ADEQUATE SAFETY
BARRICADES AT NO ADDITIONAL COST TO THE VA.
9. MAINTAIN FREE UNOBSTRUCTED PATHWAYS AND DESIGNATE AN
ALTERNATE PATHWAY WHEN REQUIRED.
10. PHASED KEYED NOTES AND SCHEDULED MAINTENANCE
CLEANUP PHASES OF START AND STOP DEPENDS UPON ACTUAL
CONSTRUCTION SEQUENCE BY THE CONTRACTOR.
11. MAINTAIN FREE AND UNOBSTRUCTED ACCESS TO THE
CONSTRUCTION AREA FOR FIRE, POLICE, AND OTHER
EMERGENCY FORCES.
12. TEMPORARY FENCING SHOWN IS CONCEPTUAL, COORDINATE
EXACT PLACEMENT, ENTRY/EXIT GATES, ETC. WITH THE COR.
13. PROTECT EXTERIOR AIR INTAKES FROM AIR-BORNE DUST,
CONTAMINANTS, AND ODORS.
14. PROVIDE TEMPORARY FIRE EXTINGUISHERS:" DEADMAN STANDS
EVERY 300'."
15. REMOVE DEBRIS AND MAINTAIN DAILY AND REDUCE FUEL LOAD
OF COMBUSTIBLE MATERIALS STORED ON-SITE.
16. PROVIDE TEMPORARY DETOURS AND DIRECTIONAL SIGNAGE
WHERE CONSTRUCTION WORK IMPEDES EXISTING VEHICULAR
AND PEDESTRIAN CIRCULATION. COORDINATE WITH THE COR.
17. PROVIDE TEMPORARY CAUTION SIGNS ON ALL CONSTRUCTION
BARRICADES. SECURE BARRICADE GATE/DOORS AT ALL TIMES.
18. PROVIDE A MINIMUM OF 5' WORKING CLEARANCE FOR
EQUIPMENT INSIDE CONSTRUCTION BARRICADES. WHEN NOT
POSSIBLE DUE TO FIELD CONDITIONS, DISCUS SAFETY
PRECAUTIONS WITH COR.
19. UPON COMPLETION OF CONSTRUCTION:
A. DO NOT REMOVE BARRIERS UNTIL THE PROJECT IS
COMPLETED, INSPECTED AND APPROVED BY THE COR.
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
GI-101
PHASING CONSTRUCTION CONTROL
PLANS
100% Submittal
AuthorChecker08.09.2019
662-17-005
1" = 50'-0"
Site Plan (Phase 1)
1" = 50'-0"
Site Plan (Phase 2)
1" = 50'-0"
Site Plan (Phase 3)
1" = 50'-0"
Site Plan (Phase 4)
Key Notes
1 WORK IN THIS AREA TO BE PERFORMED DURING OFF-HOURS.
2 MAINTAIN VEHICLE ACCESS (IN/OUT) 20'-0" WIDE ACCESS MIN.
3 TEMPORARY LAYDOWN AREA.
4 TEMPORARY CONSTRUCTION FENCE, GATE(S), LOCKS BY CONTRACTOR.
5 ADJUST TEMPORARY CONSTRUCTION FENCE UPON COMPLETION OF ROAD
PATCHING.
6 TEMP TRAFFIC DIVERTERS.
7 DEDUCT ALTERNATES AREA INDICATED IN CROSS HATCH.
1" = 50'-0"
Site Plan (Phase 5)
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
08.09.2019 100% Submittal
06/24/2020
Exp. 12.31.2021
Stamp
VETERANS DRIVE
PARKING LOT B
T-32
T-33
9 10
T-35
R
10 1010
T-38
111112
T-35
M
IN
14’−0"
M
IN
Y
R
B
PAINT COLOR LEGEND
YELLOW - AT CURBS DESIGNATED AS LOADING AREA
SHALL BE PAINTED OSHA SAFETY YELLOW.
RED - ALL CURBS DESIGNATED AS FIRE LANES SHALL
BE PAINTED OSHA RED; WITH 3" HIGH WHITE LETTERS
SPELLING OUT "NO PARKING FIRE LANE" @ 30'-0" O.C.
BLUE - AT CURBS ADJACENT TO ACCESSIBLE STALLS.
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
AD-100
DEMOLITION SITE PLAN 100% Submittal
MA ArchSMc08.09.2019
662-17-005
1" = 30'-0"
Site Plan (Demolition)
Key Notes
1 TEMPORARY CONSTRUCTION FENCE, GATE(S), LOCKS BY
CONTRACTOR.
2 BLOCK ENTRANCES/EXITS, PROVIDE TEMPORARY
WARNING BARRIERS AND SIGNAGE.
3 TEMPORARY TRAFFIC BARRICADES.
4 PAINT CURB PER SCHEDULE.
5 REMOVE (E) STRIPING AS INDICATED.
6 REMOVE (E) PAVEMENT MARKINGS AS INDICATED.
7 (E) OFFICE TRAILER TO BE REMOVED/RELOCATED BY VA
FOR INSTALLATION OF NEW UTILITY WORK.
8 REMOVE EXISTING PAVING/GROUND COVER TO INSTALL
NEW UTILITIES (REFER TO CIVIL)
9 WORK IN THIS AREA TO BE PERFORMED DURING
OFF-HOURS.
10 REMOVE (E) ACCESSIBLE STALL SIGNAGE.
11 TEMPORARY "NO PARKING SIGNS @ 50'-0" MIN.
12 TEMPORARY TRAFFIC DIRECTION ARROW PAVEMENT
MARKINGS.
1" = 30'-0"
Site Plan (Temp. Striping)
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
VETERANS DRIVE
PARKING LOT B
T-32 9 10
T-35
LOADING ZONE
AE-501
4 H.C. VAN STALLS 14 H.C. STALLS
9 99 9
10 R 10 R 10 10 RY
1111 1111 1111 1111 1111 1111 1111
10 R10
R 10
10 R
10R
10 10B B
R1010R
Y
R
B
PAINT COLOR LEGEND
YELLOW - AT CURBS DESIGNATED AS LOADING AREA
SHALL BE PAINTED OSHA SAFETY YELLOW.
RED - ALL CURBS DESIGNATED AS FIRE LANES SHALL
BE PAINTED OSHA RED; WITH 3" HIGH WHITE LETTERS
SPELLING OUT "NO PARKING FIRE LANE" @ 30'-0" O.C.
BLUE - AT CURBS ADJACENT TO ACCESSIBLE STALLS.
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
AS-100
NEW SITE PLAN 100% Submittal
MA ArchSMc08.09.2019
662-17-005
1" = 30'-0"
Site Plan (Renovation)
Key Notes
1 (N) ASPHALT PAVING OVER COMPACTED FILL PER
STANDARD DETAILS.
2 PROVIDE (N) CROSSWALK MARKINGS AS INDICATED (BLUE).
3 PROVIDE (N) YELLOW PAVEMENT MARKINGS; 4" WIDE
BORDER w/ HATCHED LINES @ 36" O.C.; COORIDINATE
SPECIFIC LAYOUT WITH VA ENGINEERING.
4 (N) CURB AND GUTTER AS REQUIRED.
5 (N) CONCRETE SIDEWALK TO MATCH EXISTING.
6 PROVIDE (N) LANDSCAPE TO MATCH EXISTING ADJACENT
CONDITIONS.
7 (N) CONCRETE PAVING.
8 (N) "STOP" PAVEMENT MARKINGS.
9 (N) ACCESSIBLE VAN STALL SIGNAGE PER CURRENT
STANDARDS w/ SIGNAGE BELOW THE INTERNATIONAL
SYMBOL OF ACCESSIBILITY SIGN.
10 PAINT CURB PER SCHEDULE.
11 (N) ACCESSIBLE STALL SIGNAGE PER CURRENT STANDARDS
w/ INTERNATIONAL SYMBOL OF ACCESSIBILITY.
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
BLUE TRAFFIC PAINT
MATTHEWS MP26511
WHITE TRAFFIC PAINT
MATTHEWS MP32071
36"
IN
D
IR
E
C T
IO
N
O F
T R
A V
L E
M
IN
2.3" − 2.4"
.3
.4
.6
M
IN
BASE OF DIAMETER
0.9 - 0.92"
TOP OF DIAMETER
0.45 - 0.47"
.1
.2
ELEVATION
PLAN
CONCRETE FOOTING
1’−0"
3" x 3" GALV. STEEL PIPE (CAP
END)
SIGNAGE PER SCHEDULE
(VERIFY SIZE)
1/4" EASED EDGE @ GRADE
CROWN
M
IN
/4
M
IN
C L
R
GROOVED PAVING, TYP.
3/4" EXCEPT ON SLOPING
PORTION OF RAMP APPROX. 1 1/2"
11 3/4"
1/4" 3/4"
/4
NO
PARKING
12’−0" @ VAN STALL
9’−0"
ACCESS AISLE
60" MIN.
ACCESSIBLE STALL
IDENTIFICATION SIGNAGE
36" x 36" INTERNATIONAL SYMBOL
OF ACCESSIBILITY
ACCESS AISLE:
BLUE BORDER w/ HATCHED LINES
@ 36" O.C. PAINTED TO
CONTRAST w/ THE AISLE
SURFACE
12" WHITE LETTERING
NO
PARKING
ACCESS AISLE
60" MIN.
’ M
IN
’ M A
X
WHEEL STOP WHERE OCCURS
2’−0"2’−0"
YIELD PAVEMENT MARKING
CROS WALK PAVEMENT
MARKING (BLUE)
10’−0"
G R
ID
A = 14 ft²
’ M
IN
R E
D C
U R
B
’ T
Y P
12" WHITE
LIMIT LINE
"STOP" SIGN PEDESTAL
12" WHITE LINE
ZERO CURB
FACE
GROOVED BORDER:
GOOVES TO BE 1/4" WIDE x
1/4" DEEP @ 3/4" O.C.
MIN.
3’−0"
PARALLEL
PERPINDICULAR
TRUNCATED DOMES
ZERO CURB
FACE
SLOPE
1:12 MAX.
TRUNCATED
DOMES
M
IN
M
IN
SLOPE
1:20 MAX.
MIN.
1'-0"
MIN
1'-0"
M
IN
.4' -0
M
IN
'-0
MIN.
2'-0"
M
IN
.1’ −0
M
IN
.3’ −0
GROOVED BORDER:
GOOVES TO BE 1/4"
WIDE x 1/4" DEEP @ 3/4" O.C.
DIAGONAL OR CORNER TYPE CURB RAMP DETAIL
SLO
PE
1:
M A
X. TRUNCATED DOMES
B A B
TRENCH
PARALLEL
TRENCH
PERPENDICULAR
L
W
B A
B
7’−3"
B A
B
STEEL ROAD PLATE PRO-TECT
EQUIPMENT OR EQUAL
STANDARD FEATURES:
1. A-36 STEEL
2. FLUSH MOUNTED PICK
PLATES
3. (2) HALF-MOON
CUTOUTS
4. BALANCE LIFTING
POINTS
NOTE:
1. TRENCH WIDTHS ARE BASED ON AN ANALYSIS PER THE 14TH EDITION OF THE "STANDARD
SPECIFICATION FOR HIGHWAY BRIDGES" BY A.A.S.H.T.O. AN ASSUMED AXLE LOADING OF 12
TONS WITH A 30% IMPACT FACTOR WAS USED. THE AXLE LENGTH IS 6 FEET; THEREFORE THE
NUMBER OF WHEELS CARRIED BY A PLATE DEPENDS ON THE ROADWAY WIDTH. PLATES
SHALL BE SECURED FROM LATERAL MOVEMENT WHILE IN USE BY MEANS OF MATERIALS
SUCH AS ASPHALT-BASE COLD MIX, SPIKES AND OTHER ACCEPTABLE MEANS.
2. STEEL ROAD PLATES HAVE NOT BEEN ENGINEERED TO BE USED IN TRENCH SHORING
APPLICATIONS. IF USED FOR SHORING, SPECIFC ENGINEERING AND DESIGN IS THE
RESPONSIBILITY OF OTHERS.
MODEL PARALLEL PARALLEL PERPENDICULAR PERPENDICULAR
“A” “B” “A” “B”
SP-48 24” 12” 48” 24”
SP-510 30” 15” 60” 30”
SP-810 48” 24” 72” 24”
SP-812 48” 24” 72” 36”
SP-816 48” 24” 72” 60”
SP-820 48” 24” 72” 84”
A IS THE MAXIMUM TRENCH WIDTH
B IS THE MINIMUM PLATE OVERLAP REQUIRED
TRENCH
SPAN
1’−0"
/2
/4
/2
"1
/4
1"
CL
VA STANDARD MESSAGE
LAYOUT. (VAN ACCESSIBLE
WHERE OCCURS)
NOTE:
1. MASSAGE LAYOUT A
"PARKING ONLY"
2. MASSAGE LAYOUT B
"VAN ACCESSIBLE"
REFLECTORIZED SIGN w/
FIGURE ON BLUE BACKGROUND.
SYMBOL AND TEXT MUST
CONFORM TO VA LAYOUT
STANDARDS.
3"x3"x3/16" GALV. STEEL PIPE
(CAP END)
CONCRETE FOOTING
1/4" EASED EDGE @ GRADE
CROWN
/4
M
IN
M
IN
FINISH GRADE / PAVEMENT
M
IN
A
F F
M
IN
MIN.
1’−0"
1’−0"
CL
3"
PAINT (E) CURB PER SCHEDULE
(E) ROADWAY (REFER TO CIVIL)
FIRE LANE NO
PARKING
LETTERING PER SCHEDULE
CL
VA STANDARD "PARKING ONLY"
MESSAGE LAYOUT.
/2
/4
/2
/2
2’−0"
2" 9 1/2"
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
AE-501
SITE DETAILS 100% Submittal
MA ArchSMc08.09.2019
662-17-005
Not to Scale
ACCESSIBLE PARKING STALL EMBLEM
1 1/2" = 1'-0"
TRUNCATED DOME DETAIL
3/8" = 1'-0"
POLE SIGNAGE
1 1/2" = 1'-0"
SIDEWALK GROOVED BORDER DTL.
3/16" = 1'-0"
TYP. VA STANDARD ACCESSIBLE
PARKING STALL
1" = 10'-0"
CROSSWALK STRIPING
1/2" = 1'-0"
PAVEMENT MARKING - ARROW
1/8" = 1'-0"
STOP MARKING DETAIL
1/4" = 1'-0"
TYP. CURB RAMP DETAILS
1/8" = 1'-0"
TYP. TRENCH PLATE
1 1/2" = 1'-0"
ACCESSABLE PARKING SIGN
3/4" = 1'-0"
ACCESSIBLE PARKING SIGNAGE
3/4" = 1'-0" 14A
PAINTED CURB
1 1/2" = 1'-0"
ACCESSABLE PARKING AREA SIGN
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
1/4" DEEP SCORED JOINTS
1/4" R. (TYP) FORMED
JOINTS ONLY
/4
T Y
P
1" SCORED OR SAWCUT
CONTRACTION JOINT
CLASS "B" CONCRETE
EXPANSION JOINT WITH 1/4"
BITUMINOUS JOINT FILLER
EXPANSION AND SCORED JOINT DETAIL
EXPANSION JOINT TO EXPANSION JOINT
60' MAX TYP.
NOTE 7
SEE
P L A
N S
P E
R
TOP OF CURB
PLAN
NOTES:
1. EXPANSION JOINTS SHALL BE LOCATED WHERE WALKWAY ABUTS CONCRETE
DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES.
2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION
JOINT LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE.
3. CONTROL JOINTS SHALL BE PLACED AT THE SPACING INDICATED FOR THE
WIDTH OF WALKWAY AND IN A 6'X6' PATTERN.
4. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF
APPROXIMATELY 15' OR AT A SPACING THAT MATCHES THE ADJACENT CURB.
5. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4"
RADIUS.
6. SCORED JOINTS SHALL BE 1/4" DEEP AND PLACED AT THE SPACING INDICATED
FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.
7. CONCRETE SHALL NOT BE TINTED AND SHALL BE FINISHED BY MEANS OF A
FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH IN A
TRANSVERSE DIRECTION.
8. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' OR EQUAL TO SIDEWALK WIDTH.
8"
(E) WALKWAY WHERE OCCURS
(N) COMPRESSIBLE FILLER
MATERIAL
ALIGN
#4 @ 18" O.C. EACH WAY
GRADE
CONCRETE SLAB
TOOL TO 1/4" RADIUS
EXPANSION CONTROL
3/8" COMPRESSIBLE
BITUMINOUS FELT FILLER
MATERIAL
1/4" RADIUS TOOLED JOINT
AS SHOWN ON PLAN
TYP.
1/2" Rad.
COCN. CURB MATCH PROFILE
OF ABUTTING CURB
6" 3/4"
(E) ASPHALT or CONC. PAD
GRADE
6" 1".TYP.
1/2" Rad.
1"
CONCRETE CURB & GUTTER
(E) ASPHALT PAVING AS
OCCURS
GRADE
8"
(E) WALKWAY WHERE OCCURS
(N) COMPRESSIBLE FILLER
MATERIAL
ALIGN
#4 @ 18" O.C. EACH WAY
GRADE
CONCRETE SLAB
TRUNCATED DOMES WET SET
IN CONC.
2% SLOPE
#4 @ 18" O.C. EACH WAY
NATURAL COLOR CONCRETE
W/ BROOM FINISH
CLASS II AGGREGATE BASE
COURSE 95% COMPACTION
UNDISTURBED OR
RECOMPACTED NATIVE SOILS
ASPHALTIC CONCRETE
CLASS II AGGREGATE BASE
COURSE 95% COMPACTION
UNDISTURBED OR
RECOMPACTED NATIVE SOILS
3'-0"
1/4"
#4 @ 18" EACH WAY AT
MID-DEPTH
3 - #4
CONCRETE GUTTER
CURB AND GUTTER
BEYOND WHERE
OCCURS
NOTES:
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
2. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT
MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED
ACCURATE.
CRUSHED FINE ROCK
WEED BLOCKER
ARTIFICIAL TURF w/ INFILL (1-2
LB/FT2)
3-4" OF 3/4" DOWN TO 1/4"
CRUSHED DRAIN ROCK
GEOTEXTILE FABRIC o/ AIRFIELD ACCELERATED DRAINAGE o/
GEOTEXTILE FABRIC
ARTIFICIAL TURF w/ INFILL (1-2
LB/FT2)
CRUSHED FINE ROCK
3-4" OF 3/4" DOWN TO 1/4"
CRUSHED DRAIN ROCK
STANDARD INSTALL
ACCELERATED DRAINAGE
SUB-LAYER
LANDSCAPE PAD SUBLAYER
.75" GF LANDSCAPE PAD
ARTIFICIAL TURF w/ INFILL (1-2
LB/FT2)
CRUSHED FINE ROCK
3-4" OF 3/4" DOWN TO 1/4"
CRUSHED DRAIN ROCK
Project Number
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
N/A
San Francisco VA Medical Center Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
AE-502
SITE DETAILS 100% Submittal
MA ArchSMc08.09.2019
662-17-005
3" = 1'-0"
TYP. CONC. SIDEWALK
1 1/2" = 1'-0"
TYP. WALKWAY OR PAD
1 1/2" = 1'-0"
TYP. CONCRETE JOINTS
1 1/2" = 1'-0"
TYP. VERTICAL CURB
1 1/2" = 1'-0"
TYP. ACCEPT CURB
1 1/2" = 1'-0"
FLUSH SIDEWALK WITH CURB
1 1/2" = 1'-0"
TYPICAL CONCRETE PAVING
1 1/2" = 1'-0"
TYPICAL ASPHALT PAVING
1 1/2" = 1'-0"
TYP. VALLEY GUTTER
1 1/2" = 1'-0"
ARTIFICIAL TURF
Rev. Date Description
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
KEY MAP
GENERAL NOTES
SURVEY NOTE
ABAAS NOTES
EXISTING UTILITY NOTES
UTILITY NOTES
CONTRACTOR RESPONSIBILITY
DISCREPANCIES
EARTHWORK NOTE
TOPOGRAPHIC NOTES
GENERAL NOTES
CS101
08.09.2019
BUILDING 8
BUILDING 9 BUILDING 10
BUILDING T-35
BUILDING
BLDG.
T-33
BUILDING 20
BUILDING T-32
BUILDING
CLEM
EN
T ST
VE
TE
RA
N
S
DR PARKING
GARAGE
FO
RT
M
ILE
Y
CI
RC
LE
KEY MAP
PLAN
M A
T C
H L
I N
E
S
E
P
L A
N
B
E L
O W
M A
T C
H L
I N
E
S
A
N
A
B O
V E
EXISTING CONDITIONS
CS102
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
BUILDING T-35
BUILDING
BLDG.
T-33
BUILDING 20
BUILDING T-32
BUILDING
CLEM
EN
T ST
VE
TE
RA
N
S
DR PARKING
GARAGE
FO
RT
M
ILE
Y
CI
RC
LE
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
DEMOLITION PLAN
CD101
PLAN
M A
T C
H L
I N
E
S
A
N
B
E L
O W
M A
T C
H L
I N
E
S
A
N
A
B O
V E
CLEM
EN
T ST
VE
TE
RA
N
S
DR PARKING
GARAGE
BUILDING T-32
BUILDING 8
FO
RT
M
ILE
Y
CI
RC
LE
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
PLAN
M A
T C
H L
I N
E
S
A
N
O
N
S
H E
C
U
M A
T C
H L
I N
E
S
R O
F I L
E
O
N
S
H E
UTILITY PLAN AND PROFILE
CU101
BUILDING T-35
BUILDING
BLDG.
T-33
BUILDING
BUILDING 8
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
M A
T C
H L
I N
E
S
A
N
O
N
S
H E
M A
T C
H L
I N
E
S
R O
F I L
E
O
N
S
H E
PLAN
UTILITY PLAN AND PROFILE
CU102
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
LATERAL PROFILES
CU103
SCALE: 1" = 20' HORIZ.
1" = 4' VERT.
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
LATERAL PROFILE
CU104
CLEM
EN
T ST
VE
TE
RA
N
S
DR PARKING
GARAGE
BUILDING 8
BUILDING 9 BUILDING 10
BUILDING T-35
BUILDING
BLDG.
T-33
BUILDING 20
BUILDING T-32
BUILDING 1
BUILDING
BUILDING
FO
RT
M
ILE
Y
CI
RC
LE
PLAN
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
EROSION CONTROL PLAN
CU105
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
DETAILS
CU106
BUILDING T-35
BUILDING
BLDG.
T-33
BUILDING
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
PLAN
M A
T C
H L
I N
E
S
A
N
O
N
C
U
PHASING PLAN
CU107
BUILDING 9
BUILDING 20
BUILDING T-32
BUILDING
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
M A
T C
H L
I N
E
S
A
N
O
N
C
U
PHASING PLAN
CU108
M A
T C
H L
I N
E
S
A
N
O
N
C
U
PLAN
VE
TE
RA
N
S
DR PARKING
GARAGE
FO
RT
M
ILE
Y
CI
RC
LE
KEY MAP
Project Number
MA Architects, Inc.
20695 S. Western Ave. –Suite 204, Torrance, CA 90501 www.ma-architects.net
Building Number
Drawing Number
Project Title
Location
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
Stamp
ARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
San Francisco VA Medical Center
Upgrade Sanitary System on East Side of Campus
4150 Clement Street, San Francisco, CA 94121
N/A
100% Submittal
Rev. Date Description
980 9TH ST, #1770 SACRAMENTO, CALIFORNIA 94518 916.556.5800
AMAH
662-17-005
01.12.2018 Site Survey & As-Built Verification
11.30.2018 65% Design Submittal
04.26.2019 95% Design Submittal
07.17.2019 100% Submittal
07.17.2019
PHASING PLAN
CU109
M A
T C
H L
I N
E
S
A
N
O
N
C
U
PLAN
| 662-17-005 (SFVAMC Sanitary Sys)_Replacement Sheets.pdf |
| GI-000 - COVER SHEET |
| S02 Project Drawings.pdf |
| GI-001 - ABBREVIATIONS, GENERAL NOTES & APPLICABLE STANDARDS |
| GI-100 - REFERENCE SITE PLAN |
| 662-17-005 (SFVAMC Sanitary Sys)_Replacement Sheets |
| GI-101 - PHASING CONSTRUCTION CONTROL PLANS |
| S02 Project Drawings |
| AD-100 - DEMOLITION SITE PLAN |
| AS-100 - NEW SITE PLAN |
| AE-501 - SITE DETAILS |
| AE-502 - SITE DETAILS |
| CS101 - GENERAL NOTES |
| CS102 - EXISTING CONDITIONS |
| CD101 - DEMOLITION PLAN |
| CU101 - UTILITY PLAN AND PROFILE |
| CU102 - UTILITY PLAN AND PROFILE |
| CU103 - LATERAL PROFILES |
| CU104 - LATERAL PROFILE |
| CU105 - EROSION CONTROL PLAN |
| CU106 - DETAILS |
| CU107 - PHASING PLAN |
| CU108 - PHASING PLAN |
| CU109 - PHASING PLAN |
File details come from the government source that posted it. Updated .