36C26119Q0007-0003001.docx

DOCX document 20 KB Posted

Attached to
Emergency Department Physician Services for VA Southern Nevada Healthcare System (VASNHS)
Solicitation number
36C26119Q0007
Issued by

About this file

36C26119Q0007 0003 S06 36C26119Q0007 A00003 Q and A.docx

View the file

Other files

File Type Posted
36C26119Q0007-0003000.docx DOCX document
36C26119Q0007-0003002.docx DOCX document
36C26119Q0007-0002001.docx DOCX document
36C26119Q0007-0002000.docx DOCX document
36C26119Q0007-0002002.xlsx XLSX spreadsheet
36C26119Q0007-0001000.docx DOCX document
36C26119Q0007-006.docx DOCX document
36C26119Q0007-004.docx DOCX document
36C26119Q0007-002.docx DOCX document
36C26119Q0007-001.docx DOCX document
36C26119Q0007-005.xlsx XLSX spreadsheet
36C26119Q0007-000.docx DOCX document
36C26119Q0007-003.docx DOCX document
36C26119Q0007_1.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26119Q0007 A00003 Answers to Questions and Requests for Information

1
Question
Under Part II - Technical (pg 70), para (a) Section 1 - Cover Letter is followed by para (b) Section 3 - Narrative Response... is there a Section 2 that is missing, or is this a typo?
Answer
That is a typo.
2
Question
Under Section 2.9 of the PWS, Key Personnel, are the minimums the total number to be staffed in the ER or the total for the contractor to provide?
Answer
This is the total for contractor to provide.
3
Question
a. What is the average timeline for background checks

b. What is the facility average timeline for credentialing?

Answer
a. Background checks can take up to 3 months since we have to submit all information to security investigation center and we have no control over the time for completion.

B. Credentialing can take 30-60 days for completion.

4
Question
What is the intent of the Letter of Commitment, what information needs to be included?
Answer
A letter of commitment is being requested to support Evaluation Factor 1 "Quality of Offered Physician," this rating for this factor would be meaningless if the offered physician had no intention of working on the contract.

The Letter of Commitment (one-year commitment) must be signed by each key personnel indicating their commitment to the Vendor, should the Vendor be awarded the contract action. The letter of commitment shall reference the RFQ number and be dated.

A sample has been uploaded. Use of this sample is optional. Vendors are free to use their own format.

5
Question
Can physicians connect w/their personal computers?

To complete notes after shift remotely

Answer
No remote access.

Personal computers are not allowed to access VA Information Systems. Notes must be completed before the end of the shift.

6
Question
Supplemental Insurance Requirements, why are Automobile Insurance

Asbestos coverage required?

Answer
This Supplemental Insurance clause is required to be used anytime the conditions for including FAR Clause 52.228-5 are met.

FAR Clause 52.228-5 is required on all fixed price contracts over the simplified acquisition threshold that will require work on a Government Installation;

so the supplemental requirements are applicable.

7
Question
Health Examinations, what is required?
Answer
Please review the PWS, the health requirements include but not limited to PPD, tuberculosis, MMR testing, proof of Varicella, acellular pertussis, influenza, hepatitis B, etc.
8
Question
Do Hospitalists do the admissions?

Is there floor call?

Answer
Yes, the hospitalists handle the admissions.

Typically, no floor calls as we have hospitalists 24/7

9
Question
Do ER Docs run or assist in floor codes?
Answer
Yes, ER physicians are code responders.
10
Question
Reviewing the info included, shifts times are noted to be following… PA = 0700-1700, PB = 0800-1800, PC = 1100-2100, PD = 1200-2200, PE = 2000-0800, PF = 2100-0700, FT = 0800-1800 and FT2 = 1000-2000… It would be helpful to know both the physician and midlevel shift times of coverage. Please confirm which is what.
Answer
Mid-levels work Mon-Fri Between 8a-8p (FT/FT2) and Sat-Sun 10a-8p (FT). Physicians work the remaining shifts.
11
Question
EMR charting system?
Answer
CPRS
12
Question
Do they provide Scribe coverage?
Answer
No
13
Question
Please confirm if Dr. Marianna Coggins is still the current ER Director? If not, can you please clarify who is?
Answer
Yes, she is still the director. But I would like to reiterate that any questions should be directed to the contracting office, not Dr. Coggins.
14
Question
Are the current positions for this requirement vacant and that is the reason why the Government is requesting letters of commitment?
Answer
The positions represent the gap between what is needed to staff the ED and current VA staff.

A letter of commitment is being requested to support Evaluation Factor 1 "Quality of Offered Physician," this rating for this factor would be meaningless if the offered physician had no intention of working on the contract.

15
Question
Can the Government provide a copy of the letter of commitment that is seeking for contractors to provide?
Answer
Sample attached.
16
Question
Will the Government consider a one-week extension on this effort?
Answer
No.