36C26119B0031-002.pdf
PDF 14 MB Posted
- Attached to
- 640-16-114 Replace Building 100 & 101 Flooring Repair Federal contract opportunity
- Solicitation number
- 36C26119B0031
About this file
This notice provides information regarding an upcoming solicitation for flooring repair and replacement services at two Department of Veterans Affairs buildings in Palo Alto, California. The solicitation will seek bids to furnish all labor, materials, equipment, and supervision to repair and replace flooring on four floors of Buildings 100 and 101 at the VA Palo Alto Health Care System campus. The period of performance is expected to be 480 days after notice to proceed. The magnitude of construction is estimated between $2 million and $5 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and issued on or around May 24, 2019 through the Federal Business Opportunities website. Bids will be due 30 days after issuance unless an extension is provided through amendment.
36C26119B0031 20181220 Package 1_Part1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26119C0122-000.docx | DOCX document | |
| 36C26119B0031-0005000.docx | DOCX document | |
| 36C26119B0031-0004001.pdf | ||
| 36C26119B0031-0004000.docx | DOCX document | |
| 36C26119B0031-0003001.pdf | ||
| 36C26119B0031-0003000.docx | DOCX document | |
| 36C26119B0031-0002000.docx | DOCX document | |
| 36C26119B0031-0001000.docx | DOCX document | |
| 36C26119B0031-007.docx | DOCX document | |
| 36C26119B0031-010.docx | DOCX document | |
| 36C26119B0031-004.pdf | ||
| 36C26119B0031-003.pdf | ||
| 36C26119B0031-006.pdf | ||
| 36C26119B0031-008.docx | DOCX document | |
| 36C26119B0031-005.doc | DOC document | |
| 36C26119B0031-009.docx | DOCX document | |
| 36C26119B0031-001.docx | DOCX document | |
| 36C26119B0031-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE BUILDING 100/101 FLOORING REPAIR
VA PALO ALTO HEALTH CARE SYSTEM
3801 Miranda Avenue, Palo Alto, CA
DVA Project Number: 640-16-114 MEI Project Number: 227
PACKAGE #1: B100 / B101 FLOORING AND TOILET ROOMS
CONSTRUCTION DOCUMENTS 100% SUBMITTAL
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
COVER SHEET
G0-1
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMMMC
100% SUBMITTAL
AS2-1 DRAWING NUMBER
DISCIPLINE PREFIX
GROUP NUMBER
A
(E) COLUMN LINE W/
COLUMN DESIGNATIONS
DOOR SYMBOL
DOOR MARK
HARDWARE GROUP
WINDOW TYPE1i
AS9-1
AS5-1
AS3-1
DETAIL
DETAIL IDENTIFICATION
SHEET WHERE DETAIL IS SHOWN
INTERIOR ELEVATION(S)
ELEVATION IDENTIFICATION
(UNFOLD ELEVATIONS CLOCKWISE)
SHEET WHERE ELEVATION IS SHOWN
SECTION
SECTION IDENTIFICATION
SHEET WHERE SECTION IS SHOWN
REVISION
CLOUD AROUND REVISION
OPTIONAL
ROOM NAME
ROOM IDENTIFICATION, TYPE 1
3RD NO.-CEILING
2ND NO.-WALLS / WAINSCOT
ROOM MATERIAL CODES
ROOM NUMBER
1ST NO.-FLOOR / BASE
ROOM NAME
ROOM IDENTIFICATION, TYPE 2
ROOM NUMBER
TYPICAL FURRING OR
PARTITION TYPE, SEE DWG. AS9-
1A1i
SOUND TREATED PARTITION
W/ ACOUSTICAL INSULATION
EXISTING WALL / PARTITION /
FURRING TO REMAIN
EXISTING ONE-HOUR FIRE
RESISTIVE COMPARTMENT
SEPARATION WALL /
PARTITION TO REMAIN
DIMENSION LINES
. CENTERLINE OF COLUMN
OR STUD
FACE OF FINISH F.O.F.
CENTERLINE OF OPENING
CENTERLINE OF OPENING
AREAS WHERE NO WORK
TO BE DONE
EXISTING DOOR TO
REMAIN
EXISTING WALL OR
PARTITION TO BE REMOVED
DOOR TO BE REMOVED
INTERIOR WINDOW
REGISTER, EXHAUST OR
RETURN
SUPPLY DIFFUSER
RECESSED MOUNTED
LIGHTING FIXTURE
RECESSED MOUNTED
LIGHTING FIXTURE
EXIT SIGN
ROOM NAME
ROOM IDENTIFICATION, TYPE 3
ROOM NUMBER
+ 9' - 0" CEILING HEIGHT, A.F.F.
EXISTING TWO-HOUR FIRE
RESISTIVE COMPARTMENT
SEPARATION WALL /
PARTITION TO REMAIN
EXISTING WALL / PARTITION /
FURRING TO REMAIN, CUT
AND REMOVE (E) FINISH AS
REQUIRED FOR NEW
CONSTRUCTION, (E) STUDS
TO REMAIN
ACCESS PANEL11
A.1
1.1
(N) COLUMN LINE W/
COLUMN DESIGNATIONS
SYMBOLS U.O.N.
ROOM NAME
A1 1
ROOM NAME
ROOM NAME
RECESSED MOUNTED
LINEAR LIGHTING FIXTURE
CONCRETE
EARTH
GYPSUM BOARD
BATT INSULATION
RIGID INSULATION
MEDIUM DENSITY FIBERBOARD
ALUMINUM
STUCCO
PLYWOOD
WOOD
PLASTER
STEEL
MATERIALS U.O.N. ABBREVIATIONS
TYP.
THRES.
S.
RM.
R.H.
REINF.
REQ.
REF.
STD.
SIM.
SHR.
THK.
T.B.
T.C.
TEL.
STOR.
STRL.
STL.
N.I.C.
NO. or #
N.T.S.
N.R.
OPNG.
OPP.
O.F.C.I
O.A.
O.C.
PLYWD.
PT.
PL.
QTY.
PTN.
VERT.
V.I.F.
W.C.
WD.
W/O
W.
W/
WP.
N.
U.O.N.
CEM.
DWG.
CONC.
CONT.
CORR.
CPT.
CTSK.
CNTR.
CLG.
CLO.
CLR.
CER.
DET.
DIA.
DIM.
DN.
DR.
CTR.
ADJ.
A.F.F.
ARCH.
(N)
A.B.
ADD.
(E)
BLKG.
BM.
BOT.
CAB.
BD.
BLDG.
MTD.
INC.
INFO.
HGT.
INT.
JT.
INSUL.
H.C.
MIN.
MISC.
MAX.
KIT.
LAB.
or H.
EA.
EQ.
EXT.
F.A.
F.D.
FDN.
FIN.
FIXT.
EL.
FPRF.
FLUOR.
F.O.F.
F.O.S.
FL.
E.
L
ACOUST.
A.P.
BKG.
BLK.
C.G.
C.J.
COL.
CONSTR.
DISP.
E.J.
ELEC.
ELEV.
ENCL.
ENGR.
E.P.B.
EQPT.
EXP.
E.W.C.
F.E.
F.E.C.
F.H.C.
FT.
F.S.
HDWD.
H.M.
HORIZ.
HR.
I.D.
LAM.
LT.
MAT.
MECH.
MET.
MFR.
NOM.
O.D.
OFF.
O.H.
P. LAM.
PR.
P.T.D.
RAD.
REFR.
RGTR.
RESIL.
R.O.
SCHED.
SECT.
SHT.
S.C.
SPEC.
SQ.
S.ST.
SUSP.
T.P.B.
VEST.
W.O.
WT.
W.R.
M.D.F.
(RL)
C.O.
E.B.
EMER.
EXST.
HDWE.
GYP.
GA.
GALV.
G.B.
GL.
DVA
Vertical
Noted
Wood
West With
Unless Otherwise
Verify In Field
Without
Water Closet
Waterproof
Typical
Threshold
Robe Hook
Top of Curb
Reinforced Required
Room
Reference
Standard
Similar
Shower
South
Storage
Towel Bar
Telephone
Structural
Thick
Steel
Not In Contract
Not To Scale
Owner (Government or VA) Furnished, Contractor Installed
Number
On Center
Opening Opposite
Overall
Non Rated
Plywood
Partition
Quantity
Point
Plate
North
Cement
Drawing Mounted
Ceiling Closet Clear
Concrete
Continuous Corridor
Ceramic
Carpet
Countersunk
Counter
Detail Diameter Dimension
Down Door
Center
Insulation
Height
Incandescent Information
Hollow Core
Interior
Joint
Maximum
Minimum
Kitchen
Laboratory
Miscellaneous
Each
At Centerline
Existing New
Adjustable
Architectural
Board
Building
Blocking Beam
Anchor Bolt
Additional
Bottom
Cabinet
Above Finished Floor
Equal
Exterior
Elevation
Finish Fixture
Fire Alarm Floor Drain Foundation
Fluorescent Face of Finish Face of Studs Fireproof
Floor
And
East
Diameter
Angle
Acoustical
Access Panel
Backing
Block
Corner Guard Construction Joint
Column
Construction
Dispenser
Expansion Joint
Electrical Elevator
Enclosure Engineer Electrical Panelboard
Equipment
Expansion Electric Water Cooler
Fire Extinguisher Fire Extinguisher
Fire Hose Cabinet
Foot or Feet Floor Sink
Hardwood
Hollow Metal Horizontal Hour
Inside Diameter
Laminate Light
Material
Mechanical Metal Manufacturer
Nominal
Outside Diameter Office Opposite Hand
Plastic Laminate
Pair
Paper Towel
Radius
Refrigerator Register
Resilient
Rough Opening
Schedule Section
Sheet
Solid Core
Specification Square Stainless Steel
Suspended
Telephone
Vestibule
Where Occurs
Weight Water Resistant
Medium Density
Relocated Existing
U.O.N.
Pound or Number
Cased Opening
Expansion Bolt
Emergency
Existing
Hardware
Gypsum
Gauge Galvanized Grab bar Glass
Cabinet
Fiberboard
Dispenser
Panelboard
Department of Veterans Affairs
CL
1. LOCATIONS OF ALL UTILITY LINES (DUCTS, PIPES, CONDUITS, AND OTHER OVERHEAD
OBSTRUCTIONS) SHOWN ARE APPROXIMATE. VERIFY IN FIELD EXACT LOCATIONS OF EXISTING
UTILITY LINES AND FIXTURES. COORDINATE ALL SUPPORT SYSTEMS SO AS NOT TO INTERFERE
WITH EACH OTHER. PROVIDE ADDITIONAL BRACING AS NECESSARY TO COMPLETE THE
INSTALLATION AT NO INCREASE TO THE CONTRACT SUM.
2. IN ALL CONSTRUCTION AREAS, SEAL ALL EXISTING AND NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPES, ETC. AT EXISTING AND NEW FIRE RESISTIVE RATED PARTITIONS AND
FLOOR/CEILING ASSEMBLIES, WHETHER SHOWN OR NOT AT NO CHANGE TO THE CONTRACT
SUM. USE SEALANT TYPE TO MAINTAIN PROPER FIRE RESISTIVE RATING OF THE PENETRATED
ASSEMBLIES. ALL PENETRATIONS AT FIRE RESISTIVE RATED PARTITIONS OR FLOOR/CEILING
ASSEMBLIES SHALL BE IN ACCORDANCE WITH THE APPROPRIATE U.L. LISTED APPROVED
SYSTEMS.
3. IF CONTRACTOR PROPOSED ALTERNATE CONSTRUCTION DETAILS AND ARE REVIEWED BY
THE CLIENT AND ARCHITECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS AND
TIME DELAYS RESULTING FROM CONTRACTOR'S PROPOSED ALTERNATE CONSTRUCTION
DETAILS WHICH AFFECT OTHER PARTS OF THE WORK OR THE WORK OF SEPARATE
CONTRACTORS.
4. FIRE PROTECTION AT FIRE RESISTIVE RATED WALLS AND PARTITIONS:
A. NO ELECTRICAL BOXES SHALL BE LOCATED BACK TO BACK WITHIN 2'-0" MEASURED
HORIZONTALLY, ON FIRE RESISTIVE RATED PARTITION. IF LOCATED WITHIN 2'-0" EACH
ELECTRICAL BOX SHALL BE SEPARATED WITH FIRE RESISTIVE RATED GYPSUM BOARD
AROUND FIVE SIDES RECESSED INTO PARTITION ASSEMBLY.
B. ANY ELECTRICAL BOX LARGER THAN 16 SQUARE INCHES SHALL BE PROTECTED WITH
FIRE RESISTIVE RATED GYPSUM BOARD AROUND FIVE SIDES.
C. FOR ANY 100 SQUARE FEET OF FIRE RESISTIVE RATED PARTITION AREA, THE
ALLOWABLE AGGREGATED AREA FOR UTILITY BOXES SHALL NOT EXCEED 100 SQUARE
INCHES.
5. CONTRACTOR STAGING AREA WILL BE DESIGNATED DURING THE CONSTRUCTION
SOLICITATION PHASE. COORDINATE WITH COR FOR EXACT LOCATION.
GENERAL NOTES PROJECT TEAM
ARCHITECT
MEI ARCHITECTS
239 9TH STREET
SAN FRANCISCO, CA 94103
TEL: (415) 703-0328
FAX: (415) 707-6328
MECHANICAL
CAPITAL ENGINEERING
11020 SUN CENTER DRIVE, SUITE 100
RANCHO CORDOVA, CA 95670
TEL: (916) 851-3500
ELECTRICAL
F.W. ASSOCIATES, INC.
520 3RD STREET, SUITE 206
OAKLAND, CA, 94607
TEL: (510) 763-7475
FAX: (510 763-7033
SIGNAGE
SMI SIGN SYSTEM, INC.
3903 CORNELL PLACE
FREDRICK, MD 21703
TEL: (301) 468-1132
PROJECT MANAGEMENT
CONCOURSE FEDERAL GROUP
1001 CONNECTICUT AVENUE, NW SUITE 704
WASHINGTON, DC 20036
TEL: (301) 802-6262
COST ESTIMATER
CONCOURSE FEDERAL GROUP
1001 CONNECTICUT AVENUE, NW SUITE 704
WASHINGTON, DC 20036
TEL: (301) 802-6262
PROJECT DATA
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL
CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY (TIL).
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 NFPA 101 LIFE SAFETY CODE
2018 NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND
NFPA 900
2017 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
2016 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2018 INTERNATIONAL MECHANICAL CODE (IMC)
2017 NATIONAL ELECTRICAL CODE (NEC)
2018 NATIONAL STANDARD PLUMBING CODE (NSPC)
2014 UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARDS
62.1- 2016
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15 -
APPLICABLE BUILDING
CODES:
EXISTING BUILDING DATA
BUILDING 100
FIRST FLOOR: 7238 SF
SECOND FLOOR: 5,002 SF
THIRD FLOOR: 4,942 SF
FOURTH FLOOR: 5,041 SF
FULLY AUTOMATIC SPRINKLERED
PROJECT GROSS AREA:
FIRE PROTECTION:
BUILDING 101
FIRST FLOOR: 6658 SF
SECOND FLOOR: 434 SF
THIRD FLOOR: 492 SF
FOURTH FLOOR: 641 SF
FULLY AUTOMATIC SPRINKLERED
OCCUPANCY
CLASSIFICATION:
CONSTRUCTION TYPE:
FIRE PROTECTION:
NO. OF STORIES:
EXISTING BUILDING AREA:
BUILDING 100
GROUP I & B [IBC]
HEALTHCARE & BUSINESS [NFPA]
TYPE I-B [IBC]
TYPE II (222) [NFPA]
FULLY AUTOMATIC SPRINKLERED
FOUR STORIES AND ONE BASEMENT
108,200 SF
BUILDING 101
GROUP B [IBC]
BUSINESS [NFPA]
TYPE I-A [IBC]
TYPE II (111) [NFPA]
FULLY AUTOMATIC SPRINKLERED
FOUR STORIES
41,000 SF
PROJECT DESCRIPTION
THE SCOPE OF WORK FOR THIS PROJECT CONSISTS OF THE FOLLOWING:
B100 FIRST, SECOND, THIRD, AND FOURTH FLOOR PUBLIC CORRIDORS / ELEVATOR LOBBIES
REPLACE EXISTING CERAMIC FLOOR TILE WITH RESINOUS TERRAZZO FLOORING
REPLACE EXISTING CERAMIC WALL TILE WITH PHENOLIC WALL PANELING
B100 FIRST, SECOND, THIRD, AND FOURTH FLOOR TOILET ROOMS
REPLACE EXISTING WALL TILE, FLOOR TILE, TOILET PARTITION, TOILET ACCESSORIES, PLUMBING
FIXTURES, LIGHTING FIXTURES, AND FINISH CEILING IN ITS ENTIRETY
B101 FIRST FLOOR PUBLIC CORRIDORS / ELEVATOR LOBBIES
REPLACE EXISTING CERAMIC FLOOR TILE WITH RESINOUS TERRAZZO FLOORING
REPLACE EXISTING CERAMIC WALL TILE WITH PHENOLIC WALL PANELING
B100 AND B101
REPLACE EXISTING SIGNAGE WITH NEW SIGNAGE AS SHOWN ON DRAWINGS.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
PROJECT TEAM, PROJECT DATA,
ABBREVIATIONS, SYMBOLS,
MATERIALS, AND DRAWING INDEX
G0-2
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMMMC
100% SUBMITTAL
VICINITY MAP LOCATION MAPPROJECT SITE
BUILDING 100 & 101
PROJECT SITE,
BUILDING 100 & 101
GENERAL
G0-1 COVER SHEET
G0-2 PROJECT TEAM, PROJECT DATA, ABBREVIATIONS, SYMBOLS, MATERIALS, AND DRAWING INDEX
G0-3.1 FIRST FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
G0-3.2 SECOND FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
G0-3.3 THIRD FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
G0-3.4 FOURTH FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
DRAWING LIST
MECHANICAL & PLUMBING
M1-1A PLUMBING & MECHANICAL PLUMBING FIXTURE SCHEDULE
M2-1A BUILDING 100 PLUMBING & MECHANICAL FIRST FLOOR OVERALL PLAN
M2-2A BUILDING 100 PLUMBING & MECHANICAL SECOND FLOOR OVERALL PLAN
M2-3A BUILDING 100 PLUMBING & MECHANICAL THIRD FLOOR OVERALL PLAN
M2-4A BUILDING 100 PLUMBING & MECHANICAL FOURTH FLOOR OVERALL PLAN
M4-1A BUILDING 100 PLUMBING & MECHANICAL FIRST FLOOR ENLARGED PLANS
M4-2A BUILDING 100 PLUMBING & MECHANICAL SECOND FLOOR ENLARGED PLANS
M4-3A BUILDING 100 PLUMBING & MECHANICAL THIRD FLOOR ENLARGED PLANS
M4-4A BUILDING 100 PLUMBING & MECHANICAL FOURTH FLOOR ENLARGED PLANS
ELECTRICAL
ES0-1 SYMBOL LEGEND, ABBREVIATIONS, GENERAL NOTES & FIXTURE SCHEDULE
ES1-1 FIRST FLOOR AREA OF WORK OVERALL PLAN
ES1-2 SECOND FLOOR AREA OF WORK OVERALL PLAN
ES1-3 THIRD FLOOR AREA OF WORK OVERALL PLAN
ES1-4 FOURTH FLOOR AREA OF WORK OVERALL PLAN
ES2-2 BUILDING 100 SECOND FLOOR
ES2-3 BUILDING 100 THIRD FLOOR
ES2-4 BUILDING 100 FOURTH FLOOR
ES4-1A BUILDING 100 FIRST FLOOR ENLARGED FLOOR PLAN - DEMO, POWER, & LIGHTING
ES4-2A BUILDING 100 SECOND FLOOR ENLARGED FLOOR - DEMO, POWER, & LIGHTING
ES4-3A BUILDING 100 THIRD FLOOR ENLARGED FLOOR PLAN - DEMO, POWER, & LIGHTING
ES4-4A BUILDING 100 FOURTH FLOOR ENLARGED FLOOR PLAN - DEMO, POWER, & LIGHTING
ES6-1 DETAILS AND DIAGRAMS
ARCHITECTURE
AS1-1A BUILDING 100 FIRST FLOOR PLAN - DEMOLITION
AS1-1B BUILDING 101 FIRST FLOOR PLAN - DEMOLITION
AS1-2A BUILDING 100 SECOND FLOOR PLAN - DEMOLITION
AS1-3A BUILDING 100 THIRD FLOOR PLAN - DEMOLITION
AS1-4A BUILDING 100 FOURTH FLOOR PLAN - DEMOLITION
AS2-1A BUILDING 100 FIRST FLOOR PLAN
AS2-1B BUILDING 101 FIRST FLOOR PLAN
AS2-2A BUILDING 100 & 101 SECOND FLOOR PLAN
AS2-3A BUILDING 100 & 101 THIRD FLOOR PLAN
AS2-4A BUILDING 100 & 101 FOURTH FLOOR PLAN
AS4-1A BUILDING 100 FIRST FLOOR - ENLARGED DEMOLITION, FLOOR, AND REFLECTED CEILING PLANS AS4-2A BUILDING 100 SECOND FLOOR ENLARGED DEMOLITION, FLOOR, AND REFLECTED CEILING PLANS AS4-3A BUILDING 100 THIRD FLOOR ENLARGED DEMOLITION, FLOOR, AND REFLECTED CEILING PLANS AS4-4A BUILDING 100 FOURTH FLOOR ENLARGED DEMOLITION, FLOOR, AND REFLECTED CEILING PLANS AS5-1A BUILDING 100 & 101 FIRST FLOOR INTERIOR ELEVATIONS, AND TYPICAL MOUNTING HEIGHTS
AS5-1B BUILDING 100 FIRST FLOOR INTERIOR ELEVATIONS
AS5-1C BUILDING 100 FIRST FLOOR INTERIOR ELEVATIONS
AS5-2A BUILDING 100 & 101 SECOND FLOOR INTERIOR ELEVATIONS
AS5-3A BUILDING 100 & 101 THIRD FLOOR INTERIOR ELEVATIONS
AS5-4A BUILDING 100 & 101 FOURTH FLOOR INTERIOR ELEVATIONS
AS9-1 PARTITION AND INTERIOR DETAILS
AS9-1A INTERIOR DETAILS
AS9-3 CEILING DETAILS
SIGNAGE
AG-1 SIGNAGE LOCATION PLANS
AG-2 SIGNAGE SCHEDULE
AG-3 SIGNAGE DETAILS
AG-4 SIGNAGE DETAILS
UPDN
UP
DN
UP
DN
DN
DN
DN
1238910111213141516
B
D
E
F
G
H
I
J
47 6 5
L
A
M
N
O
Q
P
J.2
C
7.8
K
I.3
I.5
8.58.7
M.3
9.9
1.2.3.4.5.6.7.8.9.10.
0.30.7
J.1
B.
C.
C.5
K.
L.
M.
N.
O.
P.
AS2-4A
AS2-4A
(E) CORRIDOR
B1-C01
(E) MALE
TOILET
B1-120
(E) FEMALE
TOILET
B1-122
(E) VESTIBULE
B1-C11
(E) CORRIDOR
F1-C05
(E) CORRIDOR
B1-C22
(E)
COURTYARD
(E) CORRIDOR
B1-C24
(E) CORRIDOR
B1-C21
(E) CORRIDOR
B1-C23
(E) CORRIDOR
F1-C03
(E) CORRIDOR
F1-C02
(E) CORRIDOR
F1-C06
(E) CORRIDOR
A1-C14
(E) ELEVATOR
LOBBY
A1-C15
(E) CORRIDOR
C1-016
(E) ELEVATOR
LOBBY
C1-C17
(E) CORRIDOR
D1-C04
(E) CORRIDOR
D1-C03
(E) CORRIDOR
D1-C14
(E)
INFOMATION
B1-100
(E)
LOBBY/WAIT
B1-C10
(E) FEMALE
TOILET
C1-373
(E) MALE
TOILET
F1-123
(E) FEMALE
TOILET
F1-121
ALL GENDER
TOILET
F1-236
ALL GENDER
TOILET
F1-238
(E) MALE
TOILET
C1-371
(E) ELEVATOR
LOBBY
B1-C20
(E) ELEVATOR
LOBBY
B1-C02
(E) CORRIDOR
B1-C03
(E) CORRIDOR
A1-C01
(E) CORRIDOR
A1-C30
(E) BRIDGE
A1-C10
(E) FOOD
SERVICE
C1-204
(E) VESTIBULE
C1-202
(E) ENTRY
C1-200
(E) CORRIDOR
B1-C10
ALL GENDER
TOILET
F1-122
(E) STORAGE
A1-452
(E) AE
DECENDENT
AFFAIRS
A1-106
(E) CORRIDOR
A1-C13
(E) ER SDC
A1-130
(E) RELEASE
OF INFO
F1- 115
(E) BLOOD
DRAW ROOM
F1-120
(E) VOL
SERVICE
F1-110
(E) OFFICE 02
F1-110A
(E) OFFICE 01
F1-110B
(E) PATIENT
COFFEE ROOM
F1-100
(E) CORRIDOR
F1-C01
(E) BIOMED SAT
E1-280
(E) EDUC
OFFICE
E1-200
(E)
OUTPATIENT
PHARMACY
SERVICE
ADMIN OFFICE
E1-210
(E) CONS
E1-110
(E)
OUTPATIENT
PHARMACY
E1-100
(E) DP
E1-101
(E) IV WKRM
E1-103
(E) HAC
A1-150
(E) CORRIDOR
F1-C07
(E) CORRIDOR
E1-C21
(E) CORRIDOR
E1-C01(E) INVEST
DRUGS
E1-105
(E) VAULT / SEC
/ DISP / FLAM
E1-140(E) TEL / DATA
E1-TC4
(E) ELEC
E1-EC4
(E) OPEN IP &
OP PHARMACY
E1-120
(E) IV PREP
E1-???
(E) CH RES
D1-231
(E) CORRIDOR
D1-C12
(E) PROC 01
D1-238
(E) LAB
D1-236
(E) NS
D1-200
(E) CORRIDOR
D1-C10
(E) PATIENT
LOCKER
D1-201
(E) CORRIDOR
D1-C02
(E) TRAVEL
D1-100
(E) BMS
STORAGE
C1-363
(E) CORRIDOR
C1-C14
(E) CONSULT
ROOM
C1-115
(E) CONSULT
ROOM
C1-11
(E) PROCESS 1
C1-109
(E) MED/TMT
C1-105
(E) FEMALE
TOILET
C1-103
(E) RECEPTION
C1-100A
(E) WAIT
C1-100
(E) HAC
E1-144
(E) POISON
E1-146
(E) RETAIL
STORE
A1-110
(E) STORAGE
A1-100
(E) EUCH
A1-121
(E) CHAPL 7
A1-122
(E) CHAPLAIN
SERVICE
A1-120
(E) SACRISTY
A1-130
CHAPEL
A1-132
(E) ELEC
A1-EC1
(E) TEL / DATA
A1-TC1
(E) BMS
STORAGE
A1-229
(E) STAFF
TOILET
A1-230
(E) STORAGE
A1-231
(E) CREDIT
UNION
A1-210
(E) FOOD PREP
C1-220
(E) FOOD
SERVICE
C1-206
(E)
AUDITORIUM
B1-100
(E) KITCHEN
C1-234
(E) VESTIBULE
C1-201
(E) CORRIDOR
C1-C01
(E) COFFEE
SHOP
C1-203
(E) ADMITTING
& ELIGIBILITY
A1-100
(E) TELE / DATA
A1-TC2
(E) ELEC
A1-EC2
(E) CO-PAY
D1-110
(E) AGENT
CASHIER
D1-120
AS4-1A
CONSTRUCTION PHASING NOTES1
1. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING SCHEDULE FOR GOVERNMENT REVIEW AND
APPROVAL. CONSTRUCTION PHASING SCHEDULE SHALL INCLUDE TOTAL NUMBERS OF PROPOSED
PHASES AND APPROXIMATE DATES FOR EACH PHASE.
2. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING PLANS FOR GOVERNMENT REVIEW AND
APPROVAL. CONTRUCTION PHASING PLAN SHALL INDICATE BOUNDARIES OF EACH CONSTRUCTION
PHASE, PROPOSED CONSTRUCTION BARRIER LOCATIONS, AND ALTERNATE EGRESS ROUTE FOR
CONSTRUCTION AREAS AND EXISTING ADJACENT AREAS AFFECTED BY THE CONSTRUCTION AT EACH
CONSTRUCTION PHASE.
3. WORK IN EXISTING CORRIDORS / LOBBIES:
A. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE EXECUTED IN A MINIMUM TOTAL OF
TWENTY-FIVE (25) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN
ON DRAWINGS, CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND
BOUNDARIES FOR EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING
OFFICER'S REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR
OR AS RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST.
B. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE PERFORMED DURING BUSINESS
OFF-HOURS. COORDINATE AND VERIFY EXACT TIMING OF WORK WITH COR. CLOSE DOWN OF
THESE AREAS DURING BUSINESS HOURS WILL NOT BE PERMITTED UNLESS WRITTEN
PERMISSION IS OBTAINED FROM THE COR. ALL WORK IN THESE AREAS SHALL BE SCHEDULED
AND ARRANGED SO THAT THESE AREAS CAN BE OPEN DURING BUSINESS HOURS TO MAINTAIN
HOSPTIAL OPERATIONS AND TO ALLOW PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT,
CONTRACTOR SHALL THOROUGHLY CLEAN WORK AREAS, PROTECT WORK, AND PROVIDE
COVER BOARD OR OTHER APPROPRIATE PROTECTION AS REQUIRED AND AS REQUESTED BY
COR PRIOR TO RE-OPENING OF THESE AREAS FOR PUBLIC ACCESS.
C. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE. CONTRACTOR SHALL OBTAIN
ACCEPTANCE FROM GOVERNMENT PRIOR TO BEGINNING WORK IN THE NEXT CONSTRUCTION
PHASE.
4. WORK IN EXISTING TOILET ROOMS
A. ALL WORK IN EXISTING TOILET ROOMS SHALL BE EXECUTED IN A MINIMUM TOTAL OF SIXTEEN
(16) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN ON DRAWINGS,
CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND BOUNDARIES FOR
EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR OR AS
RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST. AT EACH CONSTRUCTION
PHASE, NO MORE THAN TWO TOILET ROOMS SHALL BE SHUT DOWN.
B. TOILET ROOMS CONSTRUCTION PHASES ARE INDEPENDENT OF CORRIDORS / LOBBIES WORK
CONSTRUCTION PHASES, TOILET ROOMS CONSTRUCTION PHASE CAN EXECUTE
CONCURRENTLY WITH CORRIDORS / LOBBIES CONSTRUCTION PHASES.
C. ALL WORK IN EXISTING TOILET ROOMS SHALL BE PERFORMED DURING BUSINESS HOURS.
D. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE, CONTRACTOR SHALL OBTAIN
CERTIFICATE FOR GOVERNMENT MOVE-IN PRIOR TO BEGINNING WORK IN THE NEXT
CONSTRUCTION PHASE.
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
FIRST FLOOR AREA OF WORK AND
CONSTRUCTION PHASING PLAN
G0-3.1
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMChecker
100% SUBMITTAL
1" = 20'-0"
4 FIRST FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
1238910111213141516
B
D
E
F
G
H
I
J
7 6 5
L
A
M
N
O
Q
P
J.2
C
K
I.3
I.5
8.58.7
M.3
9.9
1.2.3.4.5.6.7.8.9.10.
0.30.7
J.1
B.
C.
C.5
K.
L.
M.
N.
O.
P.
AS2-2A
AS4-2A
AS2-2A
(E) CORRIDOR
B2-C24
(E) ELEVATOR
LOBBY
B2-C20
(E) CORRIDOR
B2-C21
(E) CORRIDOR
B2-C22
(E) CORRIDOR
B2-C23
ALL GENDER
TOILET
C2-104
ALL GENDER
TOILET
C2-106
ALL GENDER
TOILET
F2-203
ALL GENDER
TOILET
F2-201
(E) PUBLIC
TOILET
F2-360
(E) CORRIDOR
F2-C01
(E) CORRIDOR
C2-C01
(E) CORRIDOR
E2-C30
(E) CORRIDOR
B2-C04
(E) MALE
TOILET
B2-280
(E) FEMALE
TOILET
B2-290
(E) ELEVATOR
LOBBY
B2-C01
(E) FAMILY
WAIT
A1-178
(E) SOCIAL WK
A2-100
(E) CORRIDOR
A2-C01
(E) CORRIDOR
A2-C09
(E) ELEVATOR
LOBBY
A2-C10
(E) HS
F2-202
(E) VEST
F2-204
(E) CHIEF
F2-136
(E) STF PHYS
F2-134
(E) STF PHYS
F2-132
(E) STF PHYS
F2-130
(E)
PULMONARY
F2-100
(E) CORRIDOR
E2-C30(E) HYG 1
E2-302
(E) HYG 2
E2-301
(E) CORRIDOR
E2-C20
(E) PORCELAIN
E2-360A
(E) WAIT
E2-200
(E) CHIEF
E2-100C
(E)
NEPHROLOGY
E2-100
(E) OFFICE
E2-110
(E) CORRIDOR
D2-C01
(E) AUD
STORAGE 1
D2-100
(E) PHYS /
CONS
C2-174
(E) HS
C2-170
(E) N SUPV
C2-176
(E) VIS LOUNGE
C2-100
(E) CORRIDOR
C2-C09
(E) ELEVATOR
LOBBY
C2-C10
(E) CORRIDOR
C2-C08
(E) PHYS ASST
C2-171
(E) HAC
C2-173
(E) BIOCHEM
LAB
B2-150
(E) CHEM
B2-136
(E) CORRIDOR
B2-C05
(E) CORRIDOR
B2-C01
(E) TEL / DATA
B2-TC2
(E) ELEC
B2-EC2
CONSTRUCTION PHASING NOTES1
1. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING SCHEDULE FOR GOVERNMENT REVIEW AND
APPROVAL. CONSTRUCTION PHASING SCHEDULE SHALL INCLUDE TOTAL NUMBERS OF PROPOSED
PHASES AND APPROXIMATE DATES FOR EACH PHASE.
2. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING PLANS FOR GOVERNMENT REVIEW AND
APPROVAL. CONTRUCTION PHASING PLAN SHALL INDICATE BOUNDARIES OF EACH CONSTRUCTION
PHASE, PROPOSED CONSTRUCTION BARRIER LOCATIONS, AND ALTERNATE EGRESS ROUTE FOR
CONSTRUCTION AREAS AND EXISTING ADJACENT AREAS AFFECTED BY THE CONSTRUCTION AT EACH
CONSTRUCTION PHASE.
3. WORK IN EXISTING CORRIDORS / LOBBIES:
A. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE EXECUTED IN A MINIMUM TOTAL OF
TWENTY-FIVE (25) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN
ON DRAWINGS, CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND
BOUNDARIES FOR EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING
OFFICER'S REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR
OR AS RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST.
B. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE PERFORMED DURING BUSINESS
OFF-HOURS. COORDINATE AND VERIFY EXACT TIMING OF WORK WITH COR. CLOSE DOWN OF
THESE AREAS DURING BUSINESS HOURS WILL NOT BE PERMITTED UNLESS WRITTEN
PERMISSION IS OBTAINED FROM THE COR. ALL WORK IN THESE AREAS SHALL BE SCHEDULED
AND ARRANGED SO THAT THESE AREAS CAN BE OPEN DURING BUSINESS HOURS TO MAINTAIN
HOSPTIAL OPERATIONS AND TO ALLOW PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT,
CONTRACTOR SHALL THOROUGHLY CLEAN WORK AREAS, PROTECT WORK, AND PROVIDE
COVER BOARD OR OTHER APPROPRIATE PROTECTION AS REQUIRED AND AS REQUESTED BY
COR PRIOR TO RE-OPENING OF THESE AREAS FOR PUBLIC ACCESS.
C. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE. CONTRACTOR SHALL OBTAIN
ACCEPTANCE FROM GOVERNMENT PRIOR TO BEGINNING WORK IN THE NEXT CONSTRUCTION
PHASE.
4. WORK IN EXISTING TOILET ROOMS
A. ALL WORK IN EXISTING TOILET ROOMS SHALL BE EXECUTED IN A MINIMUM TOTAL OF SIXTEEN
(16) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN ON DRAWINGS,
CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND BOUNDARIES FOR
EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR OR AS
RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST. AT EACH CONSTRUCTION
PHASE, NO MORE THAN TWO TOILET ROOMS SHALL BE SHUT DOWN.
B. TOILET ROOMS CONSTRUCTION PHASES ARE INDEPENDENT OF CORRIDORS / LOBBIES WORK
CONSTRUCTION PHASES, TOILET ROOMS CONSTRUCTION PHASE CAN EXECUTE
CONCURRENTLY WITH CORRIDORS / LOBBIES CONSTRUCTION PHASES.
C. ALL WORK IN EXISTING TOILET ROOMS SHALL BE PERFORMED DURING BUSINESS HOURS.
D. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE, CONTRACTOR SHALL OBTAIN
CERTIFICATE FOR GOVERNMENT MOVE-IN PRIOR TO BEGINNING WORK IN THE NEXT
CONSTRUCTION PHASE.
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
SECOND FLOOR AREA OF WORK AND
CONSTRUCTION PHASING PLAN
G0-3.2
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMChecker
100% SUBMITTAL 1" = 20'-0"
4 SECOND FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
DN
UPDN
UP
DN
UPDN
1238910111213141516
B
D
E
F
G
H
I
J
47 6 5
L
A
M
N
O
Q
P
J.2
C
7.8
K
I.3
I.5
8.58.7
M.3
9.9
1.2.3.4.5.6.7.8.9.10.
0.30.7
J.1
B.
C.
C.5
K.
L.
M.
N.
O.
P.
AS2-3A
AS2-3A
ALL GENDER
TOILET
F3-243
ALL GENDER
TOILET
F3-241
(E) CORRIDOR
B3-C21
(E) ELEVATOR
LOBBY
B3-C20
(E) CORRIDOR
B3-C24
(E) CORRIDOR
B3-C23
(E) CORRIDOR
B3-C22
ALL GENDER
TOILET
C3-104
ALL GENDER
TOILET
C3-106
(E) CORRIDOR
C3-C01
(E) CORRIDOR
F3-C01
(E) ELEVATOR
LOBBY
B3-C01
(E) CORRIDOR
B3-C07
(E) MALE
TOILET
B3-280
(E) FEMALE
TOILET
B3-290
(E) ELEVATOR
LOBBY
A3-C10
(E) HS
F3-242
(E) CONS /
MEDIT
F3-240
(E) CORRIDOR
A3-C09
(E) CHIEF
F3-235
(E) THER
F3-236
(E) CORRIDOR
F3-C20
(E) CORRIDOR
F3-C21
(E) CORRIDOR
B3-C30
(E) CORRIDOR
C3-C09
(E) ELEVATOR
LOBBY
C3-C10
(E) SOCIAL WK
C3-177
(E) PHYS ASST
C3-174
(E) SUPV MAS
C3-176
(E) VIS LNG
C3-100
(E) N SUPV
C3-172
(E) STR W/C
C3-170
(E) CORRIDOR
C3-C08
(E) HEAD
NURSE
C3-108
(E) CONF
B3-136
(E) CORRIDOR
B3-C05
(E) HAC
C3-173
(E) DIET
C3-171
(E) CORRIDOR
B3-C01
(E)
ELECTRICAL
B3-EC2
(E) TEL / DATA
B3-TC2
(E) CORRIDOR
A3-C01
(E) SOCIAL WK
A3-100
(E) FAM WAIT
A3-176
(E) OPERATION
RECOVERY
ROOM RECP
F3-100
E3-105
(E) BIO ENG
E3-110
F3-104
(E) SURGERY
WAITING ROOM
F3-108
F3-102
CONSTRUCTION PHASING NOTES1
1. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING SCHEDULE FOR GOVERNMENT REVIEW AND
APPROVAL. CONSTRUCTION PHASING SCHEDULE SHALL INCLUDE TOTAL NUMBERS OF PROPOSED
PHASES AND APPROXIMATE DATES FOR EACH PHASE.
2. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING PLANS FOR GOVERNMENT REVIEW AND
APPROVAL. CONTRUCTION PHASING PLAN SHALL INDICATE BOUNDARIES OF EACH CONSTRUCTION
PHASE, PROPOSED CONSTRUCTION BARRIER LOCATIONS, AND ALTERNATE EGRESS ROUTE FOR
CONSTRUCTION AREAS AND EXISTING ADJACENT AREAS AFFECTED BY THE CONSTRUCTION AT EACH
CONSTRUCTION PHASE.
3. WORK IN EXISTING CORRIDORS / LOBBIES:
A. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE EXECUTED IN A MINIMUM TOTAL OF
TWENTY-FIVE (25) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN
ON DRAWINGS, CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND
BOUNDARIES FOR EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING
OFFICER'S REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR
OR AS RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST.
B. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE PERFORMED DURING BUSINESS
OFF-HOURS. COORDINATE AND VERIFY EXACT TIMING OF WORK WITH COR. CLOSE DOWN OF
THESE AREAS DURING BUSINESS HOURS WILL NOT BE PERMITTED UNLESS WRITTEN
PERMISSION IS OBTAINED FROM THE COR. ALL WORK IN THESE AREAS SHALL BE SCHEDULED
AND ARRANGED SO THAT THESE AREAS CAN BE OPEN DURING BUSINESS HOURS TO MAINTAIN
HOSPTIAL OPERATIONS AND TO ALLOW PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT,
CONTRACTOR SHALL THOROUGHLY CLEAN WORK AREAS, PROTECT WORK, AND PROVIDE
COVER BOARD OR OTHER APPROPRIATE PROTECTION AS REQUIRED AND AS REQUESTED BY
COR PRIOR TO RE-OPENING OF THESE AREAS FOR PUBLIC ACCESS.
C. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE. CONTRACTOR SHALL OBTAIN
ACCEPTANCE FROM GOVERNMENT PRIOR TO BEGINNING WORK IN THE NEXT CONSTRUCTION
PHASE.
4. WORK IN EXISTING TOILET ROOMS
A. ALL WORK IN EXISTING TOILET ROOMS SHALL BE EXECUTED IN A MINIMUM TOTAL OF SIXTEEN
(16) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN ON DRAWINGS,
CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND BOUNDARIES FOR
EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR OR AS
RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST. AT EACH CONSTRUCTION
PHASE, NO MORE THAN TWO TOILET ROOMS SHALL BE SHUT DOWN.
B. TOILET ROOMS CONSTRUCTION PHASES ARE INDEPENDENT OF CORRIDORS / LOBBIES WORK
CONSTRUCTION PHASES, TOILET ROOMS CONSTRUCTION PHASE CAN EXECUTE
CONCURRENTLY WITH CORRIDORS / LOBBIES CONSTRUCTION PHASES.
C. ALL WORK IN EXISTING TOILET ROOMS SHALL BE PERFORMED DURING BUSINESS HOURS.
D. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE, CONTRACTOR SHALL OBTAIN
CERTIFICATE FOR GOVERNMENT MOVE-IN PRIOR TO BEGINNING WORK IN THE NEXT
CONSTRUCTION PHASE.
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
THIRD FLOOR AREA OF WORK AND
CONSTRUCTION PHASING PLAN
G0-3.3
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMChecker
4 THIRD FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
DN
DN
DN
DN
UP
DN
DN
DN
DN
DN
DNDN
1238910111213141516
B
D
E
F
G
H
I
J
47 6 5
L
A
M
N
O
Q
P
J.2
C
7.8
K
I.3
I.5
8.58.7
M.3
9.9
1.2.3.4.5.6.7.8.9.10.
0.30.7
J.1
B.
C.
C.5
K.
L.
M.
N.
O.
P.
AS2-4A
AS2-4A
AS4-4A
(E) CORRIDOR
B4-C24
(E) ELEVATOR
LOBBY
B4-C20
(E) CORRIDOR
B4-C21
(E) CORRIDOR
B4-C23
(E) CORRIDOR
B4-C22
ALL GENDER
TOILET
F4-133
ALL GENDER
TOILET
F4-131
ALL GENDER
TOILET
C4-104
ALL GENDER
TOILET
C4-106
(E) STAFF
TOILET
F4-101
(E) STAFF
TOILET
F4-102
(E) CORRIDOR
F4-C01
(E) CORRIDOR
C4-C01
(E) CORRIDOR
C4-C17
(E) MALE
TOILET
B4-280
(E) FEMALE
TOILET
B4-290
(E) CORRIDOR
B4-C07
(E) ELEVATOR
LOBBY
B4-C01
(E) CORRIDOR
A4-C09
(E) ELEVATOR
LOBBY
A4-C10
(E) SOCIAL WK
A4-176
(E) HEAD
NURSE
A4-174
(E) HS
A4-100
(E) CORRIDOR
A4-C01
(E) TEL / DATA
B4-TC2
(E) ELEC
B4-EC2
(E) CORRIDOR
A4-C02
(E) CONF
B4-100
(E) CORRIDOR
C4-C09
(E) SPD
C4-175
(E) ELEVATOR
LOBBY
C4-C10
(E) HAC
C4-173
(E) BMS
STORAGE
C4-171
(E) CORRIDOR
D4-C01
(E) LAB
E4-216
(E) LAB
E4-218
(E) LAB
E4-220
(E) LAB
E4-222
(E) HAC
E4-300
(E) HEMA
F4-110
(E) MADP
CONTROL
F4-130A
(E) ACCS PROC
& DIST
F4-130
(E) BB TRANS
SERV
F4-140
(E) VEST
F4-200
(E) CORRIDOR
F4-C20
(E) REFR
F4-120A
(E) BULK
STORAGE
F4-120
(E) ADP CRTS
F4-122
(E) URIN
F4-168
(E) CLIN CHEM
F4-164
(E) DAYROOM
C4-170
(E) KITCHEN
C4-100
(E) PT/OT
OFFICE
B4-170
(E) EXTENDED
CARE ADMIN
B4-C03
CONSTRUCTION PHASING NOTES1
1. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING SCHEDULE FOR GOVERNMENT REVIEW AND
APPROVAL. CONSTRUCTION PHASING SCHEDULE SHALL INCLUDE TOTAL NUMBERS OF PROPOSED
PHASES AND APPROXIMATE DATES FOR EACH PHASE.
2. CONTRACTOR SHALL SUBMIT CONSTRUCTION PHASING PLANS FOR GOVERNMENT REVIEW AND
APPROVAL. CONTRUCTION PHASING PLAN SHALL INDICATE BOUNDARIES OF EACH CONSTRUCTION
PHASE, PROPOSED CONSTRUCTION BARRIER LOCATIONS, AND ALTERNATE EGRESS ROUTE FOR
CONSTRUCTION AREAS AND EXISTING ADJACENT AREAS AFFECTED BY THE CONSTRUCTION AT EACH
CONSTRUCTION PHASE.
3. WORK IN EXISTING CORRIDORS / LOBBIES:
A. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE EXECUTED IN A MINIMUM TOTAL OF
TWENTY-FIVE (25) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN
ON DRAWINGS, CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND
BOUNDARIES FOR EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING
OFFICER'S REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR
OR AS RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST.
B. ALL WORK IN EXISITNG CORRIDORS AND LOBBIES SHALL BE PERFORMED DURING BUSINESS
OFF-HOURS. COORDINATE AND VERIFY EXACT TIMING OF WORK WITH COR. CLOSE DOWN OF
THESE AREAS DURING BUSINESS HOURS WILL NOT BE PERMITTED UNLESS WRITTEN
PERMISSION IS OBTAINED FROM THE COR. ALL WORK IN THESE AREAS SHALL BE SCHEDULED
AND ARRANGED SO THAT THESE AREAS CAN BE OPEN DURING BUSINESS HOURS TO MAINTAIN
HOSPTIAL OPERATIONS AND TO ALLOW PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT,
CONTRACTOR SHALL THOROUGHLY CLEAN WORK AREAS, PROTECT WORK, AND PROVIDE
COVER BOARD OR OTHER APPROPRIATE PROTECTION AS REQUIRED AND AS REQUESTED BY
COR PRIOR TO RE-OPENING OF THESE AREAS FOR PUBLIC ACCESS.
C. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE. CONTRACTOR SHALL OBTAIN
ACCEPTANCE FROM GOVERNMENT PRIOR TO BEGINNING WORK IN THE NEXT CONSTRUCTION
PHASE.
4. WORK IN EXISTING TOILET ROOMS
A. ALL WORK IN EXISTING TOILET ROOMS SHALL BE EXECUTED IN A MINIMUM TOTAL OF SIXTEEN
(16) CONSTRUCTION PHASES. CONSTRUCTION PHASES AREAS ARE NOT SHOWN ON DRAWINGS,
CONTRACTOR SHALL COORDINATE EXACT NUMBER OF PHASES, AREAS AND BOUNDARIES FOR
EACH PHASE, AND SEQUENCES OF PHASES IN FIELD WITH CONTRACTING OFFICER'S
REPRESENTATIVE (COR). ADDITIONAL CONSTRUCTION PHASES AS REQUIRED BY COR OR AS
RESULT OF FIELD CONDITION SHALL NOT INCREASE CONTRACT COST. AT EACH CONSTRUCTION
PHASE, NO MORE THAN TWO TOILET ROOMS SHALL BE SHUT DOWN.
B. TOILET ROOMS CONSTRUCTION PHASES ARE INDEPENDENT OF CORRIDORS / LOBBIES WORK
CONSTRUCTION PHASES, TOILET ROOMS CONSTRUCTION PHASE CAN EXECUTE
CONCURRENTLY WITH CORRIDORS / LOBBIES CONSTRUCTION PHASES.
C. ALL WORK IN EXISTING TOILET ROOMS SHALL BE PERFORMED DURING BUSINESS HOURS.
D. COMPLETE DEMOLITION AND CONSTRUCTION FOR EACH PHASE, CONTRACTOR SHALL OBTAIN
CERTIFICATE FOR GOVERNMENT MOVE-IN PRIOR TO BEGINNING WORK IN THE NEXT
CONSTRUCTION PHASE.
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
FOURTH FLOOR AREA OF WORK AND
CONSTRUCTION PHASING PLAN
G0-3.4
100 / 101
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMChecker
4 FOURTH FLOOR AREA OF WORK AND CONSTRUCTION PHASING PLAN
DN
UP
DN
DN
8910111213
141516
E
F
G
H
I
J
7 6
J.2
7.8
K
I.3
I.5
8.59.9
(E) CORRIDOR
B1-C22
(E) CORRIDOR
B1-C24
(E) CORRIDOR
B1-C21
(E) CORRIDOR
B1-C23
(E) CORRIDOR
F1-C02
(E) CORRIDOR
F1-C05
(E) CORRIDOR
F1-C06
(E) CORRIDOR
A1-C14
(E) ELEVATOR
LOBBY
A1-C15
(E) CORRIDOR
C1-016
(E) ELEVATOR
LOBBY
C1-C17
(E) CORRIDOR
D1-C04
(E) CORRIDOR
D1-C03(E) CORRIDOR
D1-C14
(E) INFOMATION
B1-100
(E) LOBBY/WAIT
B1-C10
(E) FEMALE
TOILET
C1-373
(E) CORRIDOR
F1-C03
(E) MALE TOILET
F1-123
(E) FEMALE
TOILET
F1-121
ALL GENDER
TOILET
F1-236
ALL GENDER
TOILET
F1-238
(E) MALE TOILET
C1-371
(E) ELEVATOR
LOBBY
B1-C20
ALL GENDER
TOILET
F1-122
AS4-1A
AS4-1A
AS4-1A
AS4-1A
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE, TYP.
D1-C02
(E) CORRIDOR
D1-100
(E) TRAVEL
D1-201
(E) PATIENT
LOCKER
D1-C10
(E) CORRIDOR
D1-200
(E) NS
D1-236
(E) LAB
D1-238
(E) PROC 01
D1-C12
(E) CORRIDOR
D1-231
(E) CH RES
E1-120
(E) OPEN IP &
OP PHARMACY
E1-???
(E) IV PREP
E1-EC4
(E) ELEC
E1-TC4
(E) TEL / DATA
E1-140
(E) VAULT / SEC
/ DISP / FLAM
E1-105
(E) INVEST
DRUGS
E1-103
(E) IV WKRM
E1-C01
(E) CORRIDOR
E1-101
(E) DP
E1-100
(E) OUTPATIENT
PHARMACY
E1-110
(E) CONS
E1-210
(E) OUTPATIENT
PHARMACY
SERVICE ADMIN
OFFICE
E1-200
(E) EDUC
OFFICE
F1-C01
(E) CORRIDOR
F1-100
(E) PATIENT
COFFEE ROOM
F1-110
(E) VOL
SERVICE
F1-120
(E) BLOOD
DRAW ROOM
F1- 115
(E) RELEASE OF
INFO
C1-115
(E) CONSULT
ROOM
C1-11
(E) CONSULT
ROOM
C1-109
(E) PROCESS 1
C1-105
(E) MED/TMT C1-103
(E) FEMALE
TOILET
C1-100
(E) WAIT
C1-117
(E) EXAM 29
C1-119
(E) EXAM 28
C1-C14
(E) CORRIDOR
C1-129
(E) EXAM 27
C1-363
(E) BMS
STORAGE
D1-110
(E) CO-PAY
D1-120
(E) AGENT
CASHIER
D1-C01
(E) VESTIBULE
D1-207
(E)
PHOTOGRAPHY
C1-C07
(E) STAFF
TOILET
D1-205
(E) TUB 1
(E) TERRAZZO
FLOORING AND
BASE TO
REMAIN, TYP.
REMOVE (E)
PORCELAIN TILE
BASE AT
COLUMN
FURRING, TYP.
(E) HANDRAILS
TO REMAIN, TYP.
(E) WOOD
PANELING TO
REMAIN, TYP.
REMOVE (E) CERAMIC TILE
WAINSCOT, CUT AND
REMOVE (E) GYP. BD. AS
REQUIRED FOR NEW
CONSTRUCTION, TYP.
REMOVE (E)
PORCELAIN TILE BASE
AT ALL (E) COLUMNS
IN LOBBY, TYP.
REMOVE (E
) C
ERAMIC
W
ALL
TILE
FIN
ISH, C
UT A
ND R
EMOVE (E
GYP. B
D. A
S R
EQUIR
ED FOR N
EW
CONSTRUCTIO
N
REMOVE (E)
PORCELAIN TILE
BASE AT WINDOW
SILL, TYP.
(E) CRASH RAILS TO
REMAIN, TYP.
(E) CRASH RAILS
TO REMAIN, TYP.
REMOVE (E)
PORCELAIN TILE
BASE AT COLUMN
FURRING, TYP.
(E) HANDRAILS TO
REMAIN, TYP.
REMOVE (E) CERAMIC WALL TILE,
STAINLESS STEEL CORNER, AND
SIGNAGE PANEL, TYP.
REMOVE (E)
WALL
MOUNTED
SIGNAGE
REMOVE (E)
WALL
MOUNTED
SIGNAGE
REMOVE (E)
CERAMIC WALL
TILE, STAINLESS
STEEL CORNER,
AND SIGNAGE
PANEL, TYP.
REMOVE (E
CERAMIC
FLO
OR TILE
S, TYP.
REMOVE (E)
CORNER GUARD
COVER, (E)
CORNER GUARD
RETAINER TO
REMAIN, TYP.
REMOVE (E)
RESILIENT FLOORING
(E) HANDRAILS TO
REMAIN, TYP.
REMOVE (E) CORNER
GUARD COVER, (E)
CORNER GUARD RETAINER
TO REMAIN, TYP.
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE, TYP.
REMOVE (E) CORNER GUARD
COVERS, (E) CORNER GUARD
RETAINER TO REMAIN, TYP.
REMOVE (E) CERAMIC
WALL TILE,
STAINLESS STEEL
CORNER, AND
SIGNAGE PANEL, TYP.
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE, TYP.
REMOVE (E)
PORCELAIN
TILE FLOORING
AND BASE, TYP.
REMOVE (E)
PORCELAIN
TILE FLOORING
AND BASE, TYP.
REMOVE (E)
WALK-OFF
MAT SYSTEM
DEMOLITION NOTES1
1. DO NOT PROCEED WITH DEMOLITION WORK PRIOR TO THE INSTALLATION OF TEMPORARY CONSTRUCTION PARTITION.
PROVIDE ACCESS DOORS AT TEMPORARY CONSTRUCTION PARTITION AS REQUIRED FOR ACCESS INTO THE CONSTRUCTION AREA. ACCESS DOORS ARE NOT SHOWN ON PLAN. RELOCATE TEMPORARY CONSTRUCTION PARTITION AS NECESSARY FOR CONSTRUCTION WORK AND AS DIRECTED BY COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. PROVIDE TEMPORARY CONSTRUCTION PARTITION IN EXISTING OCCUPIED AREAS AS REQUIRED AND AS DIRECTED BY COR.
TEMPORARY CONSTRUCTION IN EXISTING OCCUPIED AREAS ARE NOT SHOWN. COORDINATE EXACT LOCATION WITH COR.
3. VERYIFY EXTENT OF DEMOLITION PRIOR TO BEGINNING DEMOLITION WORK.
4. CONTRACTOR SHALL PROTECT ALL EXISTING COMPONENTS OF EXTERIOR GLAZING SYSTEM. OTHER EXISTING CONSTRUCTION AND EXISTING LIFE/SAFETY CONSTRUCTION NOT INCLUDED IN THIS CONTRACT. IF THERE IS ANY DAMAGE TO EXISTING GLAZING SYSTEM, OTHER EXISTING CONSTRUCTION AND EXISTING LIFE/SAFETY CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND RESTORATION OF SUCH CONSTRUCTION TO THE ORIGINAL
CONSTRUCTION AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. COMPLETE DEMOLITION OF EXISTING FLOORING IN ALL TOILET ROOMS, CORRIDORS, ELEVATOR LOBBIES, AND AREAS AS SHOWN, UNLESS OTHERWISE NOTED. ALL FLOORING MATERIALS ARE TO BE REMOVED TO TOP OF EXISTING SLAB. TOP OF EXISTING SLAB SHALL BE LEFT SMOOTH, CLEAN AND FREE OF ALL ADHESIVE AND READY FOR INSTALLATION OF NEW
FLOORING.
6. COMPLETE DEMOLITION OF EXISTING CEILING AND SOFFIT IN ALL TOILET ROOMS AND AREAS AS SHOWN, UNLESS OTHERWISE NOTED. ALL CEILING MATERIALS, SUPPORTS AND BRACINGS, ACCESSORIES, AND FIXTURES ARE TO BE
DEMOLISHED.
7. REMOVE EXISITNG FINISHES, FURRINGS, PARTITIONS, CASEWORK, EQUIPMENT, AND ETC. WHERE SHOWN DASHED.
EXISTING FURRING AROUND COLUMNS SHALL REMAIN UNLESS OTHERWISE NOTED OR SHOWN.
8. AT EXISTING WALL OR COLUMN FINISHES TO REMAIN, CUT AND REMOVE EXISTING FINISH AS REQUIRED FOR NEW CONSTRUCTION, PATCH FINISH TO MATCH EXISTING IN CONSTRUCTION, MATERIAL, AND FINISH, UNLESS OTHERWISE
NOTED OR SHOWN.
9. ALL WORK IN (E) CORRIDORS, WORK IN OCCUPIED SPACE, REMOVAL OF DEMOLITION AND CONSTRUCTION DEBRIS, AND WORK THAT INDUCES LOUD NOISE, INCLUDING BUT NOT LIMITED TO CORING, DRILLING, FRAMING FASTENING, ETC. TO BE
PERFORMED DURING BUSINESS OFF-HOURS. COORDINATE EXACT TIMING WITH COR.
10. PATCH TO MATCH EXISTING FLOORS, CEILINGS, WALL, PARTITIONS, AND OTHER ITEMS THAT ARE DAMAGED RESULTING FROM DEMOLITION WORK AND NEW CONSTRUCTION WORK. PATCHWORK SHALL MATCH EXISTING ADJACENT IN TYPE, CONSTRUCTION, MATERIAL, FIRE-RESISTIVE RATING, AND FINISH.
11. PROVIDE SUPPORTS AND BRACES AS REQUIRED, FOR EXISTING STRUCTURE, UTILITIES, PIPES, DUCTS, CONDUITS, AND ETC., DURING DEMOLITION AND NEW CONSTRUCTION WORK WHERE EXISTING SUPPORTS ARE REMOVED DUE TO WORK
UNDER THIS CONTRACT. NEW SUPPORTS SHALL MEET CURRENT CODE REQUIREMENTS.
12. VA TO REMOVE ALL SIGNAGES, ARTWORK, PAINTINGS, AND ETC. ON SURFACE TO BE DEMOLISHED OR MODIFIED.
CONTRACTOR TO COORDINATE WITH VA PRIOR TO THE BEGINNING OF WORK.
13. CONTRACTOR SHALL PROTECT ALL EXISTING ARTWORK, PAINTING, ETC. ON EXISTING PARTITIONS, SOFFIT, AND CEILING TO REMAIN. IF THERE IS ANY DAMAGE TO EXISTING ARTWORK, PAINTING, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR, RESTORATION, AND REPLACEMENT OF SUCH ARTWORK OR PAINTING AT NO ADDITIONAL COST TO THE
GOVERNMENT.
14. FOR DEMOLITION OF UTILITY SYSTEMS AND FIXTURES, REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND
ELECTRICAL DRAWINGS.
15. WHERE EXISTING CONSTRUCTION, IMPROVEMENTS, FINISHES, AND / OR BUILDING SYSTEMS ARE DAMAGED OR REMOVED AS A RESULT OF THE NEW WORK, PATCH EXISTING TO MATCH EXISTING ADJACENT IN TYPE, CONSTRUCTION, MATERIAL, FIRE-RESISTIVE RATING, AND FINISH.
16. REMOVE (E) DOOR STOP AS REQUIRED FOR NEW CONSTRUCTION, SALVAGE, AND RE-INSTALL AT THE SAME LOCATION.
17. AT TOILET ROOMS WITH (E) DOOR OPERATOR, CONTRACTOR TO DE-ACTIVATE AND REMOVE DOOR OPERATOR BUTTON AS
REQUIRED FOR NEW CONSTRUCTION, SALVAGE, AND RE-INSTALL AT THE SAME LOCATION.
18. REMOVE (E) CORNER GUARD COVERS, (E) CORNER GUARD RETAINERS TO REMAIN, TYPICAL, UNLESS OTHERWISE NOTED.
NOT ALL (E) CORNER GUARDS ARE SHOWN ON DRAWINGS, CONTRACTOR SHALL VERIFY EXACT NUMBERS IN FIELD.
19. REMOVE AND RELOCATE EXISTING FLOOR OR WALL MOUNTED EQUIPMENT AS REQUIRED FOR NEW CONSTRUCTION. NOT ALL EQUIPMENT ARE SHOWN, CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT IN FIELD. COORIDINATE WITH COR FOR LOCATION OF TEMPORARY RELOCATED EXISTING EQUIPMENT. AT COMPLETION OF CONSTRUCTION, RE-INSTALL
EXISTING EQUIPMENT AT THE SAME LOCATION.
LEGEND
AREAS WHERE NO
WORK TO BE DONE
(E) PORCELAIN FLOOR
TILE AND BASE TILE TO
BE REMOVED
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
BUILDING 100 FIRST FLOOR PLAN -
DEMOLITION
AS1-1A
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMMMC
100% SUBMITTAL 1/8" = 1'-0"
4 BUILDING 100 FIRST FLOOR DEMOLITION PLAN
171.2.3.4.5.6.7.8.9.10.
0.30.7
J.1
B.
C.
C.5
K.
L.
M.
N.
(E) CORRIDOR
B1-C01
(E) MALE TOILET
B1-120
(E) FEMALE
TOILET
B1-122
(E) VESTIBULE
B1-C11
(E) ELEVATOR
LOBBY
B1-C02
(E) CORRIDOR
B1-C03
(E) CORRIDOR
A1-C01
(E) CORRIDOR
A1-C30
(E) BRIDGE
A1-C10
(E) FOOD
SERVICE
C1-204
(E) VESTIBULE
C1-202
(E) ENTRY
C1-200
(E) CORRIDOR
B1-C10
REMOVE (E) CERAMIC TILE
FINISH, CUT AND REMOVE
(E) GYP. BD. AS REQUIRED
FOR NEW CONSTRUCTION,
TYP.
C1-206
(E) FOOD
SERVICE
C1-220
(E) FOOD PREP
A1-EC1
(E) ELEC
A1-TC1
(E) TEL / DATA
C1-201
(E) VESTIBULE
A1-210
(E) CREDIT
UNION
A1-110
(E) RETAIL
STORE
A1-100
(E) STORAGE
A1-121
(E) EUCH
A1-120
(E) CHAPLAIN
SERVICE
A1-122
(E) CHAPL 7
A1-130
(E) SACRISTY
A1-132
CHAPEL
B1-100
(E) AUDITORIUM
C1-234
(E) KITCHEN
C1-203
(E) COFFEE
SHOP
C1-C01
(E) CORRIDOR
(E) WOOD WALL PANELING
TO REMAIN, TYP.
REMOVE (E
) C
ERAMIC
W
IS
H, C
UT A
ND
REMOVE (E
) G
YP. B
D. A
S
REQUIR
ED FOR N
(E) TERRAZZI
FLOORING
AND BASE TO
REMAIN, TYP.
(E)
HANDRAILS
TO REMAIN,
TYP.
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE TYP.
(E) HANDRAILS
TO REMAIN, TYP.
REMOVE (E)
PORCELAIN
TILE FLOORING
AND BASE TYP.
REMOVE (E)
PORCELAIN
TILE FLOORING
AND BASE TYP.
(E) HANDRAILS TO
REMAIN, TYP.
REMOVE (E)
PORCELAIN
TILE BASE AT
COLUMN
FURRING, TYP.
REMOVE (E)
PORCELAIN
FLOORING AND
BASE, TYP.
REMOVE (E) FLOOR
EXPANSION JOINT
COVER
REMOVE (E)
FLOOR MOUNTED
WAYFINDNG
MONUMENTAL
SIGN
REMOVE (E) CORNER GUARD
COVERS, (E) CORNER GUARD
RETAINER TO REMAIN, TYP.
(E) CRASH
RAILS TO
REMAIN, TYP.
REMOVE (E) WALK-OFF
MAT SYSTEM
NOTES19
1. REFER TO SHEET AS1-1A FOR NOTES UNLESS OTHERWISE NOTED.
LEGEND
AREAS WHERE NO
WORK TO BE DONE
(E) PORCELAIN FLOOR
TILE AND BASE TILE TO
BE REMOVED
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
BUILDING 101 FIRST FLOOR PLAN -
DEMOLITION
AS1-1B
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMMMC
100% SUBMITTAL 1/8" = 1'-0"
4 BUILDING 101 FIRST FLOOR DEMOLITION PLAN
8910111213
E
F
G
7 67.88.58.79.9
(E) CORRIDOR
B2-C24
(E) ELEVATOR
LOBBY
B2-C20
(E) CORRIDOR
B2-C21
(E) CORRIDOR
B2-C22
(E) CORRIDOR
B2-C23
ALL GENDER
TOILET
C2-104
ALL GENDER
TOILET
C2-106
ALL GENDER
TOILET
F2-203
ALL GENDER
TOILET
F2-201
AS4-2A
AS4-2A
(E) CORRIDOR
F2-C01
(E) CORRIDOR
C2-C01
D2-100
(E) AUD
STORAGE 1
D2-C01
(E) CORRIDOR
E2-110
(E) OFFICE
E2-100
(E)
NEPHROLOGY
E2-100C
(E) CHIEF
E2-200
(E) WAIT
E2-301
(E) HYG 2
E2-C20
(E) CORRIDOR
F2-100
(E) PULMONARY
F2-130
(E) STF PHYS
F2-132
(E) STF PHYS
F2-134
(E) STF PHYS
F2-136
(E) CHIEF
F2-202
(E) HS
A2-C10
(E) ELEVATOR
LOBBY
A2-C09
(E) CORRIDOR
A1-178
(E) FAMILY
WAIT
A2-100
(E) SOCIAL WK
A2-C01
(E) CORRIDOR
B2-TC2
(E) TEL / DATA
B2-EC2
(E) ELEC
B2-C01
(E) CORRIDOR
C2-174
(E) PHYS / CONS
C2-176
(E) N SUPV C2-100
(E) VIS LOUNGE
B2-150
(E) BIOCHEM
LAB
B2-136
(E) CHEM
B2-C05
(E) CORRIDOR
C2-C10
(E) ELEVATOR
LOBBY
C2-C09
(E) CORRIDOR
E2-C30
(E) CORRIDOR
REMOVE (E
) C
ERAMIC
W
IS
H, C
UT A
ND R
EMOVE (E
) G
YP.
BD. A
S R
EQUIR
E FOR N
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE, TYP.
REMOVE (E) CARPET
(E) CRASH RAILS TO
REMAIN, TYP.
REMOVE (E)
PORCELAIN TILE
BASE AT
COLUMN
FURRING, TYP.
(E) CRASH RAILS
TO REMAIN, TYP.
REMOVE (E)
PORCELAIN TILE
BASE AT COLUMN
FURRING, TYP.
REMOVE (E)
PORCELAIN TILE BASE
AT WINDOW SILL, TYP.
(E) HANDRAILS
TO REMAIN, TYP.
(E) HANDRAILS TO
REMAIN, TYP.
REMOVE (E) CERAMIC WALL TILE,
STAINLESS STEEL CORNER, AND
SIGNAGE PANEL, TYP.
REMOVE (E)
WALL
MOUNTED
SIGNAGE
REMOVE (E)
WALL
MOUNTED
SIGNAGE
REMOVE (E)
CERAMIC WALL
TILE, STAINLESS
STEEL CORNER,
AND SIGNAGE
PANEL, TYP.
(E) HANDRAILS TO
REMAIN, TYP.
REMOVE (E) CORNER
GUARD COVERS, (E)
CORNER GUARD
RETAINERS TO REMAIN,
TYP.
REMOVE (E) CERAMIC
WALL TILE, STAINLESS
STEEL CORNER , AND
SIGNAGE PANEL, TYP.
CORE DRILL (E) CONC. SLAB
FOR FLOOR MOUNTED ELEC.
OUTLET, COORDINATE WITH
THE FURNITURE LAYOUT AND
EXACT LOCATION WITH VA
REMOVE (E)
PORCELAIN TILE
FLOORING AND
BASE, TYP.
REMOVE (E)
PORCELAIN TILE
FLOORING AND
BASE, TYP.
NOTES19
1. REFER TO SHEET FOR NOTES UNLESS OTHERWISE NOTED.
LEGEND
AREAS WHERE NO
WORK TO BE DONE
(E) PORCELAIN FLOOR
TILE AND BASE TILE TO
BE REMOVED
B100
B101
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
NOTES: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
KEY PLAN
A R C H I T E C T S
239 9TH STREET SAN FRANCISCO, CA 94103
T 415.703.0328 F 415.707.6328 www.meiarchitects.com
1001 Connecticut Avenue, N.W. Suite 704, Washington, DC 20036 T 202.817.9371 www.concoursecompanies.com
BUILDING 100 SECOND FLOOR PLAN -
DEMOLITION
AS1-2A
REPLACE BUILDING 100/101
FLOORING REPAIR
640-16-114
November 2, 2018
VAPAHCS - PALO ALTO
MEI TEAMMMC
100% SUBMITTAL 1/8" = 1'-0"
4 BUILDING 100 SECOND FLOOR DEMOLITION PLAN
AS1-1A
UPDN UPDN
8910111213
E
F
G
H
I
J
7 6
J.2
7.8
K
I.3
I.5
8.58.79.9
ALL GENDER
TOILET
F3-243
ALL GENDER
TOILET
F3-241
(E) CORRIDOR
B3-C21
(E) ELEVATOR
LOBBY
B3-C20
(E) CORRIDOR
B3-C24
(E) CORRIDOR
B3-C23
(E) CORRIDOR
B3-C22
ALL GENDER
TOILET
C3-104
ALL GENDER
TOILET
C3-106
AS4-2A
AS4-2A
(E) CORRIDOR
C3-C01
(E) CORRIDOR
F3-C01
REMOVE (E
) C
ERAMIC
W
H, C
UT A
ND R
EMOVE (E
) G
YP.
BD. A
S R
EQUIR
REMOVE (E
) C
ERAMIC
W
H, C
UT A
ND R
EMOVE (E
) G
YP.
BD. A
S R
EQUIR
REMOVE (E) PORCELAIN
TILE FLOORING AND
BASE, TYP.
REMOVE (E) CARPET
(E) CRASH RAILS TO
REMAIN, TYP.
REMOVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .