About this file

36C26119B0029 0002 S05 --- AMENDMENT 0002, Question-Answers for RFI.pdf

View the file

Other files

File Type Posted
36C26119B0029-0006002.pdf PDF
36C26119B0029-0006003.jpg JPG image
36C26119B0029-0006000.docx DOCX document
36C26119B0029-0006001.pdf PDF
36C26119B0029-0005000.docx DOCX document
36C26119B0029-0004001.pdf PDF
36C26119B0029-0004000.docx DOCX document
36C26119B0029-0003004.pdf PDF
36C26119B0029-0003005.pdf PDF
36C26119B0029-0003002.pdf PDF
36C26119B0029-0003007.pdf PDF
36C26119B0029-0003000.docx DOCX document
36C26119B0029-0003001.pdf PDF
36C26119B0029-0003003.pdf PDF
36C26119B0029-0003006.pdf PDF
36C26119B0029-0002005.pdf PDF
36C26119B0029-0002000.docx DOCX document
36C26119B0029-0002003.pdf PDF
36C26119B0029-0002007.pdf PDF
36C26119B0029-0002006.pdf PDF
36C26119B0029-0002002.pdf PDF
36C26119B0029-0002008.pdf PDF
36C26119B0029-0002004.pdf PDF
36C26119B0029-0001001.pdf PDF
36C26119B0029-0001000.docx DOCX document
36C26119B0029-008.pdf PDF
36C26119B0029-015.pdf PDF
36C26119B0029-013.pdf PDF
36C26119B0029-003.pdf PDF
36C26119B0029-016.pdf PDF
36C26119B0029-007.pdf PDF
36C26119B0029-005.pdf PDF
36C26119B0029-001.docx DOCX document
36C26119B0029-004.pdf PDF
36C26119B0029-012.pdf PDF
36C26119B0029-018.pdf PDF
36C26119B0029-006.pdf PDF
36C26119B0029-014.pdf PDF
36C26119B0029-017.docx DOCX document
36C26119B0029-011.pdf PDF
36C26119B0029-010.pdf PDF
36C26119B0029-009.pdf PDF
36C26119B0029-002.pdf PDF
36C26119B0029-000.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 0002

Solicitation 36C26119B0029 Project: 640AO-19-919 Building #324 HVAC Upgrade

General

The following changes, additions or deletions shall be made to the following Contract Documents.

All other conditions shall remain the same.

1. SPECIFICATIONS

a. N/A

2. DRAWINGS

a. Attached drawings are reference only, which is in response to the below question.

3. OFFEROR QUESTION AND CLARIFICATION

a. Question: Requesting mechanical schematic drawings and schedules for:

i. AHU-A

ii. AHU-B

iii. AHU-C

iv. AHU-D

v. HV-1

vi. HV-2

vii. HV-3

viii. HV-4

b. Response: For this project, the attached drawings are from a remodel, which was completed in the 1990s. These drawings are being provided for reference only, which gives overall dimensions. Primarily, this is a remove and replace project, and the COR did not deem it necessary to have new drawings.

i. MPD.640-94-101.M-1.BLDG 324 viii. MPD.640-94-101.M-6.BLDG 324

ii. MPD.640-94-101.M-2.BLDG 324 ix. MPD.640-94-101.M-7.BLDG 324

iii. MPD.640-94-101.M-3.BLDG 324 x. MPD.640-94-101.M-7.REV1.BLDG 324

iv. MPD.640-94-101.M-4.BLDG 324 xi. MPD.640-94-101.M-8.BLDG 324

v. MPD.640-94-101.M-4.REV1.BLDG 324 xii. MPD.640-94-101.M-9.BLDG 324

vi. MPD.640-94-101.M-5.BLDG 324 xiii. MPD.640-94-101.M-10.BLDG 324

vii. MPD.640-94-101.M-5.REV1.BLDG 324 xiv. MPD.640-94-101.M-10.REV1.BLDG 324

-END OF AMENDMENT NO. 0002-