36C26118R0219-A00003000.docx

DOCX document 33 KB Posted

Attached to
570-18-2-795-0017 | #570-18-412 | VA261-18-AP-3349 | DESIGN BUILD TO REPLACE MRI (VA-18-00007660)
Solicitation number
36C26118R0219
Issued by

About this file

36C26118R0219 A00003 36C26118R0219 A00003.docx

View the file

Other files

File Type Posted
36C26118R0219-A00004002.docx DOCX document
36C26118R0219-00002000.docx DOCX document
36C26118R0219-00002001.pdf PDF
36C26118R0219-00001000.docx DOCX document
36C26118R0219-003.pdf PDF
36C26118R0219-005.docx DOCX document
36C26118R0219-004.pdf PDF
36C26118R0219-006.xlsx XLSX spreadsheet
36C26118R0219-002.docx DOCX document
36C26118R0219-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2

CONTINUATION PAGE

SOLICITATION NO:

36C26118R0219

ORDER NO:

AMENDMENT NO:

A00003

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00003 06-14-2018 570-18-2-795-0017 570-18-412 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 150 Muir Road Martinez CA 94553-4668 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 150 Muir Road Martinez CA 94553-4668 To all Offerors/Bidders

36C26118R0219

X X X July 18th, 2018, 10:00 AM PST In accordance with the direction in solicitation 36C26118R0219, this amendment serves as notification to the most highly rated offerors to submit their technical and price proposals. The most highly rated offerors shall be notified via email.

See SF30 Continutation Page for further information pertaining to Amendment A00003.

All questions or concerns shall be directed to Gregory.Cunningham@va.gov utilizing the attached RFI form.

A. The purpose of this amendment is to implement Phase II of Solicitation 36C26118R0219, Project Title: Design-Build MRI Scan Suite on 2nd Floor, Building 1 located at VA Central California Health Care System; 2615 E. Clinton Ave. Fresno, CA 93703 for the most highly rated firms identified during Phase I evaluations only.

B. Phase II price / technical proposal shall be submitted in accordance with solicitation 36C26118R0219 requirements and shall be due no later than July 18th, 2018, 10:00 AM PST.

1. All proposals shall be submitted to Denise.Groves@va.gov and Gregory.Cunningham@va.gov IAW with submission requirements outlined in solicitation 36C26118R0219.

C. Offer guarantees shall now be required with proposal submissions IAW with FAR 52.228-1

D. A group site visit will be conducted on June 27th, 2018 at 10:00 AM PST at the Engineering Section, 2615 E. Clinton Ave. Fresno, CA 93703

E. RFI’s shall be due no later than July 6th, 2018, 10:00 AM PST

F. Liquidated Damages are hereby included as reflected by FAR 52.211-12

G. All other solicitation provisions, clauses, terms, and conditions of solicitation 36C26118R0219 remain unchanged.

A.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 300 days after issuance of NTP. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 90 days after award. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of Clause)

A.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $648.50 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of Clause)

A.3 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— June 27th, 2018 at 10:00 AM PST

(c) Participants will meet at— Engineering Section, 2615 E. Clinton Ave. Fresno, CA 93703 (End of Provision)

A.4 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

STANDARD FORM 30 (CONTINUATION)

STANDARD FORM 30 (CONTINUATION)

File details come from the government source that posted it.