36C26118Q0577-0005002.pdf
PDF 14 MB Posted
- Attached to
- Repair and Maintenance Automatic Fire Sprinkler System Federal contract opportunity
- Solicitation number
- 36C26118Q0577
About this file
36C26118Q0577 0005 5YR Fire Sprinkler Reports Amendment 1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118Q0577-0007000.docx | DOCX document | |
| 36C26118Q0577-0007001.pdf | ||
| 36C26118Q0577-0006000.docx | DOCX document | |
| 36C26118Q0577-0005000.docx | DOCX document | |
| 36C26118Q0577-0005001.pdf | ||
| 36C26118Q0577-0005003.pdf | ||
| 36C26118Q0577-0004000.docx | DOCX document | |
| 36C26118Q0577-0003000.docx | DOCX document | |
| 36C26118Q0577-0003001.pdf | ||
| 36C26118Q0577-0002001.pdf | ||
| 36C26118Q0577-0002000.docx | DOCX document | |
| 36C26118Q0577-0001000.docx | DOCX document | |
| 36C26118Q0577-002.docx | DOCX document | |
| 36C26118Q0577-001.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Inspection, Testing, and Maintenance Cover Sheet NFPA25 as amended by CCR, Title 19
Property Information:
Name: Occupancy/Use:
Address: Construction Type:
City: No. Stories:
ZIP: Year Constructed:
Contact:
Telephone:
Contractor Information: Number of System Risers
Name: Copy sent to:
Address: Owner Date:
City: Fire AHJ Date:
State: Contractor Date:
NOTES:
1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011 Edition as amended by California Code of Regulations, Title 19, §901 to §906.
2) Inspection items may be performed by the owner in accordance with California Code of Regulations, Title 19, §904.1(a)
CA License#:
Job #:
Performed by:
Check box for each system inspected and enter the number of forms used for inspection.
Check boxes (Fail or Pass) to indicate status of inspected system at end of inspection.
Forms Included with this Report NFPA 25 Chapter Number of Forms N/A Fail* Pass
Automatic Sprinkler System 5
Standpipe and Hose System 6
Private Water Supply System 7
Fire Pump 8
Water Storage Tank 9
Water Spray System 10
Foam Water Sprinkler System 11
Water Mist System 12
Concerns that are not deficiencies (i.e. Non-Sprinklered Areas) Yes No
*See "Deficiencies and Comments" section at end of each respective form.
AES 1 September 3, 2013
Wet Pipe Fire Sprinkler System
California Code of Regulations - Title 19 Inspection, Testing, and Maintenance
5-Year Report 1 of 3
Property Information Contractor or Licensed Owner Information
Building Name Name
Address
Address City St. Zip
City
License # Phone
Contact Person
SFM Job #
CSLB Misc.
Riser Information Main Drain Test (ANNUAL) Riser No. Location Riser
Diameter Main Drain
Initial Static Pressure
Residual
Final Static Pressure P, F, N/A
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
5-Year INSPECTION, TESTING AND MAINTENANCE Includes ALL Quarterly and Annual Inspections, Tests, and Maintenance items
I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable
Item Description
NFPA 25 CA
ed.
Reference
Date Comments Only P, F, N/A
1.1 I Control Valves – Identification Sign 13.3.1
1.2 I Control Valves – Inspection 13.3.2
1.3 I Waterflow Alarm Devices 5.2.5
1.4 I Supervisory Devices 5.2.5
1.5 I Gauges (Wet Pipe Systems) 5.2.4.1
1.6 I Hydraulic Design Information Sign
(For hydraulically designed systems) 5.2.6
1.7 I Enter Water Supply Pressure Below Riser Check 5.2.4.1 psi
1.8 I Enter Water Supply Pressure Above Riser Check 5.2.4.1 psi
1.9 I Pressure Readings Acceptable 5.2.4.1
1.10 I General Information Sign
(not required for system prior to 2007 Edition NFPA 13) 5.2.8
1.11 I Heat Tape 5.2.7
1.12 I Spare Sprinklers 5.2.1.4
1.13 I Fire Department Connections 13.7
1.14 I Alarm Valves – Exterior Inspection 13.4.1
1.15 I Pressure Reducing Valves 13.5.1.1
1.16 I Backflow Preventers 13.6.1
Form AES 2.2 Sept. 3, 2013
Forms
Line
5 Year Report 2 of 3
Address Job #
ANNUAL INSPECTION, TESTING, AND MAINTENANCE
Include ALL Quarterly Inspections (See AES 2.1)
Item Description NFPA 25 CA ed.
Reference Date Comments Only P,F,N/A
1.17 I Small Hose Connections - Hose Valve* 5.1.6, 13.5.2
13.5.5.1
1.18 I PRV – Fire Sprinkler Systems 13.5.1.1
1.19 I Buildings (Freeze Protection) 4.1.1.1 Owner’s Responsibility
1.20 I Sprinklers 5.2.1
1.21 I Sprinklers - Accessible Concealed Space 5.2.1.1.6
1.22 I Pipe and Fittings 5.2.2
1.23 I Pipe and Fittings - Accessible Concealed Space 5.2.2.3
1.24 I Hangers 5.2.3
1.25 I Hangers - Accessible Concealed Space 5.2.3.3
1.26 I Seismic Braces 5.2.3
1.27 I Seismic Braces - Accessible Concealed Space 5.2.3.3
1.28 I Unsprinklered Areas CFC 901.4 Yes No
2.1 T Field Service Test Required
Send Report to Fire Code Official 5.3.1 If REQUIRED, Enter 'F' until results are returned from Lab
2.2 T Recalled Sprinklers
If not present = Pass; If present = Fail
Title 19 904.1(c)
2.3 T Water Flow Alarm Devices
90 secs max. Enter time
5.3.3
13.2.6 sec.
2.4 T Main Drain Test
(Enter data on Page 1 of this form)
13.2.5 13.3.3.4
2.5 T Control Valve - Position 13.3.3.2
2.6 T Control Valve – Operation 13.3.3.1
2.7 T Supervisory Devices 13.3.3.5
2.8 T Backflow Preventer Assemblies 13.6.2
2.9 T Small Hose Connections*
w/PRV Hose Valves – Partial Flow Test
13.5.2.3 13.5.3.3
2.10 T PRV – Fire Sprinkler Systems 13.5.1.3
2.11 T Pressure Gauges - Calibration 5.3.2
2.12 T Small Hose Connections* 13.5.6.2.2
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems.
include ALL Quarterly Inspections (See AES 2.1)
3.1 M Check Valves - Internal inspection 13.4.2
3.2 M Control Valves 13.3.4
3.3 M FDC - Backflush 14.3.2.3
14.3.2.4
3.4 M Internal Pipe Inspection - See Deficiencies and
Comments Section for Results. 14.2
Yes No
3.5 M Obstruction Investigation Required. If "Yes", see
Deficiencies and Comments Section for Results 14.3
3.6 M System Returned to Service 4.5.3
D = Deficiency C = Comment (Indicate type )
Item Date Riser D C Deficiencies and Comments Indicate all equipment, devices and parts that were repaired or replaced
Check here if additional Deficiencies and Comments are listed on Form AES 9
See Correction Form AES 10 for corrected deficiencies.
Number attached:
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable except as noted in the “Deficiencies and Comments” section of this form.
Print Name
Signature Date
Report 3 of 3
NFPA25FormAES1CoverSheet2013
NFPA25FormAES1CoverSheet2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
Address 1: 4951 Arroyo rd
Contact: Troy heart
Fire AHJ: Off
Contractor: On
5: 0
6: 0
7: 0
8: 0
9: 0
10: 0
11: 0
12: 0
Yes: Off
No: On
PropertyName: V.A. Hospital
PropertyZIP: 94550
PropertyCity: Livermore ca
ContactTelephone: 650-493-5000
DDOccupancyUse: [B]
DDConstructionType: [Type II-B]
NumberStories: 1
YrConstructed: 1992
AutoSprinkler: On
Standpipe: Off
PrivateWater: Off
FirePump: Off
WaterStorage: Off
WaterSpray: Off
Foam: Off
WaterMist: Off
Concerns: Off
ContractorName: Western states fire protection
ContractorAddress: 2489 technology dr
ContractorCity: Hayward
ContractorSTate: Ca
ContractorTelephone: 510-783-2400
CALicense:
JobNumber: RK1215
Inspector: Paul Hernandez
DDOwner: Off
OwnerDate:
0:
AHJDate:
ContractorDate: 05/01/17
Sprinkler NA:
0: Off
1: Yes
2: Yes
3: Yes
4: Yes
5: Yes
6: Yes
7: Yes
Sprinkler Fail:
0: Yes
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
Sprinkler Pass:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
License: 488359
Phone: 510-783-2400
SFM:
Contact PersonRow1: Troy heart
CSLB: 488359
Misc:
Riser NoRow1: 1
LocationRow1: lower floor in mechanical outside of building
Riser DiameterRow1: 4"
Main Drain DiameterRow1: 2"
Initial Static PressureRow1: 60
Residual PressureRow1: 55
Final Static PressureRow1: 60
P F NARow1: P
Riser NoRow2: 2
LocationRow2: Penthouse mechanical room
Riser DiameterRow2: 1 1/2"
Main Drain DiameterRow2: 1"
Initial Static PressureRow2: 0
Residual PressureRow2: 0
Final Static PressureRow2: 0
P F NARow2: P
Riser NoRow3:
LocationRow3:
Riser DiameterRow3:
Main Drain DiameterRow3:
Initial Static PressureRow3:
Residual PressureRow3:
Final Static PressureRow3:
P F NARow3:
Riser NoRow4:
LocationRow4:
Riser DiameterRow4:
Main Drain DiameterRow4:
Initial Static PressureRow4:
Residual PressureRow4:
Final Static PressureRow4:
P F NARow4:
Riser NoRow5:
LocationRow5:
Riser DiameterRow5:
Main Drain DiameterRow5:
Initial Static PressureRow5:
Residual PressureRow5:
Final Static PressureRow5:
P F NARow5:
This building has more than 5 risers See additional AES 29 form attached: Off
1331: 05/01/17
1332: 05/01/17
525: 05/01/17
525_2: 05/01/17
5241: 05/01/17
526: 05/01/17
5241_2: 05/01/17
5241_3: 05/01/17
5241_4: 05/01/17 psi5241:
528: 05/01/17 psi528:
527: 05/01/17 psi527:
5214: 05/01/17 psi5214:
137: 05/01/17 psi137: No debre
1341: 05/01/17 psi1341: Clean
13511: 05/01/17 psi13511:
1361: 05/01/17 psi1361:
Comments Only516 1352 13551:
Comments Only13511:
Owners Responsibility521:
Owners Responsibility52116:
Owners Responsibility522:
Owners Responsibility5223:
Owners Responsibility523:
Owners Responsibility5233:
Owners Responsibility523_2:
Owners Responsibility5233_2:
sec1325 13334:
sec13332:
sec13331: PIV does not shut sec13335: Done by others sec1362:
sec13523 13533:
sec13513:
sec532:
sec135622:
Date: 05/01/17
1334: 05/01/17
142: 05/01/17
143: 05/01/17
453: 05/01/17
ItemRow1: 3.3
DateRow1: 5/1/17
RiserRow1: 1
DRow1:
CRow1: C
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow1: Backflush was successful no debre found in the pipe.
ItemRow2: 2.6
DateRow2: 5/1/17
RiserRow2: 1
DRow2: D
CRow2:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow2: PIV does not work properly, head is not connected to stem for correct operation. Also no
ItemRow3:
DateRow3:
RiserRow3:
DRow3:
CRow3:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow3: Indicating sign inside PIV anymore,also after exercising the valve multiple times it will still not
ItemRow4:
DateRow4:
RiserRow4:
DRow4:
CRow4:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow4: Shut to isolate the system. PIV post needs to be replaced, the valve underground should be
ItemRow5:
DateRow5:
RiserRow5:
DRow5:
CRow5:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow5: Investigated a little more to insure it is not working properly before being replaced.
ItemRow6:
DateRow6:
RiserRow6:
DRow6:
CRow6:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow6:
ItemRow7:
DateRow7:
RiserRow7:
DRow7:
CRow7:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow7:
ItemRow8:
DateRow8:
RiserRow8:
DRow8:
CRow8:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow8:
ItemRow9:
DateRow9:
RiserRow9:
DRow9:
CRow9:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow9:
ItemRow10:
DateRow10:
RiserRow10:
DRow10:
CRow10:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow10:
ItemRow11:
DateRow11:
RiserRow11:
DRow11:
CRow11:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow11:
ItemRow12:
DateRow12:
RiserRow12:
DRow12:
CRow12:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow12:
ItemRow13:
DateRow13:
RiserRow13:
DRow13:
CRow13:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow13:
ItemRow14:
DateRow14:
RiserRow14:
DRow14:
CRow14:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow14:
City: Palo Alto ca
ZIP: 94540
State: Ca
Dropdown4: [P]
Dropdown20:
0: [P]
1: [N/A]
2: [NA]
Text21:
Text22:
Text23: Done by others
Text24: Done by others
Text25:
Text26:
Text27:
Text28:
Dropdown1:
5: [P]
6: [P]
7: [NA]
8: [NA]
9: [P]
10: [NA]
11: [NA]
12: [P]
13: [P]
14: [P]
15: [NA]
16: [P]
DD1:
17: [N/A]
18: [N/A]
19: [N/A]
20: [P]
21: [P]
22: [P]
23: [P]
24: [P]
25: [P]
26: [P]
27: [P]
DATE1:
17: 05/01/17
18: 05/01/17
19: 05/01/17
20: 05/01/17
21: 05/01/17
22: 05/01/17
23: 05/01/17
24: 05/01/17
25: 05/01/17
26: 05/01/17
27: 05/01/17
28: 05/01/17
DATE2:
1: 05/01/17
2: 05/01/17
3: 05/01/17
4: 05/01/17
5: 05/01/17
6: 05/01/17
7: 05/01/17
8: 05/01/17
9: 05/01/17
10: 05/01/17
11: 05/01/17
12: 05/01/17
DD2:
1: N/A
2: P
3: N/A
4: P
5: P
6: F
7: N/A
8: P
9: N/A
10: N/A
11: P
12: N/A
CB1:
28: No
Check Box31: Off
Check Box32: Off
Building Name: V.A. Hospital building #88
Address_2: 4951 Arroyo rd
Name: Western states fire protection
Job: RK1215
Date3:
3: 05/01/17
Text3:
1:
DD3:
1: [P]
2: [P]
3: [P]
4: [P]
5: [P]
6: [P]
CB3:
4: Yes cb3:
6: Yes
CBAdditional Deficiencies: Off
CBAES10: Off
DefNumberAttached:
AES10NumberAttached:
SignatureDate: 05/01/17
Contractor City: Hayward
Contractor Address: 2489 technology dr
Text2:
3:
2:
PrintName: Paul Hernandez
PropertyCity#1: Livermore ca
PropertyAddress2:
NumberAES2:
9:
1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011
VA mountain view 1776 old middlefield road Mountain view ca 94043 Richard
(650) 621-0357
A1
Type I-B
Western states fire protection
2489 Technology dr
Hayward
Ca.
(510) 783-2400
RK1217
Paul Hernandez
✔ 10/23/17
✔ 0 ✔
0 ✔
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
488359
2489 technology dr
Hayward Ca
510-783-2400
Mountain view ca RK1217
Richard
1 Stairwell landing north end of building 3" 1 1/2" 65 55 65 P Stairwell landing north end of building 3" 1 1/2" 65 55 65 P
10/23/17 P
10/23/17
P
10/23/17 NA
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
Mountain view ca
10/23/17 N/A
10/23/17 No bracing on risers F
10/23/17 ✔
10/23/17 50 N/A
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
Mountain view ca
10/23/17 ✔ P
10/23/17 ✔ P
1.26 10/23/17 Both D No four way braceing at top of the risers nore riser manifold.
3.4 10/23/17 Both C Systems are only 5yrs old very clean inside pipes.
10/23/17 Both C No lock and chain on either risers, must add them to insure the operation of the system.
1.28 10/23/17 2 C Second floor lobby leading into office space there are two heads that are being
Obstructed from a glass wall that was installed so there is no coverage on the other side of the
Glass.either add two heads or take out at least '1-0 of the top of the glass wall so the sprinkler
Can cover the other side of the glass.
1.10 10/23/17 D No signage on the outside door leading to the stairwell indicating that the fire risers are inside,it
Took me 10 minutes to find the location of the risers, there is no access from the outside so
You must enter the building go up to the second floor and back down the stairwell to access the
Fire risers. Suggest putting a handle on the door leading into the stairwell.
Main Drain Test Continuation Form
Inspection, Testing, and Maintenance 1 of 1
Address Address
City St. Zip
City License # Phone
Contact Person SFM Job #
Riser Information Main Drain Test
Pressure P,F,N/A
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
Form AES 2.9 Sept. 3, 2013
Phone
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
NFPA25FormAES1CoverSheet2013
NFPA25FormAES1CoverSheet2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
Fire AHJ: Off
DDOwner: Off
This building has more than 5 risers See additional AES 29 form attached: Off cb3:
6: Yes
CBAdditional Deficiencies: Off
CBAES10: Off
CBCSLB: Off
CBSFM: Off
This building has more than 5 risers See additional AES 29 form attached#1: Off cb3#1:
6: Off
CBAdditional Deficiencies#1: Off
CBAES10#1: Off
CBCSLB#1: Off
CBSFM#1: Off
1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011
V.A. Hospital Livermore #65
4951 Arroyo ave Livermore ca
MOD
B
Type II-B
Hayward
Ca
(510) 783-2400
RK1215
✔ 10/18/17
✔ 0 ✔
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
V.A. Hospital building #65
4951 Arroyo rd
Hayward Ca 94540
510-783-2400
Livermore ca RK1215
MOD
1 Back side of building 4" 2" 55 50 55 P
10/18/17 P
10/18/17 Done by others N/A
10/18/17 Done by others NA
10/18/17
P
10/18/17 NA
10/17/17 P
10/17/17 No debre P
10/18/17 Clean P
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
10/18/17 N/A
10/18/17 ✔
10/18/17 Done by others N/A
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
10/18/17 ✔ P
10/18/17 ✔ P
1.20 10/18/17 1 C Uprights and pendants throughout the shop have heads over 50yrs old, suggest to replace
Instead of testing 3%. Total uprights 75 total pendants 10
1.28 10/18/17 1 D Duct near inspectors test needs a head under it, duct is over 4' so required to install
Sprinkler heard for propor coverage. Old central solder link heads in shop now.
10/18/17
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
NFPA25FormAES1CoverSheet2013
NFPA25FormAES1CoverSheet2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
Fire AHJ: Off
DDOwner: Off cb3:
6: Yes
CBAdditional Deficiencies: Off
CBAES10: Off
CBCSLB: Off
CBSFM: Off
This building has more than 5 risers See additional AES 29 form attached#1: Off cb3#1:
6: Off
CBAdditional Deficiencies#1: Off
CBAES10#1: Off
CBCSLB#1: Off
CBSFM#1: Off
1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
NFPA25FormAES1CoverSheet2013
NFPA25FormAES1CoverSheet2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
NFPA25FormAES2.2 5-YearWetPipe
NFPA25FormAES2.9MainDrain Test Continuation Form 2013
Address 1: 795 Willow Rd
Contact: Garry Deshields
Fire AHJ: Off
Contractor: On
5: 0
6: 0
7: 0
8: 0
9: 0
10: 0
11: 0
12: 0
Yes: On
No: Off
PropertyName: VA hospital building #347
PropertyZIP: 94025
PropertyCity: Menlo Park
ContactTelephone: (650)208-7029
DDOccupancyUse: [B]
DDConstructionType: [Type II-B]
NumberStories:
YrConstructed:
AutoSprinkler: On
Standpipe: Off
PrivateWater: Off
FirePump: Off
WaterStorage: Off
WaterSpray: Off
Foam: Off
WaterMist: Off
Concerns: Off
ContractorName: Western States Fire Protection
ContractorAddress: 2489 Technology Dr
ContractorCity: Hayward
ContractorSTate: Ca
ContractorTelephone: 510-783-2400
CALicense: 488359
JobNumber: RK1214
Inspector: Rafael Escobar
DDOwner: Off
OwnerDate:
0:
AHJDate:
ContractorDate: 04/18/17
Sprinkler NA:
0: Off
1: Yes
2: Yes
3: Yes
4: Yes
5: Yes
6: Yes
7: Yes
Sprinkler Fail:
0: Yes
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
Sprinkler Pass:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
License: 488359
Phone: 510-783-2400
SFM:
Contact PersonRow1: Garry Deshields
CSLB:
Misc:
Riser NoRow1: 1
LocationRow1: Next to front desk 1st floor in control valve closet
Riser DiameterRow1: 4"
Main Drain DiameterRow1: 2"
Initial Static PressureRow1: 55
Residual PressureRow1: 40
Final Static PressureRow1: 55
P F NARow1: P
Riser NoRow2: 2
LocationRow2: Next to front desk 1st floor in control valve closet
Riser DiameterRow2: 4"
Main Drain DiameterRow2: 2"
Initial Static PressureRow2: 55
Residual PressureRow2: 40
Final Static PressureRow2: 55
P F NARow2: P
Riser NoRow3: 3
LocationRow3: 2nd floor in control valve closet by elevator
Riser DiameterRow3: 4"
Main Drain DiameterRow3: 2"
Initial Static PressureRow3: 55
Residual PressureRow3: 40
Final Static PressureRow3: 55
P F NARow3: P
Riser NoRow4: 4
LocationRow4: 2nd floor in control valve closet by elevator
Riser DiameterRow4: 4"
Main Drain DiameterRow4: 2"
Initial Static PressureRow4: 55
Residual PressureRow4: 40
Final Static PressureRow4: 55
P F NARow4: P
Riser NoRow5:
LocationRow5:
Riser DiameterRow5:
Main Drain DiameterRow5:
Initial Static PressureRow5:
Residual PressureRow5:
Final Static PressureRow5:
P F NARow5:
This building has more than 5 risers See additional AES 29 form attached: Off
1331: 04/18/17
1332: 04/18/17
525: 04/18/17
525_2: 04/18/17
5241: 04/18/17
526: 04/18/17
5241_2: 04/18/17
5241_3: 04/18/17
5241_4: 04/18/17 psi5241:
528: 04/18/17 psi528:
527: 04/18/17 psi527:
5214: 04/18/17 psi5214:
137: 04/18/17 psi137:
1341: 04/18/17 psi1341:
13511: 04/18/17 psi13511:
1361: 04/18/17 psi1361:
Comments Only516 1352 13551:
Comments Only13511:
Owners Responsibility521:
Owners Responsibility52116:
Owners Responsibility522:
Owners Responsibility5223:
Owners Responsibility523:
Owners Responsibility5233:
Owners Responsibility523_2:
Owners Responsibility5233_2:
sec1325 13334:
sec13332:
sec13331:
sec13335:
sec1362:
sec13523 13533:
sec13513:
sec532:
sec135622:
Date: 04/18/17
1334: 04/18/17
142: 04/18/17
143: 04/18/17
453: 04/18/17
ItemRow1: 1.20
DateRow1: 4/18/17
RiserRow1: 1
DRow1: X
CRow1: X
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow1: No access to rooms A207,A208,A204,A209,A113,D223,D224,D219,D225,D230,D231,E209
ItemRow2:
DateRow2:
RiserRow2:
DRow2:
CRow2:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow2: E210,G232,E119,E118,E117,D131,A111,A112,A108,A107,A106A
ItemRow3:
DateRow3:
RiserRow3:
DRow3:
CRow3:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow3:
ItemRow4:
DateRow4: 4/18/17
RiserRow4:
DRow4:
CRow4: C
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow4: Central 804A quick response year 1999 chrome 155 1/2" pendants throughout the building
ItemRow5:
DateRow5: 4/18/17
RiserRow5:
DRow5:
CRow5: C
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow5: Central 784A quick response year 1994 155 1/2" brass uprights throughout the building
ItemRow6:
DateRow6:
RiserRow6:
DRow6:
CRow6:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow6:
ItemRow7:
DateRow7:
RiserRow7:
DRow7:
CRow7:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow7:
ItemRow8:
DateRow8:
RiserRow8:
DRow8:
CRow8:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow8:
ItemRow9:
DateRow9:
RiserRow9:
DRow9:
CRow9:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow9:
ItemRow10:
DateRow10:
RiserRow10:
DRow10:
CRow10:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow10:
ItemRow11:
DateRow11:
RiserRow11:
DRow11:
CRow11:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow11:
ItemRow12:
DateRow12:
RiserRow12:
DRow12:
CRow12:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow12:
ItemRow13:
DateRow13:
RiserRow13:
DRow13:
CRow13:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow13:
ItemRow14:
DateRow14:
RiserRow14:
DRow14:
CRow14:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow14:
City: Menlo Park
ZIP: 94545
State: Ca
Dropdown4: [P]
Dropdown20:
0: [P]
1: [N/A]
2: [P]
Text21:
Text22:
Text23: Already tested by others
Text24:
Text25:
Text26:
Text27: 55
Text28: 55
Dropdown1:
5: [P]
6: [P]
7: [P]
8: [P]
9: [P]
10: [P]
11: [NA]
12: [P]
13: [P]
14: [P]
15: [NA]
16: [P]
DD1:
17: [N/A]
18: [N/A]
19: [N/A]
20: [F]
21: [P]
22: [P]
23: [P]
24: [P]
25: [P]
26: [P]
27: [P]
DATE1:
17: 04/18/17
18: 04/18/17
19: 04/18/17
20: 04/18/17
21: 04/18/17
22: 04/18/17
23: 04/18/17
24: 04/18/17
25: 04/18/17
26: 04/18/17
27: 04/18/17
28: 04/18/17
DATE2:
1: 04/18/17
2: 04/18/17
3: 04/18/17
4: 04/18/17
5: 04/18/17
6: 04/18/17
7: 04/18/17
8: 04/18/17
9: 04/18/17
10: 04/18/17
11: 04/18/17
12: 04/18/17
DD2:
1: P
2: P
3: N/A
4: P
5: P
6: P
7: P
8: P
9: N/A
10: N/A
11: P
12: N/A
CB1:
28: No
Check Box31: Off
Check Box32: Off
Building Name: VA Hospital Building #347
Address_2: 795 Willow Rd
Name: Western States Fire Protection
Job: RK1214
Date3:
3: 04/18/17
Text3:
1:
DD3:
1: [P]
2: [P]
3: [P]
4: [P]
5: [P]
6: [P]
CB3:
4: Yes cb3:
6: Yes
CBAdditional Deficiencies: Off
CBAES10: Off
DefNumberAttached:
AES10NumberAttached:
SignatureDate: 04/18/17
Contractor City: Hayward
Contractor Address: 2489 technology dr
Text2:
3:
2:
PrintName: Rafael Escobar
PropertyCity#1: Menlo Park
PropertyAddress2:
NumberAES2:
9:
Building Name#1:
Name#1:
License#1:
Phone#1:
SFM#1:
Job#1:
Contact PersonRow1#1:
CSLB#1:
Misc#1:
Riser NoRow1#1:
LocationRow1#1:
Riser DiameterRow1#1:
Main Drain DiameterRow1#1:
Initial Static PressureRow1#1:
Residual PressureRow1#1:
Final Static PressureRow1#1:
Riser NoRow2#1:
LocationRow2#1:
Riser DiameterRow2#1:
Main Drain DiameterRow2#1:
Initial Static PressureRow2#1:
Residual PressureRow2#1:
Final Static PressureRow2#1:
Riser NoRow3#1:
LocationRow3#1:
Riser DiameterRow3#1:
Main Drain DiameterRow3#1:
Initial Static PressureRow3#1:
Residual PressureRow3#1:
Final Static PressureRow3#1:
Riser NoRow4#1:
LocationRow4#1:
Riser DiameterRow4#1:
Main Drain DiameterRow4#1:
Initial Static PressureRow4#1:
Residual PressureRow4#1:
Final Static PressureRow4#1:
Riser NoRow5#1:
LocationRow5#1:
Riser DiameterRow5#1:
Main Drain DiameterRow5#1:
Initial Static PressureRow5#1:
Residual PressureRow5#1:
Final Static PressureRow5#1:
Riser NoRow6:
LocationRow6:
Riser DiameterRow6:
Main Drain DiameterRow6:
Initial Static PressureRow6:
Residual PressureRow6:
Final Static PressureRow6:
Riser NoRow7:
LocationRow7:
Riser DiameterRow7:
Main Drain DiameterRow7:
Initial Static PressureRow7:
Residual PressureRow7:
Final Static PressureRow7:
Riser NoRow8:
LocationRow8:
Riser DiameterRow8:
Main Drain DiameterRow8:
Initial Static PressureRow8:
Residual PressureRow8:
Final Static PressureRow8:
Riser NoRow9:
LocationRow9:
Riser DiameterRow9:
Main Drain DiameterRow9:
Initial Static PressureRow9:
Residual PressureRow9:
Final Static PressureRow9:
Riser NoRow10:
LocationRow10:
Riser DiameterRow10:
Main Drain DiameterRow10:
Initial Static PressureRow10:
Residual PressureRow10:
Final Static PressureRow10:
Riser NoRow11:
LocationRow11:
Riser DiameterRow11:
Main Drain DiameterRow11:
Initial Static PressureRow11:
Residual PressureRow11:
Final Static PressureRow11:
Riser NoRow12:
LocationRow12:
Riser DiameterRow12:
Main Drain DiameterRow12:
Initial Static PressureRow12:
Residual PressureRow12:
Final Static PressureRow12:
Riser NoRow13:
LocationRow13:
Riser DiameterRow13:
Main Drain DiameterRow13:
Initial Static PressureRow13:
Residual PressureRow13:
Final Static PressureRow13:
Riser NoRow14:
LocationRow14:
Riser DiameterRow14:
Main Drain DiameterRow14:
Initial Static PressureRow14:
Residual PressureRow14:
Final Static PressureRow14:
Riser NoRow15:
LocationRow15:
Riser DiameterRow15:
Main Drain DiameterRow15:
Initial Static PressureRow15:
Residual PressureRow15:
Final Static PressureRow15:
Riser NoRow16:
LocationRow16:
Riser DiameterRow16:
Main Drain DiameterRow16:
Initial Static PressureRow16:
Residual PressureRow16:
Final Static PressureRow16:
Riser NoRow17:
LocationRow17:
Riser DiameterRow17:
Main Drain DiameterRow17:
Initial Static PressureRow17:
Residual PressureRow17:
Final Static PressureRow17:
Riser NoRow18:
LocationRow18:
Riser DiameterRow18:
Main Drain DiameterRow18:
Initial Static PressureRow18:
Residual PressureRow18:
Final Static PressureRow18:
Riser NoRow19:
LocationRow19:
Riser DiameterRow19:
Main Drain DiameterRow19:
Initial Static PressureRow19:
Residual PressureRow19:
Final Static PressureRow19:
Riser NoRow20:
LocationRow20:
Riser DiameterRow20:
Main Drain DiameterRow20:
Initial Static PressureRow20:
Residual PressureRow20:
Final Static PressureRow20:
Print Name:
PropertyAddress:
Address:
City#1:
STate:
ZIP#1:
SignatureDate#1:
PropertyCity#2:
CBCSLB: Off
CBSFM: Off
DD1#1:
0: [ ]
1: [ ]
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
7: [ ]
8: [ ]
9: [ ]
10: [ ]
11: [ ]
12: [ ]
13: [ ]
14: [ ]
15: [ ]
16: [ ]
17: [ ]
18: [ ]
19: [ ]
PropertyAddress2#1:
PropertyPhone:
License#2:
Phone#2:
SFM#2:
Contact PersonRow1#2:
CSLB#2:
Misc#2:
Riser NoRow1#2:
LocationRow1#2:
Riser DiameterRow1#2:
Main Drain DiameterRow1#2:
Initial Static PressureRow1#2:
Residual PressureRow1#2:
Final Static PressureRow1#2:
P F NARow1#1:
Riser NoRow2#2:
LocationRow2#2:
Riser DiameterRow2#2:
Main Drain DiameterRow2#2:
Initial Static PressureRow2#2:
Residual PressureRow2#2:
Final Static PressureRow2#2:
P F NARow2#1:
Riser NoRow3#2:
LocationRow3#2:
Riser DiameterRow3#2:
Main Drain DiameterRow3#2:
Initial Static PressureRow3#2:
Residual PressureRow3#2:
Final Static PressureRow3#2:
P F NARow3#1:
Riser NoRow4#2:
LocationRow4#2:
Riser DiameterRow4#2:
Main Drain DiameterRow4#2:
Initial Static PressureRow4#2:
Residual PressureRow4#2:
Final Static PressureRow4#2:
P F NARow4#1:
Riser NoRow5#2:
LocationRow5#2:
Riser DiameterRow5#2:
Main Drain DiameterRow5#2:
Initial Static PressureRow5#2:
Residual PressureRow5#2:
Final Static PressureRow5#2:
P F NARow5#1:
This building has more than 5 risers See additional AES 29 form attached#1: Off
1331#1:
1332#1:
525#1:
525_2#1:
5241#1:
526#1:
5241_2#1:
5241_3#1:
5241_4#1:
psi5241#1:
528#1:
psi528#1:
527#1:
psi527#1:
5214#1:
psi5214#1:
137#1:
psi137#1:
1341#1:
psi1341#1:
13511#1:
psi13511#1:
1361#1:
psi1361#1:
Comments Only516 1352 13551#1:
Comments Only13511#1:
Owners Responsibility521#1:
Owners Responsibility52116#1:
Owners Responsibility522#1:
Owners Responsibility5223#1:
Owners Responsibility523#1:
Owners Responsibility5233#1:
Owners Responsibility523_2#1:
Owners Responsibility5233_2#1:
sec1325 13334#1:
sec13332#1:
sec13331#1:
sec13335#1:
sec1362#1:
sec13523 13533#1:
sec13513#1:
sec532#1:
sec135622#1:
Date#1:
1334#1:
142#1:
143#1:
453#1:
ItemRow1#1:
DateRow1#1:
RiserRow1#1:
DRow1#1:
CRow1#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow1#1:
ItemRow2#1:
DateRow2#1:
RiserRow2#1:
DRow2#1:
CRow2#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow2#1:
ItemRow3#1:
DateRow3#1:
RiserRow3#1:
DRow3#1:
CRow3#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow3#1:
ItemRow4#1:
DateRow4#1:
RiserRow4#1:
DRow4#1:
CRow4#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow4#1:
ItemRow5#1:
DateRow5#1:
RiserRow5#1:
DRow5#1:
CRow5#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow5#1:
ItemRow6#1:
DateRow6#1:
RiserRow6#1:
DRow6#1:
CRow6#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow6#1:
ItemRow7#1:
DateRow7#1:
RiserRow7#1:
DRow7#1:
CRow7#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow7#1:
ItemRow8#1:
DateRow8#1:
RiserRow8#1:
DRow8#1:
CRow8#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow8#1:
ItemRow9#1:
DateRow9#1:
RiserRow9#1:
DRow9#1:
CRow9#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow9#1:
ItemRow10#1:
DateRow10#1:
RiserRow10#1:
DRow10#1:
CRow10#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow10#1:
ItemRow11#1:
DateRow11#1:
RiserRow11#1:
DRow11#1:
CRow11#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow11#1:
ItemRow12#1:
DateRow12#1:
RiserRow12#1:
DRow12#1:
CRow12#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow12#1:
ItemRow13#1:
DateRow13#1:
RiserRow13#1:
DRow13#1:
CRow13#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow13#1:
ItemRow14#1:
DateRow14#1:
RiserRow14#1:
DRow14#1:
CRow14#1:
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow14#1:
City#2:
ZIP#2:
State#1:
Dropdown4#1: [ ]
Dropdown20#1:
0: [ ]
1: [ ]
2: [ ]
Text21#1:
Text22#1:
Text23#1:
Text24#1:
Text25#1:
Text26#1:
Text27#1:
Text28#1:
Dropdown1#1:
5: [ ]
6: [ ]
7: [ ]
8: [ ]
9: [ ]
10: [ ]
11: [ ]
12: [ ]
13: [ ]
14: [ ]
15: [ ]
16: [ ]
DD1#2:
17: [ ]
18: [ ]
19: [ ]
20: [ ]
21: [ ]
22: [ ]
23: [ ]
24: [ ]
25: [ ]
26: [ ]
27: [ ]
DATE1#1:
17:
18:
19:
20:
21:
22:
23:
24:
25:
26:
27:
28:
DATE2#1:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
DD2#1:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
CB1#1:
28: Off
Check Box31#1: Off
Check Box32#1: Off
Building Name#2:
Address_2#1:
Name#2:
Job#2:
Date3#1:
3:
Text3#1:
1:
DD3#1:
1: [ ]
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
CB3#1:
4: Off cb3#1:
6: Off
CBAdditional Deficiencies#1: Off
CBAES10#1: Off
DefNumberAttached#1:
AES10NumberAttached#1:
SignatureDate#2:
Contractor City#1:
Contractor Address#1:
Text2#1:
3:
2:
PrintName#1:
PropertyCity#3:
PropertyAddress2#2:
NumberAES2#1:
9:
Building Name#3:
Name#3:
License#3:
Phone#3:
SFM#3:
Job#3:
Contact PersonRow1#3:
CSLB#3:
Misc#3:
Riser NoRow1#3:
LocationRow1#3:
Riser DiameterRow1#3:
Main Drain DiameterRow1#3:
Initial Static PressureRow1#3:
Residual PressureRow1#3:
Final Static PressureRow1#3:
Riser NoRow2#3:
LocationRow2#3:
Riser DiameterRow2#3:
Main Drain DiameterRow2#3:
Initial Static PressureRow2#3:
Residual PressureRow2#3:
Final Static PressureRow2#3:
Riser NoRow3#3:
LocationRow3#3:
Riser DiameterRow3#3:
Main Drain DiameterRow3#3:
Initial Static PressureRow3#3:
Residual PressureRow3#3:
Final Static PressureRow3#3:
Riser NoRow4#3:
LocationRow4#3:
Riser DiameterRow4#3:
Main Drain DiameterRow4#3:
Initial Static PressureRow4#3:
Residual PressureRow4#3:
Final Static PressureRow4#3:
Riser NoRow5#3:
LocationRow5#3:
Riser DiameterRow5#3:
Main Drain DiameterRow5#3:
Initial Static PressureRow5#3:
Residual PressureRow5#3:
Final Static PressureRow5#3:
Riser NoRow6#1:
LocationRow6#1:
Riser DiameterRow6#1:
Main Drain DiameterRow6#1:
Initial Static PressureRow6#1:
Residual PressureRow6#1:
Final Static PressureRow6#1:
Riser NoRow7#1:
LocationRow7#1:
Riser DiameterRow7#1:
Main Drain DiameterRow7#1:
Initial Static PressureRow7#1:
Residual PressureRow7#1:
Final Static PressureRow7#1:
Riser NoRow8#1:
LocationRow8#1:
Riser DiameterRow8#1:
Main Drain DiameterRow8#1:
Initial Static PressureRow8#1:
Residual PressureRow8#1:
Final Static PressureRow8#1:
Riser NoRow9#1:
LocationRow9#1:
Riser DiameterRow9#1:
Main Drain DiameterRow9#1:
Initial Static PressureRow9#1:
Residual PressureRow9#1:
Final Static PressureRow9#1:
Riser NoRow10#1:
LocationRow10#1:
Riser DiameterRow10#1:
Main Drain DiameterRow10#1:
Initial Static PressureRow10#1:
Residual PressureRow10#1:
Final Static PressureRow10#1:
Riser NoRow11#1:
LocationRow11#1:
Riser DiameterRow11#1:
Main Drain DiameterRow11#1:
Initial Static PressureRow11#1:
Residual PressureRow11#1:
Final Static PressureRow11#1:
Riser NoRow12#1:
LocationRow12#1:
Riser DiameterRow12#1:
Main Drain DiameterRow12#1:
Initial Static PressureRow12#1:
Residual PressureRow12#1:
Final Static PressureRow12#1:
Riser NoRow13#1:
LocationRow13#1:
Riser DiameterRow13#1:
Main Drain DiameterRow13#1:
Initial Static PressureRow13#1:
Residual PressureRow13#1:
Final Static PressureRow13#1:
Riser NoRow14#1:
LocationRow14#1:
Riser DiameterRow14#1:
Main Drain DiameterRow14#1:
Initial Static PressureRow14#1:
Residual PressureRow14#1:
Final Static PressureRow14#1:
Riser NoRow15#1:
LocationRow15#1:
Riser DiameterRow15#1:
Main Drain DiameterRow15#1:
Initial Static PressureRow15#1:
Residual PressureRow15#1:
Final Static PressureRow15#1:
Riser NoRow16#1:
LocationRow16#1:
Riser DiameterRow16#1:
Main Drain DiameterRow16#1:
Initial Static PressureRow16#1:
Residual PressureRow16#1:
Final Static PressureRow16#1:
Riser NoRow17#1:
LocationRow17#1:
Riser DiameterRow17#1:
Main Drain DiameterRow17#1:
Initial Static PressureRow17#1:
Residual PressureRow17#1:
Final Static PressureRow17#1:
Riser NoRow18#1:
LocationRow18#1:
Riser DiameterRow18#1:
Main Drain DiameterRow18#1:
Initial Static PressureRow18#1:
Residual PressureRow18#1:
Final Static PressureRow18#1:
Riser NoRow19#1:
LocationRow19#1:
Riser DiameterRow19#1:
Main Drain DiameterRow19#1:
Initial Static PressureRow19#1:
Residual PressureRow19#1:
Final Static PressureRow19#1:
Riser NoRow20#1:
LocationRow20#1:
Riser DiameterRow20#1:
Main Drain DiameterRow20#1:
Initial Static PressureRow20#1:
Residual PressureRow20#1:
Final Static PressureRow20#1:
Print Name#1:
PropertyAddress#1:
Address#1:
City#3:
STate#1:
ZIP#3:
SignatureDate#3:
PropertyCity#4:
CBCSLB#1: Off
CBSFM#1: Off
DD1#3:
0: [ ]
1: [ ]
2: [ ]
3: [ ]
4: [ ]
5: [ ]
6: [ ]
7: [ ]
8: [ ]
9: [ ]
10: [ ]
11: [ ]
12: [ ]
13: [ ]
14: [ ]
15: [ ]
16: [ ]
17: [ ]
18: [ ]
19: [ ]
PropertyAddress2#3:
PropertyPhone#1:
1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable
This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached:
* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III
Indicate all equipment, devices and parts tha