36C26118Q0510-006.doc
DOC document 54 KB Posted
- Attached to
- Ventilation System Verification Testing and Balancing Service for the San Francisco VA Medical Center
- Solicitation number
- 36C26118Q0510
About this file
36C26118Q0510 Attachment 2 QASP Test and Balance May 8 2018.doc
View the file
Other files
| File | Type | Posted |
|---|---|---|
| -14260.docx | DOCX document | |
| 36C26118Q0510-0001000.docx | DOCX document | |
| 36C26118Q0510-0001002.xlsx | XLSX spreadsheet | |
| 36C26118Q0510-0001001.xlsx | XLSX spreadsheet | |
| 36C26118Q0510-0001003.docx | DOCX document | |
| 36C26118Q0510-005.docx | DOCX document | |
| 36C26118Q0510-007.pdf | ||
| 36C26118Q0510-004.docx | DOCX document | |
| 36C26118Q0510-002.docx | DOCX document | |
| 36C26118Q0510-003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
(QASP)
For: Facilities Operations, Engineering Services Contract Number: TBD Contract Description: Test and Balance Service
Contractor’s name: TBD
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
*Note. The QASP is not a part of the contract. Its sole use is to monitor contractor performance.
2. Government Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: <Upon award, Government will enter name.> Organization or Agency: Department of Veterans Affairs, Network Contracting Office 21
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Victor Wei, Deputy Chief Engineer, Engineering Service
c. Other Key Government Personnel - Upon award, Government will enter name, if applicable. This may include Performance Monitors, Clinical Quality experts, etc. who act on behalf of the COR to monitor performance
3. Contractor Representatives The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager –Operation Chief Engineering Service, or designee
b. Other Contractor Personnel - Upon award, Government will enter name
4. Performance measures Performance measures are comprised of performance indicators (some characteristic of a deliverable that can be measured) and performance measures (a mark, measure or benchmark that government personnel use as a point of comparison when evaluating contractor performance). The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these measures.
The Performance Requirements Summary Matrix, paragraph <enter number> in the Performance Work Statement (PWS), includes performance measures. The Government shall use these measures to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Required Service |
| Standard |
| Performance Requirement (PR) |
| Method of |
Surveillance Factors to consider for Option Year Renewal
| Contractor shall provide inspection reports of supply and exhaust fans |
| Contractor shall provide required reporting criteria |
| Contractor shall have tools necessary to validate and test function of fans per manufacturer requirements |
| COR Complaint if fans fail unplanned due to standard inspection criteria |
| Yes |
| Contractor shall provide maintenance and inspection reports of fan belt repairs |
| Contractor shall provide required reporting criteria |
| Contractor shall provide a report that is legible and complete including the repairs and confirmation of operation. |
| COR Complaint that Reports were not furnished. |
| Yes |
| Contractor Shall test and balance quarterly |
| Provide quarterly Reports of Inspection, Testing, Balancing and Correction made along with any follow up action needed. |
| Shall be submitted 14 days prior to the end of the quarter. |
| COR to confirm delivery of each |
| Yes |
| Contractor shall balance ventilation to meet requirements |
| Reference |
Latest VA HVAC Design guide. Provide reports
| Set proper air flow and air exchange rates each quarter |
| COR Field Verify Random sampling |
| Yes |
5. Incentives AND DISINCENTIVES There are no incentives or disincentives. The Government shall use the scoring methods above for continuing contract performance.
6. Methods of QUALITY ASSURANCE Surveillance Various methods exist to monitor performance. The COR may use any surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION: The COR can perform periodically or through 100% surveillance.
b. PERIODIC INSPECTION. The COR evaluates outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, or annually or use unscheduled inspections.
c. USER SURVEY: This method combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. The COR may also generate inspections and sampling.
d. VALIDATED USER/CUSTOMER COMPLAINTS. This method relies on the patient to identify deficiencies. Complaints are then investigated and validated.
e.100% INSPECTION. The COR may evaluate all outcomes.
f. RANDOM SAMPLING. This is designed to evaluate performance by randomly selecting and inspecting a sample of cases.
g. Progress reports or status meetings. The COR will analyze contractor's progress reports. (Evaluate cost, schedule, etc.)
7. Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral or negative outcome. The following ratings shall be used: 100% is positive, 95% is neutral, and 90% is negative.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE Performance (100% rating) The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE performance (90% RATING) When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor and a copy to the Contracting Officer.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.
QASP Template
NOTES ON USING THIS TEMPLATE:
This template has been developed to assist you in creating a Quality Assurance Surveillance Plan (QASP). The purpose of the QASP is to provide the Government and contractor with evaluation criteria that determines whether or not the performance standards for a specific contract have been met.
This template should be TAILORED to meet your specific requirements. The performance standards included in this QASP should match the performance standards proposed in the “Performance Requirements Summary Matrix” in your PWS.
The following guidelines are provided for using this template:
Instructions, explanations, and comments are embedded throughout this template in two forms:
AND
< User input guidance looks like this. >
TO FINALIZE THIS DOCUMENT:
Remove all instruction boxes throughout the document.
Remove all ‘< >’ markers.
Remove all highlighting.
File details come from the government source that posted it.