The file's text, extracted by GovTribe without its formatting.
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-20-2018 662-18-3-6048-0024 None
612MCP
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 5342 Dudley Blvd, Bldg 209 McClellan
CA
95652-2609
612MCP
Department of Veterans Affairs Department of Veterans Affairs VA Northern California HealthCare System 3230 Peacekeeper Way, Bldg. 209 McClellan
CA
95652-1012 To all Offerors/Bidders
36C26118Q0510 06-20-2018
X X X Solicitation 36C26118Q0510 is Amended as follows:
a. Changes to the Statement of Work - revised SOW dated June 20, 2018 is attached. Changes are in red.
b. The following attachments have been added:
1. Report Template Guide/Sample
2. A listing of Rooms, Function, Air Exchange Requirements, Cubic Feet and etc.
c. Questions and Answers are attached.
B.2 Draft STATEMENT OF WORK Ventilation System Verification Testing and Balancing Service Contract Revised June 20, 2018
1. Basic Scope
1.1 Contractor shall furnish all equipment, labor, materials, apparatus, tools, parts, transportation, supervision, permits, disposal, reporting and expertise necessary to provide:
A. Testing/inspection report of the Supply Fans and Exhaust Fans listed in table 3.5.1 B. Preventive Maintenance report of belts for belt-driven exhaust fans listed in table 4.5.1 C. Quarterly Ventilation Testing and Balancing to the rooms listed below in table 5.4.1 up to 227231. There may be an additional 10 rooms, or no more than 4% by Cubic Feet, that can be added to this requirement. These requirements must match and reference the latest VA HVAC Manual or detail any deviations as necessary.
1.2 All services will be provided at San Francisco VA Medical Center, 4150 Clement Street, San Francisco, CA 94121 and 1700 Owens Street, San Francisco, CA.
1.3 All reports, workbooks, spreadsheets, no matter what format used, are the property of the VA and must be sent unlocked and sortable. Any formulas, data, functions and calculation that are part of the reports, workbooks, spread sheets must be included and are the property of the VA. All final quarterly reports are provided in both electronic (Microsoft Excel and Adobe Acrobat pdf) and hard copy format.
2. Definitions/Acronyms
A. Operations Facilities Manager – Engineering Supervisor or designee
B. CO - Contracting Officer
C. COR - Contracting Officer Representative
D. PM - Preventive Maintenance Inspection. Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions.
E. Balancing – Adjustments to supply or exhaust dampers, either electronically or manually, to bring a specific room into “balance”, to provide the required supply, exhaust, air changes necessary for each room and function
F. Acceptance Signature - VA employee who is authorized to sign-off on the quarterly final reports which indicate that the maintenance or report has been concluded or is still pending completion
G. Authorization Signature - COR signature; indicates COR accepts work status as stated
H. HVAC – Heating Ventilation and Air Conditioning
I. TIL – Technical Information Library: https://www.cfm.va.gov/TIL/
J. VAMC - Department of Veterans Affairs Medical Center, 4150 Clement St. San Francisco, CA 94121
K. MB – Mission Bay, 1700 Owens St. San Francisco, CA 94158
3. Fan Inspection Report
3.1 The Testing/Inspection Report for all Supply and Exhaust Fans shall include an inspection of all the fans listed in Table 1(3.5.1) serving most rooms listed in Table 3 (5.4.1). These inspections are made to confirm normal operation and safe conditions.
3.1.1 The COR or designee shall notify the Contracting Officer prior to adding or deleting any supply/exhaust fans from the contract. Equipment may be added or deleted from the service contract as needed upon notification by the Contracting Officer. Additions or deletions must be documented in writing via contract modification.
3.2 A quarterly report must be provided and accepted by the COR or designee at least one week prior to the start of Testing and Balancing, Section 5.
3.3 The Contractor shall perform necessary inspections according to manufacturer's specifications. The Contractor shall have written procedures to be followed and documented evidence demonstrating that each fan has been inspected according to those procedures.
3.4 The Contractor shall provide a printed and electronic check-off sheet noting the equipment being inspected and the specifications being met. Fan Inspection List Report must indicate date of service, the model, serial number and location of equipment serviced, and the services performed, and confirmation of test completion. Any fan that fails inspection, COR or designee shall be immediately notified of this failure in writing within 24 hours and provided recommended corrective action required.
3.5 The fans to be inspected and included in the Fan Inspection Report are listed in the table below.
Table 1: Fan Inspection List, 3.5.1
| Bldg. |
| ID |
| Description |
| Location |
Supply Fans
| 12 |
| AHU-1 |
| Air Handler |
| Bldg 12, Room 136-B |
| 12 |
| AHU-2 |
| Air Handler |
| Bldg 12, Rooftop |
| 41 |
| AHU-1 |
| Baldor/Energy Labs |
| Rooftop Bldg 41 |
| 41 |
| AHU-2 |
| Baldor/Energy Labs |
| Rooftop Bldg 41 |
| 200 |
| AHU-1-ER |
| Innovent, Air Handler |
| Ground Level, outside ER |
| 200 |
| 200-AHU-7 |
| Air Handler |
| Rooftop, Bldg 200 |
| 200 |
| 200-AHU-6 |
| Air Handler |
| Penthouse |
| 200 |
| 200-AHU-2 |
| Air Handler |
| BA-100, SW Basement |
| 200 |
| 200-AHU-9 |
| Air Handler |
| Rooftop Bldg 200 |
| 200 |
| 200-AHU-4 |
| Supply Fan |
| Penthouse |
| 200 |
| 200-AHU-8 |
| Air Handler |
| Rooftop, outside penthouse |
| 203 |
| 203-AHU-1 |
| Air Handler |
| Penthouse |
| 203 |
| 203-AHU-2 |
| Air Handler |
| Penthouse |
| 203 |
| AC-2 |
| Air Handler |
| Penthouse Bldg 203 |
| 203 |
| AC-1 |
| Air Handler |
| Penthouse Bldg 203 |
| 203 |
| HV-1 |
| Air Handler |
| Penthouse Bldg 203 |
| 203 |
| HV-3 |
| Air Handler |
| Penthouse Bldg 203 |
| 203 |
| SF-4 |
| Supply Fan |
| Penthouse Bldg 203 |
| 203 |
| AHU-1 |
| Air Handler |
| 203-C Rooftop |
| 203 |
| Cath Lab 240 |
| Air Handler |
| 203 Rooftop |
| 203 |
| 203-AHU-3 |
| Air Handler |
| Penthouse |
| 203 |
| 203-AHU-9 |
| Air Handler |
| Penthouse |
| 203 |
| Unknown No. |
| Air Handler |
| Overhang, above dock |
| 203 |
| SF-2 |
| Supply Fan |
| Room BA-100, SW Basement |
| 203 |
| Unknown No. |
| Air Handler |
| Ground, outside Nuclear Med. |
| Bldg. |
| Equipment ID |
| Description |
| Location |
Exhaust Fans
Rooftop Bldg 12 (upper roof)
| 12 |
| EF-1 |
| DD |
| Rooftop Bldg 12 (lower) |
| 12 |
| EF-2 |
| DD |
| Rooftop Bldg 12 (lower) |
| 12 |
| EF-3 |
| DD |
| Rooftop Bldg 12 (lower) |
| 12 |
| EF-4 |
| DD |
| Rooftop Bldg 12 (lower) |
| 12 |
| EF-5 |
| DD |
| Rooftop Bldg 12 (lower) |
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
| 41 |
| EF-1 |
| Series TS1 |
| Rooftop Bldg 41 |
| 41 |
| EF-2 |
| Series TS1 |
| Rooftop Bldg 41 |
| 41 |
| EF-3 |
| Series TS1 |
| Rooftop Bldg 41 |
| 41 |
| EF-4 |
| Series BS |
| Rooftop Bldg 41 |
| 41 |
| EF-5 |
| Toshiba Tri-Stack |
| Rooftop Bldg 41 |
| 200 |
| AHU-1 |
| Air Handler |
| Ground Level, outside ER |
1st Floor Rooftop
1st Floor Rooftop
Rooftop, Bldg 200
Rooftop, Bldg 200
| 200 |
| 200-EF-17 |
| White Fan |
| Rooftop, Bldg 200 |
| 200 |
| 200-EF-8 |
| Blue Fan |
| Top roof, above penthouse |
Top roof, above penthouse
| 200 |
| 200-EF-200 |
| Pit Fan |
| SE Pit, Rooftop 200 |
| 200 |
| Unknown # |
| Mushroom Fan |
| Rooftop, Bldg 200 |
| 200 |
| Unknown # |
| Mushroom Fan |
| Rooftop, Bldg 200 |
| 200 |
| Unknown # |
| Mushroom Fan |
| Rooftop, Bldg 200 |
| 200 |
| Unknown # |
| Pit Fan |
| SE Pit, Rooftop 200 |
Top roof, above penthouse
Rooftop, above Penthouse
Rooftop, above Penthouse
Rooftop, above ICU
Rooftop, above ICU
203-C Rooftop
203-C Rooftop
203-C Rooftop
Rooftop, above Penthouse
Rooftop
Rooftop
Rooftop
Rooftop
Rooftop
Rooftop
Rooftop
Rooftop
| 203 |
| 203-EF-7A |
| Carnes |
| Rooftop, above Penthouse |
| 203 |
| 203-EF-7B |
| Carnes |
| Rooftop, above Penthouse |
4. Replacement Belts.
4.1 The Testing/Inspection Report for all Belt-Driven Exhaust Fans shall include PMs of all belts on belt-driven exhaust fans serving the rooms listed in Table 3 (5.4.1). These inspections are made to confirm normal operation and safe conditions.
4.2 A quarterly report must be provided and accepted by the COR or designee at least one week prior to the start of Testing and Balancing, Section 5.
4.3 The Contractor shall evaluate all belts and replace according to manufacturer's specifications. The Contractor shall have written procedures to be followed and documented evidence demonstrating that each fan belt has been inspected according to those procedures. At a minimum, each belt must be replaced annually.
4.4 The contractor shall provide a printed and electronic check-off sheet noting the equipment being inspected and the specifications being met. The Belt Replacement Report must indicate date of service, the model, serial number and location of equipment serviced, and the services performed, parts replaced, and confirmation of test completion.
4.5 The fan belts to be inspected and included in the Belt Replacement Report are listed in the table below.
Table 2: Belt Replacement List, 4.5.1
| Bldg. |
| ID |
| Description |
| Location |
Rooftop Bldg 12 (old)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop Bldg 12 (new)
Rooftop
Rooftop
Rooftop
Rooftop
Rooftop
Penthouse
Penthouse
| 200 |
| EF-8 |
| Blue Fan |
| Rooftop Bldg 200 |
| 200 |
| EF-17 |
| White Fan |
| Rooftop Bldg 200 |
Top roof, above penthouse, Bldg 200
| 200 |
| Unknown No. |
| Serves ER 10 |
| 1st Floor Rooftop, Bldg 200-D |
| 200 |
| Unknown No. |
| Serves ER Bath |
| 1st Floor Rooftop, Bldg 200-D |
| 200 |
| Unknown No. |
| Mushroom Fan |
| Rooftop Bldg 200 |
| 200 |
| Unknown No. |
| Mushroom Fan |
| Rooftop Bldg 200 |
| 200 |
| Unknown No. |
| Mushroom Fan |
| Rooftop Bldg 200 |
Rooftop Bldg 203-C
Rooftop Bldg 203-C
Rooftop, above Penthouse, Bldg 203
| 203 |
| EF-7A |
| Carnes |
| Rooftop, above Penthouse, Bldg 203 |
| 203 |
| EF-7B |
| Carnes |
| Rooftop, above Penthouse, Bldg 203 |
Rooftop, above ICU, Bldg 203
Rooftop, above ICU, Bldg 203
Rooftop South
Rooftop South
Rooftop South
Rooftop South
Rooftop North
Rooftop North
Rooftop North
Rooftop North
5. Quarterly Testing and Balancing.
5.1 Testing and balancing will be scheduled and performed on a Quarterly basis.
a. Each report will indicate if room was balanced at the time of testing.
b. If corrections or errors identified by COR or designee are made after the testing report was submitted, a second report will be provided no later than 10 days after the adjustments or corrections were made.
c. It is the responsibility of the Contractor to Test and verify Balancing of each of the 227 231 rooms listed in 5.4.1 each quarter. There are also an additional 10 rooms that may be required as well.
d. Any room that cannot meet the required air exchange rate or balanced by damper adjustments, COR or designee shall be immediately notified of this failure in writing within 24 hours and provided recommended corrective action required. These deficiencies and recommendations will also be documented as well in the comments of the quarterly report.
5.2 Testing and balancing will be performed when the work will minimize disruptions to patients, patient services or research professionals. Where possible, testing and balancing should be done on weekends or after normal business hours.
5.2.1 Rooms with In-patients must be tested and balanced after breakfast and before evening meals are served, after 10:00 AM but before 4:00 PM every day. Testing and balancing should be scheduled in advance each quarter, and agreement made in writing, between the COR or designee and Contractor.
5.2.2 All Operating Suite rooms, Cardiac Catheterizations Lab/Interventional Radiology rooms, Minor Procedures/Urology rooms inspections must be done after hours or on weekends when the Procedure Rooms are not occupied.
5.2.2.1 For Operating Room, Operating Suite and SPS (Sterile Processing Service) inspections, the Contractor must be suited in appropriate, approved, protective, sterile clothing and shall ensure no debris, dust, or fallout from ducts remain behind.
5.2.3 Readings of registers are made with a certified Alnor Balometer or equivalent. For rooms with a fume hood, a certified Shortridge Instruments Verigrid is used. Proof of equipment certification shall be provided with report submission.
5.2.4 When Balancing is required in any room, an approved self-containment unit must be used and contractor must follow VA infection control procedures when working above ceiling and or in a restricted area. It is the responsibility of the contractor to clean up after they perform work that may have disrupted debris during the process.
5.2.5 Mission Bay is a leased facility and all balancing must be performed with Lessor assistance. Balancing will be performed with Lessor’s Building Management System and pre-approved by COR or designee.
5.3 Contractor shall provide necessary manpower and supervision to properly prepare reports of the Testing and Balancing each quarter. All reports for the quarter must be submitted at least 14 days prior to the end of the quarter.
5.3.1 The Testing and Balancing reports are compiled in two Quarterly reports:
a. The Patient Care Report, which includes all rooms and facilities listed in 5.4.1 for Buildings 200, 203, 208; and,
b. The Research Facilities Report, which includes all rooms and facilities listed in 5.4.1 for Buildings 12, 41, and MB.
5.3.2 The Contractor must distribute the full reports to the COR or designee within 10 days after the completion of all quarterly testing and balancing of the rooms.
5.3.3 The Quarterly Testing and Air Balancing Report must provide the following for each room listed in 5.4.1:
a) Room Number
b) Building
c) Cubic Feet
d) Required Balance
e) Required Supply (CFM)
f) Required Exhaust (CFM)
g) Minimum Required Air Changes
h) Actual Supply (CFM) per register and total
i) Actual Exhaust/Return (CFM) per register and total
j) Actual Air Changes per Hour
k) Actual Percent POS/NEG
l) Comments from Readings and Observations (including if balancing performed)
m) Isolation Room Alarm Test Results
n) Latest VA HVAC Design Manual Reference page
5.3.4 Test and Balance Reports Requirements listed in 5.3.3, in regard to sections d) Required Balance, e) Required Supply (CFM), f) Required Exhaust (CFM), g) Minimum Required Air Changes, are provided and pre-approved by the COR or designee. Any changes must also be approved by the COR or designee. COR or designee will validate or relay any changes at the start of each quarter or prior to. These items must be included for each room on the Test and Balance Reports. Any changes to these requirements does not constitute a change to this contract.
5.4 The COR or designee can add up to 10 rooms for testing at no additional charge at any time during the quarterly cycle. COR or designee will relay any additions and which report type, either patient care or research facilities, no later than the end of the second month of the quarter. The minimum number of rooms required are listed in the table below.
Page 1 of
Page 1 of
Table 3: Rooms requiring Testing and Balancing, 5.4.1
| Bldg |
| Room Number |
| Req. ACH |
| Req. Balance |
| Bldg |
| Room Number |
| Req. ACH |
| Req. Balance |
Building 200 Emergency Room (18)
Building 203 Non-Patient Rooms (2)
| 200 |
| GA-153 |
| 12 |
| NEG |
| 203 |
| BA-10 |
| 12 |
| NEG |
| 200 |
| GD-100 |
| 6 |
| Neutral |
| 203 |
| BA-10 Storage |
| 6 |
| NEG |
| 200 |
| GD-110 Entry |
| 12 |
| NEG |
| Building 203 In-Patient Pharmacy Suite (5) |
| 200 |
| GD-111 |
| 4 |
| Neutral |
| 203 |
| BA-1 |
| 25 |
| POS |
| 200 |
| GD-116/ER-1 |
| 6 |
| Neutral |
| 203 |
| BA-1A |
| 35 |
| NEG |
| 200 |
| GD-115/ER-2 |
| 6 |
| Neutral |
| 203 |
| BA-1B |
| 35 |
| POS |
| 200 |
| GD-114/ER-3 |
| 6 |
| Neutral |
| 203 |
| BA-6 |
| 4 |
| POS |
| 200 |
| GD-113/ER-4 |
| 6 |
| Neutral |
| 203 |
| BA-Restroom |
| 10 |
| D-NEG |
| 200 |
| GD-112/ER-5 |
| 6 |
| Neutral |
| Building 203 Patient Non-Isolation (11) |
| 200 |
| GD-107/ER-6 |
| 6 |
| Neutral |
| 203 |
| 3A-70/ICU-8 |
| 6 |
| POS |
| 200 |
| GD-106/ER-7 |
| 6 |
| Neutral |
| 203 |
| 3A-72/ICU-9 |
| 6 |
| POS |
| 200 |
| GD-105/ER-8 |
| 6 |
| Neutral |
| 203 |
| 3A-80/ICU-12 |
| 6 |
| POS |
| 200 |
| GD-104/ER-9 |
| 6 |
| Neutral |
| 203 |
| 3A-82/ICU-13 |
| 6 |
| POS |
| 200 |
| GD-102/ER-11 |
| 6 |
| Neutral |
| 203 |
| 3A-84/ICU-14 |
| 6 |
| POS |
| 200 |
| GD-101/ER-12 |
| 6 |
| Neutral |
| 203 |
| 3A-86/ICU-15 |
| 6 |
| POS |
| 200 |
| GD-117 |
| 10 |
| D-NEG |
| 203 |
| 3A-88/ICU-16 |
| 6 |
| POS |
| 200 |
| GD-103/ER-10 Ante |
| 10 |
| NEG |
| 203 |
| 3A-92/ICU-17 |
| 6 |
| POS |
| 200 |
| GD-103/ER-10 Main |
| 12 |
| NEG |
| 203 |
| 3A-94/ICU-18 |
| 6 |
| POS |
Building 200 Ground Floor Clean Storage (3)
| 200 |
| GA-202 |
| 4 |
| POS |
| 203 |
| 3A-65 |
| 4 |
| POS |
| 200 |
| GB-102 |
| 4 |
| POS |
| Building 203 Patient Isolation Rooms (29) |
| 200 |
| GD-119 |
| 4 |
| POS |
| 203 |
| 2A-35 |
| 12 |
| D-NEG |
Building 200 Radiology Suite (10)
| 200 |
| 2A-104 Waiting |
| 12 |
| NEG |
| 203 |
| 2A-45A |
| 10 |
| D-NEG |
| 200 |
| 2A-105 |
| 6 |
| Neutral |
| 203 |
| 2A-46 |
| 12 |
| D-NEG |
| 200 |
| 2A-106 |
| 6 |
| Neutral |
| 203 |
| 3A-40 |
| 12 |
| D-NEG |
| 200 |
| 2A-107 |
| 6 |
| Neutral |
| 203 |
| 3A-64/ICU-6 |
| 12 |
| D-NEG |
| 200 |
| 2A-111 |
| 20 |
| POS |
| 203 |
| 3A-68/ICU-7 |
| 12 |
| D-NEG |
| 200 |
| 2A-120B |
| 6 |
| Neutral |
| 203 |
| 3A-74/ICU-10 |
| 12 |
| D-NEG |
| 200 |
| 2A-127 |
| 20 |
| POS |
| 203 |
| 3A-78/ICU-11 |
| 12 |
| D-NEG |
| 200 |
| 2A-127B |
| 15 |
| POS |
| 203 |
| 2B-12 Ante |
| 10 |
| POS |
| 200 |
| 2A-139 |
| 6 |
| Neutral |
| 203 |
| 2B-12 |
| 12 |
| D-NEG |
| 200 |
| 2A-121 |
| 4 |
| POS |
| 203 |
| 2B-12 Toilet |
| 10 |
| D-NEG |
Building 200 Sterile Processing and Distribution (15)
| 200 |
| 1A-144 |
| 6 |
| D-NEG |
| 203 |
| 2B-17 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-103 |
| 4 |
| Neutral |
| 203 |
| 2B-57 Ante |
| 10 |
| POS |
| 200 |
| 3A-103C |
| 4 |
| POS |
| 203 |
| 2B-57 |
| 12 |
| D-NEG |
| 200 |
| 3A-104 |
| 4 |
| POS |
| 203 |
| 2B-57 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-105 |
| 4 |
| Neutral |
| 203 |
| 2B-65 |
| 12 |
| D-NEG |
| 200 |
| 3A-106 |
| 4 |
| Neutral |
| 203 |
| 2B-65 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-108 |
| 10 |
| POS |
| 203 |
| 3B-12 Ante |
| 10 |
| POS |
| 200 |
| 3A-108A |
| 6 |
| NEG |
| 203 |
| 3B-12 |
| 12 |
| D-NEG |
| 200 |
| 3A-108C |
| 10 |
| D-NEG |
| 203 |
| 3B-12 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-109 |
| 6 |
| D-NEG |
| 203 |
| 3B-18 |
| 12 |
| D-NEG |
| 200 |
| 3A-109A |
| 6 |
| D-NEG |
| 203 |
| 3B-18 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-109B |
| 10 |
| D-NEG |
| 203 |
| 3B-56 Ante |
| 10 |
| POS |
| 200 |
| 3A-109E |
| 10 |
| POS |
| 203 |
| 3B-56 |
| 12 |
| D-NEG |
| 200 |
| 3A-110 |
| 4 |
| D-POS |
| 203 |
| 3B-56 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-110B |
| 10 |
| D-NEG |
| 203 |
| 3B-62 |
| 12 |
| D-NEG |
Building 200/203 Operating Rooms and Suite (34)
| 203 |
| 3B-62 Toilet |
| 10 |
| D-NEG |
| 200 |
| 3A-156/OR 1 |
| 20 |
| D-POS |
| Building 12 (21) |
| 200 |
| 3A-155/OR 2 |
| 20 |
| D-POS |
| 12 |
| 124 |
| 15 |
| POS |
| 200 |
| 3A-154/OR 3 |
| 20 |
| D-POS |
| 12 |
| 127A |
| 15 |
| D-NEG |
| 200 |
| 3A-152/OR 4 |
| 20 |
| D-POS |
| 12 |
| 128 |
| 15 |
| NEG |
| 200 |
| 3A-151/OR 5 |
| 20 |
| D-POS |
| 12 |
| 129 |
| 15 |
| NEG |
| 200 |
| 3A-150/OR 6 |
| 20 |
| D-POS |
| 12 |
| 132 |
| 15 |
| NEG |
| 200 |
| 3A-159/OR 7 |
| 20 |
| D-POS |
| 12 |
| 133 |
| 15 |
| NEG |
| 200 |
| 3B-121/OR 8 |
| 20 |
| D-POS |
| 12 |
| 134 |
| 15 |
| NEG |
| 200 |
| 3B-123/OR 9 |
| 20 |
| D-POS |
| 12 |
| 135 |
| 15 |
| NEG |
| 200 |
| 3A-140 |
| 10 |
| D-NEG |
| 12 |
| 136 |
| 15 |
| NEG |
| 200 |
| 3A-111 |
| 6 |
| D-NEG |
| 12 |
| 137 |
| 15 |
| NEG |
| 200 |
| 3A-113 |
| 4 |
| NEG |
| 12 |
| 139 |
| 15 |
| POS |
| 200 |
| 3A-113A/B |
| 4 |
| Neutral |
| 12 |
| 141 |
| 4 |
| NEG |
| 200 |
| 3A-114 |
| 10 |
| NEG |
| 12 |
| 145 |
| 20 |
| NEG |
| 200 |
| 3A-116A |
| 4 |
| Neutral |
| 12 |
| 149 |
| 4 |
| NEG |
| 200 |
| 3A-116 |
| 10 |
| NEG |
| 12 |
| 151 |
| 4 |
| POS |
| 200 |
| 3A-117 |
| 4 |
| Neutral |
| 12 |
| 152 |
| 15 |
| NEG |
| 200 |
| 3A-117A |
| 4 |
| Neutral |
| 12 |
| 154 |
| 15 |
| NEG |
| 200 |
| 3A-117B |
| 4 |
| Neutral |
| 12 |
| 155 |
| 15 |
| D-NEG |
| 200 |
| 3A-117C |
| 10 |
| D-NEG |
| 12 |
| 156 |
| 15 |
| NEG |
| 200 |
| 3A-122 |
| 6 |
| Neutral |
| 12 |
| 158 |
| 15 |
| NEG |
| 200 |
| 3A-Pre-Op |
| 6 |
| POS |
| 12 |
| 159 |
| 15 |
| NEG |
| 200 |
| 3A-139 |
| 4 |
| D-POS |
| Building 41 (30) |
| 200 |
| 3A-142 |
| 6 |
| Neutral |
| 41 |
| G01 |
| 6 |
| POS |
| 200 |
| 3A-146 |
| 12 |
| D-NEG |
| 41 |
| G04 |
| 20 |
| NEG |
| 200 |
| 3A-149 |
| 10 |
| D-NEG |
| 41 |
| G05 |
| 4 |
| Neutral |
| 200 |
| 3A-153D |
| 8 |
| POS |
| 41 |
| G06 |
| 10 |
| NEG |
| 200 |
| 3A-158A |
| 4 |
| POS |
| 41 |
| G08 |
| 10 |
| D-NEG |
| 203 |
| 3C-2 |
| 6 |
| POS |
| 41 |
| G09 |
| 6 |
| D-NEG |
| 203 |
| 3C-2A |
| 6 |
| Neutral |
| 41 |
| G11 |
| 10 |
| NEG |
| 203 |
| 3C-4 |
| 8 |
| Neutral |
| 41 |
| G13 |
| 4 |
| NEG |
| 203 |
| 3C-5 |
| 4 |
| POS |
| 41 |
| G15 |
| 8 |
| Neutral |
| 203 |
| 3C-9 |
| 10 |
| D-NEG |
| 41 |
| G16 |
| 4 |
| POS |
| 203 |
| 3C-11 |
| 12 |
| D-NEG |
| 41 |
| G17 |
| 8 |
| Neutral |
Building 203 Nuclear Medicine Suite Non-Isolation Rooms (14)
| 203 |
| GB-51 |
| 6 |
| NEG |
| 41 |
| 101 |
| 15 |
| POS |
| 203 |
| GB-52 |
| 6 |
| POS |
| 41 |
| 102 |
| 15 |
| POS |
| 203 |
| GB-53 |
| 12 |
| NEG |
| 41 |
| 103 |
| 15 |
| POS |
| 203 |
| GB-54 |
| 10 |
| D-NEG |
| 41 |
| 104 |
| 15 |
| POS |
| 203 |
| GB-55 |
| 4 |
| POS |
| 41 |
| 105 |
| 15 |
| POS |
| 203 |
| GB-56 |
| 6 |
| NEG |
| 41 |
| 106 |
| 15 |
| NEG |
| 203 |
| GB-56A |
| 10 |
| NEG |
| 41 |
| 107 |
| 15 |
| NEG |
| 203 |
| GB-56B |
| 10 |
| D-NEG |
| 41 |
| 108 |
| 15 |
| NEG |
| 203 |
| GB-59 |
| 6 |
| NEG |
| 41 |
| 109 |
| 15 |
| NEG |
| 203 |
| GB-60 |
| 12 |
| NEG |
| 41 |
| 110 |
| 15 |
| NEG |
| 203 |
| GB-61 |
| 6 |
| NEG |
| 41 |
| 111 |
| 15 |
| NEG |
| 203 |
| GB-62 |
| 12 |
| NEG |
| 41 |
| 112 |
| 15 |
| NEG |
| 203 |
| GB-63 |
| 6 |
| POS |
| 41 |
| 113 |
| 15 |
| D-NEG |
| 203 |
| GB-64 |
| 6 |
| NEG |
| 41 |
| 114 |
| 8 |
| Neutral |
Building 203 Catheter Laboratory Suite (10)
| 203 |
| 2C |
| 8 |
| Neutral |
| 41 |
| 116 |
| 8 |
| NEG |
| 203 |
| 2C Hallway/Core |
| 8 |
| POS |
| 41 |
| 119 |
| 4 |
| Neutral |
| 203 |
| 2C-4 |
| 6 |
| POS |
| 41 |
| 122 |
| 15 |
| D-NEG |
| 203 |
| 2C-4A |
| 10 |
| D-NEG |
| MISSION BAY 1700 Owens St. (19) |
| 203 |
| 2C-5 Catheter Lab 3 |
| 20 |
| D-POS |
| MB |
| 449 |
| 4 |
| Neutral |
| 203 |
| 2C-6 |
| 12 |
| D-NEG |
| MB |
| 450 |
| 15 |
| NEG |
| 203 |
| 2C-9 Control Room 2/3 |
| 8 |
| Neutral |
| MB |
| 451 |
| 15 |
| POS |
| 203 |
| 2C-10 Catheter Lab 2 |
| 20 |
| POS |
| MB |
| 452 |
| 15 |
| NEG |
| 203 |
| 2C-11 Catheter Lab 1 |
| 20 |
| POS |
| MB |
| 453 |
| 15 |
| NEG |
| 203 |
| 2C-11A Control Room 1 |
| 8 |
| Neutral |
| MB |
| 454 |
| 15 |
| NEG |
Building 203 Gastrointestinal Suite (4)
| 203 |
| 2A-64 |
| 10 |
| NEG |
| MB |
| 459 |
| 15 |
| NEG |
| 203 |
| 2A-64A |
| 4 |
| POS |
| MB |
| 460 |
| 15 |
| NEG |
| 203 |
| 2A-75 Dirty |
| 10 |
| D-NEG |
| MB |
| 463 |
| 6 |
| POS |
| 203 |
| 2A-73 |
| 4 |
| POS |
| MB |
| 464 |
| 20 |
| NEG |
Building 203 Patient Treatment (4)
| 203 |
| 3A-104 |
| 12 |
| NEG |
| MB |
| 470A |
| 15 |
| NEG |
| 203 |
| 1B-23 |
| 6 |
| Neutral |
| MB |
| 470B |
| 15 |
| POS |
| 203 |
| 1B-23A |
| 6 |
| Neutral |
| MB |
| 470C |
| 15 |
| POS |
| 203 |
| 1B-24 |
| 6 |
| Neutral |
| MB |
| 475 |
| 15 |
| POS |
Building 208 Clean Storage (2)
| 208 |
| 1A-112 |
| 4 |
| POS |
| MB |
| 478 |
| 15 |
| NEG |
| 208 |
| GA-116 |
| 4 |
| POS |
| MB |
| 484 |
| 15 |
| POS |
5.4.1 Required Balance Designations:
NEG - Negative Air Balance
D-NEG - Double Negative Air Balance
POS - Positive Air Balance
D-POS - Double Positive Air Balance
Neutral (o) - Neutral Air Balance
6. Qualification
3.1 Contractor shall have been engaged in maintaining/servicing/testing the equipment listed in table 3.5.1 for a minimum of three (3) years. Contractor shall have a field service representative who has received maintenance training specific to the models listed.
3.2 Contractor shall provide, upon request, evidence of appropriate training of any field service representative.
7. Quality Assurance
7.1 For the tasks listed in the Performance Requirement Table (PRT) below, the COR or designee will follow the methods of surveillance specified in this contract.
7.2 When a required service in the PRT indicates defective performance, the COR or designee will require the contract manager or representative at the site to document the observation and forward to the Contracting Officer to maintain in the file. The documentation of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that he or she has been made aware of the defective performance. Government surveillance of tasks not listed in the PRT or by methods other than those listed in the PRT (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the contracting officer as a result of surveillance will be in accordance with the terms of this contract.
7.3 The Contractor and COR or designee will meet prior to end of each quarter to review reports and discuss any issues. These will be scheduled in person.
7.3.1 Performance Requirements
Table 4: Performance Requirements, 7.3.1
| Required Service |
| Standard |
| Performance Requirement (PR) |
| Method of |
Surveillance Factors to consider for Option Year Renewal
| Contractor shall provide inspection reports of supply and exhaust fans |
| Contractor shall provide required reporting criteria |
| Contractor shall have tools necessary to validate and test function of fans per manufacturer requirements |
| COR Complaint if fans fail unplanned due to standard inspection criteria |
| Yes |
| Contractor shall provide maintenance and inspection reports of fan belt repairs |
| Contractor shall provide required reporting criteria |
| Contractor shall provide a report that is legible and complete including the repairs and confirmation of operation. |
| COR Complaint that Reports were not furnished. |
| Yes |
| Contractor Shall test and balance quarterly |
| Provide quarterly Reports of Inspection, Testing, Balancing and Correction made along with any follow up action needed. |
| Shall be submitted 14 days prior to the end of the quarter. |
| COR to confirm delivery of each |
| Yes |
| Contractor shall balance ventilation to meet requirements |
| Reference |
Latest VA HVAC Design guide. Provide reports
| Set proper air flow and air exchange rates each quarter |
| COR Field Verify Random sampling |
| Yes |
Invoicing: All invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/US/en/veterans-affairs/ to begin submitting electronic invoices, free of charge.
More information on the VA Financial Services Center is available at http://www.fsc.va.gov/einvoice.asp.
Vendor e-Invoice Set-Up Information:
Please contact Tungsten at the phone number or email address listed below to begin submitting your electronic invoices to the VA Financial Services Center for payment processing, free of charge. If you have question about the e-invoicing program or Tungsten, please contact the FSC at the phone number or email address listed below:
· Tungsten e-Invoice Setup Information: 1-877-489-6135
· Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com
· FSC e-Invoice Contact Information: 1-877-353-9791
· FSC e-invoice email: vafsccshd@va.gov
See attached document: Rooms-Location Attachment FY18.
See attached document: Report Template Guide-Sample.
See attached document: S05 Questions and Answers June 20, 2018.