36C26118B0608-003.pdf
PDF 16 MB Posted
- Attached to
- Waterline Bypass and Improvements Federal contract opportunity
- Solicitation number
- 36C26118B0608
About this file
36C26118B0608 Combined Drawings_Part2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118C0130-000.docx | DOCX document | |
| 36C26118B0608-0005001.pdf | ||
| 36C26118B0608-0005000.docx | DOCX document | |
| 36C26118B0608-0004000.docx | DOCX document | |
| 36C26118B0608-0003001.pdf | ||
| 36C26118B0608-0003000.docx | DOCX document | |
| 36C26118B0608-0002000.docx | DOCX document | |
| 36C26118B0608-0001000.docx | DOCX document | |
| 36C26118B0608-0001002.pdf | ||
| 36C26118B0608-0001001.pdf | ||
| 36C26118B0608-005.docx | DOCX document | |
| 36C26118B0608-008.pdf | ||
| 36C26118B0608-007.docx | DOCX document | |
| 36C26118B0608-006.docx | DOCX document | |
| 36C26118B0608-002.pdf | ||
| 36C26118B0608-004.pdf | ||
| 36C26118B0608-001.docx | DOCX document | |
| 36C26118B0608-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
acorrion Rectangle acorrion Ellipse acorrion Callout
EXISTING WATER HEATER TO REMAIN
acorrion Rectangle acorrion Callout
EXISTING WATER SOFTENING EQUIPMENT TO REMAIN
acorrion Callout
EXISTING DOMESTIC BOOSTER PUMP STATION
acorrion Rectangle acorrion Callout
REMOVE EXISTING NON-OPERATIONAL CHLORINE DIOXIDE SYSTEM
acorrion Rectangle acorrion Callout
DISCONNECT AND REMOVE DEAD LEG PIPE BACK TO MAIN AND CAP FOR FUTURE
acorrion Callout
EXISTING CW FILTRATION SYSTEM
acorrion Callout
EXISTING FILTERED CW BOOSTER PUMP STATION
acorrion Text Box
CW
acorrion Text Box
FCW
acorrion Text Box
FCW
acorrion Line jogregor Callout
EXISTING CHLORINE DIOXIDE INJECTION PORTS
JOGREGOR
Text Box Southern Nevada VA Medical Center
JOGREGOR
Text Box 593-15-305
ACORRION
Text Box VA Southern Nevada Healthcare System
ACORRION
Rectangle
ACORRION
Rectangle
JOGREGOR
Image
ACORRION
Typewritten Text
APRIL 2, 2018
ACORRION
Snapshot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-305
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
KEY PLAN
APRIL 2, 2018
F
VA Southern Nevada Healthcare System
9/15/17100% REVIEW
11/14/17ISSUED FOR CONSTRUCTION
PLUMBING PLAN - CENTRAL PLANT
BASEMENT - ENLARGED PLANS
1/4" = 1'-0"
KEY PLAN
#4
#2
#3 jogregor Rectangle jogregor Callout
OWNER EQUIPMENT ( NON PERMANENT)
JOGREGOR
Text Box Southern Nevada VA Medical Center
JOGREGOR
Text Box 593-15-305
ACORRION
Text Box VA Southern Nevada Healthcare System
ACORRION
Rectangle
ACORRION
Rectangle
ACORRION
Rectangle
JOGREGOR
Image
ACORRION
Typewritten Text
APRIL 2, 2018
SEQUENCE OF OPERATION
NORMAL OPERATIONS:
1. CW-1 NORMALLY OPEN TO FEED THE DOMESTIC BOOSTER PUMP IN THE PLANT BASEMENT (THIS VALVE IS CLOSED DURING EMERGENCY MODE).
2. CW-2 NORMALLY CLOSED TO KEEP WATER FROM LEAVING TANK (VALVE USED ONLY IN EMERGENCY MODE).
3. PUMPS ADJACENT TO TANK 2 WILL DRAW WATER FROM BOTTOM 2'-0” OF THE TANK AND PUMP TO SUPPLY EACH TANK WITH WATER (PUMPS P1 & P-2
CAN ALSO BE USED TO MOVE WATER FROM ONE TANK TO ANOTHER).
4. CW-3 IS NORMALLY OPEN TO SUPPLY WATER TO TANK 2.
5. CTF-1 VALVES, 3 & 4 ARE NORMALLY CLOSED (MANUALLY OPERATED).
6. PTF-1 VALVES, 3 & 4 ARE NORMALLY OPEN (MANUALLY OPERATED) TO ALLOW TANKS TO FILL AT SAME TIME OR WHEN CALLED FOR BY EXISTING LEVEL
TRANSDUCERS.
7. DRAIN VALVE 2 IS NORMALLY CLOSED AND ONLY OPENED TO DRAIN ANY OF THE FOUR TANKS 1, 2, 3 & 4,
8. DRAIN VALVE 1 NORMALLY CLOSED, OPENED ONLY TO DRAIN OR MOVE WATER FROM TANK TO TANK.
9. TANK ISOLATION VALVES ARE NORMALLY CLOSED.
EMERGENCY MODE: LOSS OF CITY WATER PRESSURE
1. CW-1 CLOSES
2. CW-2 OPENS
3. TANK 2 DRAIN VALVE CLOSED BY SOLENOID VALVE WHICH WILL TURN PUMPS OFF.
4. INDUSTRIAL WATER WILL CONTINUE TO PULL WATER FROM 1, 3 & 4 TANKS.
5. DOMESTIC WATER WILL BE PULLED FROM TANK 2.
6. WHEN CITY PRESSURE RETURNS TO NORMAL, SOLENOIDS WILL CLOSE CW-2 AND OPEN CW-1 AND TANK 2 DRAIN VALVE AUTOMATICALLY. IF NEEDING ADDITIONAL WATER TO FILL TANKS WHILE TANK 2 CATCHES UP, USE CTF VALVES MANUALLY USING OVERRIDE TO FILL THEN MANUALLY CLOSE ONCE
FILLED TO DESIRED LEVEL.
7. FACILITY IS NOW ON CITY WATER.
USE EXISTING LEVEL TRANSDUCER FILL VALVE SIGNAL TO OPERATE
PUMP WHEN TANK CALLS FOR WATER,THIS SIGNAL WILL ALSO BE
CONNECTED TO THE PTF VALVE TO OPERATE IN A SIMILAR FASHION.
NORMALLY CLOSED CTF FILL VALVE (TYP), USE TO REFILL A TANK FROM EMPTY (MANUALLY OPERATED).
NORMALLY OPEN FILL VALVE (TYP), CLOSE TO RELOCATE WATER FROM ONE TANK TO ANOTHER (MANUALLY
OPERATED).
TANK 2 LEVEL TRANSDUCER TO OPERATE FILL VALVE. TANKS 1, 3 & 4
LEVEL TRANSDUCERS WILL OPERATE THE PUMPS TO FILL THE
THREE TANKS WHEN THEY CALL FOR WATER.
TANKS 1,3 & 4 FILL VALVE / ISOLATION VALVE TO DRAIN A TANK.
DISCONNECT (E) 6" CW AND CONNECT NEW 6" CW AND REROUTE OVER TO WALL. REFER TO DETAIL F7 ON
SHEET P-100-CU.
DISCONNECT (E) 6" CW UNDERGROUND AT PIPE ELBOW AND CAP.
CONNECT NEW 10" CW TO (E) 6" CW LINE WITH MJ FITTINGS IN THE VERTICAL
CTF = CITY TANK FILL VALVE
PTF = PUMPED TANK FILL VALVE
DV = DRAIN VALVE
CW = CITY WATER VALVE
Plumbing Flow Diagrams
NTS
JCG AIC
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-305
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
KEY PLAN
APRIL 2, 2018
F
VA Southern Nevada Healthcare System
9/15/17100% REVIEW
11/14/17ISSUED FOR CONSTRUCTION
SEQUENCE OF OPERATION:
NORMAL OPERATIONS:
1. VALVE 1 NORMALLY OPEN TO FEED THE DOMESTIC BOOSTER PUMPS IN THE PLANT BASEMENT. DURING NORMAL OPERATION CITY WATER WILL RUN THROUGH THE BASEMENT DOMESTIC BOOSTER PUMP, VALVE CLOSED DURING EMERGENCY MODE (SOLENOID
OPERATED VALVE).
2. VALVE 2 NORMALLY CLOSED TO KEEP WATER FROM LEAVING TANK TO SERVE CENTRAL UTILITY PLANT BASEMENT DOMESTIC BOOSTER
PUMP, VALVE OPENED ONLY IN EMERGENCY (SOLENOID OPERATED VALVE).
3. PUMPS ADJACENT TO TANK 2 WILL DRAW WATER FROM BOTTOM 2'-0” OF THE TANK AND PUMP AROUND WALL ON PIPE RACK TO SUPPLY EACH TANK WITH WATER, PUMPS CAN ALSO BE USED TO MOVE WATER FROM ONE TANK TO ANOTHER.
4. FILL VALVE IS NORMALLY OPEN TO SUPPLY WATER TO TANK 2.
5. CITY TANK FILL VALVES CTF-1, 3 & 4 ARE NORMALLY CLOSED (MANUALLY OPERATED).
6. PUMP TANK FILL VALVES PTF-1, 3 & 4 ARE NORMALLY OPEN (MANUALLY OPERATED) TO ALLOW TANKS TO FILL AT SAME TIME OR WHEN
CALLED FOR BY EXISTING LEVEL TRANSDUCERS.
7. DRAIN VALVE 2 IS NORMALLY CLOSED AND ONLY OPENED TO DRAIN ANY OF THE THREE TANKS 1, 3 & 4, DRAIN VALVE 1 NORMALLY
CLOSED, OPENED ONLY TO DRAIN OR MOVE WATER FROM TANK TO TANK.
8. TANK ISOLATION VALVES ARE NORMALLY CLOSED.
EMERGENCY MODE: LOSS OF CITY WATER PRESSURE (USE EXISTING SIGNAL)
1. VALVE 1 CLOSES
2. VALVE 2 OPENS
3. TANK 2 DRAIN VALVE CLOSED BY SOLENOID VALVE WHICH WILL TURN PUMPS OFF SIMULTANEOUSLY.
4. INDUSTRIAL WATER WILL CONTINUE TO PULL WATER FROM THREE TANKS AS REQUIRED.
5. DOMESTIC WATER WILL BE PULLED FROM TANK 2.
6. WHEN CITY PRESSURE RETURNS TO NORMAL, SOLENOID VALVE 2 WILL CLOSE AND OPEN SOLENOID VALVE 1. TANK 2 SOLENOID DRAIN VALVE WILL AUTOMATICALLY OPEN USING SOLENOID VALVE. IF NEEDING ADDITIONAL WATER TO FILL TANKS WHILE TANK 2 CATCHES UP, USE CTF VALVES MANUALLY USING OVERRIDE TO FILL THEN MANUALLY CLOSE ONCE FILLED TO DESIRED LEVEL.
7. YOU ARE NOW ON CITY WATER.
PLUMBING REVISED
STORAGE TANK DETAILS
NTS
JCG JCG
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-305
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
KEY PLAN
APRIL 2, 2018
F
VA Southern Nevada Healthcare System
9/15/17100% REVIEW
11/14/17ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-305
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
KEY PLAN
APRIL 2, 2018
F
VA Southern Nevada Healthcare System
Callout
DISCONNECT AND REMOVE SYSTEM, PROVIDE QUICK DISCONNECT AT COLUMN
ACORRION
Rectangle
ACORRION
Rectangle
ACORRION
Callout
REMOVE HOT WATER FROM 160 DEGREE LINE AND CONNECT TO 120 DEGREE LINE.
ACORRION
Callout
INSTALL SPARCO MIXING VALVES ON ALL HAND SINKS SET TO DELIVER 120 DEGREES.
ACORRION
Callout
INSTALL SPARCO MIXING VALVES ON ALL HAND SINKS SET TO DELIVER 120 DEGREES.
ACORRION
Text Box
ACORRION
Text Box
BF103
ACORRION
Text Box
TUNNEL TO CLC
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
ACORRION
Text Box
BE101
ACORRION
Callout
EXISTING 6" BYPASS
ACORRION
Text Box
BD423
ACORRION
Text Box
MECH RM
ACORRION
Rectangle
ACORRION
Callout
INSULATED WATER STORAGE TANKS
ACORRION
Text Box
HX-1
ACORRION
Text Box
WH-1
ACORRION
Text Box
RCP-1
ACORRION
Text Box
RCP-2
ACORRION
Text Box
(TEMPORARY)
ACORRION
Rectangle
ACORRION
Text Box
DWH-7
ACORRION
Text Box
DWH-8
ACORRION
Text Box
DWH-9
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box I
ACORRION
Line
ACORRION
Line
ACORRION
Line
ACORRION
Text Box S
ACORRION
Ellipse
ACORRION
Arrow
ACORRION
Arrow
ACORRION
Callout
8" DOMESTIC WATER TO 6" WATER IN BASEMENT MECHANICAL ROOM
ACORRION
Callout INSTALL QUICK DISCONNECTS ON HOT, HOT RETURN AND COLD WATER MAINS FOR PORTABLE CHLORINE INJECTION SYSTEM. SEE DETAIL E4 SHEET P-501 (TYP).
ACORRION
Line
JOGREGOR
Text Box Southern Nevada VA Medical Center
JOGREGOR
Text Box 593-15-305
ACORRION
Text Box VA Southern Nevada Healthcare System
ACORRION
Rectangle
ACORRION
Rectangle
JOGREGOR
Image
ACORRION
Typewritten Text
APRIL 2, 2018
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-107
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 250, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
VA Medical Center Legionella Preventative Measures
KEY PLAN
June 8, 2015
F
JCG AIC
\\phxarch-srv\Newforma\202067\CON0082520\CON0096280\000000000250238\6.0_CAD_BIM\6.2_Work_In_Progress\DWG\250238P-603.dwg, 6/17/2015 3:52:08 PM, DWG To PDF.pc3 jogregor Rectangle jogregor Rectangle jogregor Callout
SET DISCHARGE TEMPERATURE ON THE MIXING VALVE TO 124 DEGREES
jogregor Text Box jogregor Callout
SET HEAT EXCHANGERS TO DELIVER 140 DEGREES
jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Line jogregor Line jogregor Callout
REMOVE DEAD END PIPING BACK TO THIS LOCATION AND CAP FOR FUTURE
jogregor Callout
REMOVE
jogregor Text Box jogregor Text Box jogregor Text Box jogregor Callout
OPEN HEAT EXCHANGER AND BRING ONLINE, SET FOR 140 DEGREES DELIVERY TEMP.
jogregor Callout
OPEN VALVE
jogregor Callout
OPEN VALVE
jogregor Text Box
70 TO 80 DEGREE INCOMING WATER
jogregor Ellipse jogregor Ellipse jogregor Ellipse jogregor Line jogregor Line jogregor Ellipse jogregor Line jogregor Line jogregor Callout
INCOMING PSI 100
jogregor Callout
100 PSI
jogregor Callout
100 PSI
jogregor Callout
___ PSI
jogregor Callout
___ PSI
jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box IF KITCHEN REQUIRES 160 DEGREES, THEN REMOVE MIXING VALVE ALL TOGETHER AND REMOVE SHOWERS FROM 160 LINE IN CORRIDOR - VERIFY WITH VA - REVIEW HEAT EXCHANGER DELTA CALC jogregor Callout
RESET HEAT EXCHANGER TO DELIVER 160 DEGREE WATER
jogregor Callout
RESET HEAT EXCHANGER TO DELIVER 160 DEGREE WATER
jogregor Callout
WATER PSI 100
jogregor Callout
WATER PSI 100
jogregor Callout
PSI __
jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Polygon jogregor Text Box jogregor Polygon jogregor Polygon jogregor Polygon jogregor Polygon jogregor Ellipse jogregor Ellipse jogregor Ellipse jogregor Callout
CLOSED
jogregor Ellipse jogregor Line jogregor Line jogregor Rectangle jogregor Callout
SET HEAT EXCHANGERS TO DELIVER 140 DEGREES
acorrion Text Box acorrion Callout
CONTROL VALVE
acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc acorrion Callout
CONTROL VALVE
acorrion Text Box acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc acorrion Callout
CONTROL VALVE
acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc
JOGREGOR
Text Box Southern Nevada VA Medical Center
JOGREGOR
Text Box 593-15-305
ACORRION
Text Box VA Southern Nevada Healthcare System
ACORRION
Rectangle
ACORRION
Rectangle
JOGREGOR
Image
ACORRION
Typewritten Text
APRIL 2, 2018
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-305
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
KEY PLAN
APRIL 2, 2018
F
VA Southern Nevada Healthcare System
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6
87 9
F
E
D
C
B
A
97 8654321
Scale:
593-15-107
North Las Vegas, NV
CIVIL:
MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 250, PHOENIX, AZ 85018
LIFE SAFETY:
MEDICAL EQUIP. PLANNING:
STRUCTURAL:
FOOD SERVICE:
GEOTECHNICAL:
TELECOM/SECURITY:
VERTICAL TRANSPORTATION/
MATERIALS MANAGEMENT:
VA Southern Nevada Healthcare System
KEY PLAN
NOVEMBER 14,
F
JCG AIC
PLUMBING SCHEDULES
100% REVIEW
ISSUED FOR CONSTRUCTION
9/15/17 11/14/17
-NOT TO SCALE
ACORRION
Rectangle
ACORRION
Typewritten Text
PLUMBING SCHEDULES
ACORRION
Typewritten Text
APRIL 2, 2018
Typewritten Text
MARCH 16, 2018
ACORRION
APRIL 2, 2018
| 19-P-404 |
| 20-P-405 |
| 21-P-501 |
| 22-P-502 |
| 23-P-503 |
| 24-P-601 |
| 25-P-602 |
| 26-P-603 |
| 27-P-604 |
| 28-P-701 |
| 29-E-001 |
| 30-E-115 |
| 31-EP-103 |
| 32-EP-108 |
| 33-EP-119 |
| 34-E-501 |
| 35-E-701 |
File details come from the government source that posted it.