36C26118B0608-003.pdf

PDF 16 MB Posted

Attached to
Waterline Bypass and Improvements Federal contract opportunity
Solicitation number
36C26118B0608
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26118B0608 Combined Drawings_Part2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Waterline Bypass and Improvements, newest first.
File Type Posted
36C26118C0130-000.docx DOCX document
36C26118B0608-0005001.pdf PDF
36C26118B0608-0005000.docx DOCX document
36C26118B0608-0004000.docx DOCX document
36C26118B0608-0003001.pdf PDF
36C26118B0608-0003000.docx DOCX document
36C26118B0608-0002000.docx DOCX document
36C26118B0608-0001000.docx DOCX document
36C26118B0608-0001002.pdf PDF
36C26118B0608-0001001.pdf PDF
36C26118B0608-005.docx DOCX document
36C26118B0608-008.pdf PDF
36C26118B0608-007.docx DOCX document
36C26118B0608-006.docx DOCX document
36C26118B0608-002.pdf PDF
36C26118B0608-004.pdf PDF
36C26118B0608-001.docx DOCX document
36C26118B0608-000.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

acorrion Rectangle acorrion Ellipse acorrion Callout

EXISTING WATER HEATER TO REMAIN

acorrion Rectangle acorrion Callout

EXISTING WATER SOFTENING EQUIPMENT TO REMAIN

acorrion Callout

EXISTING DOMESTIC BOOSTER PUMP STATION

acorrion Rectangle acorrion Callout

REMOVE EXISTING NON-OPERATIONAL CHLORINE DIOXIDE SYSTEM

acorrion Rectangle acorrion Callout

DISCONNECT AND REMOVE DEAD LEG PIPE BACK TO MAIN AND CAP FOR FUTURE

acorrion Callout

EXISTING CW FILTRATION SYSTEM

acorrion Callout

EXISTING FILTERED CW BOOSTER PUMP STATION

acorrion Text Box

CW

acorrion Text Box

FCW

acorrion Text Box

FCW

acorrion Line jogregor Callout

EXISTING CHLORINE DIOXIDE INJECTION PORTS

JOGREGOR

Text Box Southern Nevada VA Medical Center

JOGREGOR

Text Box 593-15-305

ACORRION

Text Box VA Southern Nevada Healthcare System

ACORRION

Rectangle

ACORRION

Rectangle

JOGREGOR

Image

ACORRION

Typewritten Text

APRIL 2, 2018

ACORRION

Snapshot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-305

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

KEY PLAN

APRIL 2, 2018

F

VA Southern Nevada Healthcare System

9/15/17100% REVIEW

11/14/17ISSUED FOR CONSTRUCTION

PLUMBING PLAN - CENTRAL PLANT

BASEMENT - ENLARGED PLANS

1/4" = 1'-0"

KEY PLAN

#4

#2

#3 jogregor Rectangle jogregor Callout

OWNER EQUIPMENT ( NON PERMANENT)

JOGREGOR

Text Box Southern Nevada VA Medical Center

JOGREGOR

Text Box 593-15-305

ACORRION

Text Box VA Southern Nevada Healthcare System

ACORRION

Rectangle

ACORRION

Rectangle

ACORRION

Rectangle

JOGREGOR

Image

ACORRION

Typewritten Text

APRIL 2, 2018

SEQUENCE OF OPERATION

NORMAL OPERATIONS:

1. CW-1 NORMALLY OPEN TO FEED THE DOMESTIC BOOSTER PUMP IN THE PLANT BASEMENT (THIS VALVE IS CLOSED DURING EMERGENCY MODE).

2. CW-2 NORMALLY CLOSED TO KEEP WATER FROM LEAVING TANK (VALVE USED ONLY IN EMERGENCY MODE).

3. PUMPS ADJACENT TO TANK 2 WILL DRAW WATER FROM BOTTOM 2'-0” OF THE TANK AND PUMP TO SUPPLY EACH TANK WITH WATER (PUMPS P1 & P-2

CAN ALSO BE USED TO MOVE WATER FROM ONE TANK TO ANOTHER).

4. CW-3 IS NORMALLY OPEN TO SUPPLY WATER TO TANK 2.

5. CTF-1 VALVES, 3 & 4 ARE NORMALLY CLOSED (MANUALLY OPERATED).

6. PTF-1 VALVES, 3 & 4 ARE NORMALLY OPEN (MANUALLY OPERATED) TO ALLOW TANKS TO FILL AT SAME TIME OR WHEN CALLED FOR BY EXISTING LEVEL

TRANSDUCERS.

7. DRAIN VALVE 2 IS NORMALLY CLOSED AND ONLY OPENED TO DRAIN ANY OF THE FOUR TANKS 1, 2, 3 & 4,

8. DRAIN VALVE 1 NORMALLY CLOSED, OPENED ONLY TO DRAIN OR MOVE WATER FROM TANK TO TANK.

9. TANK ISOLATION VALVES ARE NORMALLY CLOSED.

EMERGENCY MODE: LOSS OF CITY WATER PRESSURE

1. CW-1 CLOSES

2. CW-2 OPENS

3. TANK 2 DRAIN VALVE CLOSED BY SOLENOID VALVE WHICH WILL TURN PUMPS OFF.

4. INDUSTRIAL WATER WILL CONTINUE TO PULL WATER FROM 1, 3 & 4 TANKS.

5. DOMESTIC WATER WILL BE PULLED FROM TANK 2.

6. WHEN CITY PRESSURE RETURNS TO NORMAL, SOLENOIDS WILL CLOSE CW-2 AND OPEN CW-1 AND TANK 2 DRAIN VALVE AUTOMATICALLY. IF NEEDING ADDITIONAL WATER TO FILL TANKS WHILE TANK 2 CATCHES UP, USE CTF VALVES MANUALLY USING OVERRIDE TO FILL THEN MANUALLY CLOSE ONCE

FILLED TO DESIRED LEVEL.

7. FACILITY IS NOW ON CITY WATER.

USE EXISTING LEVEL TRANSDUCER FILL VALVE SIGNAL TO OPERATE

PUMP WHEN TANK CALLS FOR WATER,THIS SIGNAL WILL ALSO BE

CONNECTED TO THE PTF VALVE TO OPERATE IN A SIMILAR FASHION.

NORMALLY CLOSED CTF FILL VALVE (TYP), USE TO REFILL A TANK FROM EMPTY (MANUALLY OPERATED).

NORMALLY OPEN FILL VALVE (TYP), CLOSE TO RELOCATE WATER FROM ONE TANK TO ANOTHER (MANUALLY

OPERATED).

TANK 2 LEVEL TRANSDUCER TO OPERATE FILL VALVE. TANKS 1, 3 & 4

LEVEL TRANSDUCERS WILL OPERATE THE PUMPS TO FILL THE

THREE TANKS WHEN THEY CALL FOR WATER.

TANKS 1,3 & 4 FILL VALVE / ISOLATION VALVE TO DRAIN A TANK.

DISCONNECT (E) 6" CW AND CONNECT NEW 6" CW AND REROUTE OVER TO WALL. REFER TO DETAIL F7 ON

SHEET P-100-CU.

DISCONNECT (E) 6" CW UNDERGROUND AT PIPE ELBOW AND CAP.

CONNECT NEW 10" CW TO (E) 6" CW LINE WITH MJ FITTINGS IN THE VERTICAL

CTF = CITY TANK FILL VALVE

PTF = PUMPED TANK FILL VALVE

DV = DRAIN VALVE

CW = CITY WATER VALVE

Plumbing Flow Diagrams

NTS

JCG AIC

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-305

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

KEY PLAN

APRIL 2, 2018

F

VA Southern Nevada Healthcare System

9/15/17100% REVIEW

11/14/17ISSUED FOR CONSTRUCTION

SEQUENCE OF OPERATION:

NORMAL OPERATIONS:

1. VALVE 1 NORMALLY OPEN TO FEED THE DOMESTIC BOOSTER PUMPS IN THE PLANT BASEMENT. DURING NORMAL OPERATION CITY WATER WILL RUN THROUGH THE BASEMENT DOMESTIC BOOSTER PUMP, VALVE CLOSED DURING EMERGENCY MODE (SOLENOID

OPERATED VALVE).

2. VALVE 2 NORMALLY CLOSED TO KEEP WATER FROM LEAVING TANK TO SERVE CENTRAL UTILITY PLANT BASEMENT DOMESTIC BOOSTER

PUMP, VALVE OPENED ONLY IN EMERGENCY (SOLENOID OPERATED VALVE).

3. PUMPS ADJACENT TO TANK 2 WILL DRAW WATER FROM BOTTOM 2'-0” OF THE TANK AND PUMP AROUND WALL ON PIPE RACK TO SUPPLY EACH TANK WITH WATER, PUMPS CAN ALSO BE USED TO MOVE WATER FROM ONE TANK TO ANOTHER.

4. FILL VALVE IS NORMALLY OPEN TO SUPPLY WATER TO TANK 2.

5. CITY TANK FILL VALVES CTF-1, 3 & 4 ARE NORMALLY CLOSED (MANUALLY OPERATED).

6. PUMP TANK FILL VALVES PTF-1, 3 & 4 ARE NORMALLY OPEN (MANUALLY OPERATED) TO ALLOW TANKS TO FILL AT SAME TIME OR WHEN

CALLED FOR BY EXISTING LEVEL TRANSDUCERS.

7. DRAIN VALVE 2 IS NORMALLY CLOSED AND ONLY OPENED TO DRAIN ANY OF THE THREE TANKS 1, 3 & 4, DRAIN VALVE 1 NORMALLY

CLOSED, OPENED ONLY TO DRAIN OR MOVE WATER FROM TANK TO TANK.

8. TANK ISOLATION VALVES ARE NORMALLY CLOSED.

EMERGENCY MODE: LOSS OF CITY WATER PRESSURE (USE EXISTING SIGNAL)

1. VALVE 1 CLOSES

2. VALVE 2 OPENS

3. TANK 2 DRAIN VALVE CLOSED BY SOLENOID VALVE WHICH WILL TURN PUMPS OFF SIMULTANEOUSLY.

4. INDUSTRIAL WATER WILL CONTINUE TO PULL WATER FROM THREE TANKS AS REQUIRED.

5. DOMESTIC WATER WILL BE PULLED FROM TANK 2.

6. WHEN CITY PRESSURE RETURNS TO NORMAL, SOLENOID VALVE 2 WILL CLOSE AND OPEN SOLENOID VALVE 1. TANK 2 SOLENOID DRAIN VALVE WILL AUTOMATICALLY OPEN USING SOLENOID VALVE. IF NEEDING ADDITIONAL WATER TO FILL TANKS WHILE TANK 2 CATCHES UP, USE CTF VALVES MANUALLY USING OVERRIDE TO FILL THEN MANUALLY CLOSE ONCE FILLED TO DESIRED LEVEL.

7. YOU ARE NOW ON CITY WATER.

PLUMBING REVISED

STORAGE TANK DETAILS

NTS

JCG JCG

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-305

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

KEY PLAN

APRIL 2, 2018

F

VA Southern Nevada Healthcare System

9/15/17100% REVIEW

11/14/17ISSUED FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-305

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

KEY PLAN

APRIL 2, 2018

F

VA Southern Nevada Healthcare System

Callout

DISCONNECT AND REMOVE SYSTEM, PROVIDE QUICK DISCONNECT AT COLUMN

ACORRION

Rectangle

ACORRION

Rectangle

ACORRION

Callout

REMOVE HOT WATER FROM 160 DEGREE LINE AND CONNECT TO 120 DEGREE LINE.

ACORRION

Callout

INSTALL SPARCO MIXING VALVES ON ALL HAND SINKS SET TO DELIVER 120 DEGREES.

ACORRION

Callout

INSTALL SPARCO MIXING VALVES ON ALL HAND SINKS SET TO DELIVER 120 DEGREES.

ACORRION

Text Box

ACORRION

Text Box

BF103

ACORRION

Text Box

TUNNEL TO CLC

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

ACORRION

Text Box

BE101

ACORRION

Callout

EXISTING 6" BYPASS

ACORRION

Text Box

BD423

ACORRION

Text Box

MECH RM

ACORRION

Rectangle

ACORRION

Callout

INSULATED WATER STORAGE TANKS

ACORRION

Text Box

HX-1

ACORRION

Text Box

WH-1

ACORRION

Text Box

RCP-1

ACORRION

Text Box

RCP-2

ACORRION

Text Box

(TEMPORARY)

ACORRION

Rectangle

ACORRION

Text Box

DWH-7

ACORRION

Text Box

DWH-8

ACORRION

Text Box

DWH-9

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box I

ACORRION

Line

ACORRION

Line

ACORRION

Line

ACORRION

Text Box S

ACORRION

Ellipse

ACORRION

Arrow

ACORRION

Arrow

ACORRION

Callout

8" DOMESTIC WATER TO 6" WATER IN BASEMENT MECHANICAL ROOM

ACORRION

Callout INSTALL QUICK DISCONNECTS ON HOT, HOT RETURN AND COLD WATER MAINS FOR PORTABLE CHLORINE INJECTION SYSTEM. SEE DETAIL E4 SHEET P-501 (TYP).

ACORRION

Line

JOGREGOR

Text Box Southern Nevada VA Medical Center

JOGREGOR

Text Box 593-15-305

ACORRION

Text Box VA Southern Nevada Healthcare System

ACORRION

Rectangle

ACORRION

Rectangle

JOGREGOR

Image

ACORRION

Typewritten Text

APRIL 2, 2018

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-107

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 250, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

VA Medical Center Legionella Preventative Measures

KEY PLAN

June 8, 2015

F

JCG AIC

\\phxarch-srv\Newforma\202067\CON0082520\CON0096280\000000000250238\6.0_CAD_BIM\6.2_Work_In_Progress\DWG\250238P-603.dwg, 6/17/2015 3:52:08 PM, DWG To PDF.pc3 jogregor Rectangle jogregor Rectangle jogregor Callout

SET DISCHARGE TEMPERATURE ON THE MIXING VALVE TO 124 DEGREES

jogregor Text Box jogregor Callout

SET HEAT EXCHANGERS TO DELIVER 140 DEGREES

jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Line jogregor Line jogregor Callout

REMOVE DEAD END PIPING BACK TO THIS LOCATION AND CAP FOR FUTURE

jogregor Callout

REMOVE

jogregor Text Box jogregor Text Box jogregor Text Box jogregor Callout

OPEN HEAT EXCHANGER AND BRING ONLINE, SET FOR 140 DEGREES DELIVERY TEMP.

jogregor Callout

OPEN VALVE

jogregor Callout

OPEN VALVE

jogregor Text Box

70 TO 80 DEGREE INCOMING WATER

jogregor Ellipse jogregor Ellipse jogregor Ellipse jogregor Line jogregor Line jogregor Ellipse jogregor Line jogregor Line jogregor Callout

INCOMING PSI 100

jogregor Callout

100 PSI

jogregor Callout

100 PSI

jogregor Callout

___ PSI

jogregor Callout

___ PSI

jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box IF KITCHEN REQUIRES 160 DEGREES, THEN REMOVE MIXING VALVE ALL TOGETHER AND REMOVE SHOWERS FROM 160 LINE IN CORRIDOR - VERIFY WITH VA - REVIEW HEAT EXCHANGER DELTA CALC jogregor Callout

RESET HEAT EXCHANGER TO DELIVER 160 DEGREE WATER

jogregor Callout

RESET HEAT EXCHANGER TO DELIVER 160 DEGREE WATER

jogregor Callout

WATER PSI 100

jogregor Callout

WATER PSI 100

jogregor Callout

PSI __

jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Text Box jogregor Polygon jogregor Text Box jogregor Polygon jogregor Polygon jogregor Polygon jogregor Polygon jogregor Ellipse jogregor Ellipse jogregor Ellipse jogregor Callout

CLOSED

jogregor Ellipse jogregor Line jogregor Line jogregor Rectangle jogregor Callout

SET HEAT EXCHANGERS TO DELIVER 140 DEGREES

acorrion Text Box acorrion Callout

CONTROL VALVE

acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc acorrion Callout

CONTROL VALVE

acorrion Text Box acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc acorrion Callout

CONTROL VALVE

acorrion Text Box acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Line acorrion Arc acorrion Arc acorrion Arc acorrion Arc

JOGREGOR

Text Box Southern Nevada VA Medical Center

JOGREGOR

Text Box 593-15-305

ACORRION

Text Box VA Southern Nevada Healthcare System

ACORRION

Rectangle

ACORRION

Rectangle

JOGREGOR

Image

ACORRION

Typewritten Text

APRIL 2, 2018

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-305

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 350, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

KEY PLAN

APRIL 2, 2018

F

VA Southern Nevada Healthcare System

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6

87 9

F

E

D

C

B

A

97 8654321

Scale:

593-15-107

North Las Vegas, NV

CIVIL:

MEP: HDR, 3200 EAST CAMELBACK RD. SUITE 250, PHOENIX, AZ 85018

LIFE SAFETY:

MEDICAL EQUIP. PLANNING:

STRUCTURAL:

FOOD SERVICE:

GEOTECHNICAL:

TELECOM/SECURITY:

VERTICAL TRANSPORTATION/

MATERIALS MANAGEMENT:

VA Southern Nevada Healthcare System

KEY PLAN

NOVEMBER 14,

F

JCG AIC

PLUMBING SCHEDULES

100% REVIEW

ISSUED FOR CONSTRUCTION

9/15/17 11/14/17

-NOT TO SCALE

ACORRION

Rectangle

ACORRION

Typewritten Text

PLUMBING SCHEDULES

ACORRION

Typewritten Text

APRIL 2, 2018

Typewritten Text

MARCH 16, 2018

ACORRION

APRIL 2, 2018

19-P-404
20-P-405
21-P-501
22-P-502
23-P-503
24-P-601
25-P-602
26-P-603
27-P-604
28-P-701
29-E-001
30-E-115
31-EP-103
32-EP-108
33-EP-119
34-E-501
35-E-701

File details come from the government source that posted it.