36C26118B0608 0004 36C26118B0608 0004.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26118C0130-000.docx | DOCX document | |
| 36C26118B0608-0005001.pdf | ||
| 36C26118B0608-0005000.docx | DOCX document | |
| 36C26118B0608-0003001.pdf | ||
| 36C26118B0608-0003000.docx | DOCX document | |
| 36C26118B0608-0002000.docx | DOCX document | |
| 36C26118B0608-0001002.pdf | ||
| 36C26118B0608-0001001.pdf | ||
| 36C26118B0608-0001000.docx | DOCX document | |
| 36C26118B0608-005.docx | DOCX document | |
| 36C26118B0608-008.pdf | ||
| 36C26118B0608-007.docx | DOCX document | |
| 36C26118B0608-006.docx | DOCX document | |
| 36C26118B0608-002.pdf | ||
| 36C26118B0608-004.pdf | ||
| 36C26118B0608-001.docx | DOCX document | |
| 36C26118B0608-003.pdf | ||
| 36C26118B0608-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-30-2018 593-15-305 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders
36C26118B0608 08-30-2018
X x x The purpose of this amendment is to answer Requests for Information (RFIs) 1 through 14 and extend the bid due date and time. The bid due date and time is extended to September 7, 2018 at 10AM PST. A public bid opening will be at 10AM PST Sept ember 7, 2018 at 975 Kirman Avenue, Reno, NV 89502, Building 1A, Room D2427.
RFI #1 – Does the 150-calendar day Period of Performance include time to receive contractor access badges?
Specifications state to submit information to the sponsor “at least two weeks prior to requesting a badge”, however, it has been our understanding that badges can take many months to receive.
Answer: Yes, the 150 days calendar day Period of Performance include time to receive contractor access badges.
RFI #2 – Drawing pages P-103-1, P-106-1 and P-102-5 call for new surface mounted receptacles at the locations of the Water Quality Monitoring Stations. Please advise on whether these are duplex or quad receptacles.
Answer: New receptacles shall be duplex type. Clarification: The circuits shown on these drawings are not available on the same floor as the scope of work. In order to install the new receptacle and wire to an existing circuit on the same floor revise the following drawing notes as follows:
Page P-103-1:
Replace circuit call-out 4-L-5F, 32 with circuit 4-L-3C, 13 for a new receptacle and extend from existing receptacle in adjacent Social Worker Office. Per as-built drawings, this will be the 4th receptacle on to this circuit for a calculated total load of 720VA.
Replace circuit call-out 3-L-5F, 49 with circuit 4-L-3C, 11 for a new receptacle and extend from an existing receptacle in the adjacent Waiting Area. Per as-built drawings, this will be the 6th receptacle added to this circuit for a calculated total load of 900VA.
Replace circuit call-out 2-L-5F, 26 with circuit 3-L-3C,5 for a new receptacle and extend from an existing receptacle in the adjacent associate Hospital Directors’ Office. Per as-built drawings, this will be the 8th receptacle on this circuit for a calculated total load of 1440VA.
Replace circuit call-out 1-L-5F,12 with circuit 9-L-3C,2 for a new receptacle and extend from an existing receptacle in an adjacent Training Office. Per as-built drawings, this will be the 4th receptacle on this circuit for a calculated total load of 720VA.
Page P-106-1:
Replace circuit call-out 4-L-5F, 32 with circuit 4-L-6F, 24 for a new receptacle and extend from an existing Corridor receptacle. Per as-built drawings this will be the 8th receptacle on this circuit for a calculated total load of 1440VA.
Replace circuit call-out 2-L-5F, 25 with circuit 2-L-6F, 49 for a new receptacle and extend from an existing receptacle located in the adjacent Elec. Room. Per as-built drawings this will be the 5th receptacle on this circuit for a calculated load of 900VA.
Replace circuit 3-L-5F, 44 with circuit 3-L-6F, 62 for a new receptacle and extend from an existing Corridor receptacle. Per as-built drawings this will be the 5th receptacle on this circuit for a calculated load of 600VA.
Replace circuit 1-L-5F, 12 with circuit 1-L-6F, 44 for a new receptacle and extend from an existing Corridor receptacle. Per as-built drawings, this will be the 5th receptacle on this circuit for a calculated load of 600VA.
RFI #3 – Receptacle on P-102-5 does not include a circuit designation. Can the contractor assume that the circuit is nearby and that all circuits designated for added receptacles have the available space and will not exceed code requirements for receptacles per circuit?
Answer: Extend existing circuit EQL1H,14 from existing Corridor receptacle. Per as-built drawings, this will be the 5th receptacle on this circuit for a calculated load of 920VA. Refer to responses in RFI #2 to receptacle loads per circuit information.
RFI#4 – Drawing page P-403 Detail F1 includes an Option A to “DISCONNECT AND REMOVE OFFLINE WATER HEATER…” however, the bid schedule does not have a location for an optional line item. Please advise.
Answer: Disregard the scope as an Option and remove the Water Heater and associated piping.
RFI #5 – Drawing P-501 Detail F7 is for an OPTIONAL PORTABLE SAMPLING TEST KIT, however, the bid schedule does not have a location for an optional line item. Please advise.
Answer: The Portable Sampling Test Kit is not optional and shall be provided.
RFI #6 – Drawing page P-603 Detail F6 includes a note that states, “IF KITCHEN REQUIRES 160 DEGREES, THEN REMOVE MIXING VALVE ALL TOGETHER AND REMOVE SHOWERS FROM 160 LINE IN CORRIDOR…” Please advise if we are to bid to the drawing or to the note.
Answer: The kitchen requires 160 DEGREES, therefore bid to the drawing.
RFI #7 – Has the new connection to the city water been permitted and approved by the City?
Answer: Contractor is responsible for investigating this concern with the City.
RFI #8 – Solicitation documents include a DIVISION CONSTRUCTION COSTS breakdown to be submitted with our proposal. This breakdown does not include all the divisions from the Combined Specifications. Further, it includes an “Other” line item. Please advise on how we are to break out our costs.
Answer: If item is not listed under the DIVISIONS CONSTRUCTION COST breakdown, Add a line item and call it “Other”.
RFI #9 – Can the contractor propose a Value-Engineering solution?
Answer: Yes, contractor can propose a Value Engineering (VE) solution. However, the VE solution needs to be submitted for approval. Value engineering proposals shall be submitted after contract award.
RFI #10 – Is there a specification available for the Legionella monitoring system components?
Answer: Please refer to Specification Section 22 01 16 – 2.4 for Legionella Monitoring System Components.
RFI #11 – Can WiFi devices be utilized for the Legionella monitoring system components? It has been our understanding that the AVA does not allow WiFi for this type of purpose.
Answer: It depends:
1.If the monitoring system will be connected to Metasys/BMS, then it cannot be connected to any Wifi.
2.If not connecting to Metasys/BMS and does not require to be secured then it can connect to the VA general customer Wifi (no password required).
3.If not connecting to Metasys/BMS but requires secure connection then it needs to be coordinated with VA IT.
RFI #12 – The diagrams appear to show much of the water returning to the CW and HW piping after passing through the water quality monitoring stations. This is a violation of the SDWA since the water will pass non-NSF 61 certified sensors. This same flow arrangement is depicted in the "mobile unit". Can you change it so that water is sent to drain rather than recirculating into the water distribution system to ensure compliance with SDWA?
Answer: This will be corrected and discharge will go to drain or collection basin.
RFI #13 – At the site visit, Phigenics Potable Water Analytics Monitoring Systems were discussed as a solution for the continuous monitoring requirements. Will you allow Phigenics PWA Monitoring Systems which are designed to meet the VHA 1061 requirements for continuous monitoring?
Answer: Phigenics may submit information to VA on the Phigenics PWA Monitoring System for review and approval.
RFI #14 - From 2.4.3: The system will monitor the water quality and communicates the data via the existing Ethernet network. The data is received by the master station that reports the data directly to the BMS.
So the water monitor will be connected to the master via ethernet but doesn't specifically say that the master is connected to the BMS over ethernet. Technically if the water monitors and BMS are using modbus tcp and are on the same network there is no need for the masters. Can you please tell us if the masters are being provided by the VA or the contract and explain how the masters are supposed to communicate with the BMS?
Answer:
1. Metasys/BMS will only communicate with BACnet compatible devices.
2. As a minimum, if we are able to connect, we will need a Field Equipment Controller (FEC) to connected it to the closes NAE (Network Automation Engine) if there’s any. If not, we will also need a NAE as well. Fiber optic cables, media converters, switch, just to name a few, will also need to be discussed.
3. Once connected, JCI will need to program the equipment and pull all the points in Metasys/BMS and build new graphics to view/monitor.