RFI Responses Project: Replace Piping at VA Bldg. 650, Mather.
Project No.: 612A4-18-233 Solicitation No.: 36C26118B0377
RFI No. 1
Question: Please provide the length and size/type of pipe that needs to be removed and the length and size/type of pipe that needs to be placed. A scaled drawing of the roof top showing which lines are to be removed/placed and the alignment of the new lines is required to scope this project with any degree of accuracy. (Figure 2 of the SOW is insufficient for this purpose)
Answer: The existing piping are steel piping sizes are in rage of 2 to 6 inches. The estimated
2,500 feet of existing piping. See attached drawings.
RFI No. 2
Question: Please provide the number and type of AHU connections and valves that these new cold and hot water lines require. We understand that not all the systems shown on Figure 2 of the SOW are to be connected to this new system.
Answer: AHU’s 1, 8, 9, 10,11,12
AHU-1 (B-646)
B-651 (M.H under construction).
RFI No. 3
Question: Are we to use corrugated aluminum insulation jacketing or smooth aluminum?
Answer: Smooth aluminum.
RFI No. 4
Question: Are we to provide new cross over ladders?
Answer: No, re-use existing.
RFI No. 5
Question: Are we to provide a CA structural engineer to create details and provide stamped drawing for piping supports, anchoring, and bracing?
Answer: Yes, this required and submitted as part of submittals and shop drawings.
RFI No. 6
Question: - Are all the AHU connections to be hot tapped?
Answer: 6-inch and smaller
RFI No. 7
Question: Can the existing stands be reused where possible?
Answer: Only for piping size 6 and smaller, the support for larger pipes should be design and submit as part of submittals/ shop drawings.
RFI No. 8
Question: How many seismic joints will be required?
Answer: The number of Seismic joints and locations shall meet Chapter 17, ASCE standard 7-
05. Thermal expansion joints using ( Metra flex Metra loop) and Seismic Joint shall be design and submitted as part of submittals/ shop drawings.
RFI No. 9
Question: Does the newly routed gas line need to be schedule 40 galvanized or bare?
Answer: Black Steel, meet ASTM A53.
RFI No. 10
Question: The scope of work says no shut downs are allowed. Please confirm that a shut down for the natural gas connection is acceptable? Is this to be weekend work
Answer: Yes- only in weekend.
RFI No. 11
Question: Section 23 08 00 refers to General Commissioning Requirements 01 91 00 but that specification section was not included.
Answer: See attached specs.
RFI No. 12
Question: How much storage space will be available on site? If so, how far will the space be located from the site of the project?
Answer: VA will accommodate storage area for material nearby project job site.
RFI No. 13
Question: What portion of the project must be performed during night hours?
Answer: Transition from existing system to new system, any shutdown that will have affect to the Medical Center, and any welding.
RFI No. 14
Question: Can temporary rated flexible piping may be used on the roof during the installation as a method to bypass and maintain service in the system until permanent piping is installed?
Answer: Yes, the flex piping must be rigid PVC or approval equal.
RFI No. 15
Question: Are there any as built drawings available?
Answer: There are limited as built available to successful bidder.