About this file

36C26118B0040 36C26118B0040.docx

View the file

Other files

File Type Posted
36C26118C0029-000.docx DOCX document
36C26118B0040-00002000.docx DOCX document
36C26118B0040-00002001.pdf PDF
36C26118B0040-00001000.docx DOCX document
36C26118B0040-00001002.pdf PDF
36C26118B0040-00001001.pdf PDF
36C26118B0040-007.doc DOC document
36C26118B0040-010.docx DOCX document
36C26118B0040-002.pdf PDF
36C26118B0040-004.pdf PDF
36C26118B0040-008.pdf PDF
36C26118B0040-005.pdf PDF
36C26118B0040-009.pdf PDF
36C26118B0040-006.pdf PDF
36C26118B0040-003.pdf PDF
36C26118B0040-000.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26118B0040 Environmental Controls and Monitoring

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26118B0040 X 12-15-2017 593-18-2-5907-0003 593-15-103 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Bids have been authorized and are to be sent by email to Megan Barr at megan.barr@va.gov

Megan Barr 775-785-7154 Project Number: 593-15-103 Project Title: Environmental Controls and Monitoring Project Location: VA Southern Nevada Health Care System, 6900 N. Pecos Road, North Las Vegas, NV 89086

The general scope of this work is for the contractor to furnish all labor, materials, equipment, supervision, supplies, travel, etc. to provide the VA Southern Nevada Health Care System with environmental controls and monitoring devices.

Work is to include installation of wall recessed mounted touch screen panels at the door of: isolation rooms, rooms in radiology department, pharmacy department and other areas indicated in the design.

Bid, Payment and Performance Bonds are required.

NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors, Small Business Size Standard: $15M

This procurement has been set aside for 100% Service Disabled Veteran Owned Businesses IAW Public Law 109-461.

IAW VAAR 836.204 - Disclosure of Magnitude for this VA project: Between $1,000,000 and $2,000,000.

The following documents are to be included in the bid submission:

One (1)fully completed and signed SF 1442 bid page, complete bid amount entered in block 17 of the SF 1442 bid page, completed self-calculation worksheet, EMR and completed divisional breakdown;

acknowledgment of all amendments either via entering data in block 19 of the SF1442 or completing blocks 15a, b, and c or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 bid page;

One (1) scanned completed /signed SF 24 Bid Bond, with one (1) hard copy of the original completed/signed SF 24 Bid Bond mailed to the address in block 7 of the SF 1442 bid page which shall be received three days after bid due date.

Bidders are responsible for insuring and verifying their bid and all required bid documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in Block 13A of SF 1142 Solicitation (subject to amendment).

There will be only one organized site visit, see provision 52.236-27 for date/time and location.

A public bid opening will be at 10am PST on January 19, 2017 at Megan Barr’s office, 575 Double Eagle Court, Reno, NV 89521. Meet in the lobby of the main floor.

X X 52.211-10 X 10am PST 01-19-2018 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 Department of Veteran Affairs FMS-VA-2(101) Financial Services Center PO Box 149971 Austin TX 78714-9971

CONSTRUCTION SCOPE OF WORK

Project 593-15-103 Environmental Controls and Monitoring VA Southern Nevada Healthcare System

DATE: August 31, 2017

PROJECT IDENTIFICATION

Project Title: Environmental Controls and Monitoring Project Location: VA Southern Nevada Healthcare System (VASNHS) 6900 N. Pecos Rd., North Las Vegas, NV. 89086

PROJECT BACKGROUND

Project Purpose: It is the Veterans Health Administration (VHA) policy that an ongoing program for VASNHS Environmental Controls and Monitoring Devices, including provisions necessary for the monitoring of temperature, relative humidity, pressure, air flow (supply and exhaust air) for the operating rooms, the critical rooms, the sensitive rooms from the nurse’s station, and any other rooms indicated in the design study.

PROJECT DESCRIPTION

VASNHS is soliciting proposals for the construction implementation of the design study under Task Order, VA262-15-F-3954, April 3, 2015, project Environmental Controls and Monitoring Devices. Work is to include installation of wall recessed mounted touch screen panels at the door of: Isolation Rooms, rooms in the Radiology department, Pharmacy department and other areas as indicated in the design study. Additionally, work will include the installation of surface mounted touch screens in the OOTC Large Training Office, the Cath Lab, and eight (8) operating rooms. Monitoring devices shall be compatible with the existing Building Management System (BMS).

OBJECTIVES

To have the construction execution of Environmental Controls and Monitoring Devices April 3, 2015. VASNHS currently has a design study which was performed under Task Order VA262-15-F-3954, April 3, 2015. This design study shall serve as a base line for the implementation of the construction for this project. The Contractor shall provide all labor and materials to perform this work, as well as, a construction cost proposal and construction schedule for the installation and implementation of Environmental Controls and Monitoring Devices.

Contractor will follow the A-E Design Study recommendation, under Task Order VA262-15-F-3954, April 3, 2015, which includes the Construction Document Submission Report, Construction General Requirements and Electrical Requirements as well as the Construction Drawings.

GOVERNMENT PERSONNEL

Contracting Officer Representative (ACOR)

Name:
Jonathan G. Sanchez, General Engineer (COR)
Section:
Engineering Service (138) / Projects Section
Address:
6900 N. Pecos Rd. N. Las Vegas, NV 89086
Phone Number:
702-791-9000 ext. 14779
Cell Phone Number:
702-467-0531
Fax Number:
702-224-6922
E-Mail Address:
Jonathan.Sanchez@va.gov

Alternate Contracting Officer Representative (ACOR)

Name:
Tikisha Slan, General Engineer (ACOR)
Section:
Engineering Service (138) / Projects Section
Address:
6900 N. Pecos Rd. N. Las Vegas, NV 89086
Phone Number:
702-791-9000 ext. 14980
Fax Number:
702-224-6922
E-Mail Address:
Tikisha.Slan@va.gov

GOVERNMENT FURNISHED MATERIALS

The Government will provide the following materials to the Contractor at solicitation time to assist with the project:

ITEM
DATED
DESCRIPTION
01
December 2015
A-E Design for Environmental Controls and Monitoring Devices, VASNHS Task Order, VA262-15-F-3954
02
December 2015
Specifications for Environmental Controls and Monitoring Devices, VASNHS Task Order, VA262-15-F-3954
03
December 2015
Drawings for Environmental Controls and Monitoring Devices, VASNHS Task Order, VA262-15-F-3954

CONTRACTOR’S QUALITY ASSURANCE/QUALITY CONTROL

To reduce construction errors and omissions, the construction team shall develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.

Within 10 business days after receipt of Notice to Proceed (NTP), the Construction team shall submit a QA/QC plan describing each task that will be taken during development of the various design submission packages of the project; name of Design team member responsible for QA/QC for Contracting Officer approval. Each task shall be initialed and dated by the responsible Design team member.

RISK CONTROL

The VASNHS is an active hospital and therefore will require consideration to those areas with patients and staff.

The Contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, subcontracts, agents, and anyone acting for or on behalf of the Contractor.

The Government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.

Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, rain gear, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.

Contractor’s personnel are required to read, write, speak, and understand the English language, unless otherwise specified in this contract or agreed to by the Government.

All Contractor personnel are required to wear identification (I.D.) badges during the entire time they are on the VA grounds. I.D. badges shall have an identification picture, and shall state the name of the individual and the company they represent. The VA will issue an ID badge upon the completed fingerprinting process.

The parties agree that the Contractor’s personnel working, due to the execution of this contract shall not be considered VA employees for any purpose and shall be considered employees of the Contractor.

SECURITY

Contractors do not need and shall not be allowed access to any VA personnel or VA patients Personal Health Information (PHI) or Personally Identifiable Information (PII) in the performance of the requirements of this SOW. Additionally, the contractor does not need and shall not be allowed access to VA sensitive information in the performance of the requirements of this SOW.

The contractor shall not connect contractor-owned IT devices (laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public) network. Computer certification and accreditation requirements do not apply, and a security accreditation package is not required.

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

SITE VISITS

The Contractor shall visit the site prior to commencing the construction to meet with the VASNHS. The Contractor shall survey the existing facility to the extent required to confirm existing products and equipment currently installed and when approved by the VA will reference existing materials and equipment to be matched in new construction.

PERIOD OF PERFORMANCE

The Government expects to award a task order and issue a notice to proceed upon task order award. The project requires the tasks to be completed within 120 calendar days after issuance of Notice to Proceed (NTP).

The Government requires a minimum of fourteen (14) calendar days to review the contractor’s submittal(s) inclusive of all requirements (tasks) specified in this scope of work.

APPLICABLE REFERENCES

The references listed below are not intended to be all inclusive. The Contractor shall ensure that all applicable references and/or standards are followed.

#
VA Standard Title/Section
1
Master Construction Specifications Index (PG-18-1)
2
VHA PROGRAM GUIDE (PG-18-3 Design and Construction Procedures)
3
National CAD Standard Details (PG-18-4)
4
Equipment Guide (PG-18-5)
5
Equipment Inspection Manual (Program Guide 7610.2)
6
Equipment Reference Manual (PG-18-6)
7
VA Handbook H-18-8, Seismic Design Requirements
8
Space and Facility Planning (PG-18-9) (Handbook 7610)
9
Design Manuals (PG-18-10)
10
Design Guides (PG-18-12)
11
Accessibility (PG-18-13)
12
Room Finishes, Door and Hardware Schedule (PG-18-14)
13
A/E Submission Instructions (PG-18-15)
14
A/E Design Submission Requirements (Submittal Guide PG-18-15)
15
Environmental Compliance Manual (PG-18-17)
16
Fire Protection Design Manual - Fourth Edition
17
VA Cost Estimating
18
Physical Security Design Manuals for VA Facilities - Mission Critical Facilities
19
VA Signage Design Guide
20
Sustainable Design and Energy Reduction Manual (Final Draft)
21
Natural Disasters Non-Structural Resistive Design (Formerly CD-54)
22
International Building Code 2012
23
National Electric Code – Latest Edition
24
VHA Directive 1061
25
VA Plumbing Design Manual
26
VA OHI Report No. 13-01189-267
27
International Mechanical Code 2012
28
International Plumbing Code 2012
29
International Electric Code 2012
30
Rules and Regulations of the State Fire Marshal
31
American Gas Association
32
ASHRAE Standard 62.1-2007
33
ASHRAE Standard 90.1, 2007 and 2010
34
ASHRAE Equipment
35
VA Facilities Management HVAC Design Manual, PG-10, 2013

VA Physical Security Design Manual for Mission Critical and Life Safety Protection Facilities.

37
VA Seismic Design Requirement, H18-8, February 2013

National Fire Protection Association (NFPA), INCLUDING THE California Edition of National Electric Code (NEC)

39
Sheet Metal and Air Conditioning Contractors National Association (SMACNA)
40
Department of Energy (DOE)

TASK A: PROJECT CONSTRUCTION SCHEDULE

With each period of performance during the duration of the project, the Contractor shall provide a detailed Critical Path Method (CPM) or similar, estimated project construction schedule. The schedule shall include the tasks listings aligning with specifications to be performed during the construction phase and can include an estimated procurement schedule based on product lead times and project/installation requirements, if needed. Each task will be assigned a duration. When developing the schedule the contractor should account for conditions that would impede conventional construction means and methods such as alternate work hours and coordination requirements with the VASNHS. Typical task durations should be adjusted as necessary for working in a fully operational hospital. Every effort should be made to minimize the impact to patient services. The estimated construction schedule should be developed and provided to the COR as a MS Project document.

Deliverable

The project construction schedule submittal shall include four (4) hardcopies and an electronic version with the schedule tasks. The Contractor shall develop a format for the schedule and submit for Government approval before completing the task.

TASK B: PROJECT CONSTRUCTION COST PROPOSAL

The Contractor shall provide a project construction cost proposal to be submitted concurrently with each period of performance indicated above. The proposal shall follow requirements indicate in the VA Manual for Preparation of Cost Estimates. At a minimum, the cost shall include:

· Labor, materials and equipment costs

· Material installation, handling and shipping costs

· Equipment product costs, as applicable

· Equipment installation, handling and shipping costs, as applicable

· Ground area finishes selections, as applicable

· Quantity Estimates for each equipment type, as applicable

When developing the cost proposal, the Contractor should account for conditions that would impede conventional construction means and methods such as alternate work hours and coordination requirements with the VASNHS. Costs should be adjusted as necessary for working in a fully operational hospital. Every effort should be made to minimize the impact to patient services. Cost estimates should be provided to the COR as a MS Excel workbook.

Deliverable

The project construction cost proposal submittal shall include four (4) hardcopies and an electronic spreadsheet with the estimate items. The Contractor shall reference sources for the costs. The Contractor shall develop a format for the estimate and submit for Government approval before completing the task.

SOLICITATION: 36C26118B0040

CONSTRUCTION COSTS FOR PROJECT 593-15-103

ENVIRONMENTAL CONTROLS AND MONITORING

REF
DESCRIPTION
TOTAL
01000
DIVISION 1 – GENERAL REQUIREMENTS
03000
DIVISION 3 – CONCRETE
07000
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
13000
DIVISION 13 - SPECIAL CONSTRUCTION
$
23000
DIVISION 23 – MECHANICAL
26000
DIVISION 26 – ELECTRICAL

OTHER

OTHER

OTHER

SUB TOTAL

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL BID

*Total Bid Amount to be recorded on SF1442, Block 17.

*This document is to be used only for price analysis per FAR 14.408-2

CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL

Contractor Certification Regarding Project: 593-15-103

2014
2015
2016

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Company’s Current Insurance Experience Modification Rate (EMR) = _____________ (Note: Contractor must support the EMR with a signed letter from Insurance Carrier on their letterhead.)

Signature: ______________________________________________

Typed Name:______________________________________________________

Title: ______________________________________________________

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Bidders for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. This project has a specialty NAICS of 238210 where the contractor must provide 25% of the cost of the contract performance for personnel will be spent on the concern's employees or employees of other eligible SDVOSBs. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division
SDVOB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
CONSTRUCTION SCOPE OF WORK1
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS18
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)18
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)18
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)18
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)19
2.5 52.228-1 BID GUARANTEE (SEP 1996)20
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)21
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)21
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)22
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)22
2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)22
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)23
2.12 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)24
REPRESENTATIONS AND CERTIFICATIONS25
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)25
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)28
GENERAL CONDITIONS30
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)30
4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)30
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)31
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)32
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)33
4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)34
4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)35
4.8 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)36
4.9 52.223-20 AEROSOLS (JUN 2016)36
4.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)37
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS40
4.12 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984)40
4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)42
4.14 52.223-21 FOAMS (JUN 2016)43
4.15 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)45
4.16 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008)45
4.17 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)46
4.18 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)47
4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)47
4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)49
4.21 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)49
4.22 VAAR 852.236-76 CORRESPONDENCE (APR 1984)49
4.23 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)49
4.24 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)50
4.25 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)50
4.26 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)50
4.27 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS) (APR 1984)50
4.28 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)53
4.29 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)54
4.30 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)54
4.31 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)54
4.32 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)54
4.33 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)56
4.34 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)57
4.35 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)58
4.36 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)58

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
13.9 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Las Vegas, NV, Clark County

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Megan Barr Contracting Officer Hand-Carried Address:

Department of Veterans Affairs Acquisiton Operations Service (049A3)

810 Vermont Avenue, NW Washington DC 20420 Mailing Address:

Department of Veterans Affairs Acquistion Operations Service (049A3)

810 Vermont Ave, NW Washington DC 20420

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— January 5, 2018 at 10:00am PST

(c) Participants will meet at— Building 6 (Admin Building), Room 1H112, VA Southern Nevada Health Care System (End of Provision)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/index.asp

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2016
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
JUL 2016
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.211-6
BRAND NAME OR EQUAL
AUG 1999
52.214-3
AMENDMENTS TO INVITATIONS FOR BIDS
DEC 2016
52.214-4
FALSE STATEMENTS IN BIDS
APR 1984
52.214-5
SUBMISSION OF BIDS
DEC 2016
52.214-6
EXPLANATION TO PROSPECTIVE BIDDERS
APR 1984
52.214-7
LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS
NOV 1999
52.214-18
PREPARATION OF BIDS—CONSTRUCTION
APR 1984
52.214-19
CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION
AUG 1996
52.214-34
SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE
APR 1991
52.214-35
SUBMISSION OF OFFERS IN U.S. CURRENCY
APR 1991

2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)

(a) Any protest filed by an interested party shall:

(1) Include the name, address, fax number, and telephone number of the protester;

(2) Identify the solicitation and/or contract number;

(3) Include an original signed by the protester or the protester's representative and at least one copy;

(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;

(5) Specifically request a ruling of the individual upon whom the protest is served;

(6) State the form of relief requested; and

(7) Provide all information establishing the timeliness of the protest.

(b) Failure to comply with the above may result in dismissal of the protest without further consideration.

(c) Bidders/offerors and contracting officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.

(End of Provision)

2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)

As an alternative to filing a protest with the contracting officer, an interested party may file a protest with the Deputy Assistant Secretary for Acquisition and Materiel Management, Acquisition Administration Team, Department of Veterans Affairs, 810 Vermont Avenue, NW., Washington, DC 20420, or for solicitations issued by the Office of Construction and Facilities Management, the Director, Office of Construction and Facilities Management, 810 Vermont Avenue, NW., Washington, DC 20420. The protest will not be considered if the interested party has a protest on the same or similar issues pending with the contracting officer.

(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics,
Risk Management Team, Department of Veterans Affairs
810 Vermont Avenue, N.W.
Washington, DC 20420

Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management
811 Vermont Avenue, N.W.
Washington, DC 20420

2.12 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)

The contracting officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally monitor the work to be performed under this contract. Such designation will be in writing and will define the scope and limitation of the designee's authority. A copy of the designation shall be furnished to the contractor.

(End of Provision)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.

(2) The small business size standard is $15 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.

Note to paragraph (c)(1)(xvi): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.

(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[X](i) 52.204-17, Ownership or Control of Offeror.

[X](ii) 52.204-20, Predecessor of Offeror.

[](iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

[](iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Certification.

[](v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Certification.

[](vi)…