S02 RFQ 36C26026Q0472 0001 Answers and extend.pdf
PDF 360 KB Posted
- Attached to
- OFL (LMS) Lab Management Software
- Solicitation number
- 36C26026Q0472
About this file
This is Amendment 0001 to RFQ 36C26026Q0472, issued by Network Contracting Office 20 at the Department of Veterans Affairs. The amendment extends the response due date to October 2, 2026, at 1:00 PM Mountain Time and updates the Contract Line Item Numbers (CLINs) with revised Performance of Period (POP) dates and answers to eight questions received during the solicitation process.
The solicitation is a Brand Name or Equal procurement for software licensing and implementation services related to a Laboratory Management System (LMS). The base contract period runs from January 1, 2027, through December 31, 2027, with four one-year option periods extending through December 31, 2031. Required line items include licenses for Innovations ULS Enterprise Workflow Monitor/Production Scheduler, Gatekeeper Integration Kit, VisionWeb Electronic Order Processes, Microsoft SQL Upgrade, Microsoft SQL Conversion support (5 units), and Installation Services (10 hours). Additional CLINs cover on-site installation travel and per diem (10 units), LMS Support POP (annual), and Digital Lens Calculation compatible with Internet of Things (IOT) capability (annual). Key clarifications from the Q&A indicate that direct hardware is not critical if cloud-based systems are fully supported, integrated IOT design is preferred over standalone interfaces, compatibility with both legacy CPRS/VistA and new Oracle Health/Cerner Millennium EHR systems is required, and vendors must demonstrate VA system compatibility as their responsibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26026Q0472_2.pdf | ||
| 36C26026Q0472_1.pdf | ||
| S02 RFQ 36C26026Q0472 OFL Lab Managment Software.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 09-18-2026
648-27-2-8889-0005
36C260
Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd
Bldg.17, Suite B428
Vancouver WA 98661
36C260
Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd
Bldg.17, Suite B428
Vancouver WA 98661
To all Offerors/Bidders
36C26026Q0472
09-10-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 10-02-2026 1PM MDT
See CONTINUATION Page
X ONE
1. This RFQ has been amended in order to answer questions, update CLINS, and to extend the due date.
2. See Section A.1 for updated dates for the CLINS.
3. See Section A.2 for the list of answers to the question received regarding this solicitation. The questions are in black, while the answers are in red.
4. This solicitation is extended and all responses are now due on 10/2/2026 by 1PM Mountain Time.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 EA __________________ __________________
Innovations ULS Enterprise Workflow Monitor / Production Scheduler LOCAL STOCK NUMBER: ULS Licensed Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027
LOCAL STOCK NUMBER: ULS
Gatekeeper Integration Kit LOCAL STOCK NUMBER: GATEINT Licensed Contract Period: Base POP Begin: 01-01-2027
LOCAL STOCK NUMBER: GATEINT
VisionWeb Electronic Order Processes LOCAL STOCK NUMBER:
VWEBEOP Licensed Contract Period: Base POP Begin: 01-01-2027
LOCAL STOCK NUMBER: VWEBEOP
Innovations Microsoft SQL Upgrade Contract Period: Base POP Begin: 01-01-2027
5.00 EA __________________ __________________
Innovations Microsoft SQL Conversion support Contract Period: Base
10.00 HR __________________ __________________
Installation Services (Product Training) Billed as utilized LOCAL
STOCK NUMBER: SEROI
Contract Period: Base
POP End: 12-31-2027
LOCAL STOCK NUMBER: SEROI
10.00 EA __________________ __________________
On-site installation travel and per diem LOCAL STOCK NUMBER:
OSTEX
Contract Period: Base POP Begin: 01-01-2027
LOCAL STOCK NUMBER: OSTEX
1.00 YR __________________ __________________
LMS Support POP Contract Period: Base
Digital Lens Calculation compatible with IOT.
Contract Period: Base
Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028
Digital Lens Calculation compatible with IOT Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028
Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029
Digital Lens Calculation compatible with IOT Contract Period: Option 2 POP Begin: 01-01-2029
POP End: 12-31-2029
Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030
Digital Lens Calculation compatible wit IOT Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030
Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031
Digital Lens Calculation compatible wit IOT Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031
GRAND TOTAL __________________
A.2 QUESTION AND ANSWERS
Question 1: Is this solicitation specifically for Innovations?
ANSWER: No, this is a Brand Name or Equal Solicitation.
Question: 2. Section D.1 SOW - 2 Background – What do you mean about "equipment"? Servers? PCs?
Devices? Digiboards? Pinters? etc...?.
ANSWER: Anything that would be needed to communicate with the venor’s system from/to the OFL systems and network including Device Masters for the manufacturing equipment that communicate with your LMS system, any generated reports and billing invoices.
Question: 3. Section D.1 SOW - 4.1 Specific Tasks – Is hardware absolutely critical?.
ANSWER: Direct hardware is not critical as long as cloud based system are fully supported.
Question: 4. Section D.1 SOW - 4.2 Specific Tasks – For IOT, are you looking for the LMS to have the ability to interface with the IOT Calculator, or have an integrated IOT design as part of the software?
ANSWER: The Government is looking for integrated IOT designs. OFL can use other digital designs but
IOT is the design of choice for service.
Question: 5. Section D.1 SOW - 4.2 Specific Tasks – If you are looking to have a digital design integrated as part of the software, would you be open to an alternative digital lens design as part of this?
ANSWER: Other digital designs can be used only if comparable to current IOT designs and communicated to OFL equipment the same as current IOT designs.
Question: 6. Section D.1 SOW – 3 Scope, 3rd paragraph– If the vendor has integrated and/or been approved, certified, and utilized in VA PIV, CEP, CAC, VPN, PDAT, AIS, CAG, Tungsten, and other VHA
Service Center Security and VHA IT systems, then will they already be compatible with CPRS, VISTa, and
CERNER and thus already accepted for use by VHA IT systems?
ANSWER: This can not be confirmed without more detailed look at each contract. It is the responsibility of the vendor to ensure that they are compatible with VA systems.
Question: 7. Section D.1 SOW – 3 Scope, 3rd paragraph– Is integration a priority since the VA already started transitioning away from VistA/CPRS to the new Federal Oracle Health/Cerner Millennium EHR system?
ANSWER: This is a requirement as not all facilities are on ORACLE/CERNER. Legacy sites are still using
CPRS/VISTA until their specific site rolls to the new operating system. Both CPRS and CERNER are required.
Question: 8. Section D.1 SOW – 3 Scope, 3rd paragraph –Is it allowed outside hardware to connect the lab equipment to the server using serial-to-LAN internal-only connections?
ANSWER: It depends. If this is the only method of communicating with eh OFL equipment and LMS please include how/what these devices are and what they do and what they are needed for sustained operations
File details come from the government source that posted it. Updated .