This is Amendment 0001 to Request for Quote (RFQ) 36C26026Q0346 issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20, through the Network Contracting Office 20 located in Vancouver, Washington. The amendment addresses submitted questions and provides additional information and photographs regarding the procurement of one BetterBuilt R640 Series Cart and Utensil Washer for the Portland VA facility. The RFQ closing date remains September 17, 2026, at 4:00 PM Pacific Standard Time. Responses should be directed to contracting point of contact Nick Heintz at Nicholas.Heintz@va.gov.

The amendment includes a questions and answers section clarifying key procurement requirements and site conditions. Union labor is not required. Pricing must be provided in the Price/Cost Schedule with unit pricing in EA (each) and installation/removal and training pricing in JB (Job). Installation and removal/disposal are required but do not include utility disconnection/reconnection or site modifications, which will be handled by Facility Maintenance Staff or contracted general contractors. The equipment pit dimensions are 117 inches wide by 177 inches long by 27 inches deep, with grating covering unused areas. Site access details include a loading dock on level B2 that accommodates 53-foot trailers, a freight elevator measuring 88 inches wide by 93 inches tall by 86 inches deep, eight-foot corridors with 88-inch by 7-foot doors, and a 44-inch by 7-foot door at the installation space. Reference photographs of the current washer and facility are included in the amendment.

View the file

Other files

File Type Posted
36C26026Q0346.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders

36C26026Q0346 09-11-2026

X

1) The purpose of this amendment to Request for Quote 36C26026Q0346 for the purchase of a new cart and utensil washer for the Portland VA is to address submitted questions and provide additional information/photos for reference.

2) RFQ closing date remains 09/17/2026 at 16:00 PST

3) See continuation page for Q&A.

4) For responses to this solicitation/questions please e-mail Nick Heintz at Nicholas.Heintz@va.gov

CONTINUATION PAGE

1.Will this job site require union labor? Our current installation crew is non-union.
Not required
2.B.2 Price/Cost Schedule requires unit pricing in EA. It also requires install/removal and training in JB. What does JB stand for?
JB is short for Job, since the install/training is not a physical deliverable item.
3.Installation and Removal/Disposal are required yet we have no knowledge of site conditions or full scope of work required. Is there an opportunity for a site walk-through?
We’ve included picture below, that should hopefully suffice
4.Typically when we remove equipment and install new equipment we do not disconnect or reconnect utilities. Or provide any site modifications which might be required to install the new washer. I am assuming a general contractor will be handling these items?
Facility Maintenance Staff (FMS) will hire contractors or perform in house the utility disconnect and reconnect and perform necessary site modifications.
5.The washer typically is installed in a pit. Would you happen to know the pit length, width and depth?
The pit is 117” wide, 177 “ long and 27” deep. The current cart washer does not take up the entire pit so there is grating over areas that it does not fill.
6.Do you have any photos of the loading dock, doorways and hallways, perhaps elevator dimensions. Anything that will give us an idea of site access for equipment removal and equipment installation.
The loading dock is on level B2. The kitchen is above on level B1. There is a freight elevator from B2 to B1. The dock will accommodate a 53’ trailer with a reasonable tractor. Tractors with extra long sleepers have a difficult time at our dock. Skilled drivers can make it happen.
Elevator: 88” wide, 93” tall, 86” deep.

8’ corridors with 88” wide by 7’ doors on the path to the space.

Space has a 44” wide by 7’ door off of the 8’ corridor

Photos for reference:

Current Washer – image1.png image2.png image3.png image4.png