These documents are Fire Extinguisher Inspection & Maintenance Reports for various buildings at the PSHCS Seattle Division, covering fiscal year 2025 and following NFPA 10 2022 standards. The comprehensive reports detail fire extinguisher inspections across multiple buildings (Buildings 1, 7, 8, 13, 16, 18, 20, 22, 23, 24, 28, 31, 34, 37, 100, 101, 102, 103, and 104), with a total of 338 fire extinguishers inspected across the facility.
Each report systematically verifies 10 key inspection criteria, including location, accessibility, operating instructions legibility, safety seal integrity, fullness, physical condition, pressure gauge reading, labeling, maintenance procedures, and hydrostatic testing requirements. The inspections track critical details such as extinguisher size, manufacturer, specific location, six-year maintenance due dates, acquisition dates, hydrostatic test dates, barcodes, and serial numbers. Most extinguishers are ABC10 or ABC5 models, located in various areas like mechanical rooms, corridors, elevator lobbies, electrical rooms, and stairwells, with inspection dates consistently set for 7-24-2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| American Lake Annual Insp Doc.PDF | ||
| 36C26026Q0168 0001_1.docx | DOCX document | |
| FT. Lawton_Magnolia Annual Insp Doc.PDF | ||
| S02 36C26026Q0168_1.docx | DOCX document | |
| S02 36C26026Q0168.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSHCS SEATTLE DIVISION
Building I
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY 2025 NFPA 10 2022
Completed by: —
DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinc~uisher cylinder (12 YEAR)
Total Inspected: 137
L Size Mfg’r I Location 6yr Due I Acgd I Hydro I Barcode I Serial # Ann Moni L_ B1JIL~DING 1 (9th 10th & 11th Floor) Eng — —
1 ABC1O BE 9th Floor Service Elevator 2029 2023 2035 A00745, 110257564 V —
2 ABC1O BE 10th FloorW 2029 2023 2035 a~00844 105425559’ V —
3 ABOIO BE 11th Floor 2029 2023 2035 A00308 110257572 V 4 ABC5 Amx 9th Floor Electric Room 2028 2022 2034 AO4~i7,6 H-i 3635384 V —
5 ABC1O BE 9th Floor Stairs 2029 2023 2035 A008~1-7 105425560 V
~ ABC1O ~ 10th Floor 2029 2023 2035 j~01749 105425561 V
LE BUILDING~1 (8th Floor) Eng 1 ABC1O Amx 800A-Elevator Lobby 2033 1991 2027 ~GO023 KG123430 V —
2 ABCIO Amx 814 Outside 2034 1992 2028 i9~00052 KS8~14582 V 3 ABCIO Amx 814 Inside 2028 2022 2034 A’~i’0O64 H04443667 V 4 ABCIO Amx 15 K Hallway SKD 64 2029 2023 2035 .~00027 ‘ 102211957 V —
5 ABCIO Amx 15G 2029 2023 2035 A00753 102251696 ~“ —
6 ABC1O Amx 815 Hallway 2029 2023 2035 i~0il7~65 102211959 V —
7 ABCIO Amx 811 Hallway 2031 2025 2037 i~0~4’i9~1 169991775 V
8 ABC1O Amx 808 ‘ 2029 2023 2035 .~00747 102211958’ V —
9 ABC1O Amx 1OE Mech Room 2029 2023 2035 iQ~O0754 102245454 V —
10 ABC1O Amx ast Cabinet ‘ , 2033 1991 2D27 A000’19 KG123422 V —
U IJILDING 1 (7th Floor) Research — —
1 ABC10 Amx 711 2029 2023 2035 A1:ogi8 110257575 V
2 ABC1O Amx 710A Hallway . 2033 1991 2027 i~Q0034 KG123432 V 3 ABC1O Amx 709 2033 1991 2027 P~0O033 KG123446 V —
4 ABC1O Amx 710 2033 1991 2027 A00032 KG123412 V
5 ABC1O Amx 707 2033 1991 2027 A0O03~1 KG123441 V
6 ABC1O Amx 708 2031 2025 2037 A0~4~V59 ‘169988724 V 7 ABC1O Amx 708 Hallway 2033 1991 2027 A00029 KG123438 V —
8 ABCIO Amx 705 2033 1991 2027 A07810 KG123450 V —
9 ABC 10 Amx 701 2028 2022 2034 A’i0065 H04439750 V 10 ABC1O Amx. 700 A Elevator~Lobby ‘ — 2033 1991 2027 ~00063 KG1 23416 V 11 ABC1O Amx 713 Radiation Safety — 2029 2023 2035 ~00038 102251549 12 ABC1 Amx 71.4 Service Elevator - 2029 ‘ ‘ 2023 2035 A00039 102283533 ~‘
13 ABC1 Amx 715 2029 2023 2035 M,09i19 105391392 V —
14 ABC1O Amx 718 2029 2023 ‘ 2035 Ai:o92o 105391404 V —
15 ABCIO Amx 719 Hallway 2029 2023 2035 A11092’l 105391389 V —
T~ ABCIO ~ 721 ‘‘ . ‘ 2029 2023 2035 ~1:o922 ‘1010257579 ‘V
17 ABC1O Amx 720 2034 1992 2028 ~00O44 KS814563 V —
18 ABCIO Amx 723 ‘ 2029 2023 2035 A’jl0923 110257578 V
19 ABC1O ~ 722 2029 2023 2C35 A’1~O924 105391395 V —
20 ABCIO ~ 722 Hallway 2029 2023 2035 ~10925 ‘105391393 V 21 ABC1O ~ 725 2029 2023 2035 Ai1’0926 110257576 V —
~‘ ABCIO ~ 727 2029 2023 2035 A’~1O927 105391391 V —
F BUILDING1(6tljEIdo”j) . . ~esearch -
Size j~9r — Location 6yr Due Acgd Hydro Barcode Serial # Ann I Mon 1 ABC1O Amx 635 2029 2023 2035 A01751 102279046 2 5C02 Amx 635 Rear n/a 2020 2025 Al 0503 X768528 3 ABC10 Amx 34C 2029 2023 2035 A0007~-3 1022 V —
4 ABC1O Amx 634B 2020 2014 2026 A07620 CB558233 V —
5 ABCIO Amx 633 Hallway 2029 2023 2035 A07812 102251695 V
6 ABC1O Amx 631 2034 1992 2028 A00070 KS814595 V 7 ABCIO Amx 626 2034 1992 2028 A00069 KS814586 V —
8 ABCIO Amx 628 2029 2023 2035 A10928 110257580 V —
9 ABC1 Amx 8 Hallway 2029 2023 2035 A10929 105391390 V 10 ABC1O Amx 4 2034 1992 2028 A00066 KS814565 V —
11 ABC1O Amx 1 Vestibule 2034 1992 2028 ~O0065 KS814564 V —
12 ABC1O Amx 620 Service Elevator 2031 2025 2037 A00862 102279047 V
13 ABC1O Amx 61 2034 1992 2028 A0008i1 KS814568 V 14 ABCIO Amx 6 AElevatorLobby 2032 1991 2028 A00036 KG123457 V —
15 ABCIO Amx 05 2034 1992 2028 A00051 KS814593 V 16 ABCIO Amx 7 Vestibule 2034 1992 2028 A00054 KS814585 V —
17 5C02 ~ 0 — 2016 2027 A04047 A6391829 V
18 ABCIO Amx 606 Hallway 2032 1991 2028 A00053 KG1 23452 V —
19 ABC1O Amx 608 2034 1992 2028 ~~00055 KS814580 V
20 ABC1O Amx 609 2034 1992 2028 A00056 KS814569 V 21 ABCIO Amx 6lOJessicaTUIlOCh 2034 1994 2028 A00108 MD885832 V 22 ABC1O Amx 612 2034 1992 2028 A00057 KS814584 V
23 ABC1O Amx 611 2032 1991 2027 P~00058 KG123419 V 24 ABCIO Amx 612B Hallway 2032 1991 2027 ~00059 KGI 23429 V —
25 ABC1O Amx 614 2032 1991 2027 A00060 KG123443 V —
26 ABCIO Amx 613 2032 1991 2027 A00061 KG123458 ~7 —
27 ABC1O Amx 616 2032 1991 2027 A00062 KG123415 V —
~ BUILDING t(5thFloor) Eng I ABCIO Amx 516 Office 2034 1992 2028 A00082 KS814590 V
2 ABCIO Amx 514 3DLab GMA 2034 1992 2028 A02707 KS814596 V 3 ABC1O Amx 513 3D Lab GMA 2034 1992 2028 A00080 KS814594 V 4 ABC1O Amx 510 Office 2031 2025 2037 A08802 169992991 V —
5 ABCIO Amx 511 2034 1992 2028 A00079 KS814571 V —
6 ABC1O Amx IOA Hallway 2032 1991 2027 A00078 KG123421 V 7 5C02 Amx 05 Vestibule — 2020 2025 A08776 GH332569 V 8 ABC1O Amx 506 Hallway 2032 1991 2027 A000Z6 KG123440 V 9 ABC1O Amx Elevator Lobby 2032 1991 2027 A00084 KG123428 V —
10 ABC5 Amx 518 Service Elevator 2028 2022 2034 A02274 H13636700 V —
11 ABC5 Amx 529 Hallway 2028 2022 2034 A0227-3 H 13589871 V —
12 ABC5 Amx 533 Hallway 2028 2022 2034 A02267 H13635385 V
E BUIL~DING1 (4th Floor)’ Eng 1 ABC1O BE 425 Hallway 2029 2023 2035 Al 0933 105391405 V
2 ABC1O BE 423 Hallway 2029 2023 2035 Ai:o934 105391402 V —
3 ABC1O BE Service Elevator 2029 2023 2035 Al 0935 105391375 V 4 ABCIO AMX Elevator Lobby 2032 1991 2027 A00090 KG123417 V 5 ABC1O Amx 407 Hallway 2032 1991 2027 A00088 KG1 23442 V —
6 ABC1O Amx, 412A Hallway 2032 1991 2027 A00089 KG123414 V
~ ~BUILDING1 (3fdiFlàor).. - Eng I ABCIO Amx 315 Hallway 2032 1991 2027 A00095 KG123456 V —
2 ABC1O Amx 310 FlaIlway 2032 1991 2027 - A00094 KGI 23424 V —
3 ABCIO Amx 300AElevatorLobby 2032 1991 2027 A00096 KG123423 V —
4 ABC1O BE 320 Service Lobby 2029 2023 2035 Ai:o936 105391377 V —
5 ABCIO BE 331 Hallway 2029 2023 2035 A10937 105391380 V ~ ABC1O Amx 333 Hallway 2029 2023 2035 A~0938 105391378 V [~ BE BIJJILDING I (2ndlFFoor) Enq—
1 ABC1O Amx 243 Bio Med GM 2030 2024 2036 A001ll 131926862 V
2 ABC1O Amx 242A Hallway 2029 2023 2035 Ai,0939 105391371 V —~
3 ABC1O Amx 240 Conference Room 2030 2024 2036 A0011.07 131921862 V —
4 ABC1O Amx 238 Conference Room 2030 2024 2036 A00106 131971570 V [~ ABCl0~ Amx 237 Hallway I 2029 2023 2035 Al0940 105391373 V I B.L!JILDING~f(2ndF[OOr) Eng -
[_ Size j~~r Location 6yr Due Acg’d Hydro Barcode Serial # Ann Mon 6 ABC1O BE Service Lobby 2029 2023 2035 A11094ç1 105391386 V —
7 ABC1O Amx 200AElevatorLobby 2022 1992 2028 A00~l03 KS814588 V —
8 ABC1O Amx 207 Hallway 2032 1991 2027 A00’lOO KG1 23431 V —
9 ABC1,0 Amx 218 Hallway 2032 1991 2027 A00’l’Ol KG123444 V —
10 ABC1O Amx 230 Hallway 2032 1991 2027 i~00i102 KG123411 V —
~ BUILDING 1 (1st Floor) Eng —
1 ABC1O Amx l30Hosecabjnet 2032 1991 2027 A00116 KG123433 V —
2 ABC1O Mix 114AHallway 2032 1991 2027 ~00~114 KG123420 V —
3 ABC1O Amx ll2AHallway 2032 1991 2027 A00113 KG123426 V —
4 ABC1O Amx 110 AFGE Office 2032 1991 2027 A00112 KG123445 V —
5 ABC1O Amx l0OAElevatorLobby 2032 1991 2027 A0O~11r7 KG13418 V —
6 ABCIO Amx Service Elevator 2033 1993 - 2027 ~O01 18 KV897461 V —
7 ABC1O Amx 167 Hallway 2029 2023 2035 A’l 0942 105391374 V —
8 ABC1O Amx 75 2030 2024 2036 A00353 123118092 V —
9 ABC1O ~ 55 2029 2023 2035 A•10943 l05391388 V —
E ‘ BUILDING I (Basement) . Erig —
1 ABC1O Amx Radioactive Storage Cage 2028 2022 2034 A07~963 H04453987 V —
2 2OLB Amx B36 Hazardous Waste 2031 2025 2037 ‘A044~42 152660951 V —
3 ABC1O A~ 36 Hallway 2028 2022 2034 A07964 H0928265 V 4 ABCIO BE 27 Méns 2029 2023 ‘ 2035 ~O0~l-33 105391369 V —
5 ABC1O BE 25 Training Center Front 2029 2023 2035 A00~13’1 105391376 V
6 ‘ABCIO Amx 25Training,Center’Rear 2030 2024 2036, ~0Oi1~2 .131972902 V —
7 ABC1O Amx 22 Far corner 2029 2023 2035 A•109~6 105391 372 V 8 ABC1O BE- 21 Hallway ~2029 2023 . 2035 A~:o947 .105391383 V
9 ABCIO BE ervice Elevator 2029 2023 2035 A11 0948 105391370 V —
10 ABCIO’ ~Amx. BOO Elevator Lobby 2030 2024 2036 ~OO1~27 l31928246’ V —
11 ABCIO Amx B16 Microbiology Entry GMA 2030 2024 2036 AOO1-28 131971572 ~‘ —
12 ABC1O Amx Microbology’exit GMP~ 2030 2024 2036’ A08690 ‘13197290.1 V
13 ABC1O Amx SOS Hallway 2032 1991 2027 AOOI125 KG123436 V 14 ABCIO’ Amx BI1A Hallway 2032 -1991 2027 AOO1-23 KGi 23451 ,V
15 ABCIO Amx Bl5CabinetLaundry 2032 1991 2027 AOO~i24 KG123425 V —
~ BUILDING I (ComputerjRoom) RM7O Es~bort — —
1 15CO2 Amx Office — — — 2020 2025 A10498 G12775591 V —
2 15CO2 Amx Server Entry -~ — 2020 2025 A10497 G12775585 V —
3 15C02 B-Eye Mid server -. — 1983 2028 P~OO3O7 T00412736 V —
4 15C02 B-Eye Rear Exit . — — 1983 2028 A02657 TO0412734 V
EJ - BUILDING”l(Shops) ...-
1 ABC.1 0 Amx Weldin9 Shop (exit door) 2031 2025 2037 A00763 147238004 V —
2 ABC2O Amx Welding 2031 2025 2037 AOOZ64 MG282793 V —
3 ABC2O Amx Metal Shop 2031 2025 2037 A0O762 l54337892 V —
4 ABC2O Amx Electric Shop 2031 2025 2037 A04024 154337890 V —
5 2.5H2O Amx Breakroom/Conf. Rm — 2015 2025 AO445~1 A97647801 V —
6 ABC1O Amx B86 2031 2025 2037 AOO76~l 147238188 V —
7 ABC 10 Amx Front Door 2031 2025 2037 AO0776 147237998 V —
8 ABC2O Amx Paint GMA 2031 2025 2037 A00137 154337891 V —
E BUILDING I (Sub Basement) Eng 1 ABClQ Amx SBO3 Cabinet 2031 2025 2037 AOO824 153886332 V —
2 ABC1O Amx SBO5 Exitdoor 2031 2025 2037 AO~8’1r7 153886331 V —
3 ABC2O Amx SB11 MER 2024 1994 2030 A00Z86 MG282817 ~/ —
4 ABC2O Amx SBl3Exitdoor 2031 2025 2037 A0O785 154337889 V
I I I I I I~
Building 7
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO 2022
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
~—_ Size Mfgr I Location
BUILDING 7
j_J_ABC10 Amx Front Door Entrance 2 IABC1O Amx Front Desk ~JAB~1O Amx Rear -
H H 2031 2025
- 2028 2022 2031 2025
Completed by......,.~.
DATE: 7-24-2025 Total Inspected: 3
6yr Due I Acg’d Hydra I Barcode I Serial # I Ann Mä~1
2037 A00142 147194021 V ~ 2034 Al 0854 H09285258 V
2037 A00139 147230962 V
•1~
Building 8
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY 2025 NFPA 10 2022
Completed by...
DATE: 7-24-2025 Total Inspected: 9
The inspection verifies the foliowing:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
: Size I Mfgr I Location I 6yr Due I Acg’d I Hydro I Barcode I Serial # I Ann I Moni BUILDING 8 (2nd Floor) Research
1 ABCIO Amx 202 West 2031 2025 2037 A01753 153886313 V 2 ABCIO Amx 202 East 2031 2025 2037 A00866 147231074 V
— BUILDING B (ist 1-loor) Research — —
1 ABC1O Amx 102 Corridor 2031 2025 2037 A00138 MG282795 V —
2 ABC1O Amx 103 2026 2020 2032 Al 0482 G09775054 V 3 ABC1O Amx 103 Corridor 2031 2025 2037 A00865 MG282825 V —
BUILDING 8 (Basement) Research . — —
1 ABCIO Amx EIe~~~+nrRnnm 2029 2023 2035 A10950 105391382 V —
2 ABCIO Amx 5 2031 2025 2037 A00875 MG282811 V —
3 ABC5 Amx 2 (insideR) 2029 2023 2065 A10517 105391381 v” —
4 ABC1O Amx 3 Corridor 2031 2025 2037 A00878 MG282826 V —
Page 1 of I cc, >0 -43
CD
-~ 0•
0I N)
‘1
XI
m m>c -1 z C, C x m z
MZ ~
~ Cl) rb3~ <
MZ
z >z C, m
XI
m
XI
-I
-o a) (0
CD
j
—4 a)
D U)-o
CD
C)
CD
F
Building 13
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY 2025 NFPA 10 2022
Completed by:
DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Total Inspected: 21
Size j Mfgr I Location I 6yr Due I Acg’d Hydro I Barcode Serial # Ann I Moni BUILDING 13 (2nd Floor) Research
1 ABCS Amx 203 2032 2002 2026 A01995 TB820081 V 2 ABCIO Amx 203 Closet, (by Room203) 2031 2025 2037 A00868 153886314 V
3 ABCIO Amx 204 2031 2025 2037 A08747. 169992989 V 4 ABC5 Amx 206 Knock first 2034 2004 2028 A04102 WM855828 ~‘ —
5 ABC5 Amx 222 2033 2003 2027 :A01994 VM160038 V 6~ 5C02: Amx 210 n/a 2021 2026 A04055 :G99197981: ~V 7 ABC2O Amx 212 Closet 2024 1994 2030 :A00083 MG282783 V —
8. ABC5 Amx 212A (go to 34; 2ndfloor) 2031 2025 2037 VA04103 169988722 .V —
9 ABC5 Amx 215 2032 2002 2026 A04079 TB837525 V —
10 ABC5 Amx 216 — 2033 2003 2027 A01990 VX967295 V 11 ABC5 Amx 216B (in 216a) Radiolociv — 2032 2002 2026 VA01887 TB837510 12 VABC5 Amx 21.7 Radiologyi 2032 2002 2026 A04070V TB837507 E V V BUILDING 13 (lstFloor) V V Research V V V V —
1 ABCIO Amx Fire Closet 2026 2020 2032 Al 0493 G09751514 V —
2 ABC5 Amx 117 V V 2033 2003: V 2027 A04095 :WA126210. •V —
3 ABC5 Amx 106 2029 2023 2035 :A10949 V 103804961 V —
4. ABC5 V Amx 107 2032 2002 V 2026 V VA04078 V TB837509 V
5 ABCS Amx 108 2033 2003 2027 A01983 VX967302 6 ABC5 Amx 122 . 2032 2002 2026 A01991 V TB811527 V 7 ABCS Amx 109 i____________________________ 2032 2002 2026 AOl 890 TB837506 V —
8 ABC5 pj~~ .fl~ . . 2034 . 2004 2028 A04097 WM481496 V —
9 ABC1O Amx 110 Fire Closet (by Stair 1) 2031 2025 2037 A01811 147238181 V —
10 ABC5 Amx 112 2032 2002 2026 VA04073 TB820527 :
11 ABC5 Amx 114 South 2034 2004 2028 VA04104 : WK739247 12 ABCIO Amx 114.N6rthendl~ — 2034. 2016 2028. :A08460 . B70366521I 13 ABCIO Amx 103 — 2025 2019 2031 .A08815 F70335084 ~ : :: ..:.BUILDING:i.3~:(Basement) : : V .:HEng : :: V V : ::
1 ABC1O Amx Basement (Mechanical Room) 2029 2023 2035 A00876 102211956 V
2 ABCIO Amx. Basement Rm 2 (Mech..Room) . 2031 2025 2037 A00874 147238185 V
—+ I IRoom 108 SKD key access David Powell 206-351-2417 I I I I I I I
I I
Building 16
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPA102022
Completed by:
DATE: 7-24-2025 Total Inspected: 2
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing I
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR) ~ Size Mfg’r I Location 6yr Due Acgd Hydro I Barcode I Serial # I Ann Moni _____ BUILDING 16 Generator Building i...JABCIO Ansul Rear 2031 2025 2037 A04350 69988720 V ~.JABC1o Ansul Front 2031 2025 2037 A04351 169990482 V
Building 18
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO 2022
Completed by: —.
DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Total Inspected: 6
Size j MfgrI Location I 6yr Due I Acgd I Hydro I Barcode I SeriaI# lAnniMoni BUILDING 18 (2nd Floor)
1 ABC1O Amx 2nd Floor Emergency Stairs 2024 1994 2030 A00768 MD898011 V 2 ABC1O Amx 2nd Floor Stairs 2024 1994 2030 A00767 MD898010 V
— BUILDING 18 (Ground Floor) —~
1 ABC1O Amx 1ST Floor (Ely Rm) core SBD2 2029 2023 2035 Al 0954 105391385 V —
2 ABCIO Amx Rm 107 (Logistics Area) 2028 2022 2034 A10856 H04447629 V —
3 ABCIO Amx lstFloorStairs2 2024 1994 2030 A03736 MD898103 V —
4 ABC1O Amx lstFloorStairs 2029 2023 2035 Al0955 105391384 V —
Building 20
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPA102022
Completed by:
DATE: 7-24-2025 Total Inspected: 3
The inspection verifies the following.’
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
10) Hydrostatic test extinauisher cylinder (12 oca Store
Building 22
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO2O22
Completed by: _______
DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Total Inspected: 7
: Size I Mfgr - Location I 6yr Due I Acgd I Hydro I Barcode I Serial # I Ann I Moni BUILDING 22 Canteen
1 ABCIO Amx Corridor (byBarberShop) 2031 2025 2037 A00772 147231095 V —
2 ABCIO Amx Dining Room (Emergency Exit) 2031 2025 2037 A02306 147231095 V —
3 ABC1O Amx Hose Cabinet (outside Rm 116) 2031 2025 2037 A00775 153886337 V —
4 K6L .~L Grill n/a 2004 2028 A04072 Z829764 ~ —
5 ABC5 Amx Food Prep 2034 2004 2028 A04163 WK653471 V —
6 ABC1O Amx Storage Room 2031 2025 2037 A04162 169988186 V
7 ABC1O Amx Office 2034 2004 2028 A04164 WG539348 V
Building 23
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPA102022
Completed by: _______________________
DATE: 7-24-2025 Total Inspected: 3
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR) ‘101 Hydrostatic test
Size f?iTA~fl u
Building 24
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO2O22
Completed by: — —
DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Total Inspected: 8
Size Mfgr I Location I 6yr Due I Acg’d I Hydro I Barcode I Serial # I Ann I Moni . .: BUILDING~24 2m1 Floor . IT Storage : V — —
1 ABCIO Amx 2nd Floor (North Stairs) 2028 2022 2034 Al 0847: H04438762 V —
2 ABCIO Amx 2nd Floor (South Stairs) V 2028 : 2022 :2034: Al 0848 H09360417 V —
3 ABCIO Amx 2nd Floor Elevator 2028 2022 2034 A10849 H04439754 V —
E BUILDING 24 1st Floor V V IT .. . .. V — —
1 ABCIO Amx Front Entrance . 2028 2022 2034 V Al 0850 H04365666 V —
2. ABCIO Amx Elevator VLObb~ V V V 2028 V 2022 V .: 2034 VA10851 V VH04365668 V 3 ABCIO Amx Elevator Machine Room 2029 V 2011 2023 :VA04384 AT525423 V —
4 ABCIO ~ Corridàr (by Rm56Emerg. Exit) V V V 2028 2022 V~ 2034 V V~ :A10853 VH09365066 V —
5 ABCIO Amx Corridor (North Stairs) 2028 2022 2034 Al.0852~ H09364564 “ —
Building 28
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO 2022
Completed by:
DATE: 7-24-2025 Total Inspected: .._~
The Inspection verifies the foliowing:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR) ydrostatic test extinguisher cylinder (12 Size
Building 31
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY 2025 NFPA 10 2022
Completed by: •.~
DATE: 7-24-2025 Total Inspected:
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Size I Mfgr I Location Neuro Reading
6yrDue Acgd I Hydro I Barcode I Serial# lAnniMoni
- BUILDING 31
ZJABCIOI Amx IHaliway I 2029 I 2023 I 2035 I A10896 I 105425576 I “
CC)
>0 -13m -o
CD
—J CD
-~ 0
C,!
-1
D Cl) •0
CD
C, CD
0.
CD
-Il nl -I z
Cl) x
I%3Z C) 0(0 0) m
0~OC•~D
-I Ill z >z C) m m -I
-U Co
CD
Building 34
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO2O22
Completed by: —
- DATE: 7-24-2025
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinquisher cylinder (12 YEAR)
Total Inspected: 13
• Size I MfgrI - Location 6yr Due I Acg’d Hydro I Barcode I Serial# lAnniMoni ~ . :.‘ ~~ VV V . ~Research .....‘.: •....: ,~... .....:. .; . . .. .. V
1 ABC1O Amx Mechanical Room 216 2029 2023 2035 .~Ai0951. 105391365 V —
2 ABCIO Amx: CorridorCabinetRm2l4B . 2029 2023 2035 ..A10952.~ 105391364 V 3 ABCIO Amx Room 210 Vestibule — 2029 2023 2035 ;A04406., 102251548 V 4 ABCIO Amx Room 205 2030 2000 2024 :A00140 RP519452 5 ABC1O Amx Room 203 Vestibule 2029 2023 2035 .A0440i.~ 102279051 ~‘ —
6 ABCIO Amx Room~202 2029 2023 . 2035 VA04400. V 102251692, V —
7 ABC5 BE Common’s Room 2029 2023 2035 ...A10953 105391367 V —
8. ABCIO Amx Room:225 . V V 2029 2023. 2035 ~:A04403. .102283536:. ~V —
E .... ..~ V.. ~VVV Research.... V.... V~ , ~ ...:
1 ABC1O Amx. Mechanical Room 130 2029 2023 2035 . A04407 102212112 ~‘ —
2 ABCIO Amx’ Next to Room 135 . 2031 2025 2037. .AQ44O5~ 153886318 V 3 ABC1O Amx Nextto Room 146 2031 2025 2037 :..A04408~ 153886315 V —
4 ABCIO A Corridor (Next to Rm 119) 2031 2025 V 2037 :A04404.. 147238176 V 5 ABCIO Amx Corridor (Next to Rm 164) 2031 2025 2037 .A04402 . 147246794 V —
C
C C ~
0)0
~ LO~—
COCD
~ C~CD C~)CD0)c~)
C~) C~) C~) C’) C’~) C’) C’.) 0 oo a)) (NC’.)r’-~
WU LLLJULLLLLLLL
CNN
(NC’.)0
2 CO CO ~ ~
~ 00 0000000
00 0000000
~ C\JC’4
Y 0)0) 0)0)0)0)0)0)0)
U ~C) ~ < C%J(N a)
LOU)
~ (NC’.)
i~ 0 0 0 0 0 0 0 00
(NC’.)
N 2
~ C
•~ )C ~ o0 g)~~ C
,_.0 •~ V —~ 00- E—. C’.) ~
‘DO ~ 2
~o 0~ C)~CU) a) 0
a) OZC 0 0 ~ ~2 .~~.(NcaX ~ 5 2 (1) ~ 0~ ~ 0
Cr— W’—°d) a) .- —a)~0C~ —I.C .C 0 -~‘~ ~O~5 ~ ~
a) C 0 (D~ L °• 0-Es 000)~~
~ ~0.2o0a)_ c’~ c’)O~Cwa)a,00(0
~0 C~Øa)CC
~O~ ci) 0 ~.
CJC
~ ~ 100Z fDW~2~OQ~0
><x‘DØC..~C~0 ~ 22 EEEEEEE
~ ~ -~ : ~ 0 -~ 2> (0 U) U) L() U) U) U) U) U) U)~ 00 000 )OOo
<<c 0 0 ~ 5 0 ~ .~ j ci).JZOCl)L)~Zo~IQ
a) 0) a) cc.
0)
•0 a) C) a) 0~ Li) C a)
U) C’.)
0) t— a) 0_Lu Ef— 0< OlD
I—
0.
LU
LU
0z z
Z ~I
~ ZCN
≥ ~CN
LU ZLU
0 00 0 Z~’~
LU
Cl) D C, Ix
LU
LU
LL
Building 37
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY 2025 NFPA 10 2022
Completed by: —
DATE: 7-24-2025 I otal Inspected: 2
The inspection verifies the following:
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
Size I Mfg’r I Location I 6yr Due I ACgd I Hydro I Barcode I Serial # I Ann I Moni BUILDING 37 New MRI 2nd Floor B100 i]Mistl.75 Amx Entrance n/a 2010 2025 A04081 X905109 v’
2 Mistl .75 Amx Control Room n/a 2004 2025 A07632 W796702 V
Building 100
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2024 NFPAIO 2022
Completed by: -- —
DATE: 7-24-2025 Total Inspected: 338
The inspection verifies the following: -
(1) Located in designated place.
(2) No obstructions to access or visibility.
(3) Operating instructions on name plate legible and facing outward.
(4) Safety seal and tamper indicators not broken or missing
(5) Fullness determined by hefting.
(6) No obvious physical damage, corrosion, leakage, or clogged nozzle.
(7) Pressure gauge reading in The operable range or position.
(8) HMIS label and maintenance tag in place.
(9) Discharge and subject extinguisher to applicable maintenance procedures. (SIX YEAR)
(10) Hydrostatic test extinguisher cylinder (12 YEAR)
I Size Mfgr I Location I 6yr Due Acgd I hydro Barcode I Serial # I Ann I Mon BI!JIL’DING 1.00 (8~IiH EI~OOR) - Eng — —
1 ABC1O AMX 8A-S01 2030 2024 2036 ~00272 131928251 V —
2 ABC 10 AMX Elevator Room -South Small Cage 2030 2024 2036 .. A04367 -123118095 V —
3 ABC1O AMX Elevator Room - 8A100 2031 2025 2037 A04368~ 147244796 V —
4 ABCIO AMX Elevator Room - South Mezzanine 2028 2022 2034 ~.A1 0824 H04444383 V 5 ABC1O AMX Elevator Room-North Mezzanine 2028 2022 2034 A10822,. H04439753 V —
6 ABC1O AMX 8C-100 Corridor . 2028 2022 2034 A10823 H04439761 V -
7_ ABC1O AMX 8B-100 Center Pole East 2034 2016 2028 A08459 B70359786 V —
8_ ABCIO AMX 8C-100 Roof Access East 2030 2024 2036 A01687 13197290 V —
9 ABCIO AMX 8C-100 Center Pole West 2030 2024 2036 A01816’ 123118094 V —
10 ABC1O AMX 8B-100 Roof Access West 2029 2023 2035 ...A’f0893~ PP7.~1 3581. V —
11 ABCIO AMX Elevator Room North 8A (cage) 2030 2024 2036 ..A00837. 123118093 V —
12 ABC1O AMX 8A-103 (upstairs) 2029 2023 2035 A10894 FD937478 V —
‘ BUILDING 100 ~‘71iH~FLOOR) Eng : . — —
1 ABC10 AMX 7A-104 Corridor 2030 2024 2036 A01676. 131921861 V —
2 ABC1O AMX 7C-101 Corridor 2030 2024 2036 A01677 131921863 V —
3 ABC1O AMX 78-105 2030 2024 2036 A04010 131928250 V —
4 ABC10 AMX 7B-130 rear stairwell 2 2030. 2024 2036 .,A041r71 -. - 131926868’ V —
5 ABC1O AMX 7B-142 nurse station L 2030 2024 2D36 ~A04169 131971574 V —
ABCIO AMX 7B-144 ‘nurse station R . . 2030 2024 2D36 A041.70~ .131972904 V —
7 ABC1O AMX 7B-111 entrycorridor 2030 2024 2D36 A04168. 131926867 V —
8 ABC1O AMX 7C-105 2030 2024 2036 A04011 131928249 ‘V —
9 ABC1O AMX 7C-136 2034 1992 2028 A01680.. KS814576 V —
10 ABCIO AMX 7C-120 2030 2024 2036 A01681. 131971573 V —
BUILDING 100 (6jIjH~FL’GOR) . Eng — —
1 ABCIO AMX 6A-104 Corridor 2030 2024 2036 A01682 131971573 V —
2 ABCIO AMX 6C-101 Corridor 2030 2024 2036 ~0i683. 123118091 ,V —
3 ABC1O AMX 6B-105 Electrical Room 2030 2024 2036 - A044’46 131972896 V
4 ABC1O AMX 6B-113 Corridor . 2030 2024 2036. .A04684’ 131921:857 V
ABC1O AMX 6B-128 2030 2024 2036 ~.AO1685 131972899 V —
ABC1O AMX 6C-105 Electrical Room 2028 ‘ 2022 2034 Ai0826~ H04389876 V —
7 ABC1O AMX 6C Entrance 2031 2025 2037 A04450 169988718 V —
8 ABCIO AMX 6C Nurse Station 2031 2025 2037 A04451 16999043 . V -
9 ABC1O AMX 6C (by stair #3) 2031 2025 2037 A04448 169990481 V —
10 ABC1O AMX 6C Nurse Station 2031 2025 2037 A04455 . 169991772 V —
BUILDING 100 (5~H~FLOOR) Eng — —
1 ABC1O AMX 5A-107 2034 1992 2Q28 A01739 PP714469 V —
2 ABCIO AMX 5A-104 . 2034 1992 2C28 A01688. KS814589 V —
3 ABC1O AMX 5C-101 2034 1992 2C28 A01689 KS814566 V —
4 ABCIO AMX 5B-105 2034 1992 2C28 A01742 PP714466 V —
~ ABCIO ~ 5B-108 Corridor 2034 1992 2028 A01691 KS814583 V
6 ABC1O AMX 5B-135 2034 1992 2028 A01690 KS814570 V —
BUILDING 100 (5TH~FLOOR), cóntihued Eng
7 ABC1O AMX 5C-105 2034 1992 2028 A01733 PD714780 V —
8 ABCIO AMX~ 5C-137 - ~ 2030 2024 2036 A00803 MD898059 V —
9 ABCIO AMX 5C-120 2034 1992 2028 A01693 KS814567 V —
— BUILDING 100~(4TH FLOOR) Eng —
1 ABC1O AMX 4A-104 2034 1998 2028 AOl 698 PP713088 V —
2 ABCIO AMX. 4C-10i 2034 1998 2028 A01700 PP714792 V
3 ABCIO AMX 4B-104 Electrical Room 2031 2025 2037 A07714 169990476 V ABC1O AMX 4B-118 Corridor 2034 1998 2028 A01699 PP713078 V —
ABC1O AMX 4B-141 2031 2025 2037 A08800 169990474 V
6_ ABCI AMX 4C-105 Electrical Room 2034 1992 2028 A01729 PP714776 V —
7 ABC1 AMX 4C-135 Reception 2034 1998 2028 A01702. PP713081 V —
8_ ABC1O AMX 4C-9 2034 1998 2028 ~A01703 PP713691 V
9_ ABCIO AMX 4C-3 2030 2024 2036 A00819 131926859 V —
10 ABC1O AMX 4D-l64CorridorCabinet 2034 1992 2028 A00037 KS814561 V —
11 ABCIO AMX 4D-105A 2030 2024 2036 A04009 133921851 V
12 ABC5 AMX 4D-113A (bysink) 2032 2002 2026 A01893 TB811526 V —
13 ABCI 0 AMX 4D-1 1 3AA (corridor cab) 2034 1992 2028 AOl 697 PP71 3083 V —
14 ABC1O AMX 4D-114C Electrical Room 2034 1992 2028 A01730 PP714790 V
15 ABC1O AMX 4D-119 2034 1992 2016 A01696 KS814591 V
16 ABCIO AMX 4D-123 2030 2024 2036 A04206 131972880 V —
7 ABC1O AMX 4D-122 electrical room 2029 2023 2035 Al 0895 105425568 V
18 ABCIO AMX• 4D-140 2034 1992 2028 A00020. KS814587 V
19 ABC1O AMX 4D-134 2030 2024 2036 A04053 131926857 V
20 ABC1O AMX 4D~135 2030 2024 2036 A04016 131926857 V
21 ABCIO AMX 4D-182 2030 2024 2036 A00401 131972894 V
BUILDING 100 (3RD FL!OOR)~ Eng 1 ABC1O AMX 3A-105 Corridor 2034 1998 2028 A01708 PP713087 V 2 ABCIO AMX 3C-101 Corridor 2034 1992 2028 A01709 PP714783 V 3 ABC1O AMX B-105 electrical room 2034 1992 2028 A01735 PP714786 V
4 ABC1O AMX 8410 2034 1992 2028 A01710 PP714775 V —
5 ABC5 AMX 38-119 Nourishment 2032 2002 2026 A04075 TB820574 V —
ABCIO AMX 3B-12•7 2034 1992 2028 A01711 PP713090 V
7 ABCIO AMX 3C-104 electrical room 2034 1992 2028 A01736 PP714789 V —
ABC1O AMX 3C-135 2034 1992 2028 A01712 PP714784 V
9_ ABCIO AMX 3C-118 2034 1992 2028 A01713 PP713582 V —
10 ABCIO ~MX Surgery Waiting 2029 2023 2035 A07983 105425564 V —
11 ABC5 AMX Surgery Break Room 2034 2009 2028 A04189 WK653600 V —
12 ABCIO AMX 3D-l3OA Surgery Corridor 2031 2025 2037 A04013 147193140 V
13 5C02 AMX OR-7 — 2021 2026 A07977 110169165 V —
14 5C02 ‘AMX OR-6 — — 2023 2028 A07976 110169160, V —
15 5C02 AMX OR-S — — 2023 2028 A07975 110169159 V
16 5C02 AMX OR~4- 2023 2028 A07974 110169158 V —
17 ABC1O AMX Surgery Corridor 2031 2025 2037 A04015 147231204 V
18 5C02 AMX OR~3 —__— 2023 2028 A07973 110169157 V
19 5C02 AMX OR-2 — — 2023 2028 A07972 110169156 V
0 5C02 AMX OR~1’ — — — 2023 2028 A07971. 110169148 V
1 ABC1O AMX 3D-130N Surgery 2031 2025 2037 A04033 147244801 V —
22 ABC1O AMX 3D-i04 Corridor 2031 2025 2037 A04030 147244799 V
23 5C02 AMX OR-8 2023 2028 A07970 110169143 V
24 ABC1O AMX 3D-i-I Corridor 2031 2025 2037 A04032 147248406 V 25 ABC1O AMX 3D-113 Corridor 2031 2025 2037 A04037 147244800 V 26 ABC1O AMX., 3D-120C Mechanical Room 2031 2025 2037 A04026 147193136 V —
27 ABCIO AMX 3D-123 Corridor 2031 2025 2037 A04029 147147891 V 28 ABC1O AMX 3D~127.Mechanical Room 2029 2011 2023 A00368 RD937490 V 29 ABC1O AMX 3D-137 Corridor 2034 1998 2028 A01707. PP745556 V
30 ABC1O AMX 3D~136DElectrical 2034 1992 2028 A01738 PP714793 V
31 ABCIO AMX 3D-137E 2034 1992 2028 A01706 PP714464 V —
32 ABCIO AMX 3D-138F 2034 1992 2028 A01705 PP714787 V —
BIJJIL!DING 100 (2ND FLOOR) Eng — —
1 ABCIO AMX 2A-103 2030 2024 2036 A00850 131921855 V —
2 ABCIO AMX 2A-IOIA . - 2030 2024 2036 A00853 31971569 V —
3 ABC10 AMX 2C-101 2030 2024 2036 A00851. 123118090 •V —
4 ABC1O AMX 2B-102 . . 2030 2024 2036 . A04371~ 13192844? V —
ABC1O AMX 25-105 electrical 2029 2023 2035 A04353- 105425558 V —
ABC1O ~V 2B-116 . 2030 2024 2036 A04363 -‘ 131926860 V
7 ~~ö5 AMX 28 125-100 (nourishment) 2031 2025 2037 -A04378~, 158826211 V —
8 ABC10~ AMX 2B-132 2030 2024 - 2036.. ‘A04365 131921854 ~ —
9 ABCI0 AMX C-104 Electrical Room 2034 1992 2028 AOl 728~ PP713579 V —
10 ABCIO AMX 2C-137 2034 1992 2028 A01725 PP.713080 .V. —
11 ABC5 AMX C-128 (nourishment) 2032 2002 2026 A01899, TB837504 V —
12 ABCIO AMX C-120 . 2034 1992 .2028: A01~Z26. PP.714791 V
13 ABC1O AMX D-100 Lobby 2034 1998 2028 A01714: PP714778 V —
14 ABCIO AMX 2D-1’05 . . 2028 2022 2034 A07967 H27876967 V
15 ABCIO AMX 2D-108 Corridor 2034 1992 2028 AOi722, PP714782 V —
16 ABCIO: ,AMX 2D-Coiridor Stairwells 2028 2022 2034 A10829 H04443668 V 17 ABC1O AMX 2D-151C 2028 2022 2034 Al 0830 - H09306088 V —
18 ABCIO AMX 2D-1~52 MER 12 - 2028 2022 . 2034 ~A10828- -H04389868 -V
19 ABCIO AMX 2D-127 Corridor 2034 1992 2028 A0i7~2.i- PP713889 V —
0 ABC1O AMX 2D-153C ElectricáiRoom . 2034 1998 2028 AOl 795 PX045701 V —
21 ABCIO AMX D-165 2031 2025 2037 A00855; 169988715 V —
22 A8CIO AMX D-154A Electrical Rom (go to MRI) 37 - 2028 2022 2034: ~-A1’0827--- H04443582 V —
23 ABC1O AMX D-17-i MER11 2029 2023 2035 A10897 105425562 V —
24 ABCIO AMX D-l.74 - . . ‘2030 2024 2036’ ~040l4 131926863 V.
25 A8CIO AMX D-188 2030 2024 2036 . AO40l’7~ 131928247 V —
ABCIO .AMX’ D-195X North (dental lab) 2034 1992 2028 . ~A0~1.746~ PP714781. V —
7 ABC-b AMX D-195X South (dental lab) 2034 1992 2028 •.A01744 PP713092 V —
ABC1O AMX PCC Lobby (near stairs) . 2034 2004 2028 ~A04i09. WG540152 V —
ABC1O AMX 2D-A08!807 PCC 2034 2004 2028 ~.Ao41:o7 WG539355 V 30 ABCO AMX 2D-FOfAPCC . - .2031 2025 2037 A04158 169988,188 V
31 ABC1O AMX 2D-D26 PCC 2034 2004 2028 A04108’ WG539349 V —
32 ABCIO AMX 2D-C06 PCC . -. 2034 1992 2028 A00072. KS814579 V —
3 ABCIO AMX D-195B Dental Corridor 2034 1992 2028 A01718 PP714467 V —
4 ABC0: AMX D-193 Corridor - 2034 1992 2028 A017l9 PP7I 9468 ~ —
35 ABCIO AMX NuclearMedCorridor 2034 1992 2028 A01717 PP713084 V
36 ABC1O’ AMX D196B NucleàrMéd . 2030 2024 2036 - A00854 123118088. -V —
37 ABC1O AMX D-196F 2034 1992 2028 ..A0,1:715 PP714463 V —
38 ABCIO AMX D-lllAlnnerOffjce. - . . . 2034 1992 2028 A0,1716 PP7I3577 -V
39 ABC1O AMX D-l0l Inner Office 2030 2024 2036 A00856~ 123118086 V —
UILDING 100 (1ST FLOOR) Eng . — —
1 ABC1O AMX 1A-109 2034 1998 2028 A01~7•98. PX047338 V —
2 ABCIO AMX 1B-169 2030 2024 2036 A04224~ 123118089 V
3 ABC1O AMX B-114 2030 2024 2036 A0it748. 131921856 V —
4 ABC1O AMX 1’B-120 (nurse’s desk) - 2034 1998 2028 .A01-783 PX046304 V —
ABC1O AMX lB-125 2030 2024 2336 A00361’. 131928243 V —
ABCIO AMX 18-129 . 2030 2024 . 2336 ,~A00359 123118087 V -
7 ABC1O ~ 1B-137 (corridor) 2031 2025 2337 A08805. 169992982 V —
8 ABC1O AMX .IB-142 - 2030 ‘ 2024 2336 .A00115 31971559 V —
9 ABCIO AMX IB-141 Repair Room (in 144) 2031 2025 2037 ~04004, 169988185 V —
10 ABC5 AMX 1 8-148 Apartment . 2031 2025 2037 - A08827 158850625 V —
11 ABCIO 18-150 Entry 2034 1998 2028 A01781 PX047331 ~ —
12 ABC1O A~i~ -150 Stair 3 -. 2030 2024 2036 AO1747~ 131971568. V 13 ABC1O ~ 1B-156 Corridor 2030 2024 2036 - AOOj-36 123113083 V —
14 ABCIO. AMX 18-156 - 2030 2024 2036 A00848 - 131921853 V —
15 ABCIO AMX 1C-106 2030 2024 2036 AO0843 123118085 V —
16 ABCIO ~ IC-102 CLCFront Desk . 2034 .1998 2028 A01~7,82 PX047332 V —
17 ABCIO AMX C-120 Electrical’Room 2034 1998 2028 A0178O PX045684 V —
18 ABC5 AMX C-l’24ApartmentGM .2028 2022 2034 -AiO872~ H04447631 V. —
19 ABC1O AMX IC-129 2030 2024 2036 A00842 131972893 V —
20 ABC1O AMX -1C-134 . - 2028 2022 2034 A10066 H04439286 V
21 ABC1O AMX IC-151 2030 2024 2036 A04199 123118084 V —
BUILDING 1.00 (1ST FLO~OR) coñtiñued Ehg — —
22 ABC1O AMX 1C-155 E-Exit 2028 2022 2034 A10834 H04438760 V —
23 ABC1O AMX lB-168 Electrical Room 2028 2022 2034 ,A10833 H04438761 V
24 ABC1O AMX 1D-102A 2031 2025 2037 A00846 147230700 V
25 ABCIO AMX lD-118 2028 2022 2034 A10839. H04469751 V 26 ABCIO AMX 1D~l18F(seeBB102Pham1fOraCceSS) 2031 2025 2036 A00835 147193138 V
27 ABCIO AMX iD-uSC (go to rehab 103) 2031 2025 2037 A04427 169988721 V —
28 ABCI 0 AMX Corridor CBNT (go to 103) 2028 2022 2034 Al 0837 H04443669 V —
29 ABCIO AMX Corridor CBNT (next to room lD-590) 2031 2025 2037 A04420 131928241 V 30 ABC1O AMX lD-571A 2031 2025 2037 A04423 147193145 V —
31 ABC1O AMX. 10-5710 2031 2025 2037 .A04424 147193139 V
32 ABCS AMX Corridor CBNT (next to room 1 D-570) 2031 2025 2037 .~.A04416 153768893 V
3 ABCIO •AMX Prosthetic Storage 2031 2025 2037 A04038 147231209 V —
4 ABC1O AMX Old Fan Room 2029 2023 2035 Al 0917 105425563 V —
ABC1O AMX 1 D-l 25 Inpatient PT 2028 2022 2034 Al 0846 H04443959 V —
ABC1 AMX 1D-124 Corridor 2034 1992 2028 A0i692. KS814592 V —
7 ABCIO AMX .1D-l23C Electrical Room 2028 2022 2034 Al0845 H09389874 V
38 ABCIO AMX lD-l22 2028 2022 2034 Al0844 H04439756 V —
39 ABC1O AMX 1D-109 Rear 2028 2022 2034 A10842 H0444358l V —
40 ABC5 AMX 10-109 Nourishment 2031 2025 2037 .A08834 158850625 V
41 ABCIO AMX ID-Ill Corridor 2031 2025 2037 A00348 147248407. V —
42 ABCIO AMX 10-138 Fan Room (in e clinic) 2029 2023 2035 Al 0916. 105425569 V —
43 ABCIO .AMX 1D-139 Electrical Room 2034 1992 2028 .A01727. .PP714465 V —
44 ABCIO AMX D-l37 East Clinic Corridor 2028 2022 2034 Al 0843 H04439757 V —
45 ABCIO AMX 1D-l42’Veterans Pathway 2031 2025 2037 A00833 47248405 V —
46 ABCS AMX 1D-141C Electrical Room 2031 2025 2037 A08824 15882620 V 47 ABCIO AMX 1D-145.Pharmacy Entry 2031 2025 2037 A04028 .131926861 V 48 ABC1O AMX 10-145 Pharmacy Patient Window 2028 2022 2031 A10836 H04439752 V —
49 ABC1O AMX 10-145 Pharmacy Column 2031 2025 2037 A04054 131921846 V —
50 ABC1O AMX 10-145 Pharmacy Back Exit 2028 2022 2034 A10835 H04439758 V —
51 ABCIO AMX Pharmacy Waiting 2030 2024 2036 A043l3 131928240 V 52 ABC1O BOG 1D-l47 Hall 2031 2025 2037 A04l23 169990471 V —
53 ABCIO AMX lD-l47AMER7 2029 2023 2035 . Al09l5 110257565 V —
54 ABC1O AMX 1D-l47B MER 8 2029 2023 2035 Al 0914 05425570 V 55 ABCIO AMX ID-l46J 2030 2024 2036 A00839 1231.18082 V —
56 ABC1O AMX lD-148C 2034 1992 2028 A0l745 PP713578 V —
7 ABC1O AMX 1D-l49N’Exit 2031 2025 2037 A00l85 147234328 V —
8 ABC1O AMX D-149V 2031 2025 2037 A00838 147231208 V
59 ABC1O AMX Main Entrance Enrollment 2031 2025 2037 A043l4 14721207 V —
60 ABCIO AMX Medical Mall (Starbucks) 2031 2025 2037 A00755;~. 147193141 V —
61 ABC1O AMX ain.Entry Lobby 2031 2025 2037 A08801 169988187 V —
2 ABC5 AMX Women’s Clinic (frontdesk) 2034 2004 2028 A04l60 WK656815 V —
3 ABC5 AMX lD-149SSWomens Clinic (go to emerg rm) 2034 . 2004 2028 A04l6l WK649425 V —
64 ABCIO AMX ED Management Office (main lobby) 2030 2024 2036 A04340 131971567 V —
65 ABCIO AMX IA-lo5MainLobby 2030 2024 2036 A04008 147193146 V
66 ABCIO AMX IA-104 2025 2007 2019 A02630 YN841205 V
67 ABCIO AMX lB-I00 Electrical Room 2028 2022 2034 A10838. H04389871 V —
68 ABC1O AMX 10-100 Vending Mach. Area 2028 2022 2034 A1084l H04389873 V —
69 ABC1O AMX 1D-lOl Canteen Food Line 2031 2025 2037 A04006 147234327 V —
70 K6L BDG 1D-lOlE Canteen Kitchen 2021 2026 ‘Al0523. H00620022 V —
71 ABC5 AMX 10-101 Canteen Kitchen 2031 2025 2037 A04225 153761291 V 72 ABC1O AMX lD-lOl Canteen 2031 2025 2037 . A04005 147147890 V —
73 ABC1O AMX 1D-l56 Police Lobby- 2031 2025 2037 A00841 147231203 V 74 ABC1O AMX lA-l06 Police Armory (8am) 2028 2022 2034 A10825 H04439755 V —
~ . . ~. BUILDING 100 (BASEMENT) ~Eng.. ._______ . —
1 ABCIO AMX BA-lOO 2031 2025 2037 A00820. 147184781 V —
2 ABC1O AMX BB-lO3A Electrical Room . 2028. 2022 2034 Al 0858 H04447627 V —
3 ABC1O AMX BB-lOO Corridor 2031 2025 2037 A04002 RP549293 V 4 ABC1O AMX BB-l03 . 2031 2025 2037 A00821 MD898032 V —
5 ABC1O AMX BB-l02 Pharmacy Column 2031 2025 2037 A00822 MD898058 V 6 ABCIO AMX BB-102B Pharmacy East Exit. 2031 2025 2037 A00823 MD898031 v~ —
_____ BUILDING 100f(B~SEMEN~ri) continued Eng —
7 ABCIO AMX B-114 Hallway 2031 2025 ‘2037 ~A04001’ 147191627 V
8 ABC1O ~ B-108 Chapel 2031 2025 2037 A00849’~’ 147193144 V —
9 ABC1O AMX hapel Corridor Exit 2028 2022 2034. M’0859~ H09285261 V —
10 ABC1O AMX 8-120 Mechanical 2031 2025 2037 A02656~ 147193144 V —
11 ABCIO AMX B-l2OSub-Basementstairs 2031 2025 2037 ~04339~’ 147244803 V —
12 ABCIO AMX B-l20PlumbingShop 2031 2025 2037 “A0083’i’ 147193154 V
13 ABCIO’ AMX C-1’OO Plumbing Shop 2032 2014 2026 A08811 F70335079 V —
14 ABC1O AMX BB-120 MER 5 2034 2016 2028 A08457 870373801 V —
15 ABC1O AMX C-102’Sub-Statjon’C - 2026 2020 2032 :A08812’ F70342263 V —~
16 ABCIO AMX C-102 Sub-Station C 2026 2020 2032 ‘ A08807 F70338720 V —
17 ABCIO AMX B-120’MER 5 Sdüth Exit 2031 2025 2037 A08741 147151632 V —
18 ABC1O AMX BC-CS-09 2032 2014 2026 6~04i81 CB558239 V —
19 ABC.10 AMX BB-120 MER 5 Cente~’Pole 2031 ‘ 2025’ 2037 A00828 147231206 V
20 ABCIO AMX BB-I2OMER5NE 2031 2025 2037 A08458 147193147 V —
21 ABCIO AMX BA-102 N&F’Service 2028 2022 2034 A10860 H09285257 V
22 K6L BDG BA-l02 N&F Service — 2021 2026 Al 0522 H00620023 V —
23 ABCIO AMX A-102 N&F Service 1(dish pit) 2031’ 2025 2037 -A04165 147193149 ‘“V 4 ABC1O AMX A-102’N&F Service (storage) 2028 2022 2034 Al 0861’; H04447623 V —
5 ABCIO AMX A-104 Corridor 2031 2025 2037 ~A00818 147151628 V —
7 ABC1 AMX A-106 Mens 2031 2025 2037 ‘A04289 147244805 V —
28 ABC1O AMX C-106 Corridor 2028 ‘2022 2034 Ai0832’ H04443666 V 29 ABC1O AMX D-l06DoorEntry 2030 2025 2030 ‘A00815~ 147193150 V —
30 ABC1O AMX D 106 Pole 2030 2025 2030 A04021 1471 847~23 V —
31 ABC1O AMX D-106 Office Door 2030 2025 2030 A008l4 147244802 V —
32 ABCIO AMX D-lO8C Electrical Room Constructiàn 2030 2000 ‘ 2024 A04025 RP54951’3: IrilOlB 33 ABC1O AMX GD-lOg MER 4 (go to energy plant) 2028 2022 2034 ‘-Al0831’ H04389869 V —
34’ ABCIO AMX D-llOC Construction ‘ 2028 2022 2034 .A1006i H04439Z49 IiilOlB., 35 ABC1O AMX D-170 Entry 2029 2023 2035 qAOl 111 102279052 V
36 ABCIO AMX D-157AEntry ~‘ 2029 2023 ‘ 2035 “A0,i~l12~ 102279049 V —
37 ABC1O AMX D-158A Elevator room 2029 2023 2035 A1’0932’ 110257586 V
38 ABCI AMX D~l60 2029 2023 2035 AOlll3 10227944 V —
9 ABC1O AMX D-167 Sink 2029 2023 2035 A0’l414 102279050 V 40 ABC1O ~1~V D 157A Offices 2029 2023 2035 A0l~bl5 1022’Z9048 V —
41 ABCIO AMX D-lll MER 3 Construction 2030 2012 2024 : A04341~ AY473775 In 1018 42 ABC5 Añix RS Room 1 2029 2023 2035 All000 103758496 V
43 ABC5 Amx RSRoom2 2025 2019 2031 .A’llOOl F72021077 V 44 ABC1O AMX ll5SubStationB 2031 2025 2037 A08810 16999047’ V —
45 ABC1O AMX -ll5SubStationB 2031 2025 2037 ~A08806 169990468 V 46 ABCIO AMX Dll6MER~2 2029 2023 2035 Al0909 AR495887 V
47 ABC10 AMX D-l2OC Corridor 2031 2025 2037 A04216 147229527 V
48 ABC1O AMX D 120C 2028 2022 2034 A08809 F70342264 V
49 ABCIO AMX D-122C Electrical Room 2028 2022 2034 Al 0866 H04447632 V —
50 ABC1O AMX corridoi~by BD123 & BDI39 2031 2025 2037 A04207 14723W85 V
1 ABC1O AMX D-123 MER 1 2029 2023 2D35 A10908 105425555 V —
2 ABC1O AMX D l~40A~Records 2031 2025 2D37 A04369 147231090 V
53 ABC AMX D-l40Records 2029 2023 2035 A10903~ 105391362 V 54 ABC AMX BD~140fi~€oi~idor ‘ ‘ ~2028 ‘ 2022 •2034~Al’o864 H09283593~. V
55 ABCIO AMX D-139E 2028 2022 2034 A10865~ H09283605 V —
6 ABCIO AMX D 1390 2031 2025 2037 A00400 16998872 V —
7 ABCIO AMX BD-139B 2031 2025 2037 A04297 147246718 V —
ABCIO AMX D 139 Drop Off Desk 2031 2025 2037 A04296 I47229530~ V —
59 ABCIO AMX BD-l28 2031 2025 2037 ‘A04003 147246719 V —
60 ABCIO AMX D 131 C Molecular Lab 2028 2022 2034 Al 0867 H09283596 V —
61 ABCIO AMX PathologyLabColumn 2028 2022 2034 •‘A.10868” H09283599 V —
62 ABC1OI AMX orrid~’byiRM~BD 140E 2028 2022 2034 A10869 H09283600~ V —
63 ABC1O AMX D-l42 Lab Storage 2031 2025 2037 A00751 147246806 V —
64 ABC1O AMX ood Drawing.Corridor 2031 2025 2037 A00355 147194018 V —
5 ABCIO AMX D-142 (blood draw) 2031 2025 2037 A04294 147151630 V —
6 ABC1O AMX D 124 Corridor 2024 1994 2030 A00807 147244806 V —
7 ABC1O AMX D-150A 2031 2025 2037 A04051 MD898007 V —
68 ABCIO! AMX D-1’50 ‘ “2026 020 - 2032 ‘ A0869l ~E82248957 ~ —
69 ABC1O AMX l5lEAutopsyFrontDoor 2028 2022 2034 A10871 H04453988 V 70 ABCIO :.AMX BD-151 Hallway 2031 2025 . 2037 A00810 147193148 ~
• ~B.1!JlLDING 100 (BASEMENT) cóntinüéd Ehg 71 ABC1O AMX BD-151 (teach lab) 2028 2022 2034 A40870 H04447637 V
72 ABCIO: ~AMX Building 1~Buildingi00J~1allway 203.1 2025 . 2037~ A008l2 147151631. V —
73 ABC1O AMX BD-143H Supply Distribution (GM) 2031 2025 2037 A04449 169988712 V —
74 ABC1O AMX BD-143G Supply Distribution (GM) 2031 2025 2037 A04447 169988714 V —
75 ABCIO AMX BD-l43K Corridor 2031 2025 2037 A0081l 147151629 V —
76 ABC1O AMX BA-l07 Machine Room 2031 2025 2037 A04292 147246721 V BUILDING 100 (ENERGY PLANT~) Eng — —
1 ABC1O AMX H liwayto Bldg 100 2026 2020 2030 A10492 G09782591 V —
2 ABC2O AMX b-Basement Stairs . 2031 2025 2037 A00864~ 152660948 V —
3 ABCIO AMX B -101 NW 2026 2020 2032 - A10464 F99594488 V
4_ ABCIO AMX -101 SE Exit 2026 2020 2032 . Al 0465 F99594486 V
ABCIO AMX -lOlSWExit 2026 2020 2032 ,A10466 F99610587 V —
6_ ABC2O AMX -108 2031 2025 2037 A00778 152660950 V —
7 ABC1O AMX -102 NW 2026 2020 2032 A10463 F72033891 V —
8_ ABC1O AMX -102.NE 2026 2020 2032 A10459 F99617160 V —.
9 ABC1O AMX mergency Switch Gear NW 2026 2020 2032 Al 0462 F99622366 V —
10 ABC1O AMX rr’ergency Switch Gear NE 2026 2020 2032 A10457 F99608161 V —
11 ABC1O AMX -103 SE 2026 2020 2032 A10458 F99615988 V —
12 ABCIO AMX E-103 SW 2026 2020 2032 Al 0460. F99594487 V 13 ABCIO AMX ergency Switch Gear SE 2026 2020 2032 Al 0461... F99608160 V
14 5C02 AMX 0 ice — — 2020 2025 A07947- G11332573 V —
15 5C02 AMX 0 ice 2020 2025 A07948 G11332572 V
16 ABC2O AMX -107 Front 2031 2025 2037 A00783 152660943 V —
17 ABC2O AMX -107 Side Exit 2031 2025 2037 A00784 152660952 V —
18 ABC1O AMX B -107Rear 2028 2022 2034 A10857 H0444896l V —
ABCIO AMX ergy Plant. (by chiller) 2031 2025 2037 A00l09 147184780 V ABCIO AMX nérgy Plant Storage 2031 2025 2037 A00399 147193151 V —
I ABC2O AMX oiler Room 2031 2025 2037 A00884 152660947 V —
22 ABC2O AMX oiler Room 2031 2025 2037 A00885 152660949 V 23 ABC1O AMX itchen 2031 2025 2037 A08799 169990473 V —
24 ABC1O AMX oiler Room: (upstairs) 2028 2022 2034 A10862 H04447630 V 25 ABC1O AMX Restroom Corridor 2029 2023 2035 Al 0910 105391358 V
— BUILDING 100 (SUB~B~SEMEN11) Eng . — i ABC1O AMX SB CSB 09 2029 2023 2035 Al 0902. AR495883 V —
2 ABC1O AMX SB CSB 02 Stairs . 2028 2022 2034 Al 0855 H09285260 V —
3 ABC1O AMX SB Center Pole 2029 2023 2035 .AlO9Oi AR496944 V 4 ABC1O ~AMX SBEnergyPlanWoor 2029- 2023 2035 .Al0900 AR502547 V —
5 ABC1O AMX SB CSB 05 2031 2025 2037 A08814 169988184 V
6 ABC1O AMX SB Mid 2026 2020 2032 ,A08804 F70337869 V —
7 ABC1O AMX SB End 2029 2023 2035 Al 0899 105391360 V —
ABCIO BE SB Exit . . 2029 .2023 2035 A10898 110257577 V —
BUILDING 100 - INTERSTITIALS STAIR #1 Ehg . — — i ABC1O AMX 7F-l00 2026 2020 2032 Al 0475 G09782584 V —
2 ABCIO AMX 6F-l00 2026 2020 2032 . A10480 G0975l588 V
3 ABCIO AMX 5F-l00 2026 2020 2032 A10469. G09699l40 V 4 ABCIO AMX 4F-l00 2026 2020 2032 .Al0472 G09753l26 V
5 ABC1O AMX 3F-l00 2026 2020 2032 A10474 G09699142 V —
6 ABCIO AMX 2F-100 2026 2020 2032 Al 0478 G09751512 V 7 ABCIO AMX IF-bC 2031 2025 2037 A04036 147231210 V —
8 ABC1O AMX BF-lOO . . . 2031 2025 2037 A04034 147193153 V —
BUILDING 100 - INTERSTITIALS STAIR #2 Eng . — — i ABC1O AMX 7F-lOl 2026 2020 2032 Al 0476 G09775049 V —
2 ABC1O AMX 6F-b01 2026 2020 2032 A10481 G09753l23, V —
3 ABC1O AMX 5F-lOl 2026 2020 2032 A10467 G09782586 V 4 ABC1O AMX 4F-lOl 2026 2020 2032 A10471 G09782395 V 5 ABC1O AMX 3F-lOl 2026 2020 2032 A10468 G09782583 V 6 ABCIO AMX 2F-bOl 2026 2020 2032 Al0470 G09782585 V 7 ABC1O AMX iF-lOb 2026 2020 2032 Al0477 G09699144 V
BUILDING 100 INTERSTITIALS STAIR #3 Erig f~ ABC1O’ AMX 7F-103 2026 2020 2032 A10473 G09775053 V 2 ABCIO AMX 6F-103 2026 2020 2032 Al0479 G09783027 V —
3 ABCIO AMX 5F-103 2026 2020 2032 A•10487 G09751513 V —
4 ABCIO AMX 4F-103 2026 2020 2032 A10488 G09782593 V —
5 ABCI0 AMX 3F-103 2026 2020 2032 A10484 G09699141 V —
BUILDING 100 - INT. STAIR #3 Continued Eng
6 ABCIO BDG 2F-103 2030 2000 2024 A04012 RP549514 V
7 ABC1O AMX lF-103 2030 2000 2024 A07584 RP549510 V —
BUILDING 100 - INTERSTITIALS STAIR #5 Eng — —
1 ABC1O AMX 4F-105 2031 2025 2037 A00327. 169988716 V —
2 ABCIO BDG 3F-103 2031 2025 2037 A00328 1699047? V
3 ABC1O AMX 2F-105 2026 2020 2032 Al 0490 G09753128 V
4 ABCIO BDG IF-lOS 2031 2025 2037 A04022 169990475 V
5 ABC1O BDG BF-104 2031 2025 2037 A04020 169988725 V —
— BUILDING 100 - INTERSTITIALS SW~IRJ#6 Eh’~g — —
I ABCIO BDG 3F-105 2031 2025 2037 A00366 169988189 V —
2 ABC1O AMX 2F-105 2026 2020 2032 A10489 G09782587 V —
3 ABC1O BDG 1F-105 2030 2000 2024 A04023 RP54516 V —
4 ABC1O BDG BF-105 2030 2000 2024 A04031 RP549298 V —
Building 101
FIRE EXTINGUISHER INSPECTION & MAINTENANCE REPORT
FY2025 NFPAIO2O22
The inspection verifies the following:
(1) Located in designated…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .