This document is a Request for Information (RFI) Answers and Revised Statement of Work (SOW) for electrical testing services at the VA Medical Center in Boise, Idaho. The solicitation (36C26026Q0078) requires a triannual inspection, testing, cleaning, and calibration of the station electrical distribution system, covering medium and low voltage electrical equipment across multiple campus buildings. Key scope includes testing 15 kV switchgear in Building 83, inspecting and thermographically scanning forty-one pad-mounted transformers, testing fourteen automatic transfer switches, and performing comprehensive electrical system diagnostics in accordance with NFPA 70B, ANSI/NETA standards, and manufacturer recommendations.
The contract period of performance runs from award date to 08/31/2026, with proposals due on 01/20/2026 at 10:00 AM PST. The contractor must be experienced in electrical testing for critical facilities, with a senior-level electrical testing technician having at least 5 years of full-time experience in medium and low-voltage power system testing. Work must be coordinated to minimize disruption to patient care, with power outages preferentially scheduled on weekends or after 5 PM on weekdays. Upon completion, the contractor shall provide a detailed report documenting test results, infrared images, oil analysis reports, and recommended maintenance and corrective actions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26026Q0078 0005.docx | DOCX document | |
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Services.docx | DOCX document | |
| 36C26026Q0078 0004.docx | DOCX document | |
| 36C26026Q0078 0003.docx | DOCX document | |
| 36C26026Q0078 0002.docx | DOCX document | |
| 36C26026Q0078 0001.docx | DOCX document | |
| 36C26026Q0078.docx | DOCX document | |
| P07 White CityWage Determination.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses:
1. Regarding Section 1.a. of the Statement of Work (page 5) which requests testing of "all breakers and relays in the 15kV switchgear located in Building 83," could you provide the inventory or quantity of MV (medium voltage) breakers and relays that need to be tested?
See one-line drawing
2. Concerning Section 1.b. of the Statement of Work (page 5) which requests testing of certain devices with specified locations but does not provide the total number of LV (low voltage) breakers/GFI breakers/relays in the "main building distribution panels," please specify the total quantities.
See one-line drawing
3. After specifying the number of low-voltage circuit breakers that need to be tested, should they be tested via primary (such as primary current injection) or secondary (such as secondary current injection) injection?
See past electrical testing report.
4. Will electrical drawings (such as single-line diagrams) and copies of any past studies be made available to help establish the scope and cost for the arc flash, infrared, and testing work?
See attached
5. Is there an existing arc flash study or raw data file available, or will this effort need to begin from scratch?
No.
6. Have specific electrical tests been identified for each equipment type, or should all NETA (InterNational Electrical Testing Association) recommended tests be included in the proposal?
See past electrical testing report.
7. Will a site visit or pre-bid walkthrough be scheduled?
No.
8. Could you provide one-line diagrams?
See Question 4.
9. Could you provide the quantities of medium voltage breakers and relays?
See one-line drawing.
10. Would the government be willing to extend the deadline to 12/30?
Extended to 01/20/2026
11. I noticed a discrepancy between the solicitation and SAM website posting regarding the offer due date for proposal submission. Can you verify which one is correct?
Due date is 01/20/2026 per Amendment 0002.
Period of Performance
12. Can you confirm the anticipated period of performance for this solicitation?
Date of award to 08/31/2026.
Testing Standards
13. Is all testing required to be performed in accordance with VHA Directive 1028 and applicable NETA-MTS standards?
See past test report.
Circuit Breaker Testing Method
14. For circuit breaker (CB) testing, are primary injection, secondary injection, or both required?
See past test report.
Circuit Breaker Testing Requirements
15. VHA Directive 1028 differentiates testing requirements for CBs rated below 225A (< 225A) and those rated 225A and above (>= 225A). Please confirm whether CBs rated above 225A require primary injection testing, and CBs rated 225A or below requires normal testing only. If YES, please provide the quantity of CBs >= 225A and < 225A.
See past test report.
Working Hours and Outage Schedule
16. Section 3 of the Statement of Work (page 6 of the RFQ) states that work causing a disruption of power to building 85 will be performed outside normal hours. Please confirm the required working hours and outage window for this scope.
Weekends are optimal as it is the lowest amount of Veteran services affected and after 5pm M-F. All weekday power outages MUST be coordinated and approved with the FMS Point of contact. Shortest outage duration possible.
Quantity and Voltage Level Confirmation
17. Please confirm the quantity and voltage level of equipment included in this scope, specifically:
The total quantity & Voltage level of SWGR
The total quantity & Voltage level of Circuit Breakers
The total quantity, Voltage level & Type of the protective relays
The total quantity & Voltage level of distribution panels
See attached documents for quantities.
Panels and Switchgear Testing Requirements
18. Are all distribution panels and switchgear required to undergo electrical testing, or are visual inspection and infrared scanning only required?
Liquid-Filled Transformer Testing Requirements
19. Are liquid-filled transformers limited to oil testing only, or is full NETA testing required?
Single-Line Diagram (SLD)
20. Can you provide the most current single-line diagram for this site?
Attached.
Test Report
21. Can you provide the most recent test report available for this site?
Attached.
Statement of Work Tasks and Requirements:
The contractor shall provide all labor, supervision, tools, materials, equipment, and transportation necessary to perform triannual inspection, testing, cleaning, and calibration of the station electrical distribution system, in accordance with NFPA 70B, applicable ANSI/NETA ATS and MTS standards, manufacturer recommendations, and OSHA requirements. Work shall be coordinated with the VA Medical Center to avoid disruption of patient care and critical operations, and shall include all documentation, reports, and recommendations described herein.
The contractor shall test, inspect, clean, and calibrate all breakers and protective relays in the 15 kV switchgear located in Building 83. This includes cleaning all relays before testing;
removing metal filings from disks and magnets; cleaning and burnishing contacts;
checking contact wipe; and performing functional and calibration tests in accordance with manufacturer instructions and ANSI/NETA standards.
The contractor shall visually inspect and perform infrared thermographic testing of the 15 kV switchgear in Building 83; forty-one (41) pad-mounted transformers; ten (10) vault-mounted VFI switches; three (3) sectionalizers; and the main building distribution panels located in G14-27, G05-46, G25-67, G02-77, 117-85, 133-88, 122-109, 201-109, 116-110, 115-114, 112-117, 102-120, GRNDS-121, GRNDS-122, 106-123, 200-123, and 127-124. The contractor shall infrared test each breaker in the main distribution panels, test the GFI trip rating of each GFI breaker, and test and calibrate all relays in the main distribution panels, documenting any hot spots, anomalies, or deficiencies.
The contractor shall obtain an oil sample from each of the forty-one (41) pad-mounted transformers located throughout the campus. Oil samples shall be analyzed for dissolved gases, moisture content, dielectric breakdown voltage (tested per ASTM D1816), acidity, color, visual condition, specific gravity, and interfacial tension; the contractor shall check and document each transformer’s pressure gauge (nitrogen blanket), oil level, physical condition, cleanliness (removal of cobwebs and debris), and levelness.
The contractor shall infrared test and vacuum out fourteen (14) automatic transfer switches: one (1) in Building 46, one (1) in Building 27, one (1) in Building 77, three (3) in
Building 67, one (1) in Building 88, and seven (7) in Building 85. The contractor shall document all deficiencies or areas of concern discovered in the transfer switches and associated equipment.
Reporting requirements
At the conclusion of all inspection, testing, and calibration activities, the contractor shall provide a written report to the VA Medical Center summarizing all work performed. The report shall include a narrative description of procedures followed; problems or deficiencies discovered; detailed test results; infrared images of all identified problem areas; oil analysis reports for each transformer; and written recommendations for maintenance and corrective actions, including a separate cost estimate for each recommended corrective action.
Scheduling and outages
Any work that requires a disruption to Medical Center power shall be scheduled in advance with the VA Medical Center’s designated representative. Work that causes a disruption of power to Building 85 shall be performed outside normal hours of operation, at times when Surgery is not in operation, Weekends are optimal as they have the least impact on Veteran services. Additionally, work can be performed after 5 PM from Monday to Friday. All weekday power outages MUST be coordinated and approved with the FMS Point of Contact prior to the power disruption. The duration of the outage should be kept as short as possible.
Contractor qualifications
The contractor shall be regularly engaged in performing inspection, testing, and maintenance of medium-voltage electrical distribution systems (15 kV class or higher) on a recurring basis and shall have performed such services for at least five (5) years prior to award. The contractor’s experience shall include testing, inspection, and maintenance of 15 kV switchgear, pad-mounted transformers, automatic transfer switches, protective relays, and main distribution panels for hospitals, data centers, or other critical facilities with similar reliability and life-safety requirements.
All electrical testing, troubleshooting, and interpretation of test results shall be performed and directly supervised by a senior-level electrical testing technician who:
– Has a minimum of 5 years of full-time experience in medium- and low-voltage power system testing and maintenance.
– Is qualified to independently plan tests, configure test equipment, perform acceptance and maintenance tests, and interpret test data to make pass/fail decisions in accordance with current ANSI/NETA standards.
– Has documented training and demonstrated proficiency in protective relaying, circuit breaker testing, insulation testing, and switchgear commissioning.
The lead technician shall be qualified to supervise and direct junior testing personnel and to sign final test reports for submission to the Owner.
http://www.eaton.com/services 24-Hour Emergency Service: 1-800-498-2678
September 22, 2020
VA Medical Center 500 Fort Street Boise, ID 83702
Attention: Hank Fredrickson
Subject: VAMC Boise 2020 maintenance testing.
Attached please find Eaton’s Electrical Engineering Services and Systems (EESS) report covering the service performed on the electrical equipment outlined in the Equipment Table section of this report.
The information contained in this report outlines the service purpose, equipment identification, results and recommendations, service procedures, and recorded test data completed to accomplish the following service request:
Name: VA Medical Center Boise 2020 Maintenece Job Number: EPO0002499 PO Number: 36C6020P0647 Description: 2020 Maintenance Date of Service: September 19, 2020
If you have any questions regarding this report or additional services, please reach out to myself or your sales representative.
Sincerely, Gregory Gould Field Svc Engineer, EESSD Electrical Engineering Services and Systems Division, Eaton 9931 W. Emerald Street Boise, ID 83704 tel: 208-891-1428 fax:
GregPGould@Eaton.com
Connect with Eaton:
http://www.eaton.com/services http://www.eaton.com/services https://www.linkedin.com/company/eaton/ https://www.linkedin.com/company/eaton/ https://twitter.com/eatoncorp https://twitter.com/eatoncorp https://www.youtube.com/channel/UCF7vz2IAPNHv7BKTiFC9Xhw https://www.youtube.com/channel/UCF7vz2IAPNHv7BKTiFC9Xhw https://www.facebook.com/eatoncorporation/ https://www.facebook.com/eatoncorporation/
Field Service Report
Summary
Purpose: The Department of Veterans engaged the services of Eaton Electrical Engineering Services and Systems to provide maintenance testing at the VA Medical Center in Boise, ID.
Testing was performed by Greg Gould and Larry Neddo with EESS. All equipment has been inspected and tested to ensure they meet manufacturer’s specifications and industry standards for safe and proper operation.
COMMENTS PERTAINING TO EQUIPMENT TESTED:
Building 67, 67-GDG1 and 67-NDG1. Main bonding jumper was mounted on the wrong side of the neutral sensor. Corrected by EESS.
WORK PERFORMED:
Maintenance testing on low and medium voltage electrical equipment.
REPORT PREPARED BY:
Greg Gould
Test Procedures:
MEDIUM VOLTAGE VACUUM BREAKER
Visual and Mechanical Inspection Inspected breaker for physical damage and installation.
Performed mechanical operation, checked contact wipe and erosion indicators in accordance with manufacturer’s instructions.
Checked tightness of accessible electrical connections.
Inspected breaker to cell alignment and proper grounding.
Checked racking mechanism Cleaned breaker frame, operating mechanism and insulating surfaces.
Electrical Tests Verified proper electrical closing/tripping operation by activation of auxiliary devices.
Performed insulation resistance test phase-to-ground, phase-to-phase and across open contacts.
Performed vacuum bottle integrity test on each pole in accordance with manufacturer’s instructions.
Measured contact resistance.
Performed over-potential test on each phase.
Field Service Report
GROUND FAULT PROTECTION SYSTEM
Visual and Mechanical Inspection Inspected for physical damage.
Inspected neutral main bonding connection to assure:
Proper size.
Zero sequence and residual system were grounded upstream of sensor.
Ground connection was made ahead of neutral disconnect link.
Verified ground electrode conductor for proper size and termination.
Inspected sensors for proper installation.
Verified proper ground fault relay circuit identification.
Electrical Tests Measured pickup current by primary injection at sensor.
Measured time delay above pickup current level by injecting current into the sensor.
Measured system neutral insulation resistance.
PROBLEM SUMMARY:
Building 27, NMDP1 Main. There is a neutral sensor wiring issue when it is connected to the other main and tie. Since the neutral does not have any loads, this issue is low priority.
Transformers T3, T4 and T19 have significant corrosion and should be replaced.
Transformer T2 DGA shows that carbon monoxide and carbon dioxide are high. This indicates significant overheated cellulose insulation. The total dissolved combustible gas levels exceed normal concentrations. We recommend quarterly oil samples and monitoring the transformer for overloading.
Transformer T10N DGA shows that carbon monoxide and carbon dioxide are high. This indicates significant overheated cellulose insulation. The total dissolved combustible gas levels exceed normal concentrations. We recommend quarterly oil samples and monitoring the transformer for overloading. The IR section of the report also shows that the H1 and H3 connections are hot and should be investigated during the next available opportunity.
Transformer T16N DGA shows that hydrogen, methane and ethane levels are high. This indicates that there is possible partial discharge activity and severe overheating. Also carbon monoxide and carbon dioxide are high. This indicates significant overheated cellulose insulation. The total dissolved combustible gas levels exceed normal concentrations. We recommend quarterly oil samples and monitoring the transformer for overloading.
Pad Mounted Switch S15N Load Break Elbow T4C is slightly hotter when compared to similar connections indicating a possible dirty or poor connection. Investigate connection during next available opportunity.
Transformer T26E X3 bushing more than 10 deg. hotter than other two bushings (X1 & X2).
Scan seems to indicate an issue with the internal connection of the bushing. We recommend shutting down the transformer draining the oil and checking for loose connections inside the transformer as soon as possible.
Electrical Engineering Services & Systems
TEST FORMS
EPO0002499
2020 Maintenance
Location Equipment Label Equipment Type
Building 33 T27N Pad Mount Transformer
Building 124 T30N Pad Mount Transformer
Grounds SC24 Sectionalizer
Building 1/24 T14 Pad Mount Transformer
Building 123 T29N Pad Mount Transformer
Grounds SC23 North Sectionalizer
Building 23/45 T21 Pad Mount Transformer
Building 23/45 T15 Pad Mount Transformer
Building 114 T23 Pad Mount Transformer
Building 4/44 T13 Pad Mount Transformer
Grounds SC23 South Sectionalizer
Building 107 T18 E/N Pad Mount Transformer
Building 117 T26E Pad Mount Transformer
Building 117 T26N Pad Mount Transformer
Building 6 T12 Pad Mount Transformer
Grounds S19E Pad Mount Switch
Grounds S19N Pad Mount Switch
Building 121/122 T28N Pad Mount Transformer
Building 121/122 T28E Pad Mount Transformer
Building 85 T10N Pad Mount Transformer
Building 85 T10E Pad Mount Transformer
Building 67 T9N Pad Mount Transformer
Building 67 S14N Pad Mount Switch
Building 67 S14E Pad Mount Switch
Building 67 T9E Pad Mount Transformer
Building 88 T16N Pad Mount Transformer
Building 88 T16E Pad Mount Transformer
Building 27 T7N Pad Mount Transformer
Building 27 T7E Pad Mount Transformer
Building 77 T8E Pad Mount Transformer
Building 77/85A T8N Pad Mount Transformer
Grounds S7N Pad Mount Switch
Grounds S7E Pad Mount Switch
Building109 T25E Pad Mount Transformer
Building109 T25N Pad Mount Transformer
Grounds S5N Pad Mount Switch
Building 29 T6 Pad Mount Transformer
Building 109/110 T20N Pad Mount Transformer
Building 110 Grounds – 110 Switchboard
Building 34 T4 Pad Mount Transformer
Building 43 T19 Pad Mount Transformer
Building 8/50 T3 Pad Mount Transformer
Location Equipment Label Equipment Type
Building 46 T5N Pad Mount Transformer
Building 46 T5E Pad Mount Transformer
Grounds S2E Pad Mount Switch
Grounds S2N Pad Mount Switch
Building 79/2 T1 Pad Mount Transformer
Grounds S15N Pad Mount Switch
Building 106 T17 Pad Mount Transformer
Building 112/113 T22 Pad Mount Transformer
Building 28/48 T2 Pad Mount Transformer
Building 46 MCC1-46-905 MCC
Building 110 G25-110 – NMDP-2 Switchboard /Arc flash high, unable to scan
Building 110 101-110 – MDP-1 Switchboard / Arc flash high, unable to scan
Building 27 G14-27 NMDP1/EMDP1 Switchboard
Building 77 G02-77 Arc flash high, unable to scan
Building 85 117-85 GD11 / ND11 Switchboards
Building 114 115-114 MDP1 Switchboard
Building 117 112-117 NMB Arc flash high, unable to scan
Building 117 112-117 EMB Arc flash high, unable to scan
Building 88 133-88 MDP1 Switchboard / Arc flash high, unable to scan
Building 88 133-88 EDP1 Switchboard
Building 67 G-25A NDG1/GDG1 Switchboard
Building 109 122-109 EMDP1 Breaker / Arc flash high, unable to scan
Building 109 122-109 NMDP1 Breaker / Arc flash high, unable to scan
Building 109 122-109 NMDP2 Switchboard / Arc flash high, unable to scan
Building T110 SC? Sectionalizer
Building 115/116 T24 Pad Mount Transformer
Building 83 Building 83 Switchgear
Building 120 T31N Pad Mount Transformer
Building 120 T31E Pad Mount Transformer
Building 126 T32N Pad Mount Transformer
EPO0002499 Boise VA Medical Center
1/4 Preventative Maintenance IR Scan
8/26/2020 8:21:24 AM °F
Sp1
Sp2
86.8
50.6 FLIR0005.jpg FLIR T530 79301435
Measurements Sp1 88.0 °F
Sp2 79.8 °F
Parameters Emissivity 0.95
Refl. temp. 68 °F
Geolocation Location N 43° 37' 20.23", W 116° 11'
33.87" http://maps.google.com?z=17&t=k&q=43.6223,-116.1927
8/26/2020 8:21:24 AM
FLIR0005.jpg FLIR T530 79301435
Equipment: Pad Mounted Switch S15N
Issue: Load Break Elbow T4C is slightly hotter when compared to similar connections indicating a possible dirty or poor connection.
Repair Priority Level: Alert
Action Suggested: Investigate connection during next available opportunity.
2/4 Preventative Maintenance IR Scan
8/26/2020 10:35:36 AM °F
Sp1 Sp2
Sp3
91.0
75.4 FLIR0006.jpg FLIR T530 79301435
Measurements Sp1 97.0 °F
Sp2 85.5 °F
Sp3 80.4 °F
Parameters Emissivity 0.95
Refl. temp. 68 °F
Geolocation Location N 43° 37' 8.81", W 116° 11'
17.19" http://maps.google.com?z=17&t=k&q=43.6191,-116.1881
8/26/2020 10:35:36 AM
FLIR0006.jpg FLIR T530 79301435
Equipment: Building 117 Transformer T26E
Issue: X3 bushing more than 10 deg. hotter than other two bushings (X1 & X2). Scan seems to indicate an issue with the internal connection of the bushing.
Repair Priority Level: Action Needed
Action Suggested: Shutting down the transformer draining the oil and checking for loose connections inside the transformer as soon as possible.
3/4 Preventative Maintenance IR Scan
8/26/2020 11:57:29 AM °F
Sp1 Sp2
111.9
90.0 FLIR0007.jpg FLIR T530 79301435
Measurements Sp1 112.2 °F
Sp2 100.2 °F
Parameters Emissivity 0.95
Refl. temp. 68 °F
Geolocation Location N 43° 37' 13.98", W 116° 11'
25.04" http://maps.google.com?z=17&t=k&q=43.6206,-116.1903
8/26/2020 11:57:29 AM
FLIR0007.jpg FLIR T530 79301435
Equipment: Building 85 Transformer T10N
Issue: Load Break Elbow H1 & H3 are hotter when compared to H2 connection indicating a possible dirty or poor connection.
Action Suggested: Investigate connections during next available opportunity.
4/4 Preventative Maintenance IR Scan
8/26/2020 11:58:03 AM °F
Sp1
117.1
91.7 FLIR0008.jpg FLIR T530 79301435
Measurements Sp1 115.7 °F
Parameters Emissivity 0.95
Refl. temp. 68 °F
Geolocation Location N 43° 37' 14.09", W 116° 11'
24.96" http://maps.google.com?z=17&t=k&q=43.6206,-116.1903
8/26/2020 11:58:03 AM
FLIR0008.jpg FLIR T530 79301435
Equipment: Building 85 Transformer T10N
Issue: Load Break Elbow H1 & H3 are hotter when compared to H2 connection indicating a possible dirty or poor connection.
Action Suggested: Investigate connections during next available opportunity.
ProtectionSuite Pass-Fail Report
Device 52U Utility Main Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 08315048
Manufacturer Square D Special ID
Model SEPAM S84 Location Boise VA
Function 51, 27, 59 Company Eaton
Circuit Main Breaker Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 12:33 Next test due 2026-Sep-19 12:33
Prior test 2017-Aug-19 10:42
Plan 52U Utility Main Status Pass Last modified 2020-Sep-19 12:17 Comment
Last tested 2020-Sep-19 12:33 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2020-Sep-19 12:17 Comment
Last tested 2020-Sep-19 12:28 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:28 5.000 A 5.00 % 5.00 % 5.100 A 2.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Aug-19 10:38 Comment
Last tested 2020-Sep-19 12:29 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 12:29 4.900 s 5.00 % 5.00 % 4.974 s 1.52 % Pass
3.000 * Tap 1.800 s 5.00 % 5.00 % 1.867 s 3.71 % Pass
5.000 * Tap 0.620 s 5.00 % 5.00 % 0.621 s 0.11 % Pass
Test 27P1 Pickup Status Pass Description Linear Ramp, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:19 Comment
Last tested 2020-Sep-19 12:32 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:32 58.000 V 5.00 % 5.00 % 57.500 V -0.86 % Pass
Report generated on 9/22/2020 1:03:16 PM Page 1
[Header]
Test 27P1 Time Status Pass Description Operating Time, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:39 Comment
Last tested 2020-Sep-19 12:33 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Single Point Test 2020-Sep-19 12:33 1.000 s 5.00 % 5.00 % 1.011 s 1.05 % Pass
Test 59P1 Pickup Status Pass Description Linear Ramp, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:41 Comment
Last tested 2020-Sep-19 12:33 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:33 75.900 V 5.00 % 5.00 % 78.300 V 3.16 % Pass
Test 59P1 Time Status Pass Description Operating Time, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:42 Comment
Last tested 2020-Sep-19 12:33 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Single Point Test 2020-Sep-19 12:33 2.000 s 5.00 % 5.00 % 1.997 s -0.15 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:03:16 PM Page 2
Device 87B-1 Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus Unknown Serial Number 2008275368
Manufacturer SEL Special ID
Model SEL-587Z Location Boise VA
Function 87B Company Eaton
Circuit Utility Bus Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 12:13 Next test due 2026-Sep-19 12:10
Prior test 2017-Aug-19 11:19
Plan 87B-1 Status Pass Last modified 2020-Sep-19 12:08 Comment
Last tested 2020-Sep-19 12:13 Tested by E0057246
Test 87A1 Status Pass Description Linear Ramp, Voltage (VA)
Last modified 2020-Sep-19 12:08 Comment
Last tested 2020-Sep-19 12:10 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:10 70.000 V 5.00 % 5.00 % 69.000 V -1.43 % Pass
Test 87B1 Status Pass Description Linear Ramp, Voltage (VB)
Last modified 2017-Aug-19 11:14 Comment
Last tested 2020-Sep-19 12:11 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:11 70.000 V 5.00 % 5.00 % 69.000 V -1.43 % Pass
Test 87C1 Status Pass Description Linear Ramp, Voltage (VC)
Last modified 2017-Aug-19 11:14 Comment
Last tested 2020-Sep-19 12:13 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:13 70.000 V 5.00 % 5.00 % 68.500 V -2.14 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:03:45 PM Page 1
Device S2N Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 082500068
Manufacturer Square D Special ID
Model SEPAM S40 Location Boise VA
Function 50/51 Company Eaton
Circuit S2N Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 13:18 Next test due
Prior test 2017-Aug-19 12:39
Plan S2N Status Pass Last modified 2020-Sep-19 13:15 Comment
Last tested 2020-Sep-19 13:18 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2020-Sep-19 13:15 Comment
Last tested 2020-Sep-19 13:15 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 13:15 6.000 A 5.00 % 5.00 % 6.100 A 1.67 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Aug-19 12:38 Comment
Last tested 2020-Sep-19 13:16 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 13:16 9.900 s 5.00 % 5.00 % 9.987 s 0.88 % Pass
3.000 * Tap 3.700 s 5.00 % 5.00 % 3.746 s 1.25 % Pass
5.000 * Tap 1.200 s 5.00 % 5.00 % 1.251 s 4.26 % Pass
Test 51N Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2017-Aug-19 12:13 Comment
Last tested 2020-Sep-19 13:17 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 13:17 2.500 A 5.00 % 5.00 % 2.500 A 0.00 % Pass
Report generated on 9/22/2020 1:05:14 PM Page 1
Test 51N Time Status Pass Description Time Overcurrent Characteristic Plot (IA)
Last modified 2020-Sep-19 13:08 Comment
Last tested 2020-Sep-19 13:18 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 13:18 6.900 s 5.00 % 5.00 % 7.097 s 2.86 % Pass
3.000 * Tap 2.600 s 5.00 % 5.00 % 2.659 s 2.27 % Pass
5.000 * Tap 0.880 s 5.00 % 5.00 % 0.894 s 1.63 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:05:14 PM Page 2
Device S7N Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 8381299
Manufacturer Square D Special ID
Model SEPAM S23 Location Boise VA
Function 50/51 Company Eaton
Circuit S7N Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 12:59 Next test due
Prior test 2017-Aug-19 12:16
Plan S7N Status Pass Last modified 2020-Sep-19 12:59 Comment
Last tested 2020-Sep-19 12:59 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2020-Sep-19 12:56 Comment
Last tested 2020-Sep-19 12:56 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:56 6.000 A 5.00 % 5.00 % 6.000 A 0.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Aug-19 12:10 Comment
Last tested 2020-Sep-19 12:56 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 12:56 9.900 s 5.00 % 5.00 % 9.922 s 0.22 % Pass
3.000 * Tap 3.700 s 5.00 % 5.00 % 3.719 s 0.52 % Pass
5.000 * Tap 1.200 s 5.00 % 5.00 % 1.251 s 4.21 % Pass
Test 51N Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2017-Aug-19 12:13 Comment
Last tested 2020-Sep-19 12:58 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 12:58 2.500 A 5.00 % 5.00 % 2.500 A 0.00 % Pass
Report generated on 9/22/2020 1:06:20 PM Page 1
Last modified 2020-Sep-19 12:59 Comment
Last tested 2020-Sep-19 12:59 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 12:59 6.900 s 5.00 % 5.00 % 6.960 s 0.88 % Pass
3.000 * Tap 2.600 s 5.00 % 5.00 % 2.615 s 0.56 % Pass
5.000 * Tap 0.880 s 5.00 % 5.00 % 0.876 s -0.41 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:06:20 PM Page 2
Device Tie Breaker Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 8280179
Manufacturer Square D Special ID
Model SEPAM S23 Location Boise VA
Function 50/51 Company Eaton
Circuit Tie Breaker Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2017-Dec-02 09:50 Next test due
Prior test
Plan Tie Breaker Status Pass Last modified 2017-Dec-02 09:53 Comment
Last tested 2017-Dec-02 09:50 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2017-Dec-02 09:41 Comment
Last tested 2017-Dec-02 09:41 Tested by E0057246
Instrument SN 011204748
Calibrated on 5/18/2017 Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2017-Dec-02 09:41 4.000 A 5.00 % 5.00 % 4.000 A 0.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Dec-02 09:53 Comment
Last tested 2017-Dec-02 09:50 Tested by E0057246
Instrument SN 011204748
Calibrated on 5/18/2017 Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2017-Dec-02 09:50 114.510 s 5.00 % 5.00 % 114.595 s 0.07 % Pass
3.000 * Tap 42.941 s 5.00 % 5.00 % 42.954 s 0.03 % Pass
5.000 * Tap 14.314 s 5.00 % 5.00 % 14.325 s 0.08 % Pass
List of Instruments Used
Serial Number Calibration Date
011204748 5/18/2017
Report generated on 9/22/2020 1:06:50 PM Page 1
Device 52-E2 Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 08250033
Manufacturer Square D Special ID
Model SEPAM S23 Location Boise VA
Function 50/51 Company Eaton
Circuit 52-E2 Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 09:57 Next test due
Prior test 2017-Dec-02 11:18
Plan 52-E2 Status Pass Last modified 2020-Sep-19 10:00 Comment
Last tested 2020-Sep-19 09:57 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2020-Sep-19 09:45 Comment
Last tested 2020-Sep-19 09:44 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 09:44 12.000 A 5.00 % 5.00 % 12.000 A 0.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2020-Sep-19 10:00 Comment
Last tested 2020-Sep-19 09:57 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
3.000 * Tap 2020-Sep-19 09:57 79.200 s 5.00 % 5.00 % 79.214 s 0.02 % Pass
4.000 * Tap 42.240 s 5.00 % 5.00 % 42.254 s 0.03 % Pass
5.000 * Tap 26.400 s 5.00 % 5.00 % 26.424 s 0.09 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:02:09 PM Page 1
Device 52-G Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 08315047
Manufacturer Square D Special ID
Model SEPAM G87 Location Boise VA
Function 51, 27, 59 Company Eaton
Circuit Unused Ge Main Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 08:47 Next test due 2026-Sep-19 08:46
Prior test 2017-Dec-02 12:11
Plan 52-G Status Pass Last modified 2017-Dec-02 12:06 Comment
Last tested 2020-Sep-19 08:47 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2017-Dec-02 12:02 Comment
Last tested 2020-Sep-19 08:41 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 08:41 5.000 A 5.00 % 5.00 % 5.100 A 2.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Dec-02 12:06 Comment
Last tested 2020-Sep-19 08:43 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 08:43 4.950 s 5.00 % 5.00 % 4.976 s 0.52 % Pass
3.000 * Tap 1.856 s 5.00 % 5.00 % 1.872 s 0.86 % Pass
5.000 * Tap 0.619 s 5.00 % 5.00 % 0.631 s 1.95 % Pass
Test 27P1 Pickup Status Pass Description Linear Ramp, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:19 Comment
Last tested 2020-Sep-19 08:45 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 08:45 58.000 V 5.00 % 5.00 % 57.500 V -0.86 % Pass
Report generated on 9/22/2020 1:02:47 PM Page 1
Test 27P1 Time Status Pass Description Operating Time, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:39 Comment
Last tested 2020-Sep-19 08:46 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Single Point Test 2020-Sep-19 08:46 1.000 s 5.00 % 5.00 % 1.009 s 0.89 % Pass
Test 59P1 Pickup Status Pass Description Linear Ramp, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:41 Comment
Last tested 2020-Sep-19 08:47 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 08:47 75.900 V 5.00 % 5.00 % 78.200 V 3.03 % Pass
Test 59P1 Time Status Pass Description Operating Time, Voltage (VA, VB, VC)
Last modified 2017-Aug-19 10:42 Comment
Last tested 2020-Sep-19 08:47 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Single Point Test 2020-Sep-19 08:47 2.000 s 5.00 % 5.00 % 2.003 s 0.15 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:02:47 PM Page 2
Device 87B-2 Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus Unknown Serial Number 2008275369
Manufacturer SEL Special ID
Model SEL-587Z Location Boise VA
Function 87B Company Eaton
Circuit Generator Bus Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 14:52 Next test due 2026-Sep-19 14:49
Prior test 2017-Dec-02 11:42
Plan 87B-1 Status Pass Last modified 2017-Dec-02 11:37 Comment
Last tested 2020-Sep-19 14:52 Tested by E0057246
Test 87A1 Status Pass Description Linear Ramp, Voltage (VA)
Last modified 2017-Aug-19 11:14 Comment
Last tested 2020-Sep-19 14:49 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:49 70.000 V 5.00 % 5.00 % 69.500 V -0.71 % Pass
Test 87B1 Status Pass Description Linear Ramp, Voltage (VB)
Last modified 2017-Aug-19 11:14 Comment
Last tested 2020-Sep-19 14:51 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:51 70.000 V 5.00 % 5.00 % 69.500 V -0.71 % Pass
Test 87C1 Status Pass Description Linear Ramp, Voltage (VC)
Last modified 2017-Dec-02 11:37 Comment
Last tested 2020-Sep-19 14:52 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:52 70.000 V 5.00 % 5.00 % 69.500 V -0.71 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:04:18 PM Page 1
Device S2E Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 08250070
Manufacturer Square D Special ID
Model SEPAM S23 Location Boise VA
Function 50/51 Company Eaton
Circuit S2E Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 14:38 Next test due
Prior test 2017-Dec-02 10:53
Plan S2E Status Pass Last modified 2020-Sep-19 14:35 Comment
Last tested 2020-Sep-19 14:38 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2020-Sep-19 14:35 Comment
Last tested 2020-Sep-19 14:35 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:35 6.000 A 5.00 % 5.00 % 6.000 A 0.00 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Dec-02 10:48 Comment
Last tested 2020-Sep-19 14:36 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 14:36 9.900 s 5.00 % 5.00 % 9.914 s 0.14 % Pass
3.000 * Tap 3.713 s 5.00 % 5.00 % 3.723 s 0.29 % Pass
5.000 * Tap 1.238 s 5.00 % 5.00 % 1.254 s 1.36 % Pass
Test 51N Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2017-Aug-19 12:13 Comment
Last tested 2020-Sep-19 14:37 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:37 2.500 A 5.00 % 5.00 % 2.500 A 0.00 % Pass
Report generated on 9/22/2020 1:04:45 PM Page 1
Last modified 2017-Dec-02 10:49 Comment
Last tested 2020-Sep-19 14:38 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 14:38 6.930 s 5.00 % 5.00 % 6.957 s 0.39 % Pass
3.000 * Tap 2.599 s 5.00 % 5.00 % 2.609 s 0.38 % Pass
5.000 * Tap 0.866 s 5.00 % 5.00 % 0.873 s 0.79 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:04:45 PM Page 2
Device S7E Status Pass Description
Station Name Boise VA Main Switchgear
Apparatus VacuumBreaker Serial Number 082500089
Manufacturer Square D Special ID
Model SEPAM S40 Location Boise VA
Function 50/51 Company Eaton
Circuit S7E Division EESS
Firmware Version / Date Asset Tag
Tested by E0057246 Reg. Category Functional
Last tested 2020-Sep-19 14:24 Next test due
Prior test 2017-Dec-02 10:30
Plan S7E Status Pass Last modified 2020-Sep-19 14:17 Comment
Last tested 2020-Sep-19 14:24 Tested by E0057246
Test 51 Pickup Status Pass Description Linear Ramp, Current (IA, IB, IC)
Last modified 2020-Sep-19 14:17 Comment
Last tested 2020-Sep-19 14:21 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:21 6.000 A 5.00 % 5.00 % 6.100 A 1.67 % Pass
Test 51P1 Time Status Pass Description Time Overcurrent Characteristic Plot (IA, IB, IC)
Last modified 2017-Dec-02 10:18 Comment
Last tested 2020-Sep-19 14:22 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 14:22 9.900 s 5.00 % 5.00 % 10.013 s 1.14 % Pass
3.000 * Tap 3.713 s 5.00 % 5.00 % 3.752 s 1.05 % Pass
5.000 * Tap 1.238 s 5.00 % 5.00 % 1.255 s 1.44 % Pass
Test 51N Pickup Status Pass Description Linear Ramp, Current (IA)
Last modified 2017-Aug-19 12:13 Comment
Last tested 2020-Sep-19 14:23 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
Ramp 2020-Sep-19 14:23 2.500 A 5.00 % 5.00 % 2.500 A 0.00 % Pass
Report generated on 9/22/2020 1:05:52 PM Page 1
Last modified 2017-Dec-02 10:20 Comment
Last tested 2020-Sep-19 14:24 Tested by E0057246
Instrument SN n/a
Calibrated on n/a Device Firmware Version
Label / Value Tested Expected + - Actual % Error Result
2.000 * Tap 2020-Sep-19 14:24 6.930 s 5.00 % 5.00 % 7.099 s 2.44 % Pass
3.000 * Tap 2.599 s 5.00 % 5.00 % 2.672 s 2.80 % Pass
5.000 * Tap 0.866 s 5.00 % 5.00 % 0.898 s 3.64 % Pass
List of Instruments Used
Serial Number Calibration Date n/a n/a
Report generated on 9/22/2020 1:05:52 PM Page 2
BREAKER DATA
EPO0002499JOB NUMBER:
EQUIPMENT LOCATION:
Electrical Services & Systems VA Medical Center; Boise, ID
Building 83 N/A
Medium Voltage Vacuum Breaker
N/A
Utility Main DATE TESTED:
EQUIPMENT DESIGNATION:
9/19/20DEVICE ID:
SITE:
CUSTOMER:
VA Medical Center; Boise, IDOWNER:
500 MVA
15KV
CURRENT RATING:
INTERRUPT RATING:
VOLTAGE RATING:
MODEL/STYLE #:
IB NUMBER
MANUFACTURER:
TYPE:
Serial Number:
N/A
Square D
WIRING DIAGRAM:
VR
17 58587 12470SYSTEM VOLTAGE
CHARGE MOTOR:
(Other)
(Other)
ACCESSORIES
N/A
N/A
N/A
CONTROL RELAY:
CLOSE COIL:
SHUNT TRIP:
UNDERVOLTAGE:
FUSES:
AUX SWITCH(ES)
BLOWN FUSE IND:
MAINT. ACCESSORIES
(Other)
RATING RATING
N/A
N/A
CONDITION
Acceptable
N/A
Acceptable
N/A
N/A
N/A
N/A
Acceptable
N/A
N/A
N/A
CONDITION
Acceptable
100-140
N/A
100-140
70-140
N/A
VDC
VDC
VDC
N/A
V5D6133YJ00
ELECTRICAL TESTS
PF Test Performed Timing Test Performed
Additional Tests: (may be documented on additional forms)
CONTACT GAP:
AS LEFT AS LEFTAS FOUND
PRIMARY FINGERS:
SECONDARY DISCONNECTS:
CONTROL WIRING:
MANUAL CLOSE / TRIP:
ELECTRICAL CLOSE / TRIP:
FRAME CONDITION:
GROUND CONNECTION:
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
AS FOUND
CONTACT WIPE:
OVERALL CONDITION:
OPERATIONS COUNTER:
OPEN/CLOSE INDICATOR:
Acceptable
LUBRICATION:
INSPECTION DATA
No NoControl Wiring Insulation @ 500 VDC (MegOhms):
AUX SWITCH:
INSULATION / BARRIERS:
Gregory Gould / Larry NeddoTested By: PAGE
6055-31
INTERLOCKS:
A A 24.0
23.6
26.7
As Left
B23.6
26.7
24.0
As Found
C
B
C
Insulation Resistance: Contact Resistance:
10 AmpsMicroOhms @
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
A-G
GigOhms 5000
B-G
VDC@
B-C
C-A
A-B
B-B'
C-C'
A-A'A-G
B-G
C-G
As Left:As Found:
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
505 505
505 505
N/ACoil #1 Minimum Trip Voltage
@ KV AC DC
0.63
AS FOUND:
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
B1
0.66
C1
0.70
0.66
0.69
0.70
A1
0.69
27 27
0.63
0.63
0.63
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'0.66
0.70
0.66
0.69
0.70
0.69
B2
C2
A2Pass
Pass
Pass N/A
N/A
N/A
Bottle Integrity:Overpotential Test:
AS LEFT:
0.63
0.63
Readings in Milliamps @ KV AC DC
Acceptable Acceptable OPER. COUNT. READING:CONTACT EROSION: 283 285
N/A
N/A
COMMENTS:
EQUIPMENT LOCATION:
Electrical Services & Systems VA Medical Center; Boise, ID
Building 83 N/A
Medium Voltage Vacuum Breaker
N/A
S7N DATE TESTED:
EQUIPMENT DESIGNATION:
9/19/20DEVICE ID:
SITE:
CUSTOMER:
VA Medical Center; Boise, IDOWNER:
500 MVA
15KV
CURRENT RATING:
INTERRUPT RATING:
VOLTAGE RATING:
MODEL/STYLE #:
IB NUMBER
MANUFACTURER:
TYPE:
Serial Number:
N/A
Square D
WIRING DIAGRAM:
VR
17 58378 12470SYSTEM VOLTAGE
CHARGE MOTOR:
(Other)
(Other)
ACCESSORIES
N/A
N/A
N/A
CONTROL RELAY:
CLOSE COIL:
SHUNT TRIP:
UNDERVOLTAGE:
FUSES:
AUX SWITCH(ES)
BLOWN FUSE IND:
MAINT. ACCESSORIES
(Other)
RATING RATING
N/A
N/A
CONDITION
Acceptable
N/A
Acceptable
N/A
N/A
N/A
N/A
Acceptable
N/A
N/A
N/A
CONDITION
Acceptable
100-140
N/A
100-140
70-140
N/A
VDC
VDC
VDC
N/A
V5D6133YJ00
ELECTRICAL TESTS
PF Test Performed Timing Test Performed
Additional Tests: (may be documented on additional forms)
CONTACT GAP:
AS LEFT AS LEFTAS FOUND
PRIMARY FINGERS:
SECONDARY DISCONNECTS:
CONTROL WIRING:
MANUAL CLOSE / TRIP:
ELECTRICAL CLOSE / TRIP:
FRAME CONDITION:
GROUND CONNECTION:
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
AS FOUND
CONTACT WIPE:
OVERALL CONDITION:
OPERATIONS COUNTER:
OPEN/CLOSE INDICATOR:
Acceptable
LUBRICATION:
INSPECTION DATA
No NoControl Wiring Insulation @ 500 VDC (MegOhms):
AUX SWITCH:
INSULATION / BARRIERS:
Gregory Gould / Larry NeddoTested By: PAGE
6055-31
INTERLOCKS:
A A 23.8
24.2
25.1
As Left
B24.2
25.1
23.8
As Found
C
B
C
Insulation Resistance: Contact Resistance:
10 AmpsMicroOhms @
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
A-G
GigOhms 5000
B-G
VDC@
B-C
C-A
A-B
B-B'
C-C'
A-A'A-G
B-G
C-G
As Left:As Found:
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
505 505
505 505
N/ACoil #1 Minimum Trip Voltage
@ KV AC DC
0.62
AS FOUND:
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
B1
0.66
C1
0.70
0.66
0.68
0.70
A1
0.68
27 27
0.63
0.63
0.62
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'0.66
0.70
0.66
0.68
0.70
0.68
B2
C2
A2Pass
Pass
Pass N/A
N/A
N/A
Bottle Integrity:Overpotential Test:
AS LEFT:
0.63
0.63
Readings in Milliamps @ KV AC DC
Acceptable Acceptable OPER. COUNT. READING:CONTACT EROSION: 83 84
N/A
EQUIPMENT LOCATION:
Electrical Services & Systems VA Medical Center; Boise, ID
Building 83 N/A
Medium Voltage Vacuum Breaker
N/A
S7E DATE TESTED:
EQUIPMENT DESIGNATION:
9/19/20DEVICE ID:
SITE:
CUSTOMER:
VA Medical Center; Boise, IDOWNER:
500 MVA
15KV
CURRENT RATING:
INTERRUPT RATING:
VOLTAGE RATING:
MODEL/STYLE #:
IB NUMBER
MANUFACTURER:
TYPE:
Serial Number:
N/A
Square D
WIRING DIAGRAM:
VR
17 58586 12470SYSTEM VOLTAGE
CHARGE MOTOR:
(Other)
(Other)
ACCESSORIES
N/A
N/A
N/A
CONTROL RELAY:
CLOSE COIL:
SHUNT TRIP:
UNDERVOLTAGE:
FUSES:
AUX SWITCH(ES)
BLOWN FUSE IND:
MAINT. ACCESSORIES
(Other)
RATING RATING
N/A
N/A
CONDITION
Acceptable
N/A
Acceptable
N/A
N/A
N/A
N/A
Acceptable
N/A
N/A
N/A
CONDITION
Acceptable
100-140
N/A
100-140
70-140
N/A
VDC
VDC
VDC
N/A
V5D6133YJ00
ELECTRICAL TESTS
PF Test Performed Timing Test Performed
Additional Tests: (may be documented on additional forms)
CONTACT GAP:
AS LEFT AS LEFTAS FOUND
PRIMARY FINGERS:
SECONDARY DISCONNECTS:
CONTROL WIRING:
MANUAL CLOSE / TRIP:
ELECTRICAL CLOSE / TRIP:
FRAME CONDITION:
GROUND CONNECTION:
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
AS FOUND
CONTACT WIPE:
OVERALL CONDITION:
OPERATIONS COUNTER:
OPEN/CLOSE INDICATOR:
Acceptable
LUBRICATION:
INSPECTION DATA
No NoControl Wiring Insulation @ 500 VDC (MegOhms):
AUX SWITCH:
INSULATION / BARRIERS:
Gregory Gould / Larry NeddoTested By: PAGE
6055-31
INTERLOCKS:
A A 25.0
24.5
22.9
As Left
B24.5
22.9
25.0
As Found
C
B
C
Insulation Resistance: Contact Resistance:
10 AmpsMicroOhms @
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
A-G
GigOhms 5000
B-G
VDC@
B-C
C-A
A-B
B-B'
C-C'
A-A'A-G
B-G
C-G
As Left:As Found:
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
505 505
505 505
N/ACoil #1 Minimum Trip Voltage
@ KV AC DC
0.65
AS FOUND:
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
B1
0.65
C1
0.71
0.65
0.70
0.71
A1
0.70
27 27
0.65
0.65
0.65
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'0.65
0.71
0.65
0.70
0.71
0.70
B2
C2
A2Pass
Pass
Pass N/A
N/A
N/A
Bottle Integrity:Overpotential Test:
AS LEFT:
0.65
0.65
Readings in Milliamps @ KV AC DC
Acceptable Acceptable OPER. COUNT. READING:CONTACT EROSION: 64 66
N/A
EQUIPMENT LOCATION:
Electrical Services & Systems VA Medical Center; Boise, ID
Building 83 N/A
Medium Voltage Vacuum Breaker
N/A
52-G DATE TESTED:
EQUIPMENT DESIGNATION:
9/19/20DEVICE ID:
SITE:
CUSTOMER:
VA Medical Center; Boise, IDOWNER:
500 MVA
15KV
CURRENT RATING:
INTERRUPT RATING:
VOLTAGE RATING:
MODEL/STYLE #:
IB NUMBER
MANUFACTURER:
TYPE:
Serial Number:
N/A
Square D
WIRING DIAGRAM:
VR
17 68242 12470SYSTEM VOLTAGE
CHARGE MOTOR:
(Other)
(Other)
ACCESSORIES
N/A
N/A
N/A
CONTROL RELAY:
CLOSE COIL:
SHUNT TRIP:
UNDERVOLTAGE:
FUSES:
AUX SWITCH(ES)
BLOWN FUSE IND:
MAINT. ACCESSORIES
(Other)
RATING RATING
N/A
N/A
CONDITION
Acceptable
N/A
Acceptable
N/A
N/A
N/A
N/A
Acceptable
N/A
N/A
N/A
CONDITION
Acceptable
100-140
N/A
100-140
70-140
N/A
VDC
VDC
VDC
N/A
V5B6133YJ00
ELECTRICAL TESTS
PF Test Performed Timing Test Performed
Additional Tests: (may be documented on additional forms)
CONTACT GAP:
AS LEFT AS LEFTAS FOUND
PRIMARY FINGERS:
SECONDARY DISCONNECTS:
CONTROL WIRING:
MANUAL CLOSE / TRIP:
ELECTRICAL CLOSE / TRIP:
FRAME CONDITION:
GROUND CONNECTION:
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
AS FOUND
CONTACT WIPE:
OVERALL CONDITION:
OPERATIONS COUNTER:
OPEN/CLOSE INDICATOR:
Acceptable
LUBRICATION:
INSPECTION DATA
No NoControl Wiring Insulation @ 500 VDC (MegOhms):
AUX SWITCH:
INSULATION / BARRIERS:
Gregory Gould / Larry NeddoTested By: PAGE
6055-30
INTERLOCKS:
A A 27.8
28.2
27.2
As Left
B28.2
27.2
27.8
As Found
C
B
C
Insulation Resistance: Contact Resistance:
10 AmpsMicroOhms @
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
A-G
GigOhms 5000
B-G
VDC@
B-C
C-A
A-B
B-B'
C-C'
A-A'A-G
B-G
C-G
As Left:As Found:
Closed ( Ph. - Gnd. ) Closed ( Ph. - Ph. ) Open ( Line - Load )
505 505
505 505
N/ACoil #1 Minimum Trip Voltage
@ KV AC DC
1.65
AS FOUND:
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'
B1
1.64
C1
1.72
1.64
1.72
1.72
A1
1.72
27 27
1.65
1.65
1.65
A-G
B-G
C-G
B-C
C-A
A-B
B-B'
C-C'
A-A'1.64
1.72
1.64
1.72
1.72