This document is an amendment (Amendment 0002) to Solicitation Number 36C26025R0059 for a Veterans Affairs (VA) construction project involving asbestos abatement and ceiling replacement in select rooms. The project is estimated between $100,000 and $250,000, located at a VA facility, and involves removing asbestos tiles, existing ceiling grids, and installing new LED lighting and vent fans. Key clarifications in the amendment include: the VA will pre-clear rooms of loose objects, provide a staging area and dumpster location, allow existing branch circuits to be reused for new fixtures, and confirm that site visit attendance is not mandatory for bidding. The project allows contractors flexibility in fixture mounting methods and requires contractors to notify the facility a week in advance of using loud equipment. The amendment also provides guidance on past performance submissions, noting that CPARS evaluations can be considered and must contain the same information as the Performance Past Questionnaire (PPQ) template.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Abate B219 Ceilings-Select Rooms, newest first.
File Type Posted
sitewalk B219 ceilings.pdf PDF
36C26025R0059 0001.docx DOCX document
Attachment 1 - Specifications 692-25-104 _.pdf PDF
36C26025R0059.docx DOCX document
Attachment 3 - PPQ B219.pdf PDF
Attachment 2 - 692-25-104 Abate B219 Ceilings at select rooms SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-23-2025 692-25-104 36C260 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661

To all Offerors/Bidders

36C26025R0059 03-27-2025

X X X This purpose of this amendment is to provide answers to questions received from industry.

CONTINUATION PAGE

1. Will the ceiling grid be replaced? There could be damage to the existing ceiling grid if left in place while removing the upper gypsum board ceiling.

Per Attachment 2, pg. 2, first image on page, “it shows the ACM asbestos tile connected to the existing structure, and the ACT ceiling that is beneath the asbestos tile. All of this will need removed and replaced. The drop-down ceiling tile will need to be replaced with tile in accordance with the specifications.”

1. Will the VA clear out the rooms before work starts, or is that on us?

The rooms will be cleared out of all loose objects before the project starts by the VA.

1. Will there be a designated staging area and dumpster spot nearby?

Yes, the COR will setup the laydown and dumpster area with contractor once there is an award.

1. Are there any restrictions on the tools or equipment we can bring inside?

No, as long as there is notification given of any loud equipment being used a week in advance for us to notify the facility.

1. Where can we pull power from during the work?

There is power in the rooms that you can pull from.

1. Can one person from the Prime Contractor serve as Superintendent, QCM, and SSHO?

Yes, however, the superintendent must be solely dedicated to this project.

1. Would the VA prefer a specific manufacturer or model for the LED lights and vent fans?

The LED lights and vent fans are not brand name requirements in this RFP.

1. Can the existing branch circuits be reused for the new LED light fixtures and vent fans, or should the contractor plan to install new dedicated circuits The existing branches are allowed to be reused for LED fixtures and vent fans.

1. Does the VA require surface-mounted or recessed light fixtures?

This is means and methods of the contractor if not already specified in scope documents.

1. I was reviewing this document and wanted to determine if there was mandatory attendance for site visit conducted on 4/10 in order to bid this contract.

No- site visit attendance is not mandatory to submit a proposal.

11- Will the asbestos contractor be responsible for the replacement of tiles and electrical items such as lights and fans, or will this be handled by the general contractor on the job? If yes, will the abatement contractor be required to install drop ceiling systems in areas that currently do not have them installed?

Absent specific instruction in the specifications and drawings, it is an interested party’s independent business judgement decision to determine division of work required by this project.

Interested parties’ proposals shall only include work that is listed in the scope of this RFP.

12- Can CPARS evaluations be accepted instead of PPQs for the past performance section?

Please see the instructions for the past performance criteria for any and all restrictions/guidance to industry. Any past performance examples provided should contain the same information as on the PPQ template.

Construction project with an estimated magnitude, per FAR 36.204, of between $100,000 and $250,000.00.

File details come from the government source that posted it. Updated .