This document is an Amendment of Solicitation/Modification of Contract for a road paving project at the VA Puget Sound Medical Center - American Lake Campus in Tacoma, Washington. The solicitation (36C26025Q0711) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a NAICS code of 238990 and a small business size standard of $19 million. The project involves front entrance road paving and repairs, to be awarded as a firm fixed-price contract.
Key details include a site visit scheduled for 08/28/2025 from 10:00 a.m. to 2:00 p.m., with advanced notice required. Questions were due by 14:00 PST on August 29, 2025, and quotes must be submitted via email to derek.crockett@va.gov by 15:00 PST on September 04, 2025. The amendment addresses specific contractor responsibilities, including milling 2" of asphalt, repairing substructure areas, disposal of road materials, and completing all paving work in a single weekend to minimize hospital operation impact. No bid bond is required, and contractors must be verified SDVOSB in the SBA Dynamic Small Business Search database.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26025Q0711.docx | DOCX document | |
| Attachment A - Site Visit Instructions.docx | DOCX document | |
| SCA WAGE DETERMINATIONS Service Contract Act WD 2015-5539 Pierce County Washington.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
09-02-2025 none 36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
To all Offerors/Bidders
36C26025Q0711 08-19-2025
X
The purpose of this amendment is to answer industry questions.
See page 2 for questions and answers.
All other terms remain in effect.
Derek Crockett
1. B.3 3 Specific Tasks 4 Will the VA quantify the substructure area to be removed/replaced?
The contractor is responsible for Mil the asphalt 2” at the top and is required to repair any substructure sectional areas that may need maintenance repairs such cracks or damage. Any substructure sectional areas that may be required complete removal and replacement must be identified by the contractor and communicated to the VA COR and CO.
1. B.3 3 Specific Tasks 6 Will the VA provide a designated and approved disposal site for the anticipated asphalt mill grindings generated during project execution, or will the contractor be responsible for identifying and coordinating with a permitted facility for recycling or disposal?
The government does have a disposal site on the VA American Lake Campus, and a disposal site is available for the removed road materials only and is subject to the VA COR approval beforehand. In the event the VA site cannot accommodate additional materials for disposal on the American Lake Campus, the contractor shall be responsible for proper disposal offsite.
1. B.3 3 Specific Tasks 13 Will speed bump need to be reinstalled as part of this contract?
The contractor does not need to reinstall a speed bump.
1. B.3 4. Performance Monitoring Will Columbus Day and/or Veterans Day be considered as working days under this contract, or will work need to be performed on weekends only?
The contractor is not expected to work federal holidays, all contractor work must be completed in one weekend, and the contractor’s schedule must be reviewed and approved in advance by the VA COR before any onsite work is to commence by the contractor.
1. The SOW states work will be completed over “a” weekend. It is the intent of the government to have the contractor only allowed one weekend to complete work?
All paving is to be completed in one weekend and is required by a contractor to accomplish all work. Restriping the new road may be possible with prior written approval by the VA COR.
1. Please advise if, after milling approximately 2” in depth, the existing subbase material is not suitable for accepting new HMA will the contractor be required to remove additional material beyond the 2”?
The contractor is responsible for Mil the asphalt 2” at the top and is required to repair any substructure sectional areas that may need maintenance repairs such cracks or damage. Any substructure sectional areas that may require complete removal and replacement must be identified by the contractor and communicated to the VA COR and CO.
For example, broken/heaved sections of existing asphalt are deeper than 2” in which milling won’t completely remove or if soft areas in the subbase are present or become obvious during milling process.
The contractor is responsible for Mil the asphalt 2” at the top and is required to repair any substructure sectional areas that may need maintenance repairs such cracks or damage. Any substructure sectional areas that may require complete removal and replacement must be identified by the contractor and communicated to the VA COR and CO.
1. The statement of work says to remove areas identified for repair. Are these areas marked out on the road already so we can see them at the walk thru and figure the proper repairs into our bid?
The areas are marked.
8.) I didn’t see any areas in the road identified for repairs, as stated in the Specific Tasks. Will that be determined after grinding? Or do you have a square footage for the repairs?
The contractor is responsible for Mil the asphalt 2” at the top and is required to repair any substructure sectional areas that may need maintenance repairs such cracks or damage. Any substructure sectional areas that may require complete removal and replacement must be identified by the contractor and communicated to the VA COR and CO.
9.) Also, can this project take place on more than one Saturday as long as its completed by November 1st?
The contractor shall complete all removal and re-paving in one weekend to prevent impact on hospital operations. Restriping the surface of the new road may be possible with prior written approval by the VA COR.
10.) 1. If the VA is expecting patching to be needed after the asphalt is removed, how many square feet of patching is expected?
The contractor is responsible for Mil the asphalt 2” at the top and is required to repair any substructure sectional areas that may need maintenance repairs such cracks or damage. Any substructure sectional areas that may require complete removal and replacement must be identified by the contractor and communicated to the VA COR and CO.
(11.) Is the 2” pre-level designed to establish the crown (which would be an average of 1” across) or is it a full 2” base lift across the cross section?
The statement of work lists estimates of the work required. These are estimates only, and it is the responsibility of the contractor to verify all site conditions and design dimensions required to complete this road repair and replacement.
(12.) The work is described as to be performed over a weekend. Can the work be performed over multiple weekends (that is, come back to stripe the road the following weekend, for example )?
The contractor shall complete all removal and re-paving in one weekend to prevent impact on hospital operations. Restriping the surface of the new road may be possible with prior written approval by the VA COR.
13.) Is a bid bond required?
No, a bid bond is not required.