This document is an Amendment to a Request for Quote (RFQ) for roof repairs at the Puget Sound VA Medical Center - American Lake Campus. The solicitation (36C26025Q0320) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for repairing roof leaks on Building 200 and Building 3, involving removal and replacement of water-damaged insulation and membrane. The roof on Building 200 features a metal substrate with an estimated 80mil Evergaurd TPO membrane originally installed in 2011, while Building 3 has a concrete substrate.

Key solicitation details include a site visit scheduled for Friday 03/14/2025 requiring 24-hour advance notice, with questions due by Monday 03/17/2025 at 12:00 PST and quote submissions accepted via email until 03/21/2025 at 15:00 PST. Offerors must be registered in the SBA database as a certified SDVOSB at the time of offer and award. The contracting office is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20, located in Vancouver, WA, with Derek Crockett as the point of contact.

View the file

Other files

File Type Posted
36C26025Q0320.docx DOCX document
Attachment A - Site Visit Instructions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

03-19-2025

None 36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26025Q0320 09-09-2024

X

The purpose of this amendment is to answer industry questions.

See page 2 for questions and answers.

All other terms remain in effect.

Derek Crockett

Questions Building 200

1. Roof Age and Membrane Type: Could you please provide the installation date or membrane age?

The roof is original and was installed in 2011.

1. Scupper Involvement: The scope of work requires us to operate near or around two scuppers, which are the lowest point of the roof. Due to their proximity to the repair area and the amount of pooling water, it may be necessary to remove and replace the scuppers along with the new membrane, ensuring proper termination well above them. Are the scuppers included in the repair estimate, or are we trying to avoid these costs?

The scope of work does not include replacing the scuppers.

Insulation and Membrane Details:

1. What type and thickness of insulation is under the TPO membrane?

1. What is the brand and thickness of the membrane?

Evergaurd TPO is the brand. And estimated measurement is 80mil. However, this is an estimate only and the contractor must verify actual thickness and utilize all industry and general standards outlined in the RFQ to repair the leaks.

1. What is the substrate of the roof?

Building 200 has a metal bottom substrate.

Building 3 has a concrete substrate.

1. Surface Irregularities: Surface Irregularities: There is a noticeable bump in the middle of the repair area. Would it be preferable to address this by extending the repairs from wall to wall to smooth it out?

The scope of work and requirement is for a contractor to remove the water-damaged and soaked insulation and replace that insulation, along with the membrane itself in the repair area where leakages are occurring. Extending repairs from wall to wall or other areas beyond the repair area or areas of the roof other than those required to fix the leakages is not part of the scope of work.