Attachment 3 - 668-21-102_AHU01-AHU04_Construction_Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 36C26024R0106
About this file
This document contains construction drawings for the replacement of two air handling units (AHU-01 and AHU-04) and associated mechanical systems at the Mann-Grandstaff VA Medical Center in Spokane, WA under Project No. 668-21-102. The drawings provide details on the demolition of existing equipment, installation of new AHU-01B and AHU-04 units, ductwork modifications, piping connections, and related mechanical, electrical, and structural work. The project involves upgrading the efficiency and capacity of the HVAC systems serving specific building areas. This work is being solicited under Solicitation Number 36C26024R0106 as a Small Business Set-Aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - 668-21-102_AHU01-AHU04_Construction_Specifications.pdf | ||
| Attachment 4 - 668-21-102 Wage Determination 20240524.pdf | ||
| Attachment 6 - Contractor Rules Of Behavior.pdf | ||
| Attachment 5 - Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 1 - SOW Construction 668-21-102.pdf | ||
| 36C26024R0106.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GI001
COVER SHEET
1WBR
MMM
UPGRADE AHU-01 AND AHU-04 MECHANICAL SYSTEMS
DEPARTMENT OF VETERANS AFFAIRS
PROJECT NO. 668-21-102
MANN-GRANDSTAFF VA MEDICAL CENTER
4815 N ASSEMBLY ST
SPOKANE, WA 99205
LOCATION PLAN
N
NORTH
REPLACE OLD AND UNDERSIZED AIR HANDLER UNITS AND MODERNIZE HEATING
VENTILATION AND COOLING EFFICIENCY TO EACH OF THE RESPECTIVE ZONES.
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
GI002
SHEET INDEX
WBR
MMM 2
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
SHEET LIST TABLE
SHEET
NUMBER SHEET TITLE
GENERAL
GI001 COVER SHEET
GI002 SHEET INDEX
GI003 ABBREVIATIONS AND SYMBOLS
GI004 SITE PLAN
GI101 ASBESTOS SURVEY
ARCHITECTURAL
AD101 EXTERIOR WALL DEMOLITION
AE301 EXTERIOR ELEVATION AND WALL SECTION
AE501 DUCT DETAILS
STRUCTURAL
SI001 STRUCTURAL NOTES
SE301 STRUCTURAL ELEVATIONS AND DETAILS
SE501 STRUCTURAL DETAILS
MECHANICAL
MI001 MECHANICAL GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLAN BASEMENT NORTH
MD102 MECHANICAL DEMOLITION PLAN BASEMENT SOUTH
MH101 MECHANICAL PLAN BASEMENT NORTH
MH102 MECHANICAL PLAN BASEMENT SOUTH
MH111 MECHANICAL PLAN FIRST FLOOR (1-AHU-4)
MH401
ENLARGED BASEMENT MECHANICAL ROOM PLAN
(1-AHU-1B)
MH402 ENLARGED BASEMENT MECHANICAL ROOM PLAN
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH503 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MH701 1-AHU-1B - MECHANICAL CONTROLS
MH702 1-AHU-1B - MECHANICAL CONTROLS
MH703 1-AHU-4 - MECHANICAL CONTROLS
MH704 1-AHU-4 - MECHANICAL CONTROLS
ELECTRICAL
EI001 GENERAL ELECTRICAL NOTES
EI002 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP101 BASEMENT ELECTRICAL PLAN
EP102 FIRST FLOOR ELECTRICAL PLAN
EP401 ENLARGED ELECTRICAL PLAN
EP601 PANEL SCHEDULES
1. IF THE CONTRACTOR SUSPECTS OR ENCOUNTERS ASBESTOS
DURING ANY POINT OF CONSTRUCTION OR DEMOLITION,
IMMEDIATELY REPORT TO THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO CONTINUATION OF WORK.
GENERAL NOTES
GI003
ABBREVIATIONS AND SYMBOLS
WBR
MMM
POT POINT OF TANGENT
PPL PEOPLE
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RAD RADIUS
RB RUBBER BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO, REFERENCE
REIN REINFORCE(D)(ING)
RECP RECEPTACLE
RCYL RECYCLE AREA
REFR REFRIGERATOR
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAFB SOUND ATTENUATION FIRE BATTS
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE - SEALED CONCRETE
SCH SCHEDULE
SD STORM DRAIN
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPF
INSULATION
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STORM SEWER,
STAINLESS STEEL
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWBD SWITCHBOARD
T&G TONGUE AND GROOVE
TCU THIN CLAD UNIT
TEL TELEPHONE
THK THICK(NESS)
THRU THROUGH
TJI TRUSJOIST INCORPORATED
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLER UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALM ALARM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING & AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS
ASSOCIATION
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
BRK BRICK
BR BROCHURE RACK
BTG BETWEEN THE GLASS
CAB CABINET
CF CUBIC FOOT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLOS CLOSET
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CRS COURSE(S)
CTR CENTER
CNTR COUNTER
CU IN CUBIC INCH
CU YD CUBIC YARD
CW CLEAR WIDTH
d PENNY (NAILS, ETC.)
DEMO DEMOLITION
DET DETAIL
DIAM,Ø DIAMETER
DC DISPLAY CASE
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DWG DRAWING
DWS DOMESTIC WATER SUPPLY
E EAST
EA EACH
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EP ELECTRICAL PANEL
EPDM ETHYLENE-PROPYLENE-DIENE-
MONOMER
EF EXHAUST FAN
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPOSED
EXT EXTERIOR
FLUOR FLUORESCENT
FMS FACILITY MANAGEMENT SERVICES
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE / CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FOOT / FEET
FTG FOOTING
FURR FURRED(ING)
GA GAGE, GAUGE
GALV GALVANIZE(D)
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GRND GROUND
GRT GROUT
HAC HOUSEKEEPING AIDS CLOSET
HB HOSE BIB
HNDCP HANDICAP
HDW HARDWARE
HJT HEAD JOINT
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER / HIGH PRESSURE
HSKP HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
IES ILLUMINATING ENGINEERING SOCIETY
IGU INSULATED GLASS UNIT
IN INCH (“)
INC INCORPORATED
INFO INFORMATION
INSUL INSULATION/INSULATE(D)(ING)
INT INTERIOR
INV INVERT
JT JOINT
K KIP (1,000 LB.)
LDR LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LAG LAG SCREW
LG LENGTH / LONG
LTG LIGHTING
LVL LAMINATED VENEER LUMBER
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MTL METAL
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
UC UNDERCUT
UG UNDERGROUND
UL UNDERWRITERS'
LABORATORIES, INC.
UNO UNLESS NOTED
OTHERWISE
V VOLT
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VIF VERIFY IN FIELD
VIT VITREOUS
VS VERSUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF
TANGENT
VPI VERTICAL POINT OF
INTERSECTION
VPC VERTICAL POINT OF CURVATURE
W WEST / WIDTH / WIDE /
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
WDW WINDOW
W/O WITHOUT
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
XPAN CROSS PAN
XSECT CROSS SECTION
XSTR EXTRA STRONG
YD YARD
YR YEAR
ABBREVIATIONS
FA FIRE ALARM
FB FACE BRICK
FC FOOT-CANDLE
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FG FIXED GLASS
FIN FL FINISHED FLOOR
FIN FL EL FINISHED FLOOR ELEVATION
FIX FIXTURE
FL FLOOR
FH FIRE HYDRANT
N/A NOT APPLICABLE
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPOI OWNER PROVIDED, OWNER INSTALLED
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
POC POINT OF CURVE/CONTACT
POI POINT OF INTERSECTION
FRP FIBER GLASS REINFORCED PLASTIC
BUR BUILT UP ROOFING
DOM DOMICILIARY
SPRAY APPLIED POLYURETHANE FOAM
X
SIM
REVISION CLOUD
SECTION
NUMBER
SHEET
NUMBER
ELEVATION
NUMBER
SHEET
NUMBER
DRAWING
TITLE
DRAWING
SCALE
DRAWING TITLE
DRAWING SCALE
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
ROOM NUMBER
GRAPHIC SCALE
0' 16'8'4'
SCALE: 1/8" = 1'-0"
MATCH LINE
SEE XX/X-XXX
LEVEL 1/8"=1'-0"
ELEVATION
ELEVATION HEIGHTS
COLUMN GRID LINE
INTERIOR
ELEVATION MARKERA101
1Ref
1 R ef
1Ref
1R ef
SECTIONS
EXTERIOR
ELEVATION
REFERENCED VIEW TITLES
DETAIL OR
ENLARGED PLAN
NORTH SYMBOL
ROOM NAME AND
NUMBER
KEY NOTE
WINDOW OPENING
PARTITION TYPE
TAG
DOOR TAG
REVISION NUMBER
MATCHLINE
SYMBOLS LEGEND
NORTH
A3 A-204
X1
X-XXX
A1
X-XXX
SCALE: 1
2" = 1'-0"
A2
X-XXX
VIEW NAME
SHEET TITLE
LOBBY
B100
A
SCALE: 1
8" = 1'-0"A1 XXXXXXXXX
EHRM ELECTRONIC HEALTH RECORD
MODERNIZATION
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
CIP CAST-IN PLACE CONCRETE WALL
"C"
"A"
12 1
"D"
"G"
27 2
6a
37 39
"E"
1e
F R E E D O M W A Y
A S S E M B L Y S T R E E T
M
EM
O
RIAL C
IRC
LE
W E L L E S L E Y A V E .
I N D E P E N D E N C E D R I V E
I N D
E P E N D
E N C
E D R I V E
R E S E R V E R O A D
Patient Parking Patient Parking
14a
"F"
"L"
"K"
"J"
"B" "H"
GI004
SITE PLAN
WBR
SITE
MMM
SCALE:1 SITE PLAN
NTS
N
VA MEDICAL CENTER SPOKANE
1 MAIN HOSPITAL BUILDING
1e PHARMACY / SPECIALTY CARE
2 UTILITY PLANT / LAUNDRY
3 LOGISTICS ADMIN / GARAGE / MAINTENANCE
4 EDUCATION / LRC
5 ENGINEERING
6 HUMAN RESOURCES
6a VETERANS SERVICES
7 SUBSTANCE ABUSE TREATMENT / SOCIAL WORK
12 COMMUNITY LIVING CENTER
14 WAREHOUSE RECEIVING
14a ENGINEERING STORAGE
15 MRI
16 WAREHOUSE STORAGE
23 CHILLERS
27 OUTPATIENT CLINIC
30 EYE CLINIC / QUALITY MANAGEMENT
31 PHYSICAL THERAPY / OCC. THERAPY / PROSTHETICS
32 UNDER CONSTRUCTION
33 DENTAL CLINIC
37 NATIVE AMERICAN VETERANS HEALING LODGE
38 SWITCHGEAR BULDING
39 GENERATOR BUILDING
40 OUTPATIENT MENTAL HEALTH BULDING
41 AUDIOLOGY BUILDING
44 BOILER PLANT
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
AREA 101 CONTRACTOR PARKING
LAYDOWN AREA
25' x45' APPROXIMATE DIMENSIONS
MAIN ENTRANCE
STORAGE
COOLER
OFFICE
PIPE SHOP
IT OFC
IT OFC
VEST
BOILER
ELEC/MECH
OFFICE
IT OFC
EL #2 EL #1
EL #3
STOR
STOR
STOR
MECH
MECH
MALE LOCKER
MALE TLT/SHWR
FEMALE TLT
FEMALE LOCKER
STORAGE
HAC
STORAGE
HAC
DISHWASH
MECH
MECH
CORRIDOR
WORK RM
OFFICEWORK/BREAK
CORRIDOR
FREEZE/COOLER
STORAGE
COOLER
COOLER
MECH
MECH
STORAGE
STORAGE
TLT
SOILED
VAULT
SERVER
HSK SHOP
STAIR
FIRE CLOSET
OFFICE
O2 STOR
DOCK
STORAGEEXAMEXAM
EXAMCONFERENCE RM
DOC OFFICE
DIRTY
EXAM
WAITING RM
TOOL RM
OFFICE
OFFICE
HALL
LRC
LOCK SHOP
OFFICE
VESTIBULE
ELECT COMM
SHOP
DRY GOODS
-- KITCHEN
EDS
HALL
HALL
HALL
CORRIDOR
CORRIDOR
VESTIBULE
OFFICE
MECH
VEST
FREEZER
I.T.
KITCHEN
GI101
ASBESTOS SURVEY
5WBR
MMM
# KEY NOTES:
1. HOT WATER PIPING INSULATION CONTAINING ASBESTOS. (TYP)
2. PLUMBING INSULATION CONTAINING ASBESTOS. (TYP)
3. TEST TILE AND GROUT ALONG THIS WALL FOR ASBESTOS
PRIOR TO COMMENCEMENT OF ANY WORK THAT MAY DISTURB
THE SURROUNDING AREA.
SHEET NOTES:
1. INFORMATION IS PROVIDED IN GOOD FAITH AND BASED ON
PREVIOUS ASBESTOS SURVEY DATA UPDATED 2021 AND SITE
OBSERVATIONS. ADDITIONAL AREAS CONTAINING ASBESTOS
MAY EXIST THAT ARE NOT INDICATED ON THESE DRAWINGS.
STOP WORK AND NOTIFY THE COR IMMEDIATELY IF
ADDITIONAL SUSPECTED ASBESTOS CONTAINING MATERIALS
ARE DISCOVERED DURING DEMOLITION.
2. ASBESTOS TESTING AND SURVEYING SHOULD BE DONE BY A
LICENSED ASBESTOS SURVEYOR.
3. KNOWN INSULATION, MASTIC, AND OTHER ASBESTOS
CONTAINING MATERIALS ARE LABELED IN THE FIELD.
4. INFORMATION FROM THESE DRAWINGS, SITE INVESTIGATION,
AND LICENSED ASBESTOS SURVEYOR SHOULD BE COMBINED
TO PROVIDE THE VA AN ASSESSMENT AND ABATEMENT PLAN
IN THE LIMITS OF CONSTRUCTION FOR REVIEW PRIOR TO
COMMENCEMENT OF WORK.
5. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE
CONTROL METHOD AND CLASS OF ASBESTOS WORK.
6. CONTENTS OF THE FIRST FLOOR MECHANICAL ROOM (NOT
SHOWN) ARE ASSUMED TO BE FREE OF ASBESTOS
CONTAINING PRODUCTS.
7. LIMIT ABATEMENT WORK TO ROOMS A017B, C005A, AND ANY
RENOVATION WORK THAT DISTURBS KNOWN EXISTING
ASBESTOS. CONFIRM WITH THE COR THE EXTENT OF
ABATEMENT WORK REQUIRED PRIOR TO BID.
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
0' 32'16'8'
SCALE: 1/16" = 1'-0"
SCALE:1
OVERALL BUILDING 1 BASEMENT
ASBESTOS SURVEY
1/16" = 1'-0"
N
BUILDING 1
KEY PLAN
GI101
GI101
SCALE:2
ROOM A017B
ASBESTOS SURVEY
1/2" = 1'-0" SCALE:3
ROOM C005A
ASBESTOS SURVEY
1/2" = 1'-0"
0'
SCALE: 1/2" = 1'-0"
4'2'1'
ROOM C005A ASSESSMENT NOTES:
1. MISCELLANEOUS, NON-FRIABLE 12" X 12" VFT 6-8%
CHRYSOTILE; NON-FRIABLE BLACK MASTIC 4-8% CHRYSOTILE.
AHERA 5, PLD 4 ASSESSMENT CATEGORIES. INTACT OR
OTHERWISE ENCAPSULATED CONDITION.
2. THERMAL SYSTEM INSULATION, FRIABLE PIPING RUN
INSULATION 4-12% CHRYSOTILE. AHERA 5 PLD 4 ASSESSMENT
CATEGORIES. MOSTLY INTACT WITH MINOR VISIBLE DAMAGE.
PARTIALLY EXPOSED
3. THERMAL SYSTEM INSULATION, FRIABLE MUDDED FITTINGS
65-70% CHRYSOTILE. AHERA 5 PLD 4 ASSESSMENT
CATEGORIES. PARTIALLY EXPOSED, MOSTLY ENCLOSED, AND
HIDDEN ABOVE SUSPENDED CEILING TILE SYSTEM. MIXED
WITH FIBERGLASS PIPING INSULATIONS.
4. THERMAL SYSTEM INSULATION FRIABLE, EAST SIDE IN THE
ADJACENT MECHANICAL ROOM, ASBESTOS CONTAMINATED
GROUND SOIL. AHERA 1 PLD 2 ASSESSMENT CATEGORIES.
EXPOSED SOIL; ACCIDENTAL EXPOSURE POSSIBLE.
5. THERMAL SYSTEM INSULATION FRIABLE, STEAM PIPING ENTRY
FLOOR PIT, ASBESTOS CONTAMINATED GROUND SOIL. AHERA 1
PLD 2 ASSESSMENT CATEGORIES. EXPOSED SOIL
UNDERNEATH REMOVABLE METAL FLOOR PANELS;
ACCIDENTAL EXPOSURE POSSIBLE.
ROOM A017B ASSESSMENT NOTES:
1. MISCELLANEOUS, NON-FRIABLE BLACK MASTIC 4-8%
CHRYSOTILE. AHERA 5, PLD 4 ASSESSMENT CATEGORIES.
INTACT OR OTHERWISE ENCAPSULATED CONDITION.
2. THERMAL SYSTEM INSULATION, FRIABLE PIPING RUN
INSULATION 4-12% CHRYSOTILE. AHERA 5 PLD 4 ASSESSMENT
CATEGORIES. MOSTLY INTACT WITH MINOR VISIBLE DAMAGE.
PARTIALLY EXPOSED
3. THERMAL SYSTEM INSULATION, FRIABLE MUDDED FITTINGS
65-70% CHRYSOTILE. AHERA 5 PLD 4 ASSESSMENT
CATEGORIES. PARTIALLY EXPOSED, MOSTLY ENCLOSED.
MIXED WITH FIBERGLASS PIPING INSULATIONS.
AD101
BASEMENT LEVEL
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
FIFTH LEVEL
AD101
EXTERIOR WALL DEMOLITION
6LMF
JME
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
SCALE:1 EXTERIOR WALL DEMOLITION
1/4" = 1'-0"
0'
SCALE: 1/4" = 1'-0"
8'4'2'
STUCCO
WALL
SYSTEM
CIP WALL
SHEET NOTES
1. ALL WORK WILL BE COMPLETED IN COMPLIANCE WITH
APPLICABLE CODES AND TO THE SATISFACTION OF THE
COR.
2. PROTECT ALL EXISTING CONSTRUCTION FROM
DEMOLITION ACTIVITIES AND KEEP WEATHER TIGHT.
3. EXAMINE AND VERIFY ALL EXISTING CONDITIONS BOTH ON
PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES
WITH THE COR.
5. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO
NEW CONDITION.
6. REMOVE MECHANICAL, PLUMBING AND ELECTRICAL
EQUIPMENT AND DEVICES PER DISCIPLINE SHEETS.
KEY NOTES
1. REMOVE STUCCO WALL ASSEMBLY INCLUDING METAL
FRAMED STUD WALL - LIMIT SIZE TO REQUIRED ROUGH
OPENING.
2. SAWCUT OPENING THROUGH CAST-IN-PLACE CONCRETE
(CIP) WALL. PREVENT RESIDUAL DAMAGE TO
SURROUNDING WALL AREA AND PROTECT EXPOSED
EQUIPMENT FROM FLYING DEBRIS AND SPARKS.
AREA OF
CONSTRUCTION
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FOURTH LEVEL
FIFTH LEVEL
AE301
EXTERIOR ELEVATION AND DETAILS
7LMF
JME
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
SCALE:1 EXTERIOR ELEVATION AND WALL SECTION
1/4" = 1'-0"
0'
SCALE: 1/4" = 1'-0"
8'4'2'
CIP WALL
NEW DUCT
OPENINGS,
REFER TO
MECHANICAL
SCALE:2 SECTION
1/2" = 1'-0"
TYP
AE301
AE501
1 STUCCO
WALL
SYSTEM
0'
SCALE: 1/2" = 1'-0"
4'2'1'
AE5017
AE501
AE501
AE501
# KEY NOTES:
1. VERIFY IN FIELD THE LOCATIONS OF THE DUCTS AND
COORDINATE WITH MECHANICAL DRAWINGS AND COR. SEE
AD101.
2. COLOR MATCH NEW STUCCO FINISH COAT WITH EXISTING
WALL COLOR.
SHEET NOTES
1. ALL WORK WILL BE COMPLETED IN COMPLIANCE WITH
APPLICABLE CODES AND TO THE SATISFACTION OF THE COR.
2. PROTECT ALL EXISTING CONSTRUCTION FROM DEMOLITION
ACTIVITIES AND KEEP WEATHER TIGHT.
3. EXAMINE AND VERIFY ALL EXISTING CONDITIONS BOTH ON
PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. COORDINATE THE REMOVAL AND/OR RELOCATION OF
FIXTURES, EQUIPMENT AND OTHER APPURTENANCES WITH
THE COR.
5. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF
EXISTING CONSTRUCTION AFFECTED BY DEMOLITION TO NEW
CONDITION.
6. REMOVE MECHANICAL, PLUMBING AND ELECTRICAL
EQUIPMENT AND DEVICES PER DISCIPLINE SHEETS.
3,6
AE501
EXISTING STUCCO WALL
SYSTEM - VERIFY IN FIELD
AND PROVIDE COMPATIBLE
PATCH AND REPAIR AT
DUCT OPENINGS
CONTINUOUS BEAD OF
SEALANT
METAL DUCT FLASHING
METAL DUCT
EXISTING GYPSUM
SHEATHING
SPRAY FOAM
INSULATION
METAL FRAMED
BOX HEADER
METAL DUCT FLASHING
WITH CONTINUOUS SEALANT
METAL DUCT
EXISTING CAST-IN-PLACE
CONCRETE WALL
EXPANDING FOAM
INSULATION
METAL DUCT
SPRAY FOAM INSULATION
DUCT SUPPORT BRACKET
NOTCHED STRUCTURAL
TRACK, REFER TO 3/SE501
BACKER ROD AND SEALANT
EXISTING GYPSUM BOARD ON
METAL STUDS
PROVIDE SPRAY FOAM
INSULATION BEHIND BRACKET
ATTACHMENT - R-VALUE TO
EQUAL EXTERIOR RIGID
INSULATION
METAL FLASHING WITH
CONTINUOUS SEALANT
ON BOTH SIDES OF WALL
BACKER ROD AND SEALANT
BACKER ROD AND
SEALANT AROUND
ALL SIDES OF CLOSURE
PLATE
ALIGN 18 GAUGE
CLOSURE PLATE
WITH EDGE OF WALL,
SEE 7/AE501
METAL DUCT FLASHING
CONTINUOUS SEALANT METAL DUCT
BACK WRAP MESH AT
EXPOSED EDGE OF
INSULATION
SPRAY FOAM
INSULATION
BACKER ROD
WITH SEALANT METAL DUCT
EXPANDING FOAM
INSULATION
METAL DUCT FLASHING
SUPPORT BRACKET,
REFER TO STRUCTURAL
BACKER ROD AND SEALANT
METAL DUCT
SPRAY FOAMINSULATION
ATTACHMENT
FASTENER, REFER
TO STRUCTURAL
EXISTING CAST-IN-PLACE
(CIP) CONCRETE WALL
METAL FLASHING WITH
CONTINUOUS SEALANT
ON BOTH SIDES OF WALL
BACKWRAP EIFS WHERE
IT MEETS 18 GA. CLOSURE
PLATE AND FILL JOINT BETWEEN
THEM WITH BACKERROD AND
SEALANT ON ALL SIDES, SEE 3/AE501
18 GA CLOSURE PLATE
DUCT SUPPORT BRACKET,
SEE STRUCTURAL
EIFS WALL
AE501
DUCT DETAILS
8LMF
JME
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
0'
SCALE: 1" = 1'-0"
2'1'
SCALE: 3" = 1'-0"
1'6"0'
SCALE:1 DUCT THRU STUCCO WALL
3" = 1'-0" (TOP OF DUCT)
(BOTTOM OF DUCT)SCALE:4 DUCT THRU STUCCO WALL
3" = 1'-0"
SCALE:2 DUCT THRU CIP WALL
3" = 1'-0" (TOP OF DUCT)
SCALE:5 DUCT THRU CIP WALL
3" = 1'-0" (BOTTOM OF DUCT)
SCALE:3 SECTION
1" = 1'-0"
SCALE:6 SECTION
1" = 1'-0"
SCALE:7 SECTION
3" = 1'-0"
SCOPE
THE FOLLOWING DRAWING SHEETS OUTLINE THE STRUCTURAL DESIGN
CRITERIA FOR AHU ADDITIONS TO A VA MEDICAL CENTER IN SPOKANE, WA.
WHEN A DIFFERENCE EXISTS BETWEEN THESE DRAWINGS AND ANY
OTHER GOVERNING CODE, THE MORE STRINGENT SHALL CONTROL. ANY
OTHER ITEMS NOT COVERED THEREIN SHALL BE COMMENSURATE WITH
GOOD ENGINEERING PRACTICE.
THESE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH
CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS AND SPECIFICATIONS.
DESIGN STANDARDS
1. INTERNATIONAL BUILDING CODE, 2018 EDITION.
2. AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-16.
3. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE.
4. AISC STEEL CONSTRUCTION MANUAL, 15TH EDITION, 2017.
5. AISI S-100-16, NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF
COLD FORMED STEEL STRUCTURAL MEMBERS.
6. VA SEISMIC DESIGN REQUIREMENTS, H-18-8, 2020.
7. VA STRUCTURAL DESIGN MANUAL 2009.
DESIGN LOADING
1. DEAD LOADS: WEIGHT OF STRUCTURE AND ALL THINGS PERMANENTLY
ATTACHED.
• INSULATED DUCTWORK 22.6 PLF
2. GRAVITY LIVE LOADS:
• ROOFS (NOT REDUCIBLE) 20 PSF
3. SNOW LOAD
1) GROUND SNOW LOAD Pg = 39 PSF
2) FLAT ROOF SNOW LOAD Pf = 33 PSF
3) SNOW EXPOSURE FACTOR 1.0
4) SNOW IMPORTANCE FACTOR 1.2
5) SNOW THERMAL FACTOR 1.0
4. SEISMIC DESIGN CRITERIA
1) SITE CLASS D
2) SEISMIC IMPORTANCE FACTOR 1.25
3) RISK CATAGORY IV
4) SEISMIC DESIGN CATAGORY C
5) SPECTRAL RESPONSE: Ss = 0.307
S1 = 0.112 Sds = 0.318 Sd1 = 0.177
6) SEISMIC RESPONSE COEFFICIENT Cs = 0.133
5. WIND LOAD
1) ANALYSIS PROCEDURE DIRECTIONAL
2) BASIC WIND SPEED115 MPH (3-SEC GUST)
3) RISK CATEGORY IV
4) EXPOSURE CATEGORY C
DESIGN CRITERIA
1. DETAIL, FABRICATE AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH
THE LATEST PROVISIONS OF AISC MANUAL OF STEEL CONSTRUCTION, CODE
OF STANDARD PRACTICE AND CHAPTER 22 OF THE IBC PER THE
REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
2. MATERIALS SHALL BE AS FOLLOWS UNO:
1) PLATES AND ANGLES ASTM A36
2) WIDE FLANGE SHAPES ASTM A992
3) HOLLOW STRUCTURAL SECTIONS ASTM A500, GRADE C
4) PIPE COLUMNS ASTM A53, GRADE B
5) HIGH−STRENGTH BOLTS ASTM A325, U.N.O.
6) PLAIN WASHERS ANSI B18.22.1−65 (R2008)
7) WELDING ELECTRODES SHALL BE E70XX RODS CONFORMING TO
AWS A5.20 (FCAW PROCESS), AWS A5.18 (GMAW PROCESS) OR AWS
A5.1 (SMAW PROCESS)
3. WELDING SHALL BE PERFORMED BY AN AWS CERTIFIED WELDER.
4. WELDING PROCEDURES ARE THE RESPONSIBILITY OF THE STRUCTURAL STEEL
CONTRACTOR.
5. WHERE NO SIZE IS PROVIDED ALL WELDS ARE 3/16" FILLET WELDS AND WHERE
NO LENGTH IS PROVIDED ALL WELDS ARE CONTINUOUS.
6. ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION WELDS AND
SHALL DEVELOP THE FULL STRENGTH OF THE WEAKER MEMBER.
7. CLEAN GRIND SMOOTH AND PAINT ALL WELDS EXPOSED TO VIEW. PAINTING
DONE ON STEEL MEMBERS SHOULD BE AT LEAST 3" FROM FIELD WELDS
UNLESS WELDS ARE COMPLETED. SHOP PRIME AND PAINT STEEL PER THE
OWNER'S SPECIFICATIONS.
8. ENSURE CONNECTIONS MADE WITH HIGH STRENGTH STEEL BOLTS CONFORM
IN ALL RESPECTS TO THE CURRENT SPECIFICATIONS FOR STRUCTURAL JOINTS
AS ENDORSED BY AISC.
9. FOR BEARING TYPE CONNECTIONS, INSTALL BOLTS TO A SNUG TIGHT
CONDITION. THE SNUG TIGHT CONDITION IS DEFINED AS THE TIGHTNESS THAT
EXISTS WHEN ALL PLIES OF A JOINT ARE IN FIRM CONTACT. THIS CONDITION
MAY NORMALLY BE ATTAINED BY A FEW IMPACTS OF AN IMPACT WRENCH OR
THE FULL EFFORT OF A PERSON USING AN ORDINARY SPUD WRENCH.
10. PROVIDE DOUBLE NUTS AT ALL CONNECTING POINTS OF BRACING AND SAG
RODS.
11. ALL EXTERIOR STEEL IS HOT-DIPPED GALVANIZED.
05 12 00 STRUCTURAL STEEL REQUIREMENTS
1. STEEL STUD CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL
CONNECTIONS AND FRAMING TO THE CONTRACTING OFFICER'S
REPRESENTATIVE FOR REVIEW AND APPROVAL BY THE STRUCTURAL
ENGINEER PRIOR TO FABRICATION OR ERECTION.
2. ALL COLD-FORMED STEEL FRAMING SHALL BE FABRICATED AND ERECTED IN
ACCORDANCE WITH AMERICAN IRON AND STEEL INSTITUTE (AISI)
"SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL
MEMBERS".
3. ALL FRAMING SHALL BE GALVANIZED PER THE ASTM A653 SPECIFICATION .
4. STUDS SHALL BE PLUMB, ALIGNED, AND FULLY NESTED IN BOTH THE UPPER
AND LOWER TRACK.
5. ALL CONNECTIONS SHALL BE SCREWED OR WELDED. SCREWS SHALL
CONFORM TO SAE J78. ATTACH STUDS TO TRACKS WITH A MINIMUM OF (1)#10
TEK SCREW BETWEEN EACH FLANGE AND THE TRACK UNLESS NOTED
OTHERWISE. SCREW THREADS SHALL EXTRUDE A MINIMUM OF 3 EXPOSED
THREADS THROUGH STEEL. POWDER ACTUATED FASTENERS (PAF) SHALL
COMPLETELY PENETRATE THE STRUCTURAL STEEL.
6. ALL WELDS SHALL BE TOUCHED UP WITH ZINC-RICH PAINT.
7. FRAMING OF WALL OPENINGS SHALL INCLUDE HEADERS AND SUPPORTING
STUDS.
8. STEEL FOR 16, 14, 12 GAGE STEEL SHALL HAVE MIN YIELD STRENGTH OF 50 KSI.
ALL OTHER STEEL THICKNESSES SHALL USE 33 KSI STEEL UNLESS NOTED
OTHERWISE.
9. ALL WELDING OF COLD FORMED STEEL SHALL BE PERFORMED BY AWS
CERTIFIED WELDERS EXPERIENCED IN COLD FORMED STEEL FRAMING. ALL
WELDING OF COLD FORMED STEEL SHALL USE E60 SERIES ELECTRODES
UNLESS NOTED OTHERWISE.
10. ALL STUDS SHALL BE SECURELY SEATED FOR FULL END BEARING ON TOP AND
BOTTOM TRACK.
05 40 00 COLD FORMED STEEL REQUIREMENTS
SI001
STRUCTURAL NOTES
9RID
N/A
MAL
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
rday RID CO Seal
FIRST FLOOR
SECOND FLOOR
(E) COLD FORMED STEEL STUD WALL,
800S162-43 AT 16"O.C.
(E) 8" THICK CONCRETE WALL
7' -6
" M
AX
1' -4
" M
IN
2'-8" MIN
800T200-54
CUT WEB, SCREW FLANGE
TO JAMB WITH (1) #10 SCREW
SEE 4/S301 FOR
JAMB/HEADER CONNECTION
ALL STUDS ARE 800S162-43
HEADER WITH (2) 600S137-43
AND (2) 800T200-54, ATTACH
WITH #10 SCREWS EACH
FLANGE 12" O.C.
800S162-43 STUD, TYP.,
CONNECT TO JAMB STUD
WITH #10 SCREWS 12" O.C.
800S162-43 STUD SLOTTED
INTO 800T162-43 TRACK
CONNECT WITH #10 SCREWS
12" O.C.
1-1/2x1-1/2 43 MIL ANGLE, ATTACH VERTICAL LEG TO
JAMB WITH (4) #10 SCREWS
800T162-43 TRACK, ATTACH
WEB TO JAMB WITH (6) #10
SCREWS, ATTACH FLANGES
TO HEADER WITH (3) #10
SCREWS EACH FLANGE
3" 2"
3"
8" O.C. MAX
A36 L5x3-1/2x3/8, EACH SIDE AND
T&B, DO NOT
OVERCUT FOR
ANGLE PLACEMENT
8"
3/8" DIA SCREW ANCHOR,
2.5" EMBEDMENT
4'-0" MAX
3' -0
" M
AX
800S162-43 STUD, TYP.,
(E) PRECAST
HOLLOW CORE SLAB
CUSTOM DUCT
WORK SUPPORT
COLD FORMED
STEEL STUD
WALL
(E) 8" THICK
CONCRETE WALL
SE301
STRUCTURAL ELEVATIONS AND DETAILS
10RID
MAL
SHEET NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY SHORING,
SUPPORT, AND BRACING REQUIRED DURING CONSTRUCTION.
2. ALL EXISTING INFORMATION WAS GATHERED FROM PREVIOUS
DESIGN DOCUMENTS. ALL EXISTING CONDITIONS SHALL BE
VERIFIED IN THE FIELD.
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
0'
SCALE: 1" = 1'-0"
2'1'
0'
SCALE: 1/4" = 1'-0"
8'4'2'
SE501
SCALE:1 STRUCTURAL ELEVATIONS AND DETAILS
1/4" = 1'-0"
SCALE:2 OPENING THROUGH EXISTING CONCRETE WALL
1" = 1'-0"
SCALE:3 OPENING THROUGH EXISTING STUD WALL
1" = 1'-0" SCALE:4 HEADER AND JAMB DETAIL
NTS
SE301
SCALE:5 DUCT SUPPORT ELEVATION
1/2" = 1'-0"
SE301
SE301
0'
SCALE: 1/2" = 1'-0"
4'2'1'1
SE501
AIR DUCT, RE: MECH
L2-1/2x2-1/2x1/4, ATTACH TO EACH
SUPPORTING ANGLE WITH (1) 1/2" BOLT
(2) L2-1/2x2-1/2x1/4
1/2" DIA BOLT, TYP.
6-1/2"x4-1/2"x1/4" PL, BETWEEN ANGLES
4"x4"x1/4" PL, BETWEEN ANGLES
(2) L2-1/2x2-1/2x1/4
5"x3"x1/4" PL, BETWEEN ANGLES
L2-1/2x2-1/2x1/4, ATTACH TO
SUPPORTING ANGLE WITH 1/2" BOLTS
12" O.C.
AT DUCT WORK PERIMETER
ANGLES ATTACH WITH #10
SCREWS 3" O.C.
3'-5" MAX
(6) 1/4" DIA SCREW
ANCHOR WITH 2.5"
NOMINAL EMBEDMENT
SPACING AS SHOWN
3/ 4"
1' -6
/4
1/
4"
2' -0
3/4" 3 3/4"
3/4"
5 1/4"
(2) L2-1/2x2-1/2x1/4
(4) #12 SCREWS
TOP OF EACH
ANGLE, (4)
SCREWS MAX
PER NOTCHED
TRACK
1/
2" M
AX
2'
-0
3/4" 3 3/4"
3/4"
5 1/4"
(2) L2-1/2x2-1/2x1/4
1/
4" M
AX
(2) #12 SCREWS
BOTTOM OF
EACH ANGLE
50KSI 400T125-54
NOTCHED TRACK, SPAN
(4) STUDS MIN, TYP.
(3) #8 SCREWS
AT EACH STUD
(E) 800S162-43
STUDS 16" O.C.
18GA STEEL PLATE FOR
CLOSURE, RE: ARCH
1/8 2-6
TYP. ALL 18 GA
PLATES
AIR DUCT, RE: MECH
L2-1/2x2-1/2x1/4, ATTACH TO EACH
SUPPORTING ANGLE WITH (1) 1/2" BOLT
(2) L2-1/2x2-1/2x1/4
1/2" DIA BOLT, TYP.
6-1/2"x4-1/2"x1/4" PL, BETWEEN ANGLES
4"x4"x1/4" PL, BETWEEN ANGLES
L2-1/2x2-1/2x1/4
5"x3"x1/4" PL, BETWEEN ANGLES
L2-1/2x2-1/2x1/4, ATTACH TO
SUPPORTING ANGLE WITH 1/2" BOLTS
12" O.C.
AT DUCT WORK PERIMETER
ANGLES ATTACH WITH #10
SCREWS 3" O.C.
3'-5" MAX
L2-1/2x2-1/2x1/4 BETWEEN BRACKETS, SUPPORTING INSIDE CORNER OF DUCTWORK
L2-1/2x2-1/2x1/4
AIR DUCT, RE: MECH
L2-1/2x2-1/2x1/4
(2) L2-1/2x2-1/2x1/4
AIR DUCT, RE: MECH
L2-1/2x2-1/2x1/4
L2-1/2x2-1/2x1/4
SE501
STRUCTURAL DETAILS
11RID
MAL
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
SCALE: 3" = 1'-0"
1'6"0'
SE501
SE501
SE501
SE501
SCALE: 1 1/2" = 1'-0"
0' 2'1'
SCALE:2 SECTION THROUGH SUPPORT
3" = 1'-0" SCALE:3 EXTERIOR DUCT SUPPORT CONCRETE ANCHORAGE
1-1/2" = 1'-0"
SCALE:1 EXTERIOR DUCT SUPPORT FRAMING
1-1/2" = 1'-0"
SCALE:4 EXTERIOR DUCT SUPPORT FRAMING
1-1/2" = 1'-0"
SCALE:5 SECTION THROUGH SUPPORT
3" = 1'-0"
SCALE:6 EXTERIOR DUCT SUPPORT STUD WALL ANCHORAGE
1-1/2" = 1'-0"
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
BD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BR BOTTOM REGISTER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CPVC CHLORINATED POLYVINYL
CHLORIDE
CR CEILING REGISTER
CSG CLEAN STEAM GENERATOR
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DAMPER - AUTOMATIC
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING
COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGT ENTERING GLYCOL TEMP
EH EXHAUST HOOD
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FS FLOW SWITCH
FSD COMBINATION FIRE SMOKE
DAMPER
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HP HEAT PUMP / HORSEPOWER
HPS HIGH PRESSURE STEAM
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN-LB INCH POUND
IU INDUCTION UNIT
IV INLET VANES
kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPS LOW PRESSURE STEAM
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MCDB MEAN COINCIDENT DRY
BULB
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE
DIFFERENCE
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH –
GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
PVC POLYVINYL CHLORIDE
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING
VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TAG TRANSFER AIR GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
URV UPBLAST UNIT VENTILATOR
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIF VERIFY IN FIELD
VIV VARIABLE INLET VANES
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WSHP WATER SOURCE HEAT PUMP
YR YEAR
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN
OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS
SHALL BE FURNISHED AND INSTALLED PER THE ARCHITECTURAL
SPECIFICATIONS.
4. FOR TYPICAL WATER PIPING CONNECTIONS TO EQUIPMENT, SEE
STANDARD EQUIPMENT DETAILS.
5. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON PLANS ARE NECK
SIZES.
6. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE
MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
7. HANGERS SHALL BE ISOLATED BY TYPES OF ITEMS THEY SUPPORT. DUCTS
INDEPENDENT FROM PIPES, CABLE TRAYS, ETC.
8. PROVIDE NEGATIVE PRESSURE CONTAINMENT AREA DURING PHASING FOR
NEW CONSTRUCTION TO PROTECT AGAINST CONSTRUCTION DEBRIS. EACH
TENANT TO REMAIN OPERATIONAL DURING CONSTRUCTION. RECEIVE
INFECTION CONTROL AND CONTAMINATION PREVENTION INSTRUCTION
FROM VAMC BEFORE STARTING WORK. COMPLY WITH ALL SUCH
REQUIREMENTS.
9. PROVIDE TEMPORARY AIR CONDITIONING INCLUDING VENTILATION,
HEATING AND COOLING. MEET DESIGN CONDITIONS SHOWN ON MI001.
10. SUBMIT WORK PLAN FOR COR PRE-APPROVAL. WORK REQUIRING
DOWNTIME OF TENANTS IS LIMITED TO NIGHTS AND WEEKENDS. SHOW ON
WORK PLAN NEGATIVE PRESSURE CONTAINMENT AREAS AND MINIMIZE
AREA OF TENANT DISTURBANCE. EACH TENANT TO REMAIN OPERATIONAL
DURING CONSTRUCTION.
11. T-STATS SHOWN ON DRAWINGS ARE EXISTING TO REMAIN (EXCEPT WHERE
NOTED). FIELD VERIFY THAT EACH T-STAT IS PROPERLY CONNECTED TO ITS
CORRESPONDING VAV BOX.
12. AIRFLOWS SHOWN ON DRAWING IN SPACES ARE FOR BALANCING
PURPOSES ONLY. NO NEW DIFFUSERS OR AIR OUTLETS ARE EXPECTED TO
BE INCLUDED AS PART OF THE SCOPE OF WORK.
13. PROVIDE ALL CONTROLS FIELD DEVICES TO VA ENGINEERING SERVICES.
VA ENGINEERING SERVICES WILL REVIEW CONTROLLERS AND MAY
INSTRUCT GC TO PROPERLY DISPOSE OF EQUIPMENT NOT SUITABLE FOR
REUSE. REMOVE CONTROLS WIRING AND EXPOSED CONDUIT. EMPTY
CONDUIT ABOVE CEILING AND IN MECHANICAL ROOM SHALL REMAIN.
REMOVE UNUSED 120VAC POWER WIRING BACK TO BREAKERS. REMOVE
UNUSED POWER WIRING 24VAC/VDC BACK TO BAS TRANSFORMER.
REMOVE PNEUMATIC CONTROLS PIPING AND REPLACE WITH CONVERTER
FOR DDC CONTROLS TO MATCH EXISTING SYSTEM.
14. CONTRACTOR SHALL PERFORM BASELINE TEST AND BALANCE TO
DOCUMENT EXISTING FLOWS FOR EACH EXISTING AIR HANDLER INCLUDED
IN THE SCOPE OF WORK, TO INCLUDE EACH VAV AND DIFFUSER
DOWNSTREAM OF THE AIR HANDLERS. NO ADJUSTMENTS TO PRESENT AIR
OR HYDRONIC FLOWS ARE REQUIRED AS PART OF BASELINE TEST AND
BALANCE. INCLUDE BASELINE TEST AND BALANCE OF PRESENT AIR FLOWS
FOR SYSTEM DIFFUSERS. SUBMIT LIST OF DEVICES NOT INCLUDED IN
CONTRACT THAT REQUIRE MAINTENANCE OR REPLACEMENT DUE TO
DEFICIENCIES.
15. PRIOR TO DEMOLITION AND CONSTRUCTION MOBILIZATION, SUBMIT
ASBESTOS CONTAINING MATERIALS (ACM) TESTING RESULTS AND REPORT.
PERFORM TESTING FOR ACM TO CONFIRM AND DOCUMENT ACM VERSUS
NON-ACM IN AREAS AFFECTED BY CONSTRUCTION INCLUDING ROOFING.
16. PRIOR TO DEMOLITION AND CONSTRUCTION MOBILIZATION, SUBMIT
ACCIDENT PREVENTION PLAN (APP), INCLUDING FALL PROTECTION
STRATEGY. CONTRACTOR SHALL VERIFY APPLICABILITY OF FALL
PROTECTION SECTION DEVELOPMENT WITHIN APP.
17. COORDINATE AND OBTAIN PRE-APPROVAL WITH MANN-GRANDSTAFF VAMC
FOR PAINT COLOR OF VERTICAL RUNS OF EXTERIOR JACKETED DUCTWORK
AND CONDUIT.
18. EXISTING CEILING GRID AND CEILING TILES ARE TO REMAIN. MINIMIZE
DISTURBANCE OF CEILING GRID AND TILE. PRESERVE AND REINSTALL GRID
AND/OR TILE AND PROVIDE MATCHING CEILING TILE TO REPLACE BROKEN
CEILING TILES. PRESERVE AND PROTECT EXISTING LIGHT FIXTURES, FIRE
PROTECTION SYSTEMS, AND TENANT SPECIALIZED EQUIPMENT. REPAIR
WALL, FLOOR, AND CEILING FINISHES DAMAGED DURING CONSTRUCTION
TO MATCH EXISTING. PERFORM PHOTO LOG OF BASELINE CONDITIONS
PRIOR TO COMMENCING CONSTRUCTION. COORDINATE WITH USERS TO
CONFIRM EQUIPMENT TO BE RELOCATED BY MANN-GRANDSTAFF VAMC
PERSONNEL. PROTECT EQUIPMENT REMAINING FROM DAMAGE, DUST, AND
DEBRIS DURING CONSTRUCTION.
19. SEISMIC RESTRAINTS OF NON-STRUCTURAL COMPONENTS IS A DELEGATED
DESIGN ITEM. CONTRACTOR SHALL ENGAGE A LICENSED STRUCTURAL
ENGINEER IN THE PROJECT STATE. REFER TO SPECIFICATION 13 05 41.
DESIGN CONDITIONS
ROOM DESCRIPTION
INDOOR OUTDOOR
SUMMER WINTER
% RH
WINTER SUMMER
°F Db °F Db 99.6% °F Db 0.4% °F Db 0.4% °F Wb
RESTROOM - - -
5.1° F 92.9° F 62.8° F
LOCKER ROOM 75 70 30-60
KITCHEN 78 70 0-60
OFFICE 75 70 30-60
CORRIDOR 75 70 30-60
STORAGE 75 70 30-55
MECHANICAL/ELECTRICAL 80 65 N/A
ALL OTHER AREAS 75 70 20-60
OUTDOOR DESIGN CONDITIONS PER ASHRAE FUNDAMENTALS HANDBOOK 2017
GENERAL NOTESMECHANICAL ABBREVIATIONS SYMBOLS
SQUARE 1-WAY CEILING DIFFUSERS
LIMIT OF DEMOLITION
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
FC
10x8
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE REMOVED
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
FLEXIBLE CONNECTION, EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
SUPPLY DIFFUSER/DUCT
EXHAUST GRILLE/DUCT
RETURN GRILLE/DUCT
MI001
MECHANICAL GENERAL NOTES
12CDL
N/A
MLR
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
clong Stamp clong Typewritten Text 8/8/23
EL #2 EL #1
STOR
STOR
STOR
MECH
MECH
MALE LOCKER
MALE TLT/SHWR
FEMALE TLT
FEMALE LOCKER
STORAGE
HAC
STORAGE
HAC
DISHWASH
MECH
MECH
CORRIDOR
WORK RM
OFFICEWORK/BREAK
CORRIDOR
FREEZE/COOLER
STORAGE
COOLER
STORAGEEXAMEXAM
EXAMCONFERENCE RM
DOC OFFICE
DIRTY
EXAM
WAITING RM
LRC
LOCK SHOP
OFFICE
VESTIBULE
ELECT COMM
SHOP
DRY GOODS
-- KITCHEN
EDS
HALL
HALL
HALL
MECH
VEST
FREEZER
EL #2 EL #1
STOR
STOR
STOR
MECH
MECH
MALE LOCKER
MALE TLT/SHWR
FEMALE TLT
FEMALE LOCKER
STORAGE
HAC
STORAGE
HAC
DISHWASH
MECH
MECH
CORRIDOR
WORK RM
OFFICEWORK/BREAK
CORRIDOR
FREEZE/COOLER
STORAGE
COOLER
STORAGEEXAMEXAM
EXAMCONFERENCE RM
DOC OFFICE
DIRTY
EXAM
WAITING RM
LRC
LOCK SHOP
OFFICE
VESTIBULE
ELECT COMM
SHOP
DRY GOODS
-- KITCHEN
EDS
HALL
HALL
HALL
MECH
VEST
FREEZER
AREA SERVED BY AHU-1
(D)AHU-1
8"Ø24"x10"
"x
6"
"x
6"
6" x6
"Ø
6" x6
10"x10"
"x
9"
"x
6"
24"x8"
10"Ø
10"x6"
10"x8"
"x 6"
26"x16"
18"x6"
(D)CD
(E)CD
(E)EG
(E)CR
(E) WF
(E) WF
(E) WF
(E)WF
(E)CD
(E)CR
(E)CD
(E)CD
(E)CD
(E)CD
(E)EG
(E)CD
(E)CD
(E)CD
(D)CD
(E)EG
(E)SG
(E)CD
(E)CD
(E)CD
(E)SG
(E)SG (E)SG
"x
6"
10"x6"
"x
9"
"x
6"
MD101
MECHANICAL DEMOLITION PLAN
BASEMENT NORTH
13CDL
SCALE: 3/32" = 1'-0"
0' 20'10'
MLR
SCALE:1
MECHANICAL DEMOLITION PLAN
BASEMENT NORTH BUILDING 1
3/32" = 1'-0"
N
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
UPGRADE AHU-01 AND AHU-04
MECHANICAL SYSTEMS
SPOKANE, WA
AUGUST 2023
668-21-102
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SEAL:
BUILDING 1
KEY PLAN
BUILDING 1 SOUTH - MD102
BUILDING 1 NORTH - MD101
BUILDING 1
BUILDING 27
# KEY NOTES:
1. DEMOLISH EXISTING AIR HANDLING UNIT. PREPARE
FOR RE-CONNECTION TO NEW AHU.
2. VERIFY EXISTING PAD IS OF THE ADEQUATE SIZE
AND THICKNESS FOR SUBMITTED NEW AIRHANDLER
AND ADDITIONAL SEISMIC REQUIREMENTS.
DEMOLISH, REMOVE, AND REPLACE IF PAD DOES
NOT MEET REQUIREMENTS.
3. PROPOSED EQUIPMENT REMOVAL/ENTRY ROUTE
FOR USE BY THE CONTRACTOR. ALTERNATE
ROUTES MUST BE COORDINATED WITH THE COR
PRIOR TO USE.
4. EXISTING OUTSIDE AIR INTAKE LOUVER AND
DUCTWORK TO AHU TO REMAIN. CONTRACTOR TO
ADJUST OUTSIDE AIR DUCT AS NEEDED FOR
REPLACEMENT AHU'S OUTSIDE AIR OPENING.
5. DEMOLISH AND REMOVE EXISTING DUCTWORK AS
SHOWN. REMOVE AND RETAIN SUPPLY AIR
DIFFUSER/GRILLE FOR RE-USE.
6. DISCONNECT, DEMOLISH, OR REMOVE EXISTING
LOW PRESSURE STEAM HEATING COIL AND
CONDENSATE RETURN CONNECTIONS TO AIR
HANDLER BEING REPLACED. FIELD VERIFY POINTS
OF CONNECTION FOR REPLACEMENT AIR HANDLER
AND MODIFY PIPE CONFIGURATION.
7. EXISTING STEAM PIPE, STEAM/CONDENSATE TRAP,
AND CONDENSATE RETURN PIPING TO REMAIN, NO
CHANGE.
SHEET NOTES:
1. PATCH, SEAL, AND REPAIR TO MATCH EXISTING
ANY SURFACE OR FINISH.
2. DEMOLISH AND REMOVE CONTROLS WIRING,
ABANDONED BY THIS PROJECT, BACK TO CONTROL
PANEL.
3. DEMOLISH AND REMOVE ALL PNEUMATIC
CONTROLS AND EQUIPMENT. REFER TO SHEET
MH701 FOR NEW WORK.
4. REINSTALL ALL AFFECTED CEILING TILES AT THE
END OF EACH SHIFT FOR WORK AREAS OUTSIDE OF
THE RATED CONSTRUCTION BARRIER. IF THE TILES
CANNOT BE REINSTALLED, THE SPRINKLER SYSTEM
IS CONSIDERED OUT OF SERVICE IN THESE AREAS
AND 1-HOUR FIRE RATED SEPARATION IS
REQUIRED BETWEEN THE CONSTRUCTION AREA
AND THE OCCUPIED PORTIONS OF THE BUILDING.
LEGEND:
EXHAUST GRILLE
SUPPLY DIFFUSER
RETURN DIFFUSER
THERMOSTATT
clong Stamp clong
COOLER
OFFICE
PIPE SHOP
IT OFC
IT OFC
VEST
BOILER
ELEC/MECH
OFFICE
IT OFC
EL #2 EL #1
EL #3
HAC
STORAGE
COOLER
COOLER
MECH
MECH
STORAGE
STORAGE
TLT
SOILED
VAULT
SERVER
HSK SHOP
STAIR
FIRE CLOSET
OFFICE
O2 STOR
DOCK
RECYCLING
CLOSET
REFRIG
TOOL RM
BIO MED
FIRE CLOSET
OFFICE
OFFICE
OFFICE
HALL
OFFICE
TEL/SERVER
LRC
OFFICE
VESTIBULE
ELECT COMM
SHOP
-- KITCHEN
CORRIDOR
CORRIDOR
VESTIBULE
OFFICE
VEST
FREEZER
I.T.
KITCHEN
EG
(E)TAG
(E)WF
(E)FTR
(E)WF
(E) UH
(E) FAN
EXHAUST
BLOWER
(E) FAN
EXHAUST
BLOWER
(E) AHU-B010
(E) DWH
CONVERTER
(E) STEAM
PRV
(E) PORT AC
(E) PORT AC
(E) FTR (E) FTR
(E) UH
(E)FTR(E)FTR
(E) LOUVER
(E) WF
(E) CONDENSER
REC PUMP
(E)FTR
STORAGE
STORAGE
COOLER
OFFICE
PIPE SHOP
IT OFC
IT OFC
VEST
BOILER
ELEC/MECH
OFFICE
IT OFC
EL #2 EL #1
EL #3
HAC
STORAGE
COOLER
COOLER
MECH
MECH
STORAGE
STORAGE
TLT
SOILED
VAULT
SERVER
HSK SHOP
STAIR
FIRE CLOSET
OFFICE
O2 STOR
DOCK
RECYCLING
CLOSET
REFRIG
TOOL RM
BIO MED
FIRE CLOSET
OFFICE
OFFICE
OFFICE
HALL
OFFICE
TEL/SERVER
LRC
OFFICE
VESTIBULE
ELECT COMM
SHOP
-- KITCHEN
CORRIDOR
CORRIDOR
VESTIBULE
OFFICE
VEST
FREEZER
I.T.
KITCHEN
AREA SERVED BY AHU-4
(D)AHU-4 26"x20"
18"x8" UP3
20"x21"
34"x10"
8" Ø
20"x10"
37"x20"
"x
"x
8"
8"Ø 8"Ø
8"Ø
8"Ø
8"Ø
"x
"x
"x6
24"x6"
"x
6"
8"Ø
8" Ø
6"x6"
(E)RG
(E, NIC)
(E)CD
(E)RG
(E)CD(E)CD(E)CD
(E)CD
(E)CD
(E)CD
(E)RG
(E)CD
(D)CD
(D)CD
(E)CD
(E)RG
(E)CD
(E)CD
MD102
MECHANICAL DEMOLITION PLAN
BASEMENT SOUTH
14CDL
SCALE: 3/32" = 1'-0"
0' 20'10'
MLR
# KEY NOTES:
1. DEMOLISH AND REMOVE EXISTING AIR HANDLING
UNIT WITH SUSPENSION SUPPORTS.
2. PROPOSED EQUIPMENT REMOVAL/ENTRY ROUTE
FOR USE BY THE CONTRACTOR. ALTERNATE
ROUTES MUST BE COORDINATED WITH THE COR
PRIOR TO USE.
3. EXISTING FILTER SECTION TO REMAIN.
4. EXISTING EXHAUST FAN, SUPPORTS, AND
DUCTWORK TO REMAIN, NO CHANGE.
5. DEMOLISH AND REMOVE EXISTING OUTSIDE AIR
DUCT UP THROUGH FIRST FLOOR ABOVE.
6. DISCONNECT, CAP, AND SEAL EXISTING STEAM AND
CONDENSATE PIPING.
SHEET NOTES:
1. SELECTIVE DEMOLITION OF AHU-1, AHU-4, AND
ASSOCIATED SUPPLY DUCTWORK FROM AHU TO
AIR DIFFUSERS.
2. PATCH, SEAL, AND REPAIR TO MATCH EXISTING
ANY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .