This document appears to be Attachment 7 - B201A ME Drawings, which is related to the federal contract opportunity for Solicitation Number 36C26024R0101 "Z1DA--692-23-104 Retrofit HVAC in Four Buildings" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

The drawings provide technical specifications and details for the HVAC retrofit work required under this solicitation. The solicitation seeks to retrofit the HVAC systems in four buildings. Key details include the specific buildings to be retrofitted, the scope of HVAC work required, and the technical drawings that provide the design specifications for the retrofit. This document serves as a technical attachment that prospective contractors should review as part of preparing their proposals in response to the overall solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

131GJ

JCY

MECHANICAL SYMBOLS2013.11.15RECORD_DRAWINGS

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

132GJ

MECHANICAL NOTES AND ABBREVIATIONS2013.11.15RECORD_DRAWINGS

12Ø (TYP 5)

ADD 2

CI 12

RFI 50

ADD 2

CI 12

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/8" = 1'-0"

MECHANICAL PLAN - CRAWL SPACE13

MECHANICAL PLAN

CRAWL SPACE

ADD-2 2011.08.30

CI-12 2012.05.11

RFI-50 2012.09.25

2013.11.15RECORD_DRAWINGS

ASI 18

ASI 18

ASI 18

RFI 63

ASI 30

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/4" = 1'-0"

MECHANICAL PLAN - FIRST FLOOR - NORTH13

MECHANICAL PLAN

FIRST FLOOR - NORTH

ASI-18 2012.08.03

RFI-63 2012.10.26

ASI-30 2013.01.30

IU-1

EF-2

ASI XX

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

ADD 1

RFI 63

RFI 63

ASI 30

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/4" = 1'-0"

MECHANICAL PLAN - FIRST FLOOR - SOUTH13

MECHANICAL PLAN

FIRST FLOOR - SOUTH

2011.08.09ADD1

2012.08.03ASI-18

2012.10.26RFI-63

2013.01.30ASI-30

ASI 18

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ADD 1

ASI 18

ASI 18

RFI 63

RFI 63

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENT

SCALE: 1/4" = 1'-0"

SECOND FLOOR MECHANICAL PLAN - NORTH13

MECHANICAL PLAN

SECOND FLOOR - NORTH

ADD1 2011.08.09

ASI-18 2012.08.03

RFI-63 2012.10.26

IU-2

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ASI 30

ADD 1

ASI 18

ASI 18

RFI 63

RFI 63

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENT

SCALE: 1/4" = 1'-0"

SECOND FLOOR MECHANICAL PLAN - SOUTH13

MECHANICAL PLAN

SECOND FLOOR - SOUTH

ADD1 2011.08.09

ASI-18 2012.08.03

RFI-63 2012.10.26

ADD 1

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/8" = 1'-0"

ROOF MECHANICAL PLAN13

MECHANICAL PLANS

ROOF AND GENERATOR ROOM

SCALE: 1/4" = 1'-0"

GENERATOR ROOM MECHANICAL PLAN15

ADD1 2011.08.09

RFI 69

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/4" = 1'-0"

SECTION AT FC-5 8

MECHANICAL SECTIONS

SCALE: 1/4" = 1'-0"

SECTION AT AH-1 AND SHAFT16SCALE: 1/4" = 1'-0"

SECTION AT BASEMENT MECHANICAL ROOM15

SCALE: 1/4" = 1'-0"

SECTION THROUGH 1ST FLOOR CEILING11

ASI-18 2012.08.03

RFI-69 2012.11.08

IU-3

ADD 1

ADD 1

ASI 18RFI 69

ADD 1

ASI 18

ASI 18ASI 18

ASI 18

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/4" = 1'-0"

MECHANICAL PLAN - BASEMENT13

PARTIAL MECHANICAL PLANS

SCALE: 1/8" = 1'-0"

MECHANICAL PARTIAL SITE PLAN 15

ADD1 2011.08.09

ASI-18 2012.08.03

RFI-69 2012.11.08

SCALE: NTS

SUPPORT /ANCHOR FOR PIPE RISERS9 SCALE: NTS

SUPPORT ANCHOR ( CHILLED WATER )10

SCALE: NTS

CONCRETE EQUIPMENT BASES1 SCALE: NTS

SECURING HANGER RODS IN CONCRETE2

SCALE: NTS

SEISMIC BRACING FOR EQUIPMENT3

SCALE: NTS

PIPE HANGERS4

BOTTOM VIEW

FRONT VIEW

TOP VIEW

SCALE: NTS

CWBT-1 DETAIL16

ASI-03

SCALE: NTS

TRENCH SECTION AT CHILLED WATER LINES13

ADD 2

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

GENERAL MECHANICAL DETAILSADD2 2011.08.30

DRAIN VALVE AND AIR VENT CONNECTIONS13 SCALE: NTS

WATER COILS - PIPING CONNECTIONS14 SCALE: NTS

INSTALLATION OF THERMOMETER WELLS15 SCALE: NTS

CHILLED BEAM WATER COILS - PIPING CONNECTIONS16

SCALE: NTS

FLOOR MOUNTED EXPANSION TANK12

SCALE: NTS

IN-LINE PUMPS - CONNECTIONS1

SCALE: NTS

AIR HANDLING UNIT DRAIN TRAP DETAIL3 SCALE: NTS

WATER TREATMENT - CLOSED SYSTEMS4SCALE: NTS

SINGLE SUCTION FLOOR MOUNTED PUMP2

SCALE: NTS

AIR COOLED CHILLER - PIPING CONNECTIONS7

SCALE: NTS

UNIT HEATER PIPING CONNECTIONS5

ASI 28

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

HYDRONIC SYSTEM DETAILSASI-28 2012.12.28

STEAM LINE DRIP POCKET AND TRAP ASSY2

SCALE: NTS

INVERTED BUCKET STEAM TRAP ASSY9

SCALE: NTS

STEAM SAFETY VALVE1

SCALE: NTS

HEAT EXCHANGER - STEAM TO HOT WATER3

SCALE: NTS

CONDENSATE PUMPS - PIPING CONNECTIONS4

SCALE: NTS

FLOAT AND THERMOSTATIC STEAM TRAP ASSY10 SCALE: NTS

END OF STEAM LINE DRIP TRAP ASSY11

SCALE: NTS

TYPICAL CONNECTIONS TO FLASH TANK12

SCALE: NTS

HUMIDIFIER STEAM PRESSURE REDUCING STATION13 SCALE: NTS

STEAM HUMIDIFIER14 SCALE: NTS

STEAM DOMESTIC HOT WATER HEATER16

ADD 1

ADD 1

ASI 18

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

STEAM AND CONDENSATE SYSTEM DETAILSADD1 2011.08.09

ASI-18 2012.08.03

FLEXIBLE DUCT CONNECTIONS13 SCALE: NTS

DUCT RISER SUPPORTS14 SCALE: NTS

ACCESS PANEL AND DOOR DETAIL15 SCALE: NTS

FIRE DAMPER INSTALLATION16

SCALE: NTS

EXHAUST OR RETURN BRANCH DUCTWORK8SCALE: NTS

SUPPLY DUCTWORK TAKE-OFFS7SCALE: NTS

DUCTWORK TRANSITIONS WITH EQUIPMENT6

SCALE: NTS

ROUND DUCT HANGERS2

SCALE: NTS

VOLUME DAMPER DETAIL5

SCALE: NTS

LOW-SILHOUETTE EXHAUST OR INTAKE HOOD1 SCALE: NTS

DUCTWORK SQUARE VANE ELBOWS3 SCALE: NTS

DUCTWORK RADIUS ELBOWS4

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

144GJ

AIR DISTRIBUTION SYSTEM DETAILS2013.11.15RECORD_DRAWINGS

CHILLED WATER PIPING DIAGRAM13

ADD 1

RFI 114

RFI 114

RFI 135

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

MECHANICAL DIAGRAMSADD1 2011.08.09

RFI-114 2013.02.12

RFI-135 2013.03.29

MECHANICAL HOT WATER AND STEAM PIPING DIAGRAM13

ADD 1 ADD 1

ADD 1

ASI 18

ASI 18

RFI 114

RFI 114

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

MECHANICAL DIAGRAMSADD1 2011.08.09

ASI-18 2012.08.03

RFI-114 2013.02.12

AH-1 AND EF-3 CONTROLS DIAGRAM15

SCALE: NTS

HOISTWAY VENT DAMPER CONTROLS5

did not get into addendum 1

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

147GJ

MECHANICAL DIAGRAMS2013.11.15RECORD_DRAWINGS

ASI 18

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

SCALE: 1/8" = 1'-0"

FIRST FLOOR AIR BALANCE DIAGRAM - MAXIMUM FLOW1

AIR BALANCE DIAGRAMS

FIRST FLOOR

SCALE: 1/8" = 1'-0"

FIRST FLOOR AIR BALANCE DIAGRAM - MINIMUM FLOW3

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

ASI 18

DEPARTMENT OF VETERANS AFFAIRS

SOUTHERN OREGON

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

AIR BALANCE DIAGRAMS

SECOND FLOOR

SCALE: 1/8" = 1'-0"

SECOND FLOOR AIR BALANCE DIAGRAM - MAXIMUM FLOW1 SCALE: 1/8" = 1'-0"

SECOND FLOOR AIR BALANCE DIAGRAM - MINIMUM FLOW3

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

MECHANICAL SCHEDULES

ADD 1

ADD1 2011.08.09

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

MECHANICAL SCHEDULES2013.11.15RECORD_DRAWINGS

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENT

MECHANICAL SCHEDULESASI-18 2012.08.03

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENT

MECHANICAL SCHEDULES

ADD 1

2011.08.09ADD1

REHABILITATION CENTER & CLINICS

8495 CRATER LAKE HIGHWAY

WHITE CITY, OREGON

REVISIONS DATE DRAWING TITLE:

CARE CLINIC EXPANSION

DATE:

VA PROJECT NO.:

DRAWING NO.:

DWG. OF

DRAWN BY:

CHECK BY:

PROJECT TITLE AMBULATORY

CONTRACT DOCUMENTS

MECHANICAL SCHEDULES

ADD 1

ADD 1

ADD1 2011.08.09

ASI-18 2012.08.10

ASI 18

ASI 18

ASI 18

ASI 18

File details come from the government source that posted it. Updated .