This document is a Price Schedule Breakdown for a federal contract opportunity. The contract is for Project No. 648-24-103, Bldg. 100, Remove Sewer Riser at the Portland VAMC in Portland, Oregon. The Price Schedule Breakdown provides instructions and a template for the contractor to itemize and calculate pricing for the various divisions of work, including General Requirements, Existing Conditions, Thermal and Moisture Protection, Special Conditions, and Plumbing. The pricing is to be submitted on a fixed-price basis, and the contractor is responsible for determining the accuracy of the formulas and transposing the totals to the Price Summary. The contract opportunity is being solicited by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20. The solicitation number is 36C26024R0079.

View the file

Other files

File Type Posted
36C26024R0079 0005.docx DOCX document
36C26024R0079 0004.docx DOCX document
Amendment0004.RemoveSewerRiser.071824.docx DOCX document
36C26024R0079 0003.docx DOCX document
36C26024R0079 0002.docx DOCX document
36C26024R0079 0001.docx DOCX document
Attachment 3 - Wage Determination.txt TXT text file
Attachment 1 - Specifications 648-24-103.pdf PDF
36C26024R0079.docx DOCX document
Attachment 2 - DrawingsReplace Sewer Riser.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
648-24-103

Remove Risers Portland VAMC, Portland Oregon

RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A$0.00
Division Item 2 Existing ConditionsN/A$0.00
Division Item 3 Thermal and Moisture ProtectionN/A$0.00
Division Item 4 Special ConditionsN/A$0.00
Division Item 5 PlumbingN/A$0.00

TOTAL DIVISION $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00