Amendment0004.RemoveSewerRiser.071824.docx

DOCX document 23 KB Posted

Attached to
Y1DA--CON NRM 648-24-103 Replace Bldg. 100 Sewer Riser
Solicitation number
36C26024R0079
Issued by

About this file

This document is an Amendment to a Solicitation for the Removal of Sewer Risers at the Department of Veterans Affairs Bldg. 100 in Portland, Oregon, Solicitation No. 36C26024R0079. The amendment provides details on a site visit held on July 8, 2024, including the attendees and questions asked. The questions cover availability of plumbing plans, core drilling, laydown area, and RODI water disposal. The related federal contract opportunity is for Project No. 648-24-103 to Replace the Sewer Riser at Bldg. 100, issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 20.

View the file

Other files

File Type Posted
36C26024R0079 0005.docx DOCX document
36C26024R0079 0004.docx DOCX document
36C26024R0079 0003.docx DOCX document
36C26024R0079 0002.docx DOCX document
36C26024R0079 0001.docx DOCX document
Attachment 3 - Wage Determination.txt TXT text file
Attachment 4- Contractor Price Breakdown.xlsx XLSX spreadsheet
Attachment 1 - Specifications 648-24-103.pdf PDF
36C26024R0079.docx DOCX document
Attachment 2 - DrawingsReplace Sewer Riser.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT

REMOVE SEWER RISERS

SOLICITATION NO. 36C26024R0079

A Site Visit was held on July 8, 2024 at 15:00 PDT for the Removal of Sewer Risers, Solicitation No. 36C26024R0079. Attendees met at 3710 SW US Veterans Hospital Rd, Portland, Oregon, Bldg. 100 Floor B2 to obtain temporary badges and proceeded to the job site.

The following individuals attended the Site Visit

Alejandro MunozContracting Officer Representative (COR),
Veterans Administration
Madeline SmallContract Specialist
Veterans Administration
Scott CoderHeidelberg Resources
Josh JamisonAllied Mechanical and Plumbing
Ryan RoeSkytek
Lowell HaywardLovett, Inc.

The following questions were asked: (Q = Question; R= Response)

Q1.Is it possible to get a full set of waste plumbing plans for the horizontal branches that tie into the sewer riser on each floor?
R1.Drawings can be provided.
Q2.Are the floors post tension and would core drilling be acceptable in order to install the new riser to simplify diversion and tie in?
R2.The floors are not post tension but core drilling would not be acceptable.
Q3.Is there an identified laydown area for material and utility trailer? If so where is this area in proximity to the basement entrance?
R3.Laydown area will be provided in an area located near the basement (B2 level)
Q4.Does RODI water go into the drain on B2?
R4.No RODI water does not go into the drain but RO waste water does.