Attachment 1 531-24-103_SOW Final.pdf
PDF 124 KB Posted
- Attached to
- Replace R22 Chillers Federal contract opportunity
- Solicitation number
- 36C26024R0026
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to replace R22 chillers at the Boise VA Medical Center. The scope of work includes replacing 6 existing chillers, with 4 located on the ground and 2 on the roof. The contractor will be responsible for removing and reconnecting all existing piping and accessories, as well as providing and installing all new piping and accessories. The work must be completed between November 2024 and March 2025.
The related federal contract opportunity is a pre-solicitation notice for Solicitation Number 36C26024R0026, which will be issued on or about April 12, 2024 as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The North American Industry Classification Code (NAICS) is 238220, Plumbing, Heating and Air Conditioning Contractors, with a small business size standard of $19M. The magnitude of the construction project is between $1,000,000 and $5,000,000. Responses are due by June 30, 2024 at 12:00 PM Pacific Time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26024R0026 0002.pdf | ||
| Site Visit Sign In.pdf | ||
| Attachment 6_ Wage Determination ID20240104_01-12-2024.pdf | ||
| Solicitation Amendment 001 Final Solicitation.pdf | ||
| Attachment 2_ Specs_531-24-103 Replace Chillers.pdf | ||
| Attachment 3_ Drawings_531-24-103 Replace Chillers.pdf | ||
| Attachment 4_ Contractor Rules of Behavior.pdf | ||
| Attachment 5_ Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 2_ Specs_531-24-103 Replace Chillers Draft.pdf | ||
| Attachment 3_ Drawings_531-24-103 Replace Chillers Draft.pdf | ||
| Attachment 6_ Wage Determination ID20240104_01-12-2024 Draft.pdf | ||
| Attachment 1 531-24-103_SOW Draft.docx | DOCX document | |
| 36C26024R0026 Presolicitation_Solicitation Draft.docx | DOCX document | |
| Attachment 4_ Contractor Rules of Behavior Draft.pdf | ||
| Copy of Attachment 5_ Price Breakout Draft.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
12/6/2023
FORCE Number: 23NR3TA01
Boise VAMC Project Number: 531-24-103
1. Contracting Officer’s Representative (COR) and Alt COR
Name: Bryan Lightfield/ Brian Blake
Section: FMS
Address: 500 W. Fort St., Boise, ID 83702
Phone Number: 208-422-1345
Fax Number: 208-422-1334
E-Mail Address: Bryan.Lightfield@va.gov
2. Contract Title
Replace R22 Chillers
3. Background
The existing 6 Packaged Water Chillers at Building 27,67 and 88 at the Boise VA Medical Center
(BVAMC) are decades old and R22 refrigerant is being phased out. This project will replace the existing chillers with new.
4. Scope
BASE BID: Contractor shall provide all materials, equipment, labor, and supervision necessary to replace 6 existing chillers. 4 are located on the ground and two are on the roof. The Contractor is responsible for removing and reconnecting all existing piping and accessories as well as providing and installing all new piping and accessories. The Work shall be in strict accordance with the contract Drawings and Specifications provided.
All contract work shall take place between the months of November 2024 and March 2025.
5. Specific Tasks
The Boise Veterans Affairs Medical Center is a Hospital First! Any and all construction activities shall be secondary to the mission of the Medical Center. This means: some activities shall only be performed outside of normal business hours; some activities may be curtailed if they interfere with normal activities, and may be delayed for other times or conditions. Other potential issues may include: noise pollution; noxious fumes; and vibrations. Restrictions on activities may be imposed even if they are below OSHA allowable limits. The Contracting Officer (CO) or
Contracting Officer’s Representative (COR) shall have the final authority over the needs of the
Medical Center. Additionally, construction safety, infection control and site security shall be prime requirements of the Work, and as such any infraction may be considered a material breach of the work and cause for the government to take remedial action.
Unless otherwise specifically identified, the Contractor shall provide all tools, materials, equipment, labor and supervision of every kind necessary to provide complete and operational systems for the Medical Center meeting the intent of this Statement of Work, the Specifications, and Drawings.
TESTING
The Contractor shall be responsible for all testing and laboratory services in connection with this project as stated in the contract Drawings and Specifications.
DISPOSAL OF EQUIPMENT AND MATERIALS
The Contractor is responsible for the correct disposal of all materials associated with this project.
All R22 refrigerant will be evacuated from the chillers and provided to the VA for reuse.
COORDINATION OF WORK
If any questions or concerns arise, the Contractor is to coordinate with the COR for direction.
Any and all disruptions to the normal functions of the BVAMC (road closures, utility connections, etc.) shall be brought to the attention of the COR at the earliest possible date. Refer to the Specifications for the acceptable time frames of notification.
6. Performance Monitoring
The Government is required to monitor contractor performance and certify the work was done in accordance with the contract. This monitoring is done by the COR. At least weekly, the COR shall perform Safety and Interim Life Safety inspection and Environmental inspections. In addition the COR shall perform periodic inspections of the Work as further detailed in the
Specifications.
7. Security Requirements
The Contractor shall only access Medical Center Buildings directly associated with the Work.
The Contractor shall not enter or attempt to enter any patient care area. Additionally, the
Contractor shall provide construction site security as further identified in the Specifications or on the Drawings.
8. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI)
There is no GFE for this contract. GFI includes this SOW, contract drawings, and contract specifications.
9. Other Pertinent Information or Special Considerations
There are no special considerations necessary to accomplish the Work.
a. Identification of Possible Follow-on Work
This is the first and only phase of construction for the chilled water system at each building (27, 67, and 88). No follow-on work is scheduled.
b. Identification of Potential Conflicts of Interest (COI)
There are no known Potential Conflicts of Interest.
c. Identification of Non-Disclosure Requirements
The Contractor shall not have access to sensitive and/or proprietary information.
d. Packaging, Packing and Shipping Instructions
All deliveries shall be specifically addressed to the Contractor and not the Medical Center. The
Medical Center shall make best efforts to refuse delivery of Contractor goods or materials. Any materials inadvertently received by the Medical Center will be identified to the Contractor for immediate pick-up. The Medical Center takes no responsibility in the receipt of any goods or materials that are the Contractor’s.
e. Inspection and Acceptance Criteria
The COR is responsible for certifying that the work done under the contract is performed to time and standard. The COR is also responsible to assure the inspection and acceptance of in place products provided incidental to services. A demo period or trial is not inspection of a product.
10. Risk Control
The Contractor shall refer to division 01 specifications for guidelines on safety, risk, and infection control.
11. Quality Control
The Contractor is responsible for their own quality control. Refer to specification 01 45 00 for expectations and reporting requirements related to quality control.
12. Place of Performance
Work shall be performed at the Boise VA Medical Center, Boise, ID, 500 W. Fort Street, Boise, ID 83702.
13. Period of Performance
Due to long lead on chillers, the contract length shall be 330 calendar days from receipt of the
Phase I Notice to Proceed. Refer to specification section 01 00 00 – 1.42 for information on the contract schedule.
- End of Section -
File details come from the government source that posted it. Updated .