36C26024R0026 0002.pdf

PDF 142 KB Posted

Attached to
Replace R22 Chillers Federal contract opportunity
Solicitation number
36C26024R0026
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This document appears to be an amendment to a solicitation for a federal contract opportunity to replace R22 chillers at the Boise VA Medical Center. The key details are:

The solicitation number is 36C26024R0026, and the project number is 531-24-103. This is a set-aside for service-disabled veteran-owned small businesses (SDVOSB) under NAICS code 238220 for plumbing, heating, and air conditioning contractors. The magnitude of the construction project is between $1-5 million. The amendment provides answers to 33 questions related to the contract requirements, such as bid bonds, commissioning agents, controls contractors, electrical gear, as-builts, staging areas, noise restrictions, asbestos, phasing, and use of cranes/helicopters. There are no temporary chillers required, and the VA's controls contractor is Clima-Tech Corp. The solicitation is expected to be issued on or around April 12, 2024 via SAM.gov, with a response due date of June 30, 2024.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 8

5/7/24

531-24-103

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd

Bldg.17, Suite B428

Vancouver WA 98661

To all Offerors/Bidders

36C26024R0026

X

X

X 1

Project Title: Replace R22 Chillers.

Project Number: 531-24-103

Project Location: Boise VAMC, 500 W. Fort St, Boise, ID 83702.

The purpose of this amendment is to provide answers to proposed questions as well as to provide the site visit sign in. See continuation pages for details.

POC for this amendment is Ty Draszt, ty.draszt@va.gov

1. Question: Will a bid bond be required?

VA Response: Yes.

2. Question: Who is the preferred commissioning agent?

VA Response: None Preferred.

3. Question: Who is the preferred controls contractor?

VA Response: Clima-Tech Corp is licensed and authorized to program to the VA network.

4. Question: Clarify valve on N Chiller B.67.

VA Response: On sheet M402, Detail 4 North Chiller 67, the plans call for (1) new motorized valve. This value was replaced recently and is in good condition.

Contractor shall reuse (1) existing motorized valve for North Chiller.

5. Question: Building 67 , Chiller 1 & 2 feeders share junction boxes in electrical room G25 and G25A, basement of 67. Will the VA allow new feeder wire to pass through exiting junction boxes? Or will we need to intercept and separate the new feeder wire. New feeder wire will be 480V?

VA Response: Yes, reuse existing conduit from roof to basement. Then install new conduit/feeder to 480 gear inside the same electrical room. 208v and 480v cannot be in the same junction box without separation per NEC. Yes, contractor can intercept conduit in electrical room, install new junction box, or provide separation inside existing so long as the jbox is large enough for the feeders.

6. Question: The existing GE Electrical switchgear ‘NDG1’ and ‘MDP1’ at Buildings

67 and 88 contains circuit breakers and components that are now obsolete. As shown in the drawings, the Electrical gear for these buildings will require the installation of 175A circuit breakers to feed the new chillers. When speaking to electrical vendors, the only 175A circuit breakers available on the market for these pieces of gear are 35kAIC rated. There will possibly be new mounting hardware required for installation as well. Please confirm the 35 kAIC rating and appropriate mounting hardware will be acceptable to use.

VA Response: B.67 gear was installed in 2015. contractor will need to purchase the newer style SACE Tmax XT breaker along with the mounting kit ABB has prepared for what they consider retrofit installs. Both the older SK and newer XT

These typically come in standard frame sizes with a swapable trip plug. That means it’d be a 200A or 400A breaker with a 175A plug (depending on frame size and availability). It would still be on the contractor to provide all necessary hardware including mounting kits in order to install a new breaker into existing equipment. The mounting kit for this board amounts to a couple of plates and screws and should be relatively minor compared to the cost of the breaker. ABB

Spectra Retrofit Kit. This board is rated for 65kA SCCR and the breakers in this board need to be 65KAIC. 35kAIC is not suitable. 65kAIC is required. If a 200A breaker is more widely available at the specified AIC ratings, and easier to obtain due to lead time, and doesn’t require the additional mounting hardware or just easier to install, etc., then they could install a 200A breaker and then use a fused disconnect with 175A fuses at the chiller to meet the MOCP overcurrent device per the chiller manufacturer cut sheet For B.88 the gear is older. Needing additional mounting hardware to install newer breakers into older boards is not uncommon and is expected in equipment that is older. B88 has a 500kVA transformer with a 5.29%Z (Impedance). This does decrease the available fault to below 35kA regardless of what the upstream fault current may be. A 35kAIC breaker is suitable for use in B88.

7. Question: Building 67 , Chiller 1 & 2 feeders share junction boxs in electrical room G25 and G25A, basement of 67. Will the VA allow new feeder wire to pass through exiting junction boxes? Or will we need to intercept and separate the new feeder wire. New feeder wire will be 480V.

VA Response: Answered above.

8. Question: Are there any additional as-builts for the chiller units?

VA Response: All existing as-builts were used to produce current construction drawings. Is there a specific item you are looking for? All facility asbuilts will be available at FMS office for viewing purposes.

9. Question: Are their staging locations that are preauthorized for use? Laydown areas predesignated for materials? Areas for trailer set up? Secure material storage predesignated?

VA Response: Contractor parking located near loading dock of 77. Next to each existing chiller location. B77 contractor parking. We have space around campus.

Contractor would need to provide container and lock, if needed.

10. Question: Are there any buildings with noise restrictions and if so are off hours and weekend work required?

VA Response: No. Normal hours is adequate.

11. Question: Does the city/county/state require any inspections or permits to be pulled?

VA Response: Federal work. No city/state/county permits required.

12. Question: Can Superintendent and Safety be the same person? Superintendent and Quality be the same person?

VA Response: Yes, with OSHA 30 card No, superintendent should be focused on subcontractors and schedule.

13. Question: Will we be working with any insulation that has asbestos and if so are their any hazmat reports available?

VA Response: No asbestos is anticipated. Chillers and insulation were installed long after asbestos was banned.

14. Question: Are any of the buildings Historical buildings (Example Building 1) on site?

VA Response: 27 and 67 are historic but this scope does not change any of the architectural or SHPO requirements.

15. Question: Are their certain days, hours or locations that cranes cannot operate?

VA Response: No. We would expect them to operate during normal working hours, 7-5 on weekdays.

16. Question: Will specific contractor parking near the job site be available for tool trucks and critical equipment delivery?

VA Response: Yes. But it is on a first come, first serve basis with other contractors.

17. Question: Will you required us to use your controls contractor (such as

Climatech)? And if so when will they be providing their bid to us?

VA Response: No, any contractor that is certified to service Automated Logic system. The contractor will have to have access to the VA computer system.

Currently ClimaTech is the only contractor who has this access to our network.

When you contact them.

18. Question: Relating to question 11, if yes, who is our POC for your controls person?

VA Response: Recommend contacting Mike Scott to request a bid.

19. Question: Who will the A/E be on this project? Can you share their RFIs and answers from the Design portion bid of the this project?

VA Response: Page 1 of the construction drawings. AESUS Design RFI’s are not applicable to construction bids.

20. Question: Are there any special commissioning reports or requirements?

VA Response: Test and Balance of chilled water system

21. Question: Do you have a specific commissioning agency that Boise VA Sole sources for this project?

VA Response: See repeat question above.

22. Question:Are there any seismic requirements or reports required for commissioning or component installation?

VA Response: no

23. Question:Is there any specific format for Volume 1 - Past Performance Proposal in terms of project information that is required for each past project (i.e. Contract

Name: Contract Number, Date of Contract Award: Contract ,Dollar Amount, Contract POC, etc.)?

VA Response: Contract name, contract number, date of contract award to include original start and end date with actual end date, contract original dollar amount, final dollar amount, contract point of contact,

24. Question: Are there specific submission requirements for the Volume 2 Price

Proposal in addition to the completed and signed SF1442 with the total price offer?

VA Response: Please follow all of the solicitation instructions for providing price in the SF 1442 and solicitation attachments.

25. Question: Please confirm if Volume 1 Past Performance and Volume 2 Price

Proposal are to be submitted as two separate files?

VA Response: Price proposal will be submitted as part of the solicitation and solicitation attachments. Past performance will be submitted as a separate document along with the proposal.

26. Question: Please advise if there is any Asbestos known to be present in the areas of work on this project, and if any project-specific site surveys have been completed for locating asbestos containing materials. To date, the VA has provided general Environmental Surveys for the entire facility and not a project specific survey. Pursuance to OSHA 29 CFR 1926, it’s the owner’s responsibility to identify and quantify environmental hazards requiring abatement for a construction project.

VA Response: No asbestos anticipated and none has been identified. The VA has conducted extensive asbestos surveys of the entire facility.

27. Question: Please confirm, if asbestos is unexpectedly encountered during the project on materials required for removal, please advise the procedure for bringing the issue to the VA’s attention and whether a modification will be issued to address abatement.

VA Response: No asbestos anticipated or identified. If suspected materials are found, notify the COR. VA has an IH on staff that will test and send for analysis.

28. Question: Please advise if there are any phasing requirements or preferred sequencing by the VA for removing and replacing the Air Chillers on this project.

VA Response: Physical work can happen anytime between Nov 15 to March 1.

No phasing. Existing equipment should remain until know delivery of new equipment is locked in.

29. Question: Please clarify/confirm which Chillers are required to have temporary chillers while being replaced.

VA Response: No temp chillers should be needed.

30. Question: Please advise who the site HVAC DDC Contractor is?

VA Response: Answered several times above.

31. Question: Will crane work need to take place on the weekend?

VA Response: Advanced planning and coordination should prevent any weekend work.

32. Question: Can a helicopter be used to hoist chillers on/off the roof?

VA Response: Yes, with proper safety plan and notification. This has been done with several other roof top equipment.

33. Question: We would like to know if this is a brand new contract OR if there is

(was) an incumbent performing these services.

VA Response: New contract.