This document is an amendment to Solicitation 36C26024R0024, which is a request for repair of leaking roofs (Solicitation # CON-NRM 653-24-105) issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20.

The amendment provides answers to 8 questions submitted by offerors. Key details include:

  • Past performance proposal page limit is 5 pages, including cover letter and table of contents. Past performance questionnaires are limited to 5 pages each, and up to 5 references may be submitted.
  • Contractors must follow code requirements for moisture content and repair any damage caused by leaks, but decking/structural repairs beyond those in the scope will be considered unforeseen conditions.
  • Painting is required only for interior walls/ceilings directly impacted by the repairs, not entire rooms.
  • A 20-year extended warranty is required for the repaired roof sections, in addition to the standard FAR warranty of construction.
  • CPARS records can be submitted in lieu of past performance questionnaires.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 653-24-105 36C260 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver

WA

98661

To all Offerors/Bidders

36C26024R0024 03-12-2024

X X X

The purpose of the amendment is to answer eight questions submitted.

1. See continuation page for questions and answers.

2. All other terms and conditions of the solicitation will remain the same.

RFI# 1 Page 45 of 61 of the solicitation states the page limits for proposals. The Past Performance proposal limit is stated as 5 pages, which includes cover letters, table of contents, etc. Each past performance questionnaire is 5 pages, not including a cover letter or table of contents. Page 55 of 61 states offerors may submit up to five (5) past performance references. Even submitting one (1) past performance reference with a cover letter and table of contents will exceed the page limit. Please confirm the page limit for the Past Performance proposal.

Past Performance Questionnaires are not required if all required CPARs documentation are provided. If you do not have any CPARs for your projects, then the contractor can submit three (3) Past Performance Questionnaires.

RFI# 2 For all six areas of work listed in the Statement of work, it states, “Test and confirm that all surfaces are dry to prevent mold growth.” Is there a specific percentage of moisture the material needs to be at or below to meet this requirement? If the moisture content is above the limit, what will the VA require of the contractor, and will any additional work required be considered an unforeseen condition?

Contractor shall follow the code requirements for moisture content. Any damage caused by the leaks needs to be repaired. If the additional work is related to the project that is not already noted in an area disclosed in the scope documents, then unforeseen conditions could arise.

RFI# 3 The construction notes on the drawings for each area state, “Repair/replace/ existing decking damaged by any dry rot,” and “Repair/replace/clean/paint any locations inside the structure that was damaged due to the roof leak.” It is unknown whether there is any dry rot of the existing decking or structural framing caused by the roof leaks. Is there a specific dollar amount each offeror should include for each work area as a contingency so each offeror’s price proposals are comparable, or will any decking and structural repair required be considered an unforeseen condition and be addressed by a modification to the contract?

A site-walk was provided. Contractors shall use their best judgement in preparing their proposal. Decking and structural repair will not be considered an unforeseen condition unless additional damage is noted in an area not already disclosed in the scope documents. Also see Construction Note 1.

RFI# 4 The construction notes on the drawings for each area state, “Paint adjacent areas of roof repair/replacement.” Some of the areas have drywall/paint damage that will need to be repaired and painted on the inside of the structure. Please identify what “adjacent” means for the paint requirements. Are we to paint corner to corner on the walls with the damages/repairs, or are we to repaint the entire room that has the damage?

Only the walls/ceilings that are damaged on the interior side need to be repainted. “Paint adjacent areas of roof repair/replacement.” is referring to painted areas such as wood trim that may get damaged during the roof repair.

RFI #5 – Do we need to inspect for mold and rot with every leak in every building? Some leaks result from blocked drains, and once cleared, they should not recur. Additionally, some minor leaks can be sealed without being opened up. We want to confirm whether you prefer not to have them opened and inspected. It will be more expensive to open them and repair them then to seal coat leaks.

Yes, any damage caused by the roof leak needs to be repaired.

RFI #6 – Can you please define the specific warranty that we will need to provide to the government after the work? We can only provide workmanship warranties on the specific areas that were repaired.

For the section of roof that is repaired, there will be a “Warranty of Construction” per the FAR followed by a 20-year extended warranty period.

RFI #7 – Regarding past performance, do we need to submit the Past Performance Questionnaires (Attachment 5) even if we have the CPARS records?

No, if you provide the CPARS records, you do not have to submit Past Performance Questionnaires. CPAR’s is the preferred method.

RFI #8 - Can we utilize Past Performance Questionnaires containing identical information that were previously completed for recent bids?

If the information is true and accurate, Means & Methods used to complete the documentation is up to the contractor.