This file contains solicitation question and answer responses for RFQ 36C25927Q0030, a firm-fixed price contract for FCC Medical Cache Maintenance and Storage services supporting the Eastern Colorado Healthcare System (ECHCS). The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) under NAICS code 624230 with a $41.5 million size standard to maintain and deploy a medical cache across approximately 44,000 square miles, primarily serving Denver and Colorado Springs areas. The contractor must provide monthly storage maintenance in a minimum 2,000-square-foot climate-controlled facility, perform inventory reconciliation and equipment tracking with 90-day expiration notifications, support up to 20 annual training and meetings events (mostly virtual via Microsoft Teams, ranging 2–12 hours), conduct complete and partial cache deployments with transportation and setup/breakdown labor included, and provide emergency labor support. All pricing is fixed-unit rates covering transportation, labor, loading, unloading, setup, breakdown, and return transportation within the service area, with historically deployments occurring in the Denver area and an unlikely maximum 200-mile transport distance.

Key staffing and labor requirements include personnel with minimum two years of medical cache maintenance and deployment experience plus ICS 100, 200, 700, and 800 certifications for anyone involved in planning or deployment activities. The revised contract line items consolidate staffing into three primary CLINs (x002, x003, x004) with a 360-hour annual labor pool for emergency deployments and separate pricing for monthly storage maintenance, training/meeting support (20 events annually), and optional transition/onboarding services. Scheduled exercises are known at least six months in advance and typically occur in April or May, with a maximum of two full deployments permitted annually unless real-world emergencies require additional activations; real-world deployments exceeding the labor ceiling will be authorized through emergency contract modifications. The quote submission deadline is 10:00 AM Mountain Time on November 13, 2026, with a 60-day minimum quote acceptance period, and quotes must be emailed to Noaa.Lanotte@va.gov with a maximum file size of 10 MB; a signed cover page on each volume satisfies signature requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Questions

RFQ 36C25927Q0030

1. EXERCISE STAFFING SUPPORT – CLINs 0005, 1005, 2005, 3005, AND 4005 These CLINs identify "NTE FCC Exercise Staffing Support (6 Staff)," with a unit of measure of EA and an annual quantity of two.

Could the government please clarify:

a. Does each EA represent one exercise event requiring six contractor personnel?

b. How many hours should contractors assume for each staffing event? Is an eight-hour workday anticipated?

c. Are these six personnel intended to remain on site supporting FCC operations after the initial delivery and setup, with their services priced separately from the delivery/setup CLINs?

d. If personnel are required to remain longer than the anticipated event duration, how will additional staffing hours be compensated?

e. If exercise setup is required the preceding day, which CLIN should cover that additional labor?

Answer: Please refer to revised line items. This line-item has been removed/replaced. All staffing should be included in revised line items x002,x003,x004. Line item x005 is only for emergency cache labor support due to a real world activation.

2. EMERGENCY LABOR – CLINs 0006, 1006, 2006, 3006, AND 4006 These CLINs identify "NTE Labor – Emergency Cache (7 Staff Support)," with a unit of measure of HR and an annual quantity of 168.

Could the government clarify whether the 168-hour quantity represents:

a. A total of 168 individual labor-hours distributed among seven personnel; or

b. 168 hours of seven-person crew coverage?

Additionally, should the unit price represent one individual labor-hour or one hour of support by the entire seven-person crew?

Answer: Please refer to revised line items. All staffing should be included in revised line items x002,x003,x004. Line item x005 is only for emergency cache labor support due to a real world activation.

3. COMPLETE AND PARTIAL CACHE DELIVERY – CLINs 0002/0003 AND CORRESPONDING OPTION YEARS Please confirm whether the unit price for each complete or partial cache deployment is intended to include all transportation, loading, unloading, setup, breakdown, return transportation, and replacement of equipment into storage.

Also, are the personnel required to perform these functions separate from the six staff identified under the exercise staffing support CLINs?

Answer: Each unit price includes all labor, transportation, loading, unloading, setup, breakdown, return transportation, and replacement of equipment to storage.

4. TRAINING AND MEETINGS SUPPORT – CLINs 0004, 1004, 2004, 3004, AND 4004 These CLINs identify an annual quantity of 20 events.

Could the government clarify:

a. What constitutes one billable training or meeting event?

Answer: These events can be but are not limited to coordination meetings, planning meetings, community partnership building events, trainings in which the cache is deployed partially or fully, training staff on equipment use, table top discussions and exercise.

b. What duration should contractors assume for each event?

Answer: Most meetings are apprx. 2 hours in length, while trainings can be up to 12.

b. How many contractor personnel are expected to participate?

Answer: For meetings, at minimum 1 staff member, preferably from leadership. For trainings and exercises ECHCS will advise contractor prior to event on the number of staff needed but it shall not exceed 6.

c. Are these primarily virtual meetings, in-person meetings, or a combination?

Answer: Almost all meetings are virtual through Microsoft TEAMs. Some trainings are hybrid online and in person.

e. If equipment must be transported or deployed for a training event, is that activity billed separately under the applicable partial-cache deployment CLIN?

Answer: Applicable to the partial cache deployment CLIN.

5. GEOGRAPHIC SERVICE AREA AND TRANSPORTATION

The PWS identifies an ECHCS catchment area of approximately 44,000 square miles.

Should contractors assume that the fixed unit prices for complete and partial cache deployments must cover transportation to any location within this service area?

If so, can the government provide an anticipated transportation distance, representative destination, or historical exercise location to establish a consistent pricing basis?

Alternatively, would additional transportation costs for distant locations be separately reimbursable?

Answer: Yes, contractor assume fixed unit prices for transportation within catchment area. Historically, the cache has only ever been deployed in Denver. But future planned areas for operations are in the Denver and Colorado Springs areas. It is extremely unlikely for the cache to be deployed elsewhere within the ECHCS catchment area. In the unlikely event it must be transported elsewhere, it shall not exceed 200 miles from Denver.

6. INITIAL TRANSITION/ONBOARDING – CLIN 0007

The PWS requires the incoming contractor to transfer and reconcile the existing inventory and move it into a new storage facility within 30 days.

Could the government provide:

a. The current storage location of the FCC cache.

Answer: Currently located in a private facility in Commerce City. CO.

b. Whether the complete inventory is currently located at one facility.

Answer: Complete inventory is located at that site.

c. Whether the existing inventory is palletized, racked, or stored as individual pieces.

Answer: It is a mix of palletized, individual pieces, totes, and boxes. Some equipment requires use of a fork lift (a pallet jack will not suffice).

d. Whether government personnel or equipment will assist with loading and inventory reconciliation.

Answer: Govt. personal will help coordinate but will not be involved in the physical labor.

e. Whether CLIN 0007 is intended to include all transportation, handling, inventory reconciliation, and initial storage setup associated with the transition.

Answer: Revised line items CLIN 0006 covers all transportation, inventory reconciliation, and initial storage setup. Some items will need to go back to hospital that will no longer be tracked by the new vendor. The remaining items will go to the new storage area.

7. STORAGE REQUIREMENTS AND INVENTORY INCREASES

The PWS requires a minimum of 2,000 square feet of climate-controlled storage.

If the government increases the cache inventory beyond the capacity of the designated storage footprint, will the contractor be authorized to charge for additional warehouse space?

If so, would the government prefer a separately established square-foot rate or a negotiated contract modification?

Answer: If additional space is required, a contract modification would need to be processed.

8. EXERCISE WORKSHOPS AND MULTIPLE DEPLOYMENTS

The PWS explains that a workshop may precede a full-scale exercise and that this could require two complete cache deployments.

Can the government confirm that each separately requested deployment, including an advance workshop and subsequent exercise, constitutes a separately billable event under the appropriate deployment CLIN?

Additionally, does the annual quantity of two complete-cache events already account for these workshops?

Answer: They are separately billable events. Yes, it accounts for them. There shall not be more than 2 full deployments of the cache per year. Some years the mission may only call for 1x partial deployment, others may call for 2x.

9. REAL-WORLD EMERGENCY ACTIVATIONS

The PWS recognizes that real-world activations may last several days, weeks, or months.

Could the government clarify:

a. How labor exceeding the 168-hour annual NTE quantity would be authorized and compensated.

b. Whether additional transportation, lodging, per diem, and other direct costs associated with an extended deployment are separately reimbursable.

c. Whether a contract modification would be issued before authorized services exceed the applicable CLIN ceiling.

Answer: See revised line items providing 360 hour labor pool. If additional hours are needed, emergency contract mod for real world deployment will be executed before CLIN ceiling.

10. EMPLOYEE CERTIFICATION AND EXPERIENCE REQUIREMENTS

The PWS identifies a minimum of two years of medical cache maintenance and deployment experience, as well as ICS 100, 200, 700, and 800 certifications or equivalent qualifications.

Does the government require these qualifications for every contractor employee assigned to the requirement, including temporary exercise personnel, or only designated supervisory and key personnel?

If equivalent qualifications are acceptable, could the government identify the applicable standard?

Answer: Any contractor who staffs the FCC during an exercise, real world activation or partial/full deployment) and is involved in any of the planning aspects shall have all four certifications. Equivalent certifications will be considered on a case by case basis.

11. EXERCISE NOTIFICATION AND SCHEDULING

Could the government identify the anticipated advance-notification period for scheduled exercises, workshops, and training events?

We understand that actual emergency activations require a different level of readiness. However, advance scheduling is relevant to ensuring that the appropriate personnel, trucks, and equipment are available for planned activities.

Answer: Scheduled exercise will be known at least 6 months out. All previous full cache exercises have occurred in either April or May.

12. NON-FCC EQUIPMENT STORAGE AND MAINTENANCE

The PWS distinguishes between FCC cache equipment requiring maintenance and non-FCC medical equipment that does not require maintenance.

Could the government confirm whether the minimum 2,000-square-foot storage requirement includes both categories of equipment?

Additionally, are inventory reporting, periodic inspections, and physical handling of non-FCC equipment included in the monthly storage CLIN?

Answer: Both categories of equipment shall be included in the 2,000 square foot need. Yes, all reporting, inspections, and physical handling are included in the monthly storage CLIN.

13. CLIN x006 (NTE Labor, Emergency Cache, 7 Staff Support): Are the 168 hours the total labor hours for all 7 staff combined, or the hours per staff member? Should offerors quote a rate per staff hour or per 7-person team hour? How will the Government address real-world activations that exceed the NTE quantity?

Answer: See revised line items CLIN x005 360 labor hours. That labor pool covers all staffing for emergency cache deployment.

14. CLIN006 has 7 pax in the line description, but the UOM is hourly for 168 hours. Is the 168 hours for 7 people per hour which would equal a total of 1,176 total man hours, or is the total man hours 168 spread across the 7 personnel?

Answer: See answer to Q13.

15. CLIN002 and CLIN005 has a qty of 2. For each CLIN, Is that 1 for the practice mobilization the week ahead of the exercise and then 1 for the exercise, or is that for 2 exercises that should include the practice mobilization with each exercise?

Answer: 1 for the practice mobilization aka “Workshop”, and 1 for the following exercise. Only 2 full deployments allotted per year unless real world deployment happens.

16. The QASP states the contractor must "deliver, set up, or break down within 2 hours," while PWS Section 5 allows 72 hours to deploy after an Activation Notice. Please confirm the 2-hour standard applies to setup and breakdown after arrival at the Patient Reception Site.

Answer: The contractor must be able to transport the cache within 72 hours of activation. However, some sites that volunteer their space to setup the PRS are private businesses and will not allow the cache to be setup until the last minute in order to minimize disruption to their business. As such, 2 hour time-limit may be imposed to minimize disruption to their operations. Some sites will allow the cache to be setup the day prior or to remain setup for extended periods of time. Others will not and allow a short amount of time to setup/breakdown.

17. CLINs x002/x003 and x005: Do the delivery and setup CLINs include the labor for setup and breakdown, with CLIN x005 covering staffing for the duration of the event only? Does CLIN x005 include the optional day-before setup described in PWS Section 2?

Answer: Please refer to revised line items. All staffing should be included in revised line items x002,x003,x004.

18. CLIN x004 (Training and Meetings Support, 20 EA): What does one unit include (typical duration, number of contractor staff, and virtual versus in-person attendance)?

Answer: See answer 4c.

19. CLIN x001: Does "Maintenance" include any task beyond battery rotation and conditioning under PWS 4.c, such as expiration tracking or replenishment ordering? Will the Government purchase all replacement and replenishment items?

Answer: The contractor shall track any expirable equipment and advise government at least 90 days prior to expiration that it needs to be replaced. The government shall be responsible for procuring and transporting any replacement equipment. Contractor shall be responsible for disposing of any expired equipment. Maintenance may include cleaning dirty equipment after training or exercise and keeping equipment usable and presentable.

20. CLIN 0007 (Transition/Onboarding, If Needed): If an offeror's existing facility, inventory system, and personnel already satisfy PWS 4.a, may the offeror price CLIN 0007 at $0.00 or a nominal amount? Will CLIN 0007 be included in the evaluated total price?

Answer: Yes, if no transition is required you would put $0.00. Transition/Onboarding CLIN will be included in the total evaluated price.

21. If storage of non-FCC equipment grows materially during performance, will the Government address the change by contract modification?

Answer: Yes

22. Attachment A is dated March 2025. Will the Government accept a jointly reconciled inventory at contract start as the baseline for GFE accountability under PWS 4.j?

Answer: Yes

23. The RFQ cites NAICS 624230 but uses the title "Commercial and Industrial Machinery and Equipment Repair and Maintenance," and the clause list marks both 52.219-6 and VAAR 852.219-73. Please confirm this is a 100% SDVOSB set-aside under NAICS 624230, Emergency and Other Relief Services, with a $41.5M size standard.

Answer: Confirmed. This is a SDVOSB set-aside under NAICS 624230 with a $41.5M Size Standard.

24. The instructions reference page limitations but state none. Are there page limits for any volume? Do attachments such as CPARS evaluations and personnel certifications count toward any limit?

Answer: No page limitations.

25. The RFQ must be signed and dated, but no SF 1449 is attached. Will a signed cover page on each volume and the signed VAAR 852.219-75 certificate satisfy this requirement, or does the Government require a specific form?

Answer: A signed cover page on each volume will suffice.

26. If the complete quote exceeds the 10 MB email limit, may offerors send the volumes in separate, sequentially labeled emails before the closing time?

Answer: Yes.

27. What minimum quote acceptance period does the Government require?

Answer: 60 Days.